Sie sind auf Seite 1von 38

PROJECT NAME:

INFRASTRUCTURE WORK FOR VIKRAM UDYOGPURI


NEAR UJJAIN, MADHYA PRADESH

EMPLOYER:

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA


PRADESH

EMPLOYERS CONSULTANT:

AECOM ASIA COMPANY LTD.


EPC CONTRACTOR:

SPML-OM METALS (JV)


CONSULTANT:

SANGUINE INFRA TECH PVT. LTD.


38 Mezzanine Floor, Kuber Complex, Opposite Laxmi Industrial Estate, Lind Road, Andheri (West), Mumbai 400053
Mobile : 9820349717 Ph: 91-22-26743321 Email:info@sanguineinfra.com Website : www.sanguineinfra.com

TITLE:

APPROVAL STAMP:

DESIGN OF PRESTRESSED PRECAST BOUNDARY


WALL

DOCUMENT NO.

REVISION:
R1

VUL-MS-CWALL-3701
COMMENTS:

(No. of Pages)

To

REFERENCE DOCUMENTS AND DRAWINGS:


1) VUL-MS-CWALL-C-GA-3702-R1,
2) VUL-MS-CWALL-C-REINF-3703-R1

REVISION STATUS:
REVISION

DATE

DESCRIPTION

PREPARED
BY

CHECKED
BY

R0
R1
R2
R3

16-11-2015
30-01-2016

For Approval
Revised considering comments dated 27-01-16

ARIF
ARIF

KAMATH
KAMATH

This document is not to be reproduced, copied or used for any purpose other than that for which it is prepared.

Sanguine Infra Tech Pvt.Ltd., Mumbai

APPROVED
BY

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

CONTENT
Cl.

Description

Page

No.

No.

Scope of the Report

Design Methodology

Design Data

Design Assumptions

References

List of Drawings

Calculations

Substructure Analysis

12

Design of Footing

15

10

Design of Precast Plank

26

11

Design of Column

31

12

Summary

34

Appendix - A

Sanguine Infra Tech Pvt.Ltd., Mumbai

Drawings

35

Page | 1

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

1.0) SCOPE OF THE REPORT :


1.1 This submission contains the design of Prestressed Precast Boundary Wall with Precast
Open Isolated footing at Development of Vikram Udyogpuri Near Ujjain. The column are
spaced at 2.25m centre of centre.
The report presents the design of Precast footing, Prestressed Precast Column and
Prestressed Precast Plank .
Footing is

RCC Precast Concrete

Column is

Prestressed Precast Concrete

Plank is

Prestressed Precast Concrete

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 2

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

2.0) DESIGN METHODOLOGY :


2.1 ) The design has been carried generally in accordance with the design loadings as per
IS 875 Part-1 and Part-3.
2.2 ) The design approach is to consider structure subjected to both static loading ( due to dead
loads, variable load due to wind.)
2

2.3 ) SBC considered is 7.5 t/m at 1.0m below GL. However footing depth required is 0.4m and
soil cover of 0.60m is considered. Hence footing bottom below GL kept as 1.00m.
2

2.4 ) The allowable bearing pressure is restricted to 75kN/m in normal case and for Wind case
this is restricted to 93.75 kN/m2. In the Wind case, allowable bearing pressure is
increased by 25% as per (IS 875 Part-5, Cl 8.1, Note 6).
2.5) The Column is checked for conditions of stability against overturning and sliding for all load
case as per IS 456:2000 Cl. 20.1 & 20.2 as follows :
Factor of safety
overturning sliding
All Load case

1.55

1.55

2.6) The Precast column will be inserted in 170 x 270 x 300 mm spout in footing.
After 150 x 250 mm column is placed, the gap of 10 mm on all sides will be filled with filler
material. After filler material is placed, the column end will be restrained against traslation
and rotation. The support considered is Fixed support. BM at this support i.e. at footing
top level will be maximum.The forces for Column design are obtained in Cl 8.0
2.7) The forces at Column bottom for Column design & footing design are obtained in Cl 8.1.2.
2.8) Effective Length factor in longitudinal direction (direction parallel to plank) considered is
1.00 & in transverse direction perpendicular to plank considered is 2.0. Unsupported length
of column is 2.6 m. Due to slenderness of Column in transverse direction, additional
moment due to slenderness is considered. Column is designed as per IS 1343 at working
load and ultimate load presented in Cl 11.0
2.9) Footing Analysis & design by Bending theory method taking section at face of Column
presented in Cl 9.0 respectively.

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 3

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

2.10) Prestressing Wire Layout :


The cable Layout is symmetrical about midspan. The cables are stressed from one end only.
2.11) Losses due to elastic shortening, Creep, Shrinkage and Relaxaxtion :
This is calculated as per IS 1343 as presented in Cl 10 & 11 for Column & Plank design.
2.12) Bending stress check at Initial and Final condition :
Bending stresses are checked after prestressing and loading at service condition after
taking into account appropriate losses.
2.13) Check at Ultimate Load Condition :
This is checked at as per IS 1343, Appendix A
2.14)Prestressing steel :
Prestressing steel shall be Wires, low relaxation, uncoated stress relieved strands with a
nominal diameter of 3mm & 4mm confirming to the requirements of IS: 6003-2010.
E = 210000 Mpa
2.15)Grade of concrete

Sanguine Infra Tech Pvt.Ltd., Mumbai

M30 For Column & Plank


M20 For Footing

Page | 4

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

3.0) DESIGN DATA


3.1) H =

2.00 m

Height of Wall above Ground level

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 5

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

4.0) DESIGN ASSUMPTIONS


Following assumption are made here:
2

4.1) The SBC of the Founding strata considered is 75 KN/m

4.2) Risk factor k1 for Wind Load calculation considered is 0.76 as per IS875-Part 3, Table-1
4.3) Soil cover over footing minimum should be 0.60 m.

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 6

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

5.0) REFERENCES
5.1) IS-875:1987 (Part-1)
Code of practice for design Loads - Dead Loads for buildings and structures.
5.2) IS-875:1987 (Part-3)
Code of practice for design Loads - Wind Loads for buildings and structures.
5.3) IS-456:2000
Standard specification and code of practice for Plain & Reinforced Concrete
structures.
5.4) IS-1343:1980
Standard specification and code of practice for Prestressed Concrete
structures.

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 7

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

6.0) LIST OF DRAWINGS


6.1) VUL-MS-CWALL-C-GA-3702-R1

Concrete Profile of Prestressed Precast


Boundary wall.

6.2) VUL-MS-CWALL-C-REINF-3703-R1

Reinforcement/Prestressing detail of
Prestressed Precast Boundary wall.

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 8

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


7.0 )

SPML - OM METALS (JV)

LOADING DETAILS

7.1 ) Load Calcuation for Compound Wall Column


DL & WL Calculation for Compound Wall
7.1.1) General Details :
Span 1
C/C distance of column

C1

2.250

Span 2

2.250 m

Column Top level

2.000 m

Ht. of Wall above Ground Lvl.

2.00 m

Footing top below GL

0.600 m

Ground level

0m

Footing top lvl.

-0.600 m

Ht. of Column above Footing top

2.6 m

Footing bottom below GL

1.00 m

Footing depth

0.400 m

Footing Size

1.275 m 0.900 m
=

23.5 kN/m

Reinforced Concrete density

25 kN/m

Soil density

18 kN/m

Prestressed Concrete density

Concrete Grade

(IS 875, P-1, Table-1,21)

Column & Plank


Footing

fck
fck
fy

Reinforcement
Prestressing Steel

=
=
=
=

30
20
500
1865

Mpa
Mpa
Mpa
Mpa

7.1.2) Load calculation


7.1.2.1) Dead Loads
A) Precast Column
Column above GL
0.035 m
0.035 m

Column below GL

0.250 m
0.07 m

0.250 m
m

0.0330
0.15 m

0.15 m

0.00 m

= 0.03295 m

M I of Column bottom @ transverse axis

= 0.00019 m

M I of Column bottom @longitudinal axis

= 0.00005 m

C/s area of Column per metre above GL ( 0.15

x 0.25 ) -

( 0.07

x 0.07 )

r min of Column @ column bottom bottom lvl @ transverse axis =

0.00019 / 0.033 =

0.0767 m

r min of Column @ column bottom bottom lvl @ Longitudinal axis =

0.00005 / 0.033 =

0.0407 m

Wt. of Column =

( 0.15

x 0.25

x 0.50 ) +

( 0.03295 x 2.100 )

x 24 =

2.07 kN

B) Precast Slab Plank


2.17 m
0.30 m
2.10 m

Length =

2.17 m

Thickness =

0.06 m

Panel Width =

0.3 m

Panel Nos. =

Sanguine Infra Tech Pvt.Ltd., Mumbai

7 Nos.

Page | 9

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

Wt. of Slab Plank

SPML - OM METALS (JV)

2.17

x 2.10

x 0.06

x 23.5

6.43 kN

24 kN

C) Footing
Wt. of Footing +soil after column is placed

=
+

1.275

x 0.900

x 0.400

x 25 =

1.275

x 0.900

x 0.600

x 18

7.1.2.2) Wind loads :


Wind pressure is calculated as per IS:875 ( Part 3 ) -1987
Wind speed
K1 =

Vb
0.76

=
K2

( Ref . IS 875 ( part 3) -1987 / Figure - 1 ) =

1.05

K3 =

39 m/s

( Ref . IS 875 ( part 3) -1987 / Tab 1 & 2 )


Note : For K1; Risk factor for boundary wall is considered

(Ref . IS 875 ( part 3) / Cl. 5.3.2.1 & 5.3.2.2)

Note : For K2; Category 1 and class A is considered


Design Speed

Vz

Wind pressure
Wind Load on Structure is given by

Vb * K1 * K2* K3

31 m/s

0.6 * Vz ^2

0.58 kN/m2

Cf pd Ae
F=

( Ref . IS 875 ( part 3) -1987 Cl 6.3)

From IS875, P-3, Table 24, For Wall on ground, B>1000m & H=2.10m , B/H = 1000/2.1 = 476.19 > 160
Drag Coefficient Cf =
2.0
Wind Load on column per metre height

2.0

x 0.58

x 2.25

x 1.00

2.610 kN/m

Wind Load on one plank per metre length

2.0

x 0.58

x 0.30

x 1.00

0.348 kN/m

Wind Load on Razor Wire :


Assume solidity ration of wire fencing and angles =
Height of Razor wire =
Cf =
Effective area = x h x L
0.1 x 0.6 x 2.25=
Wind Load on anlge over column = Cf Ae Pd =
1.9x0.135x0.58

Sanguine Infra Tech Pvt.Ltd., Mumbai

0.10
0.60 m
1.9 (Ref IS 875, Part - 3 , T-28)
2
0.135 m

= 0.149 kN acting @ 0.6/2 =

0.30 m above column top

Page | 10

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

0.149
Wind

0.3
C/s area of column
2
=0.033 m

2.0
W1

2.610 kN/m
0.600

W3

1.0
W2

0.400
0.90
Active EP

1.275

8.10
Passive EP

(Figure - 1)

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 11

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


8.0)

SPML - OM METALS (JV)

Substructure Analysis :

8.1.1) Stability Calculation for Boundary wall design :


8.1.1.1) Design parameters :
Grade of concrete
Height of wall above ground
Depth of foundation below ground
Total height of wall
Angle of internal friction ' phi'
Coeff. Of friction

H1
H
m

Backfill Earth density


Prestressed Concrete density
Ce-efficient of Active Earth Pressure = (1-Sin/1+Sin)
Ce-efficient of Passive Earth Pressure = (1+Sin/1-Sin)
Earth Pressure will be exerted on column width only
Column Width
Earth pressure at Base = Ka * g * H1 * B
= (0.333 x 18 x 1 * 0.15)
Passive pressure at Base = Kp * g * H1 * B
= (3 x 18 x 1 * 0.15)

(Ref. Figure -1 )
2

=
=
=
=
=
=

30
2.000
1.000
2.6
30
0.5

N/mm
m
m
m
Degree
(IRC 78:2014, Cl 706.3.4)

=
=
=
=

18 kN/m
3
23.5 kN/m
0.333
3.000

0.150 m

0.90 kN/m

8.10 kN/m
rad

8.1.1.2) Summary of forces :


Load

Load in kN L.A @ A Moment


(kN)
(kN-m)

Vertical Force due to Dead Weight of each member


W1
{ (0.03295 x 2 ) + ( 0.15 x 0.25 x 0.6 ) } x 23.5
W2
1.275 x 0.9 x 0.4 x 25
W3
( 1.275 x 0.9 x 0.6 x 18 ) - (0.15 x 0.25 x 0.6 x 18 )
W4
( 2.17 x 2.1 x 0.06 x 23.5
Total
Horizontal Force due to Wind on wall =
2.61 x 2
Horizontal Force due to Wind on wire =
0.149
Earth pressure :
Horizontal component of Active
P1
( 1 x 0.9 ) / 2
Horizontal component of Passive
Pp
( 1 x 8.1 ) / 2

2.077
11.475
11.988
6.425
31.966
5.220
0.149

0.638
0.638
0.638
0.638
2.000
3.300

1.324
7.315
7.642
4.096
20.377
10.440
0.492

0.450

0.333

0.150

4.050

0.333

1.349

8.1.1.3) Load summary under Wind Load condition :


Total vertical load
Total Stabilizing moment = 20.377 + 1.349
Net horizontal Load = 5.22+0.149+0.45
Total Overturning moment = 10.44 + 0.492 + 0.15
Net stabilizing moment

=
=
=
=
=

8.1.1.4) Stability Check :


a) FOS against overturning =

1.96 > or =

1.55
SAFE

2.75 > or =

1.5
SAFE

b) FOS against sliding


Sanguine Infra Tech Pvt.Ltd., Mumbai

(21.726 / 11.082 )

0.5 x 31.966
5.819

31.966
21.726
5.819
11.082
10.644

kN
kN-m
kN
kN-m
kN-m

Page | 12

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

8.1.2 ) Substructure Load summary for Column & Footing Design :


8.1.2.1)Load summary at Footing top level: (Fixed support for column @ Footing top)
( Ref. Cl. 8.1.1.2 )

Sr
No.
1) Dead loads
Precast Column
Precast Plank
Total D. L .

Load in KN
L.A.(m) ML
L.A.(m)MT
Vertical HL ( KN) HT ( KN)for ML (kN-m) for MT (kN-m)
2.077
6.425
8.503

2) Wind Load :

5.220
0.149

1.6
2.90

8.35
0.43

8.1.2.2) SLS FORCE SUMMARY AT FOOTING TOP LEVEL

CombLoad Combination
No.
101 DL
Wind load combination
102 DL+WL

Vmax
kN

HL
kN

HT
kN

ML
kNm

MT
kNm

8.503
8.503

5.369

8.78

8.1.2.3) ULS FORCE SUMMARY AT FOOTING TOP LEVEL

CombLoad Combination
No.
201 1.5 DL
Wind load combination
202 1.5 DL + 1.5 WL

Vmax
kN

HL
kN

HT
kN

ML
kNm

MT
kNm

12.754
12.754

8.054

13.170

Footing design is presented in Cl 9.0


Column design is presented in Cl 11.0

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 13

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

8.2.1 ) Substructure Load summary for Footing Design at change of Alignment:


Total Number of Columns at this location is
2 Nos.
Wind Load on each column will be half from both sides
8.2.1.1)Load summary at Footing top level: (Fixed support for column @ Footing top)
Sr
No.
1) Dead loads
Precast Column
Precast Plank
Total D. L .

Load in KN
L.A.(m) ML
L.A.(m)MT
Vertical HL ( KN) HT ( KN)for ML (kN-m) for MT (kN-m)
4.155
6.425
10.58

2) Wind Load :

2.61
0.075

2.610
0.075

1.6
2.9

4.18
0.22

1.6
2.90

4.18
0.22

8.2.1.2)SLS FORCE SUMMARY AT FOOTING TOP LEVEL (FOR FOOTING DESIGN)


CombLoad Combination
No.
101 DL
Wind load combination
102 DL+WL

Vmax

ML
kNm

MT
kNm

10.580 2.685 2.685 4.400

4.40

kN

HL
kN

HT
kN

10.580

Footing design is presented in Cl 9.5

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 14

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

9.0 DESIGN OF FOOTING :


9.1 Explanation of footing design :
The forces used for analysis of footing is summarised in Cl 8.1.2.2 & 8.2.1.2.
The SLS loadcase forces are used to find the size of the footing.
2

The SBC for footing design considered is 7.5 ton/m .


The Load factor of 1.5 is considered for the design of footing at ultimate state.
Footing is designed by bending theory as per IS 456:2000.
The overburden pressure and the self weight of footing is considered in design in cl no. 9.2 and
hence the self wt of footing in Force Summary for footing design (CL 8.1.2.2) was not considered.
The tension is found on one side of footing due to pressure below footing, the contact length below
footing is kept upto 85% of length of footing.

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 15

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


SPML-OM METALS (JV)
-------------------------------------------------------------------------------------------------------------------------------------------------------

Cl 9.2
FOOTING DESIGN

Page | 16

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


METHOD

Comments: PRELIMINARY

21:05
0.375

Safe Bearing Capacity of Soil =

7.5

T/m2

Depth of Founding Level below Ground(Df) =

1.0

Weight Density of Soil & Backfill together =

1.8

T/m3

Load Factor for Limit State Method (LF) =


(For Wind Load case) (LF) =
Concrete Grade
(Fck) =

1.5
1.5
20

Factor
Factor
N/mm2

Steel Grade

(fy) =

500

N/mm2

Pedestal Dimensions: E_W


Pedestal Dimensions: N_S

(L1) =
(B1) =

0.15
0.25

m Width
m Width

Ld

De

Z-Axis

BP/2

0.035

+
-

L1 = 0.15

B1 = 0.25

B = 1.275 m

X - Axis

Lpu = 0.49

+
+

+
-

Xf = 0.08
Crack width

0.3

P-face

P-face

P-face

P-face

Case II
Tension Allowed

COMPOUND WALL FOOTING

Case I
No Tension

Time

Ld

30-Jan-16

Lf =
Footing Identifier =

STATE

Pedge

Pedge

0.17

Date

LIMIT

0.51

ARIF

BY

Lf =

Vikram UdhyogPuri

FOOTING

Bpu = 0.59

User

ISOLATED

dP

Project

OF

dP

DESIGN

SPML - OM METALS (JV)

Xd = 0.415

L = 0.900 m

0.87
0.87

0
0

0
0.90

1
1.25

0.10
0.53

Trial Footing Size


L/B
Length - L
Width - B

0.900
1.275

For SBC
Punching Shear

1.42

2
M E_W AREA
1.1475 m
M N_S
Section Modulus
m3
Z_NS
0.2

if (P > Pp) then 'Revise Footing Size'Z_EW

0.2

Depth of Footing at Centre

400

mm

Eff. Cover to Bott. Reinf. d'

60

mm

(P-max
(actual /
- Pob)
allowable allowable)
0.76
0.11
7.50
0.10
5.02
9.38
0.53
(2.08)
0.00
(2.08)
0.00
(2.08)
0.00
(2.08)
0.00
(2.08)
0.00
(2.08)
0.00
0.11
0.53
Enter KFdn Size OK
Depth OK

Pd

0.87

P-face

DL + LL
DL + WL

Pedge

I
II
III
IV
V
VI
VII
VIII

Ld

P-face

Lf

Moments (T.M) Soil over


MZ( @Z ) MX( @X ) Stress
Actual /
M_E-W M_N-S
Factor Allowable

Pd

Load (T)

Pedge

LOAD CASES
Case

Stress (EW)
Stress (NS)

Depth OK
Depth OK

Depth (bending)

Depth OK

C=
Shear due to
Moment =

Sanguine Infra Tech Pvt.Ltd., Mumbai

Case II
Tension Allowed

m3

de=D-d'=

340

mm

Distances from CL of to a) Column Face, b) De from & its Distance from Edge,
Perimeter & Punching Area for Shear ECT,.
For Moment
For punching shear
E-W
N-S
perimeter area, Ap
L1 (E-W)
0.15
Xf
0.075
0.125
L (E-W)
0.9
Lf
0.375
0.5125
B1 (N-S)
0.25
Xd
0.415
0.465
B (N-S)
1.275
Ld
0.035
0.1725
Lpu=(L1+De)
0.49
Bpu=(B1+De)
0.59
2.16
0.289

a=
J=

Case I
No Tension

E-W
0
0.03

N-S
0
0.04

0.245
M_E-W
0
0

0.295
M_N-S
0

Graph from Teng's Book - Page 133


E-W
N-S
a = 1-(1/(1+2/3*SQRT(Lpu/Bpu)))
1-(1/(1+2/3*SQRT(Bpu/Lpu)))
J= [2*(De*Lpu^3)/12]+[2*(Lpu*De^3)/12]+[De*(
[2*(De*Lpu^3)/12]+[2*(Lpu*De^3)/12]+
Bpu*Lpu^2/2))]
[(De*Lpu*Bpu^2)/2)]
C= Lpu/2
Bpu/2
M=

a/ (0.85*J_E-W)

a/ (0.85*J_N-S)

Page | 17

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

Overburden Pressure
Df - D =
0.60
IF (foundation depth-D) is <= 0, then this component is 0
*(Area of Footing) x (D * 2.5 + (foundation depth - D) *1.8)
OB Load(Ptot)
2.39
Eb = {M_E-W} / (P + Pob)
OB Press(Pob) 2.080
El = {M_N-S} / (P + Pob)
R = 0.138 or 0.15 * fck

R=

0.15

20

Case

(0.85*J_N-S))

I
K-:
II

2.84
Lcontact

2.84
Lcontact
K-:
2.5
III
Lcontact
K-:
IV
Lcontact
K-:
V
Lcontact
K-:
VI
Lcontact
K-:
VII
Lcontact
K-:
VIII
Lcontact
K-:

El/L
Eb/B
M-(E-W)/ M-(N-S)/ p-max
Ptot/L
Ptot/B
t/m2
0.00
0.00
2.84
0.00
0.00
0.00
0.00
0.2167 Enter K1.08 1.00
0.00
1.30
7.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.30
7.10

Limit state
De = SqRt((Mu / K Fck) * b)

3.00

WITH NO TENSION
P-edge=Ptot*(1+6*Eb/B)
P-edge=Ptot*(1+6*El/L)
P-face=Ptot*(1+12*Eb/B^2*Xf)
P-face=Ptot*(1+12*El/L^2*Xf)
P-d =Ptot*(1+12*Eb/B^2*Xd)
P-d =Ptot*(1+12*El/L^2*Xd)
M-face = Lf^2*{P-edge/3+P-face/6-Pob/2}L TM
V-De = Ld*{(P-edge+P-d)*0.5-Pob}L T/m
WITH TENSION
p-edge=2*Ptot / {3*B*(0.5-Eb/B)/L
p-edge=2*Ptot / {3*L*(0.5-El/L)/B
=2*p-tot/(3*(0.5-Eb/B))
=2*p-tot/(3*(0.5-El/L))
p-face = p-edge*(1-Ld/(3*B(0.5-Eb/B))
p-face = p-edge*(1-Ld/(3*L(0.5-El/L))
FOR - M_E-W only
FOR - M_N-S only
P-edge
P-face
P-d
M-face
V@De Punch.sh P-edge
P-face
P-d
M-face
t/m2
t/m2
t/m2
tm
t
strs t/m2
t/m2
t/m2
t/m2
tm
2.84
2.84
2.84
0.068
0.034
0.886
2.84
2.84
2.84
0.090

p-max=Ptot*(1+6*Eb/B+6*El/L)
p-min=Ptot*(1-6*Eb/B-6*El/L)
If 6Eb/B>1, then triangular pressure(Be=3*(B/2-Eb)
If 6El/L>1, then triangular pressure(Le=3*(L/2-El)
If both 6Eb/B &6El/L>1 Find pressure co-ef.from graph
Punching shear stress = ((A-Ap)*(Ptot-Pob)) /
(P.Perimeter*De)+((M_E-W*a*c_E-W) /
(0.85J_E-W))+((M_N-S*a*c_N-S) /
Ptot
(P+Pob)/A

p-min
t/m2
2.84

2.84

2.84

2.84

0.068

0.034

V@De
t
0.118

0.886

85%

6.68

3.52

5.62

0.419

0.632

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%
2.84

0.07
0.102
1.63

De (cm)=

0.03
0.05

0.886
1.33

0.419
0.629
4.83

0.632
0.947

Depth OK
Permissible Punching Shear Stress = Ks * tc =
Ks = (0.5 + bc) bc = L / B Ks =
1.00
tc = 0.25 * Sqrt(Fck)
tc =
111.80 t/m2

111.80
Depth OK

R = Mu / b * de2 - N/mm2

0.01

0.06

Pt (Req) = 0.5*Fck/Fy{[1-(1-4.6*Mu/B*de^2)/Fck]^0.5}*b*de

0.002

0.014

Pt (Req)
Min = 0.12%
Ast - Bottom Reinforcement to be provided = Pt (req) * A * d
Ast - Bottom Reinforcement provided
=0.85*sqrt(0.8*Fck)*(sqrt(1+5*b)-1)/6*b
Allowable Shear Stress (t/m2)

0.12
520
550

0.12
367
393

b =0.8 * Fck / 6.89 * pt

1459.04 for E_W

166.48

3.28

9.49

for N_S

Actual Shear stress (t/m2)

0.12
Depth OK

FOR TOP REINFORCEMENT


Mu
=Pob*Lf^2 / 2 * Load Factor or Pob*Lf^2 / 2 * load Factor
R = Mu / b * de2 - N/mm2
Pt (Req)
Min Pt req
Min = 0.06%
Ast - Top Reinforcement to be provided
Ast - Top Reinforcement provided

3.10
Depth OK

0.28

0.37

0.02
0.004
0.06
306
352

0.04
0.008
0.06
216
251

Summary
Footing Size
Pedestal Dimensions: E_W =
Pedestal Dimensions: N_S =
Length - L: E_W =
Width - B: N_S =
Depth =
Ast =

0.15
0.25
0.90
1.275
400

m
m
m
m
mm
Bottom Reinf.

Long Side
(E_W)
(E_W)

Top Reinf.

Kgs
6
Kgs
4

Nos.
7
Nos
7

Dia
10
Dia
8

Spacing
200
Spacing
200

Short Side
(N_S)
(N_S)

Kgs
5
Kgs
3

Nos.
5
Nos.
5

Dia
10
Dia
8

Spacing
200
Spacing
200

Quantities
Footing
1
2
3
4
5

Excavation
PCC
RCC
Formwork
Reinforcement

Pedestal
2
0
0
2
18

m3
m3
m3
m2
Kgs

Sanguine Infra Tech Pvt.Ltd., Mumbai

1 Concrete
2 Formwork

0 m3
0 m2

View Reinforcement Drawing


Page | 18

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

Sanguine Infra Tech Pvt.Ltd., Mumbai

SPML - OM METALS (JV)

C L O S E GRAPH

Page | 19

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

9.3 Design of Footing as beam for Lifting case:


0.10

0.5025

0.27

0.5025

Precast footing at the time of lifting will behave as simply supported beam subjected to its self weight.
Concrete grade of column

Consider the age of concrete at the time of lifting as

Consider Strength of concrete at 7 Days is

7 Days

12 Mpa

Reinforcing steel grade

500 Mpa

Width of Footing is

900 mm

Depth of footing is middle portion =

100 mm

Depth of footing at edge portion =

400 mm

Maximum Bending Moment =

0.77 kNm

Maximum Shear Force =

4.83 kN

Ultimate Bending Moment Mu =

1.155 kNm

Ultimate Shear Force Vu =

7.245 kN

Depth at Maximum Bending Moment =

100 mm

Clear cover to reinforcement =

50 mm

Effective depth

45 mm

2.91 kNm

63 mm

353 mm

Udl (kN/m)

2.25

60%

20 Mpa

9.00

1.075
Reaction 4.83kN

Mbal =
Ast required =

4.83

0.133*fck*b*d^2
2

0.5 fck / fy x (1-sqrt(1-(4.6 Mu/ fck b d ))) b d

Provided reinforcement is

Y 10 Dia

@ 200 in Width of 900 mm

Safe
Shear stress due to shear force v =
Shear capacity of concrete

( 7.245 x 1000) / (900 x (400 - 50 - 5) )=

(Pt = 0.114%)

c =

2
0.023 N/mm

0.28 N/mm2
Safe

9.4 Capacity of Lifting Hook

1 Failure of Bond of concrete =


2 Yielding of steel =

bd d L=1.2x1.6x x10x100/1000 =
2

0.87 fy /4 d =

Failure of Hook = (Minimum of 1 & 2)


Maximum Reaciton on one hook =
Sanguine Infra Tech Pvt.Ltd., Mumbai

6.0 kN

0.87 x 500 x / 4 x 10 x 10 =
=

4.83kN

34.2 kN
6.0 kN
< 4.83 kN Safe
Page | 20

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

9.5 Precast Column to foundation Socket connection:

In socket connection, the precast columns are fixed rigidly to the foundation and loads are
transmitted by skin friction in socket and by end bearing.
The design of socket connection may adopt the following steps:

Figure - A

Support Reactions:
Referring to figure - A, a rotation of the column in the socket under moment shifts the support
reactionat the column base from centre line towards the edge. The resultant reaction R at the base
may be assumed to act at a distance a/6 from the column centre line.
From Figure - A, following forces may be derived:
a. Horizontal force HB :Moment about Point A
M + (N x a/2) + (HD x 0.9h) = (HB x 0.8h) + (HB x a) + (R x (a/2+a/6))
Support Recation at column base is
R = N - HB
Substitution R into the above equation and after rearranging,
HB = (M - 0.17 a N + 0.9hHD) / (0.8h + 0.33a)
a=

0.25 m Depth of column

Recation at footing top is : (Ref Cl 8.1.2.3)


Vertical Load N =
Horizontal Load HD =

Sanguine Infra Tech Pvt.Ltd., Mumbai

12.754 kN
8.054 kN

Page | 21

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

Moment M =

13.170 kN m

If the height of socket is taken as h =

0.30 m i.e.

For smooth surface, the coefficient of friction =

h=1.20a and

0.30

is used,

substituting the above values, equation obtained is:


HB =

55.91 kN

HA =

-47.86 kN

Vertical reaction on base = R = N - HB

-4.02 kN

As the net vertical reaction at base is negative, the vertical reaction is


fully resisted by friction between column and socket foundation.
Contact Area of HB on socket footing/column =

h/2

Width of column

150 mm
x
150 mm
Bearing stress on concrete of column/Socket footing due to HB = HB / Contact Area
=55.91x 10^3 / (150 x 150) =
2.48 N/mm2
Bearing stress on concrete of column/Socket footing due to HA = HA / Contact Area
2.13 N/mm2

=47.86x 10^3 / (150 x 150) =


Permissible Bearing strength of concrete = 0.45 fck (IS 456:2000, Cl 34.4) =

2
9.00 N/mm

Safe
2
2.48 N/mm

Strenght of filler material should also be greater than


Check of Column Section for Shear:
Maximum Shear Force @ Footing top (Cl 8.1.2.3, LC 202) =

8.0535 kN

Column Cross section area (Consider I-section area) =

32950 mm

Clear cover to steel =


Total steel percentage provided =

30 mm
(100 x 87.96) / (32950 ) =

0.27 %

Shear capacity of concrete ignoring increase in shear capacity due


to axial compression (IS 1343, T-6)

c =

0.37 N/mm2

Shear stress due to shear force v = ( 8.0535 x 1000) / (32950)


=

0.24 N/mm2

As v < c, Shear reinforcement is Not required

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 22

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


SPML-OM METALS (JV)
-------------------------------------------------------------------------------------------------------------------------------------------------------

Cl 9.5
FOOTING DESIGN @ CHANGE OF ALIGNMENT

Page | 23

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


METHOD

Comments: PRELIMINARY

21:09
0.425

Safe Bearing Capacity of Soil =

7.5

T/m2

Depth of Founding Level below Ground(Df) =

1.0

Weight Density of Soil & Backfill together =

1.8

T/m3

Load Factor for Limit State Method (LF) =


(For Wind Load case) (LF) =
Concrete Grade
(Fck) =

1.5
1.5
20

Factor
Factor
N/mm2

Steel Grade

(fy) =

500

N/mm2

Pedestal Dimensions: E_W


Pedestal Dimensions: N_S

(L1) =
(B1) =

0.15
0.25

m Width
m Width

Ld

De

Z-Axis

BP/2

0.085

+
-

L1 = 0.15

B1 = 0.25

B = 1.000 m

X - Axis

Lpu = 0.49

+
+

+
-

Xf = 0.08
Crack width

0.3

P-face

P-face

P-face

P-face

Case II
Tension Allowed

COMPOUND WALL FOOTING

Case I
No Tension

Time

Ld

30-Jan-16

Lf =
Footing Identifier =

STATE

Pedge

Pedge

0.04

Date

LIMIT

0.38

ARIF

BY

Lf =

Vikram UdhyogPuri

FOOTING

Bpu = 0.59

User

ISOLATED

dP

Project

OF

dP

DESIGN

SPML - OM METALS (JV)

Xd = 0.415

L = 1.000 m

1.08
1.08

0
0.45

0
0.45

1
1.25

0.14
0.79

Trial Footing Size


L/B
Length - L
Width - B

1.000
1.000

For SBC
Punching Shear

1.00

M E_W AREA
1
M N_S
Section Modulus

m2
3

Z_NS

0.2

if (P > Pp) then 'Revise Footing Size'Z_EW

0.2

m3

Depth of Footing at Centre

400

mm

Eff. Cover to Bott. Reinf. d'

60

mm

de=D-d'=

(P-max
- Pob)
1.08
7.40
(2.08)
(2.08)
(2.08)
(2.08)
(2.08)
(2.08)
Enter KFdn Size OK
Depth OK

Pd

1.08

P-face

DL + LL
DL + WL

Pedge

I
II
III
IV
V
VI
VII
VIII

Ld

P-face

Lf

Moments (T.M) Soil over


MZ( @Z ) MX( @X ) Stress
Actual /
M_E-W M_N-S
Factor Allowable

Pd

Load (T)

Pedge

LOAD CASES
Case

Stress (EW)
Stress (NS)

Depth OK
Depth OK

Depth (bending)

Depth OK

340

(actual /
allowable allowable)
7.50
0.14
9.38
0.79
0.00
0.00
0.00
0.00
0.00
0.00
0.79

C=
Shear due to
Moment =

Sanguine Infra Tech Pvt.Ltd., Mumbai

E-W
0
0.03

N-S
0
0.04

0.245
M_E-W
0
0

0.295
M_N-S
0

Case II
Tension Allowed

mm

Distances from CL of to a) Column Face, b) De from & its Distance from Edge,
Perimeter & Punching Area for Shear ECT,.
For Moment
For punching shear
E-W
N-S
perimeter area, Ap
L1 (E-W)
0.15
Xf
0.075
0.125
L (E-W)
1
Lf
0.425
0.375
B1 (N-S)
0.25
Xd
0.415
0.465
B (N-S)
1
Ld
0.085
0.035
Lpu=(L1+De)
0.49
Bpu=(B1+De)
0.59
2.16
0.289

a=
J=

Case I
No Tension

Graph from Teng's Book - Page 133


E-W
N-S
a = 1-(1/(1+2/3*SQRT(Lpu/Bpu)))
1-(1/(1+2/3*SQRT(Bpu/Lpu)))
J= [2*(De*Lpu^3)/12]+[2*(Lpu*De^3)/12]+[De*(
[2*(De*Lpu^3)/12]+[2*(Lpu*De^3)/12]+
Bpu*Lpu^2/2))]
[(De*Lpu*Bpu^2)/2)]
C= Lpu/2
Bpu/2
M=

a/ (0.85*J_E-W)

a/ (0.85*J_N-S)

Page | 24

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

Overburden Pressure
Df - D =
0.60
IF (foundation depth-D) is <= 0, then this component is 0
*(Area of Footing) x (D * 2.5 + (foundation depth - D) *1.8)
OB Load(Ptot)
2.08
Eb = {M_E-W} / (P + Pob)
OB Press(Pob) 2.080
El = {M_N-S} / (P + Pob)
R = 0.138 or 0.15 * fck

R=

0.15

20

Case

p-max=Ptot*(1+6*Eb/B+6*El/L)
p-min=Ptot*(1-6*Eb/B-6*El/L)
If 6Eb/B>1, then triangular pressure(Be=3*(B/2-Eb)
If 6El/L>1, then triangular pressure(Le=3*(L/2-El)
If both 6Eb/B &6El/L>1 Find pressure co-ef.from graph
Punching shear stress = ((A-Ap)*(Ptot-Pob)) /
(P.Perimeter*De)+((M_E-W*a*c_E-W) /
(0.85J_E-W))+((M_N-S*a*c_N-S) /
(0.85*J_N-S))
Ptot
El/L
Eb/B
(P+Pob)/A M-(E-W)/ M-(N-S)/ p-max
p-min
Ptot/L
Ptot/B
t/m2
t/m2
I
3.16
0.00
0.00
3.16
3.16
Lcontact
0.00
K-:
0.00
0.00
II
3.16
0.14
0.1424 Enter KLcontact
1.00
0%
K-:
3
0.85
0.85
9.48
III
0.00
Lcontact
0.00
0.00%
K-:
0.00
0.00
IV
0.00
Lcontact
0.00
0.00%
K-:
0.00
0.00
V
0.00
Lcontact
0.00
0.00%
K-:
0.00
0.00
VI
0.00
Lcontact
0.00
0.00%
K-:
0.00
0.00
VII
0.00
Lcontact
0.00
0.00%
K-:
0.00
0.00
VIII
0.00
Lcontact
0.00
0.00%
K-:
0.00
0.00
0.85
1.00
9.48
3.16
Limit state
De = SqRt((Mu / K Fck) * b)
De (cm)=

3.00

WITH NO TENSION
P-edge=Ptot*(1+6*Eb/B)
P-edge=Ptot*(1+6*El/L)
P-face=Ptot*(1+12*Eb/B^2*Xf)
P-face=Ptot*(1+12*El/L^2*Xf)
P-d =Ptot*(1+12*Eb/B^2*Xd)
P-d =Ptot*(1+12*El/L^2*Xd)
M-face = Lf^2*{P-edge/3+P-face/6-Pob/2}L TM
V-De = Ld*{(P-edge+P-d)*0.5-Pob}L T/m
WITH TENSION
p-edge=2*Ptot / {3*B*(0.5-Eb/B)/L
p-edge=2*Ptot / {3*L*(0.5-El/L)/B
=2*p-tot/(3*(0.5-Eb/B))
=2*p-tot/(3*(0.5-El/L))
p-face = p-edge*(1-Ld/(3*B(0.5-Eb/B))
p-face = p-edge*(1-Ld/(3*L(0.5-El/L))
FOR - M_E-W only
FOR - M_N-S only
P-edge
P-face
P-d
M-face
V@De Punch.sh P-edge
P-face
P-d
M-face
t/m2
t/m2
t/m2
tm
t
strs t/m2
t/m2
t/m2
t/m2
tm
3.16
3.16
3.16
0.098
0.092
1.045
3.16
3.16
3.16
0.076

5.86

3.57

5.40

0.272

0.302

1.045

5.86

3.84

5.67

0.27
0.408
3.69

0.30
0.45

1.045
1.57

0.218

0.218
0.327
3.30

V@De
t
0.038

0.129

0.129
0.193

Depth OK
Permissible Punching Shear Stress = Ks * tc =
Ks = (0.5 + bc) bc = L / B Ks =
1.00
tc = 0.25 * Sqrt(Fck)
tc =
111.80 t/m2

111.80
Depth OK

R = Mu / b * de2 - N/mm2

0.04

0.03

Pt (Req) = 0.5*Fck/Fy{[1-(1-4.6*Mu/B*de^2)/Fck]^0.5}*b*de

0.008

0.007

Pt (Req)
Min = 0.12%
Ast - Bottom Reinforcement to be provided = Pt (req) * A * d
Ast - Bottom Reinforcement provided
=0.85*sqrt(0.8*Fck)*(sqrt(1+5*b)-1)/6*b
Allowable Shear Stress (t/m2)

0.12
408
471

0.12
408
471

b =0.8 * Fck / 6.89 * pt

285.18

for E_W

355.82

7.31

6.56

for N_S

Actual Shear stress (t/m2)

1.33
Depth OK

FOR TOP REINFORCEMENT


Mu
=Pob*Lf^2 / 2 * Load Factor or Pob*Lf^2 / 2 * load Factor
R = Mu / b * de2 - N/mm2
Pt (Req)
Min Pt req
Min = 0.06%
Ast - Top Reinforcement to be provided
Ast - Top Reinforcement provided

0.57
Depth OK

0.28

0.22

0.02
0.006
0.06
240
302

0.02
0.004
0.06
240
302

Summary
Footing Size
Pedestal Dimensions: E_W =
Pedestal Dimensions: N_S =
Length - L: E_W =
Width - B: N_S =
Depth =
Ast =

0.15
0.25
1.00
1.000
400

m
m
m
m
mm
Bottom Reinf.

Long Side
(E_W)
(E_W)

Top Reinf.

Kgs
5
Kgs
3

Nos.
6
Nos
6

Dia
10
Dia
8

Spacing
200
Spacing
200

Short Side
(N_S)
(N_S)

Kgs
5
Kgs
3

Nos.
6
Nos.
6

Dia
10
Dia
8

Spacing
200
Spacing
200

Quantities
Footing
1
2
3
4
5

Excavation
PCC
RCC
Formwork
Reinforcement

Pedestal
2
0
0
2
16

m3
m3
m3
m2
Kgs

Sanguine Infra Tech Pvt.Ltd., Mumbai

1 Concrete
2 Formwork

0 m3
0 m2

View Reinforcement Drawing


Page | 25

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


10.0)
10.1)

SPML - OM METALS (JV)

DESIGN OF Precast Concrete Plank as BEAM supported on column

The 50 mm thick precast Plank will be inserted in the 50mm wide spout in the column.
The column will be solid rectangular till ground level. The column above ground level will have 60/70mm thick x 35 mm deep groove for the Precast plank
insert. The bottom plank will be resting on the column having bearing of 30 mm on both side of column.
Total Number of Planks will be 7 of 300 mm depth.
Bottom Plank will act as simply supported beam resting on column and other 6 planks will be resting on bottom plank.
Bottom Plank is designed as simply supported beam and same design will be applied to all planks.

2.25
Effective span of Plank =

2.16

- 0.035

2.125 m

Design of Bottom Plank supporting other Planks above


Plank Thickness =

60 mm

Plank Depth =
Plank Length =

=
=

300 mm
2160 mm

x 23.5

2.961 kN/m

/8

1.671 kNm

2.507 kNm

3.146 kN

4.719 kN

Uniform Load over Bottom Plank =

0.060

x 2.10

Maximum BM @ Midspan =

2.961 x 2.125 ^2

Ultimate Moment Mu =

1.50

x 1.671

Maximum Shear Force @ Support =

2.96

x 2.13

Ultimate Shear Force Vu =

1.50

x 3.146

Sanguine Infra Tech Pvt.Ltd., Mumbai

/2

Page | 26

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

Design of Individual Plank for its self weight while lifting


Also each Panel shall be designed for its self weight while lifting at both end.
Uniform Load of one Plank due to self weight

0.060

x 0.30

x 23.5

0.423 kN/m

Maximum BM @ Midspan =

0.423

x 2.16 ^2

/8

0.247 kNm

Ultimate Moment Mu =

1.50

x 0.247

0.370 kNm

Maximum Shear Force @ Support =

0.42

x 2.16

0.457 kN

Ultimate Shear Force Vu =

1.50

x 0.457

0.685 kN

0.348 kN/m

/2

Design of Plank for Wind Load


Also each Panel shall be designed for wind load.
Uniform Load of one Plank due to wind

(Ref Cl 7.1.2.2)

The uniform load on plank due to wind is less than the uniform load of plank for self weight.
The plank designed checked for self weight will satisfy design checks for for wind load also.
10.2) Prestressing detail & Check for section :
Use

4 Nos.

of

3 mm

of

Allowable stress in Prestressing steel =


Total Prestressing steel area =
Total Prestressing force =

4
28.270

ultimate strength of

0.80
/4

1492

fy
x

3^2

1865

Mpa

1492

28.27

Mpa
mm2

42.18

kN

10.2.1 ) Losses due to pretension :


( As per IS : 1343-1980, Cl 18.5)

Grade of Concrete

Stress in cable after prestress


Stress in concrete at CG of cable
10.2.1.1)

42180

Loss due to elastic shortening :


=

( 60

x 300 )

30 N/mm2

1492 N/mm2

2.34 N/mm2

(IS 1343:1980, Cl 18.5.2.4 b)

x modular ratio x avg. stress in concrete at c.g. of cable

2
Grade of concrete at the time of stressing

Sanguine Infra Tech Pvt.Ltd., Mumbai

(Consider 50% strenght)

15

N/mm2

Page | 27

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


Ec

5700 x

=
m

15

22076 N/mm

SPML - OM METALS (JV)

210000 =

9.5

22076
Loss
10.2.1.2)

9.5

Due to creep of concrete :

10.2.1.3)

Take creep coefficient


=

1.6

2.3

9.5

Loss

= 1.49 %

N/mm

= 2.39 %

63.0 N/mm2

= 4.22 %

90.0 N/mm2

= 6.03 %

211 N/mm2

= 14.13 %

22.3

1.6

35.6

Due to shrinkage of concrete : (IS 1343:1980, Cl 18.5.2.2)


Shrinkage strain =

10.2.1.4)

N/mm

(IS 1343:1980, Cl 18.5.2.1)

Age of loading @ 28 days


Loss

2.34

=
=

0.0003

210000

Loss due to relaxation of H.T. steel at first stage loss :


0.800 UTS

0.00030

(IS 1343:1980, Cl 18.5.2.3)

Total loss due to elastic shortening, creep , shrinkage & relaxation :


=

22.3

35.6

63.0

85.87 %

1000

90.0

10.2.2 ) Prestress after Losses :


Prestressing force after losses =
Stress due to prestressing force =
Permissible Compressive stresses =
Permissible Tensile stresses =

Sanguine Infra Tech Pvt.Ltd., Mumbai

42.18
36.22
0.34 fck =
=

( 60

x 300 )

10.2 N/mm

(Refer IS 1343, Cl. 22.7.1(b) & Fig 7)

0.0 N/mm

(Refer IS 1343, Cl. 22.7.1 Type - 2)

36.22 kN

2.01 MPa

Page | 28

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

10.2.3 ) Check of Section


A. Section Check for Stress
Section Moment b
(kN-m)

Bottom Plank 1.67


Midspan
Individual Plank 0.25
Midspan

Moment Cg of NA Cg of NA Sect ModulusSect Modulus Bending stress M/Z


Stress due to Resultant stress
RemZTOP
ZBOTTOM
of Inertia from Top from Bottom
@ Top @ Bottom Initial Prestress
@ Top
@ Bottom ark

(mm)

(mm)

(mm4)

(m3)

(m3)

60

300

0.000135

0.15

0.15

0.00090

N/mm2
N/mm2
Compressive Tensile
(i)
(ii)
0.00090
1.86
-1.86

300

60

0.000005

0.03

0.030

0.00018

0.00018

1.37

N/mm2
N/mm2
N/mm2
Compressive Compressive Compressive
(iii)
(i) + (iii)
(ii) + (iii)
2.01
3.87
0.16
Safe

-1.37

2.01

3.38

0.64

Safe

B. Section Check for Limit State of Collapse


The ultimate strenght of cross section is calculated according to the recommendattions of IS 1343, Appendix B
Section
Mult.

Bottom Plank
2.507 kN-m
N/mm2

Individual Plank
0.370
kN-m
30

N/mm2

fck

Concrete grade

30

Depth of Section

0.300

0.060

B
c.g.st

Width of Section
Depth of cg of prestressing steel from top of section

=
=

0.060
0.150

m
m

0.300
0.030

m
m

As

Area of Prestressing steel

28.27

mm2

28.27

mm2

fp

Ultimate tensile strength of prestressing steel

1865

N/mm2

1865

N/mm2

(Ref IS 1343, T-11)


(Ref IS 1343, T-11)

=
=

0.098

0.098

1.000

1.000

(Ref IS 1343, T-11)

0.217

0.217

1623

1623

0.033

(Ap fp) / (b d fck)


fpu/(0.87fpu
Xu/d
fpu

= 0.87 fp

Xu
Ast
Non Prestressing steel
Mult. Due to yielding of steel
Remark

Sanguine Infra Tech Pvt.Ltd., Mumbai

=
=

0
6.253
safe

0.007

m
2

mm
kN-m

0
1.251

m
mm2
kN-m

safe

Page | 29

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

C. Check for Limit State of Shear


Section Shear

Force
(kN) (mm)

clear

Shear

Ast prov.

(mm)

cover
(mm)

(mm)

stress
v (N/mm2)

dia
(mm)

Pt %

Shear
capacity
provided
of
c (N/mm2)

Remark.

IS1343, T-6
Bottom Plank
Midspan
Individual Plank

4.72

60

300

28.5

270

0.291

3 mm

4 Nos.

0.175

0.370

Shear Reinf
Not Required

0.69

300

60

28.5

30

0.076

3 mm

4 Nos.

0.314

0.380

Shear Reinf
Not Required

Midspan

10.3) Check for Bearing strength on concrete column bearing area due to reaction from planks:

Reaction at one end of column 1.5 x 2.961 x 2.16 / 2

Bearing Area =

30

x 60

Bearing Stress on column


4800 / 1800
Permissible bearing strength on concrete 0.45 fck =

Sanguine Infra Tech Pvt.Ltd., Mumbai

4.8 kN
2
1800 mm
2.67 N/mm2
6.75 Mpa
Safe

(Ref IS 456:2000, Cl 34.4)

Page | 30

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

11.0 ) COLUMN DESIGN


11.1) At point of maximum moment :
Maximum moment will be at bottom of Column. This will be under Wind load condition LC 102
Hence design of column is governed by LC 102.
Initial forces in column under LC 102 :

Pu =

8.503

kN

Mu =

8.780

kN m

For designing the Column in SLS load combinations,. The effect of slenderness is considered
in design by considering additional moment due to slenderess as per IS 456:2000, Cl 39.7.1
Distance of point of max BM from Column top to footing top = H1 =

2.60 m

@ Transverse
Column Size

0.25 m

Effective Length factor

2.00

Effective Length

5.20

le/h

20.80

Eccentricitty due to slenderness


= (D / 2000) x (lex / D)^2
ecc1.

0.054

Additional Moment due to slenderness effect


( 8.503

- 2.08 ) x 0.054

Final design force after slenderness moment:


Mu =

8.780 +

0.347

kN m

Pu =

8.503

kN

9.127

kN m

0.347

Design About Longitudinal Axis :


At point of maximum moment, column size is solid rectangular of

0.15

Cross Sectional Area of Column

0.03750 m

Moment of Inertial of Column

0.00020 m

Depth of External fibre for Neutral Axis

Sectional Modulus for Column

I/y

0.125

x 0.25 m

= 0.001563 m

Direct & Bending stress due to final design forces : Maximum Stress @ Top =

8.503

/ 0.03750

9.127

0.0016 = 6.07 Mpa

Minimum Stress @ Bottom =

8.503

/ 0.03750

9.127

0.0016 = -5.6 Mpa

11.2) Prestressing detail & Check for section :


Use

7 Nos.

of

4 mm of ultimate strength of

Allowable stress in Prestressing steel =


Total Prestressing steel area =
Total Prestressing force =

Sanguine Infra Tech Pvt.Ltd., Mumbai

0.80

fy

7 x

/4

87.960 x

1492

4^2

1865

Mpa

= 1492
= 87.96

Mpa
2
mm

= 131.24

kN

Page | 31

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

11.2.1 ) Losses due to pretension :


( As per IS : 1343-1980, Cl 18.5)

Grade of Concrete

Stress in cable after prestress


Stress in concrete at CG of cable

131.24 / 0.033

11.2.1.1)
Loss due to elastic shortening :
=

30 N/mm

1492 N/mm

3.980 N/mm

15

N/mm

37.9

N/mm

= 2.54 %

1.6

60.6

N/mm

4.1 %

63.0 N/mm

4.2 %

(IS 1343:1980, Cl 18.5.2.4 b)

x modular ratio x avg. stress in concrete at c.g. of cable

2
Grade of concrete at the time of stressing
Ec

5700 x

=
m

15

22076 N/mm

(Consider 50% strength) =

210000 =

9.5

22076
Loss =

9.5

11.2.1.2)
Due to creep of concrete :

(IS 1343:1980, Cl 18.5.2.1)

Age of loading @ 28 days


Loss

3.98

Take creep coefficient


=

11.2.1.3)
Due to shrinkage of concrete :

1.6 x

4.0

9.5

(IS 1343:1980, Cl 18.5.2.2)

Shrinkage strain =
Loss

= 0.00030
=

0.0003 x

210000

11.2.1.4)
Loss due to relaxation of H.T. steel at first stage loss :
@ 0.80 UTS

(IS 1343:1980, Cl 18.5.2.3)


=

90.0 N/mm

= 6.03 %

90.0 =

251 N/mm

= 16.9 %

Total loss due to elastic shortening, creep , shrinkage & relaxation :


=

37.9

60.6 +

63.0

11.2.2 ) Prestress after Losses :


Prestressing force after losses =

131.24 x

Stress due to prestressing force (Mpa)=


Permissible Compressive stresses=

83.15 %

109 x

0.34 fck =

Permissible Tensile stresses =

1000

6.07

At Bottom (Min)=-5.61

+
+

Sanguine Infra Tech Pvt.Ltd., Mumbai

2.91
2.91

/ 150

250 = 2.91 MPa

10.2 N/mm (Refer IS 1343, Cl. 22.7.1(b) & Fig 7)


2

-3.0 N/mm (Refer IS 1343, Cl. 22.7.1 Type - 2)

Resultant Stresses after Prestressing force:


At Top (Max) =

= 109 kN

(As Wind is Temporary load)


=
=

8.98 N/mm

-2.70 N/mm

<
<

10.20 N/mm

Safe

-3.00

Safe

N/mm

Page | 32

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

11.3) Check for Limit State of Collapse


The ultimate strenght of cross section is calculated according to the recommendattions of IS 1343.
Mult. Req.

1.5 x 9.127 =

13.691

kN-m
N/mm

fck

Concrete grade

30

Depth of Section

0.250

B
Width of Section
=
c.g.st Depth of cg of prestressing steel from top of section
=

0.150
0.125

m
m

As

Area of Prestressing steel

87.96

mm

fp

Ultimate tensile strength of prestressing steel=

1865

N/mm

(Ap fp) / (b d fck)


fpu/(0.87fpu

(Ref IS 1343, T-11)


(Ref IS 1343, T-11)

=
=

0.146

Xu/d

(Ref IS 1343, T-11)

0.326

fpu

1623

N/mm

Xu

0.041

=
=

Ast
Non Prestressing steel
Mult. Due to yielding of steel
Remark

Sanguine Infra Tech Pvt.Ltd., Mumbai

1.000

15.397

mm
kN-m

safe

Page | 33

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH

SPML - OM METALS (JV)

12.0 Summary :
12.1 Footing Design :
Footing design is presented in Cl 9.0
Concrete grade

fck

20 Mpa

Reinforcement

fy

500 Mpa

Clear cover to reinforcement


Footing size =

0.900 m Width x

Bottom Reinf.Main reinf.


Top Reinf.

50 mm
1.275 m Length x 0.400 m Depth

Y 10

200 c/c

Distribution

Y 10

200 c/c

Main reinf.

Y8

200 c/c

Distribution

Y8

200 c/c

Ref:- DRG:VUL-MS-CWALL-C-REINF-3703-R1 Reinforcement/Prestressing detail of


Prestressed Precast Boundary wall.
12.2 Column Design :
Column design is governed by combination which are surmised in Cl.8.0
Concrete grade

fck

Reinforcement

fy

Column Size

30 Mpa
1865 Mpa
0.15 m

0.25 m

Upto Ground Level

0.15 m

0.25 m

With 35 x 60/70mm spout


on both side in column

Clear cover to reinforcement:

30 mm

Prestressing steel
Vertical Reinf.

4 mm

7 Nos.

Ref:- DRG:VUL-MS-CWALL-C-REINF-3703-R1 Reinforcement/Prestressing detail of


Prestressed Precast Boundary wall.
12.3 Precast Plank design :
Plank is designed like simply supported beam presented in Cl 10.0.
Concrete grade

fck

Reinforcement

fy

Plank Size
Plank Length
Clear cover to reinforcement:

30 Mpa
1865 Mpa
60 mm

300 mm

4 Nos.

2160 mm
30 mm

Prestressing steel
Horizontal Reinf.

3 mm

Ref:- DRG:VUL-MS-CWALL-C-REINF-3703-R1 Reinforcement/Prestressing detail of


Prestressed Precast Boundary wall.

Sanguine Infra Tech Pvt.Ltd., Mumbai

Page | 34

VIKRAM UDYOGPURI LIMITED, UJJAIN, MADHYA PRADESH


SPML-OM METALS (JV)
-------------------------------------------------------------------------------------------------------------------------------------------------------

APPENDIX A
DRAWINGS

Page | 35

KEY PLAN
NOTES :

1.ALL DIMENSION ARE IN MM, UNLESS STATED OTHERWISE.


2.ALL LEVELS ARE IN METERS.
3.NO DIMENSION SHALL BE SCALED FROM THIS DRAWING.
ONLY WRITTEN DIMENSION SHALL BE FOLLOWED.
4.ALL THE DIMENSION SHALL BE CHECKED AND VERIFIED AT SITE
5.IN CASE OF ANY DISCREPANCY IN THIS DRAWING, PLEASE STOP
THE WORK & CONSULT US.
6.USE HYSD BARS OF GRADE Fe 500 FOR RCC WORK.
7.STRUCTURAL CONCRETE GRADE : FOOTING
- M20
COLUMN & PLANK - M30
8.COMPRESSIVE STRENGTH OF FILLER MATERIAL SHALL BE
GREATER THAN 20 MPa

REFERENCE DRAWINGS :

VUL-MS-CWALL-C-REINF-3703-R1 - REINFORCEMENT/PRESTRESSING
DETAIL OF PRESTRESSED PRECAST BOUNDARY WALL

REV.

DATE

DESCRIPTION

DWG. APPD. BY

R3
R2
R1
R0

COMPLIED WITH COMMENTS


30/01/2016 DATED 27/01/2016
09/11/2015
FOR APPROVAL

DHARM ARIF
DHARM ARIF

APROVAL
STAMP:

INFRASTRUCTURE WORK FOR VIKRAM


UDYOGPURI NEAR UJJAIN,
MADHYA PRADESH.

PROJECT
NAME:

EMPLOYER:

VIKRAM UDYOGPURI LIMITED


UJJAIN, MADHYA PRADESH.

EMPLOYERS
CONSULTANT:

AECOM ASIA COMPANY. LTD.

EPC
CONTRACTOR:

SPML - OM METALS (JV)

CONSULTANT:

SANGUINE INFRA TECH PVT. LTD.


TITLE:
DRAWN BY
DHARMESH

CONCRETE PROFILE OF PRESTRESSED


PRECAST BOUNDARY WALL
CHECKED BY
ARIF
DRG. NO.:

APPROVED BY
DIGVIJAY

VUL-MS-CWALL-C-GA-3702

SCALE
1/10,1/25

DWG SIZE
A1
SHEET NO REVISION
1 OF 1

R1

DEAD END

900

900

75

250
900
1000

55

75

10mm Bar as Lifting Hook


To be Lapped With Top Reinf.

F1

300

1000

F1

KEY PLAN

SECTION THROUGH LIFTING HOOK


OF FOOTING

350

F1

1275

1275

1275

350

12

After Footing is Placed,


Hook shall be cut & Pocket
shall be filled with Filler Material

50

F2

SCALE 1/5

2250

2250

2250

2250

2100

95

4545

95

FOOTING LAYOUT
900

SCALE 1/25

A
Column Reinf detail
Above Ground Lvl.

F1
7 Nos. - 4mm Wire

1275

SCALE 1/10

NOTES :

1.ALL DIMENSION ARE IN MM, UNLESS STATED OTHERWISE.


2.ALL LEVELS ARE IN METERS.
3.NO DIMENSION SHALL BE SCALED FROM THIS DRAWING.
ONLY WRITTEN DIMENSION SHALL BE FOLLOWED.
4.ALL THE DIMENSION SHALL BE CHECKED AND VERIFIED AT SITE
5.IN CASE OF ANY DISCREPANCY IN THIS DRAWING, PLEASE STOP
THE WORK & CONSULT US.
6.USE HYSD BARS OF GRADE Fe 500 FOR RCC WORK.
7.STRUCTURAL CONCRETE GRADE : FOOTING
- M20
COLUMN & PLANK - M30
8.CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS:
FOOTING (BOTTOM) = 50 mm
FOOTING (SIDES)
= 50 mm
COLUMN
= 30 mm
PLANK
= 30 mm
9.'Y' INDICATES HYSD BAR
10.PRESTRESSING STEEL SHALL BE 3 mm & 4 mm DIA WIRE CONFIRMING
TO IS 6003:2010, OF MINIMUM TENSILE STRENGTH OF 1865 MPa
REFERENCE DRAWINGS :

FPL
365

8# @ 200
Both Ways

170 x 270 x 300 mm Spout


for Precast column Insert
365

170

415

170 x 270 x 300 mm Spout


for Precast column Insert
415

170

VUL-MS-CWALL-C-GA-3702-R1 - CONCRETE PROFILE OF PRESTRESSED


PRECAST BOUNDARY WALL

100

8# @ 200
Both Ways

A
Column Reinf detail
Upto Ground Lvl.

800
75mm Thk M10 PCC

10# @ 200

DESCRIPTION

DWG. APPD. BY

R2
R1
R0

SCALE 1/10

75mm Thk M10 PCC

Firm Strata

DATE

R3

400

300

400

300

REV.

COMPLIED WITH COMMENTS


30/01/2016 DATED 27/01/2016
09/11/2015
FOR APPROVAL

DHARM ARIF
DHARM ARIF

Firm Strata

SECTION CC

10# @ 200

SECTION CC

10# @ 200

SCALE 1/10

APROVAL
STAMP:

10# @ 200

SCALE 1/10

900

JACKING END

Sectional Elevation A-A

1000

30

4 Nos. - 3mm Wire

8# @ 200

80

VIKRAM UDYOGPURI LIMITED


UJJAIN, MADHYA PRADESH.

60

SECTION B-B

TYPICAL DETAIL OF RCC PLANK

SCALE 1/10

SCALE 1/10

10# @ 200

EMPLOYER:

30

8# @ 200

300

1275

1000

JACKING END

10# @ 200

DEAD END

80

8# @ 200

INFRASTRUCTURE WORK FOR VIKRAM


UDYOGPURI NEAR UJJAIN,
MADHYA PRADESH.

PROJECT
NAME:

80

8# @ 200

10# @ 200

SCALE 1/10

EMPLOYERS
CONSULTANT:

AECOM ASIA COMPANY. LTD.


100

10# @ 200

100

EPC
CONTRACTOR:
POCKET FOR LIFTING HOOK 75 x 25 x 12

FOOTING F2 REINF. DETAIL


POCKET FOR LIFTING HOOK 75 x 25 x 12

SPML - OM METALS (JV)

SCALE 1/10

FOOTING F1 REINF. DETAIL


SCALE 1/10

CONSULTANT:

FOOTING FOUNDATION EXCAVATION FOUNDATION


SIZE
SIZE
IDENTIFIER
TYPE
L X B
L X B

BOTTOM REINFORCEMENT
TOP REINFORCEMENT
SHORT DIR.
LONG DIR.
SHORT DIR.
LONG DIR.
DIA SPACING DIA SPACING DIA SPACING DIA SPACING

SANGUINE INFRA TECH PVT. LTD.

ITEM

Stressing
No. of Wires P ultimate P jacking
& Dia of Wire in Each Wire in Each Wire

F1

ISOLATED

1050 x 1425

900 x 1275

400

Y10

200

Y10

200

Y8

200

Y8

200

COLUMN

7 - 4mm

10.55 kN

8.44 kN

One End

F2

ISOLATED

1150 x 1150

1000 x 1000

400

Y10

200

Y10

200

Y8

200

Y8

200

PLANK

4 - 3mm

10.55 kN

8.44 kN

One End

TITLE:
DRAWN BY
DHARMESH

REINFORCEMENT/PRESTRESSING DETAIL OF
PRESTRESSED PRECAST BOUNDARY WALL
CHECKED BY
ARIF
DRG. NO.:

APPROVED BY
DIGVIJAY

VUL-MS-CWALL-C-REINF-3703

SCALE
DWG SIZE
1/5,1/10,1/25
A1
SHEET NO REVISION
1 OF 1

R1