Beruflich Dokumente
Kultur Dokumente
Legal Notice
Intellectual Property Rights
All copyrights and intellectual property rights for Nokia Siemens Networks training documentation, product documentation and
slide presentation material, all of which are forthwith known as Nokia Siemens Networks training material, are the exclusive
property of Nokia Siemens Networks . Nokia Siemens Networks owns the rights to copying, modification, translation, adaptation
or derivatives including any improvements or developments. Nokia Siemens Networks has the sole right to copy, distribute,
amend, modify, develop, license, sublicense, sell, transfer and assign the Nokia Siemens Networks training material.
Individuals can use the Nokia Siemens Networks training material for their own personal self-development only, those same
individuals cannot subsequently pass on that same Intellectual Property to others without the prior written agreement of Nokia
Siemens Networks .
The Nokia Siemens Networks training material cannot be used outside of an agreed Nokia Siemens Networks training session
for development of groups without the prior written agreement of Nokia Siemens Networks.
Module Objectives
BSC
DAP
BAL
MAL
MALD
BCF
BTS2
BTS1
ADCE
ADCW
TRX
RTSL
PCU
HOC
PCM
SEG
POC
RA
LAPD
Abbreviated name
rxLevAccessMin
Managed object
BTS
Multiplicity
Description
With this parameter you define the minimum power level an MS has to receive before it is allowed to
access the cell.
Additional information
Default value
-105 dBm
Required on Creation
optional
Related functions
Modification
Online
Modified
Related parameters
Parameter relationships
Related options
Related features
Interfaces
References
MML Commands
EQG, EQO
RXP
true
true
ZWOI command
ZWOS command
7
ZEGO command
8
Viewing parameters
Using NetAct CM Editor
Viewing parameters
with MML Commands in BSC
ZEQO Output
10
Exporting parameters
Using NetAct CM Ops Manager
11
12
BTS
BSC
Phase 2 : MM signalling
Phase 8 : Ciphering
Phase 2 : MM signalling
SETUP (SDCCH)
ASSIGNMENT (SDCCH-FACCH)
CH.RELEASE
ALERTING & CONNECT
(FACCH)
CONN. ACK. and MEASUREMENT
Phase 4 : Release
Phase 2 : MM signalling
Phase 15 : Conversation
Phase 4 : Release