OPEN UNIVERSITY
BIDDING DOCUMENTS
for
February 2016
TABLE OF CONTENTS
SECTION I. INVITATION
TO
BID.............................................
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
In accordance with the General Appropriations Act (GAA) 2015, the UP Open
University (UPOU) through its Bids and Awards Committee (UPOU BAC) intends to apply the
sum of One Million Two Hundred Eighty Seven Thousand Pesos (PhP1,287,000.00) only,
this being the Approved Budget for the Contract (ABC) for Construction of Elevator Shaft at
the Administration Building (Reference No. ITB No. 16-02-001). Bids received in excess of
the ABC shall be automatically rejected at bid opening.
UPOU now invites all prospective contractors to submit bids for the project
Construction of Elevator Shaft at the Administration Building. Prospective contractors
should possess a valid Philippine Contractors Accreditation Board (PCAB) License Category
C and D for General Building and Registration Particular for Small B under GB-1
Building or Industrial Plant classification. The project should be completed within one
hundred twenty (120) calendar days, the starting date being seven (7) calendar days from the
issuance of the Notice to Proceed.
Bidders should have completed, within the last five years from the date of submission
and receipt of bids, a contract similar to the project and equivalent to 50% of the approved
budget for this contract. The description of an eligible bidder is contained in the bidding
documents, particularly in Section II. Instructions to Bidders. Bidding is restricted to Filipino
citizens/sole proprietorships, partnerships, or organizations with at least seventy five percent
(75%) interest or outstanding capital stock belonging to citizens of the Philippines, and to
citizens or organizations of a country the laws or regulations of which grant similar rights or
privileges to Filipino citizens, pursuant to RA 5183 and subject to Commonwealth Act 138.
Bidding will be conducted through an open competitive bidding procedure using a
non-discretionary pass/fail criterion as specified in the Implementing Rules and
Regulations (IRR) of Republic Act (RA) 9184, otherwise known as the Government
Procurement Reform Act.
A complete set of bidding documents may be acquired from the address below and
upon payment of a non-refundable fee for the bidding documents in the amount of One
Thousand Three Hundred Pesos (PhP 1,300.00) only. It may also be downloaded from the
website of the Philippine Government Electronic Procurement System (PhilGEPS) provided
that Bidders shall pay the non-refundable fee for the bidding documents not later than the
submission of their bids.
A pre-bid conference shall be held on 24 February 2016, 2:00 PM at the National
Computer Center (NCC), C.P. Garcia Avenue, UP Diliman, Quezon City. Only those who
have purchased the bidding documents shall be allowed to attend and participate in the prebid conference.
Bids must be delivered to the address below. All bids must be accompanied by a bid
security in the form and in the amount stated in ITB Clause 18.
Bid opening shall be on 8 March 2016, 1:00 PM at UPOU Headquarters, Los Baos,
Laguna. Bids will be opened in the presence of the bidders representatives who choose to
attend at the address below. Late bids shall not be accepted.
The UPOU BAC reserves the right to accept or reject any bid, to annul the bidding
process, and to reject all bids at any time prior to contract award, without thereby incurring
any liability to the affected bidder or bidders.
For further information, please contact:
MS. PURA SV. AMOLOZA
Scope of Bid..............................................................................................................
2.
Source of Funds........................................................................................................
3.
4.
Conflict of Interest....................................................................................................
5.
Eligible Bidders.........................................................................................................
6.
Bidders Responsibilities..........................................................................................
7.
8.
Subcontracts............................................................................................................
Pre-Bid Conference.................................................................................................
10.
C. PREPARATION OF BIDS................................................................................12
11.
Language of Bids....................................................................................................
12.
13.
14.
Alternative Bids......................................................................................................
15.
Bid Prices................................................................................................................
16.
Bid Currencies.........................................................................................................
17.
Bid Validity.............................................................................................................
18.
Bid Security.............................................................................................................
19.
20.
22.
Late Bids.................................................................................................................
23.
24.
Process to be Confidential.......................................................................................
26.
Clarification of Bids................................................................................................
27.
28.
Post Qualification....................................................................................................
29.
Reservation Clause..................................................................................................
F. AWARD OF CONTRACT................................................................................26
30.
Contract Award........................................................................................................
31.
32.
Performance Security..............................................................................................
33.
Notice to Proceed....................................................................................................
34.
Protest Mechanism....................................................................................................28
A. General
.1.1. Scope of Bid
.1.2.
The Procuring Entity as defined in the BDS, invites bids for the construction
of Works, as described in Section VI. Specifications. The name and
identification number of the Contract is provided in the BDS.
.1.3.
The successful bidder will be expected to complete the Works by the intended
completion date specified in SCC Clause 1.16.
Unless otherwise specified in the BDS, the Procuring Entity, as well as bidders
and contractors, shall observe the highest standard of ethics during the
defines, for purposes of this provision, the terms set forth below as
follows:
()i
()ii
()iii
()iv
()v
obstructive practice is
(aa)
(bb)
()b
()c
.1.7.
Further, the Procuring Entity will seek to impose the maximum civil,
administrative, and/or criminal penalties available under the applicable laws
on individuals and organizations deemed to be involved in any of the practices
mentioned in ITB Clause 3.1.
.1.8.
Furthermore, the Funding Source and the Procuring Entity reserve the right to
inspect and audit records and accounts of a contractor in the bidding for and
performance of a contract themselves or through independent auditors as
reflected in the GCC Clause 34.
()b
()c
A Bidder has the same legal representative as that of another Bidder for
purposes of this Bid;
()d
()e
A Bidder submits more than one bid in this bidding process. However,
this does not limit the participation of subcontractors in more than one
bid;
()f
()g
()b
()c
()d
If the Bidder is a joint venture (JV), the provisions of items (a), (b), or
(c) of this Clause shall correspondingly apply to each of the members
of the said JV, as may be appropriate.
()b
()c
()d
()e
()a
()b
()c
Having made an estimate of the facilities available and needed for the
contract to be bid, if any;
()d
()e
()f
()g
()h
()i
()j
Failure to observe any of the above responsibilities shall be at the risk of the
Bidder concerned.
.1.20. The Bidder, by the act of submitting its bid, shall be deemed to have inspected
the site, determined the general characteristics of the contract works and the
conditions for this Project and examine all instructions, forms, terms, and
project requirements in the Bidding Documents.
.1.21. It shall be the sole responsibility of the prospective bidder to determine and to
satisfy itself by such means as it considers necessary or desirable as to all
matters pertaining to this Project, including: (a) the location and the nature of
the contract, project, or work; (b) climatic conditions; (c) transportation
facilities; (c) nature and condition of the terrain, geological conditions at the
site communication facilities, requirements, location and availability of
construction aggregates and other materials, labor, water, electric power and
access roads; and (d) other factors that may affect the cost, duration and
execution or implementation of the contract, project, or work.
.1.22. The Procuring Entity shall not assume any responsibility regarding erroneous
interpretations or conclusions by the prospective or eligible bidder out of the
data furnished by the procuring entity.
.1.23. Before submitting their bids, the Bidders are deemed to have become familiar
with all existing laws, decrees, ordinances, acts and regulations of the
Philippines which may affect the contract in any way.
.1.24. The Bidder shall bear all costs associated with the preparation and submission
of his bid, and the Procuring Entity will in no case be responsible or liable for
those costs, regardless of the conduct or outcome of the bidding process.
.1.25. Bidders should note that the Procuring Entity will only accept bids only from
those that have paid the nonrefundable fee for the Bidding Documents at the
office indicated in the Invitation to Bid.
.1.27. Subcontracts
.1.28. Unless otherwise specified in the BDS, the Bidder may subcontract portions of
the Works to an extent as may be approved by the Procuring Entity and stated
in the BDS. However, subcontracting of any portion shall not relieve the
Bidder from any liability or obligation that may arise from the contract for this
Project.
.1.29. Subcontractors must submit the documentary requirements under ITB Clause
12 and comply with the eligibility criteria specified in the BDS. In the event
that any subcontractor is found by the Procuring Entity to be ineligible, the
subcontracting of such portion of the Works shall be disallowed.
.1.30. The Bidder may identify the subcontractor to whom a portion of the Works
will be subcontracted at any stage of the bidding process or during contract
implementation. If the Bidder opts to disclose the name of the subcontractor
during bid submission, the Bidder shall include the required documents as part
of the technical component of its bid.
the BDS.
.1.33. Bidders are encouraged to attend the pre-bid conference to ensure that they
fully understand the Procuring Entitys requirements. Non-attendance of the
Bidder will in no way prejudice its bid; however, the Bidder is expected to
know the changes and/or amendments to the Bidding Documents as recorded
in the minutes of the pre-bid conference and the Supplemental/Bid Bulletin.
.1.34. Any statement made at the pre-bid conference shall not modify the terms of
the bidding documents unless such statement is specifically identified in
writing as an amendment thereto and issued as a Supplemental/Bid Bulletin.
C. Preparation of Bids
.1.39. Language of Bids
The Bid, as well as all correspondence and documents relating to the Bid exchanged
by the Bidder and the Procuring Entity, shall be written in English. Supporting
documents and printed literature furnished by the Bidder may be in another language
provided they are accompanied by an accurate translation in English certified by the
appropriate embassy or consulate in the Philippines, in which case the English
translation shall govern, for purposes of interpretation of the Bid.
Eligibility Documents
()ii
()iii
percentages
of
planned
accomplishments, if applicable;
and
actual
(.iii.13)
()iv
()v
()vii
Technical Documents
()i
()ii
(.i.2)
()iii
()b
.1.44. (a) Unless indicated in the BDS, all Bids that exceed the ABC shall not be
accepted.
(b)
(ii)
and administrative penalties that may be imposed upon the persons and
entities concerned.
.1.60. In exceptional circumstances, prior to the expiration of the bid validity period,
the Procuring Entity may request Bidders to extend the period of validity of
their bids. The request and the responses shall be made in writing. The bid
security described in ITB Clause 18 should also be extended corresponding to
the extension of the bid validity period at the least. A Bidder may refuse the
request without forfeiting its bid security, but his bid shall no longer be
considered for further evaluation and award. A Bidder granting the request
shall not be required or permitted to modify its bid.
()b
()c
()d
()e
Cash or
cashiers/managers check issued
by a Universal or Commercial
Bank.
Bank
draft/guarantee or irrevocable
letter of credit issued by a
Universal or Commercial Bank:
Provided, however, that it shall
be confirmed or authenticated by
a Universal or Commercial Bank,
if issued by a foreign bank.
Surety bond
callable upon demand issued by a
surety or insurance company
duly certified by the Insurance
Commission as authorized to
issue such security; and/or
Any
combination of items (a) to (c)
above.
Bid Securing
Declaration
For biddings conducted by local government units, the Bidder may also submit
bid securities in the form of cashiers/managers check, bank draft/guarantee,
or irrevocable letter of credit from other banks certified by the BSP as
authorized to issue such financial statement.
The Bid Securing Declaration mentioned above is an undertaking which
states, among others, that the bidder shall enter into contract with the
procuring entity and furnish the performance security required under ITB
Clause 31.2, from receipt of the Notice of Award, and committing to pay the
corresponding fine, and be suspended for a period of time from being qualified
to participate in any government procurement activity in the event it violates
any of the conditions stated therein as provided in the guidelines issued by the
GPPB.
.1.63. The bid security should be valid for the period specified in the BDS. Any bid
not accompanied by an acceptable bid security shall be rejected by the
Procuring Entity as non-responsive.
.1.64. No bid securities shall be returned to bidders after the opening of bids and
before contract signing, except to those that failed or declared as postdisqualified, upon submission of a written waiver of their right to file a motion
for reconsideration and/or protest. Without prejudice on its forfeiture, Bid
Securities shall be returned only after the bidder with the Lowest Calculated
Responsive Bid has signed the contract and furnished the Performance
Security, but in no case later than the expiration of the Bid Security validity
period indicated in ITB Clause 18.2.
.1.65. Upon signing and execution of the contract, pursuant to ITB Clause 31, and
the posting of the performance security, pursuant to ITB Clause 32, the
successful Bidders Bid security will be discharged, but in no case later than
the Bid security validity period as indicated in ITB Clause 18.2.
.1.66. The bid security may be forfeited:
()a
if a Bidder:
()i
()ii
()iii
()iv
()v
()vi
()vii
()viii
()ix
refusal to clarify or validate in writing its bid during postqualification within a period of seven (7) calendar days from
receipt of the request for clarification;
()x
containing
false
()b
()xi
()xii
all other acts that tend to defeat the purpose of the competitive
bidding, such as habitually withdrawing from bidding,
submitting late Bids or patently insufficient bid, for at least
three (3) times within a year, except for valid reasons.
()ii
.1.76. The original and the number of copies of the Bid as indicated in the BDS shall
be typed or written in indelible ink and shall be signed by the bidder or its duly
authorized representative/s.
.1.77. All envelopes shall:
()a
()b
()c
()d
()e
bear a warning DO NOT OPEN BEFORE the date and time for
the opening of bids, in accordance with ITB Clause 21.
.1.78. If bids are not sealed and marked as required, the Procuring Entity will assume
no responsibility for the misplacement or premature opening of the bid.
Bidder that withdraws its bid shall not be permitted to submit another bid,
directly or indirectly, for the same contract.
.1.85. No bid may be modified after the deadline for submission of bids. No bid may
be withdrawn in the interval between the deadline for submission of bids and
the expiration of the period of bid validity specified by the Bidder on the
Financial Bid Form. Withdrawal of a bid during this interval shall result in the
forfeiture of the Bidders bid security, pursuant to ITB Clause 18.5, and the
imposition of administrative, civil, and criminal sanctions as prescribed by RA
9184 and its IRR.
with the appropriate equivalent documents, if any, issued by the country of the
foreign Bidder concerned.
.1.92. Each partner of a joint venture agreement shall likewise submit the documents
required in ITB Clauses 12.1(a)(i) and 12.1(a)(ii). Submission of documents
required under ITB Clauses 12.1(a)(iii) to 12.1(a)(vi) by any of the joint
venture partners constitutes compliance.
E.
()b
The ranking of the total bid prices as so calculated from the lowest to
highest. The bid with the lowest price shall be identified as the Lowest
Calculated Bid.
.1.100. The Procuring Entity's BAC shall immediately conduct a detailed evaluation
of all bids rated passed, using non-discretionary pass/fail criterion. The
BAC shall consider the following in the evaluation of bids:
()a
.1.101. Based on the detailed evaluation of bids, those that comply with the abovementioned requirements shall be ranked in the ascending order of their total
calculated bid prices, as evaluated and corrected for computational errors,
discounts and other modifications, to identify the Lowest Calculated Bid.
Total calculated bid prices, as evaluated and corrected for computational
errors, discounts and other modifications, which exceed the ABC shall not be
considered, unless otherwise indicated in the BDS.
.1.102. The Procuring Entitys evaluation of bids shall only be based on the bid price
quoted in the Financial Bid Form
.1.103. Bids shall be evaluated on an equal footing to ensure fair competition. For
this purpose, all bidders shall be required to include in their bids the cost of all
taxes, such as, but not limited to, value added tax (VAT), income tax, local
taxes, and other fiscal levies and duties which shall be itemized in the bid form
and reflected in the detailed estimates. Such bids, including said taxes, shall
be the basis for bid evaluation and comparison.
.1.104.Post Qualification
.1.105. The Procuring Entity shall determine to its satisfaction whether the Bidder that
is evaluated as having submitted the Lowest Calculated Bid (LCB) complies
with and is responsive to all the requirements and conditions specified in ITB
Clauses 5, 12, and 13.
.1.106. Within a non-extendible period of three (3) calendar days from receipt by the
Bidder of the notice from the BAC that it submitted the LCB, the Bidder shall
submit the following documentary requirements:
()a
Latest income and business tax returns in the form specified in the
BDS;
()b
()c
Failure of the Bidder declared as Lowest Calculated Bid (LCB) to duly submit
the requirements under this Clause or a finding against the veracity of such,
shall be ground for forfeiture of the bid security and disqualification of the
Bidder for award.
.1.107. The determination shall be based upon an examination of the documentary
evidence of the Bidders qualifications submitted pursuant to ITB Clauses 12
and 13, as well as other information as the Procuring Entity deems necessary
and appropriate, using a non-discretionary pass/fail criterion.
.1.108. If the BAC determines that the Bidder with the Lowest Calculated Bid passes
all the criteria for post-qualification, it shall declare the said bid as the Lowest
Calculated Responsive Bid, and recommend to the Head of the Procuring
Entity the award of contract to the said Bidder at its submitted price or its
calculated bid price, whichever is lower, subject to ITB Clause 30.3.
.1.109. A negative determination shall result in rejection of the Bidders Bid, in which
event the Procuring Entity shall proceed to the next Lowest Calculated Bid to
make a similar determination of that Bidders capabilities to perform
satisfactorily. If the second Bidder, however, fails the post qualification, the
procedure for post qualification shall be repeated for the Bidder with the next
Lowest Calculated Bid, and so on until the Lowest Calculated and Responsive
Bid is determined for contract award.
.1.110. Within a period not exceeding seven (7) calendar days from the date of receipt
of the recommendation of the BAC, the Head of the Procuring Entity shall
approve or disapprove the said recommendation. In the case of government
owned and government-owned and/or -controlled corporations (GOCCs) and
government financial institutions (GFIs), the period provided herein shall be
fifteen (15) calendar days.
.1.111.Reservation Clause
.1.112. Notwithstanding the eligibility or post-qualification of a bidder, the Procuring
Entity concerned reserves the right to review its qualifications at any stage of
the procurement process if it has reasonable grounds to believe that a
misrepresentation has been made by the said bidder, or that there has been a
change in the Bidders capability to undertake the project from the time it
submitted its eligibility requirements. Should such review uncover any
misrepresentation made in the eligibility and bidding requirements, statements
or documents, or any changes in the situation of the Bidder which will affect
its capability to undertake the project so that it fails the preset eligibility or bid
evaluation criteria, the Procuring Entity shall consider the said Bidder as
ineligible and shall disqualify it from submitting a bid or from obtaining an
award or contract.
.1.113. Based on the following grounds, the Procuring Entity reserves the right to
reject any and all Bids, declare a Failure of Bidding at any time prior to the
contract award, or not to award the contract, without thereby incurring any
liability, and make no assurance that a contract shall be entered into as a result
of the bidding:
()a
()b
()c
for any justifiable and reasonable ground where the award of the
contract will not redound to the benefit of the Government as follows:
()i
()ii
()iii
.1.114. In addition, the Procuring Entity may likewise declare a failure of bidding
when:
()a
()b
()c
All bids fail to comply with all the bid requirements or fail postqualification; or
()d
F.
Award of Contract
.1.115.Contract Award
.1.116. Subject to ITB Clause 28, the Procuring Entity shall award the contract to the
Bidder whose Bid has been determined to be the Lowest Calculated and
Responsive Bid (LCRB).
.1.117. Prior to the expiration of the period of Bid validity, the Procuring Entity shall
notify the successful Bidder in writing that its Bid has been accepted, through
a Notice of Award received personally or sent by registered mail or
electronically, receipt of which must be confirmed in writing within two (2)
days by the LCRB and submitted personally or sent by registered mail or
electronically to the Procuring Entity.
.1.118. Notwithstanding the issuance of the Notice of Award, award of contract shall
be subject to the following conditions:
()a
()b
Valid PCAB license and registration for the type and cost of the
contract to be bid for foreign bidders, within thirty (30)
calendar days, if allowed under a Treaty, or International or
Executive Agreement mentioned in ITB Clause 12.1(a)(iv);
()c
()d
Contract Agreement;
()b
Bidding Documents;
()c
()d
Performance Security;
()e
()f
()g
.1.124.Performance Security
.1.125. To guarantee the faithful performance by the winning Bidder of its obligations
under the contract, it shall post a performance security within a maximum
period of ten (10) calendar days from the receipt of the Notice of Award from
the Procuring Entity and in no case later than the signing of the contract.
.1.126. The performance security shall be denominated in Philippine Pesos and posted
in favor of the Procuring Entity in an amount equal to the percentage of the
total contract price as stated in the BDS in accordance with the following
schedule:
Form of Performance Security
()a
Cash or
cashiers/managers check
issued by a Universal or
Commercial Bank.
()b
Bank
draft/guarantee or irrevocable
letter of credit issued by a
Universal or Commercial Bank:
Provided, however, that it shall
be confirmed or authenticated
by a Universal or Commercial
Bank, if issued by a foreign
bank.
()c
Surety bond
callable upon demand issued by
a surety or insurance company
duly certified by the Insurance
Commission as authorized to
issue such security; and/or
()d
Any
combination of the foregoing.
.1.128.Notice to Proceed
.1.129. Within three (3) calendar days from the date of approval of the Contract by the
appropriate government approving authority, the Procuring Entity shall issue
its Notice to Proceed to the Bidder.
.1.130. The contract effectivity date shall be provided in the Notice to Proceed by the
Procuring Entity, which date shall not be later than seven (7) calendar days
from the issuance of the Notice to Proceed.
.1.131.Protest Mechanism
Decision of the Procuring Entity at any stage of the procurement process may be
questioned in accordance with Section 55 of the Revised Implementing Rules and
Regulations of Republic Act 9184.
2.
3.1
.1.13.
.1.14.
.1.16.
.1.28.
.1.29.
.1.32.
.1.36.
10.3
.1.41.
BAC Secretariat
Supply and Property Management Office (SPMO)
Tel. No.: (049) 536-6001-06 loc. 210-211
Fax No.: (049) 536-5991
Email: bac@upou.edu.ph
No further instructions.
The first envelope shall contain the following eligibility and technical
documents:
()a Eligibility Documents
Class A Documents:
()i Registration Certificate (SEC, DTI, CDA, or any proof of such
registration as stated in the BDS.
()ii 2016 Mayors Permit.
()iii Duly accomplished and notarized Questionnaire for Prospective
Bidders.
()iv Statement of all its ongoing and completed government and
private contracts within five (5) years from the submission of
bids, including contracts awarded but not yet started, if any, and
statement of all government and private contracts completed
which are similar in nature.
()v Valid Philippine Contractors Accreditation Board (PCAB)
Category C and D for General Building and Registration
Particular for Small B under GB-1 Building or Industrial Plant
classification.
()vi Annual Income Tax Return (BIR Form No. 1701/1702) filed
through the Electronic Filing and Payment System (EFPS) and
Audited Financial Statements, showing, among others, the
prospective total and current assets and liabilities, stamped
received by the BIR or its duly accredited and authorized
institutions, for the preceding calendar year which should not be
earlier than two (2) years from the date of bid submission.
()vii Duly signed NFCC computation
()viii
Tax Clearance per Executive Order 398,
Series of 2005, as finally reviewed and approved by the BIR
Class B Documents;
()ix Valid Joint Venture Agreement (JVA), if applicable
()b Technical Documents
()x Bid Security - Bidders shall select and use one form of bid
security, the amount of which shall be equal to a percentage of
the ABC in accordance with the following:
1. 2% of ABC (PhP 25,740.00), in the form of cash,
cashiers/managers check issued by a universal or commercial
bank;
2. 2% of ABC (PhP 25,740.00), if bank draft/guarantee or
irrevocable letter of credit issued by a universal or commercial
bank;
3. 5% of ABC (PhP 64,350.00), if surety bond callable upon
demand issued by a surety or insurance company duly certified
by the Insurance Commissions authorized to issue such
security;
4. Any combination of items (a) to (c) proportionate to the share
of form with respect to the total amount of security; OR
5. Duly notarized Bid Securing Declaration
.1.41.()a()i
.1.41.()a()iv
13.1
13.1 (b)
.1.47..
15.4
16.1
17.1
18.1
18.2
20.3
Bidders shall select and use one form of bid security, the amount of
which shall be equal to a percentage of the ABC in accordance with the
following schedule:
a) 2% of ABC (PhP 25,740.00), in the form of cash,
cashiers/managers check issued by a universal or commercial bank;
b) 2% of ABC (PhP 25,740.00), if bank draft/guarantee or irrevocable
letter of credit issued by a universal or commercial bank;
c) 5% of ABC (PhP 64,350.00), if surety bond callable upon demand
issued by a surety or insurance company duly certified by the Insurance
Commission as authorized to issue such security;
d) Any combination of items (a) to (c) proportionate to the share of form
with respect to the total amount of security; or
e) Duly notarized Bid Securing Declaration
The bid security shall be valid from one hundred twenty (120) calendar
days from date of opening of bids.
Each Bidder shall submit one (1) original and one (1) duplicate copy
(COPY 1) of the first (Eligibility and Technical documents) and second
(Financial Proposal) components of its bid, STAMPED/SIGNED
CERTIFIEDTRUE/XEROX COPY.
Each copy shall be submitted in a separate sealed envelope, ring bound or
properly fastened and arranged in the order listed in the checklists for
envelopes 1 and 2.
Marking and Sealing of Bids:
BID PROPOSAL
ORIGINAL BID
ORIGINAL
ELIGIBILITY AND
TECHNICAL
COMPONENTS
ORIGINAL
FINANCIAL
COMPONENTS
COPY NO. 1
COPY NO. 1
ELIGIBILITY AND
TECHNICAL
COMPONENTS
COPY NO. 1
FINANCIAL
COMPONENTS
Bidders must follow the instructions on the Sealing and Marking of Bids:
.1 Original Eligibility and Technical Components enclose in envelope
and must be sealed and signed;
.2 Original Financial Components enclose in envelope and must be
sealed and signed;
.3 No. 1 and 2 enclose in envelope marked ORIGINAL BID and must be
sealed and signed;
.4 Copy No. 1 Eligibility and Technical Components enclose in envelope
and must be sealed and signed;
.5 Copy No. 1 Financial Components enclose in envelope and must be
sealed and signed;
.6 No. 4 and 5 enclose in envelope marked COPY NO. 1 and must be
sealed and signed;
.7 No. 3 and 6 enclose in envelope marked BID PROPOSAL and must
be sealed and signed;
ADMINISTRATION BUILDING
[NAME AND ADDRESS OF THE BIDDERS]
BIDS AND AWARDS COMMITTEE SECRETARIAT
SUPPLY AND PROPERTY MANAGEMENT OFFICE
UP OPEN UNIVERSITY
UPOU HEADQUARTERS, LOS BAOS, LAGUNA
REFERENCE NO. 16-02-001
21
DO NOT OPEN BEFORE [Insert Time and Date for the opening of
bid]
The address for submission of bids is:
BAC Secretariat
Supply and Property Management Office
UP Open University
Los Baos, Laguna
24.1
24.2
27.3(b)
27.4
28.2(a)
28.2(c)
31.4(g)
32.2
security;
d) Any combination of items (a) to (c) proportionate to the share of form
with respect to the total amount of security
AND
LAW.................................................
4. COMMUNICATIONS...................................................................
5. POSSESSION
OF
SITE................................................................
7. PERFORMANCE SECURITY...........................................................
8. SUBCONTRACTING....................................................................
9. LIQUIDATED DAMAGES..............................................................
10.SITE INVESTIGATION REPORTS.....................................................
11.THE PROCURING ENTITY, LICENSES
12.CONTRACTORS RISK
13.LIABILITY
OF THE
AND
AND
PERMITS............................
WARRANTY SECURITY..............................
CONTRACTOR...................................................
FOR
DEFAULT
OF
CONTRACTOR..................................
17.TERMINATION
FOR
DEFAULT
OF
PROCURING ENTITY...........................
18.TERMINATION
FOR
OTHER CAUSES...............................................
19.PROCEDURES
FOR
TERMINATION
OF
CONTRACTS..............................
OF
DISPUTES.........................................................
22.SUSPENSION
OF
OR
APPROPRIATION...............
TO
OF THE INTENDED
COMPLETION DATE.............................
VARY......................................................................
28.CONTRACTORS RIGHT
TO
CLAIM..................................................
29.DAYWORKS............................................................................
30.EARLY WARNING.....................................................................
31.PROGRAM
OF
WORK.................................................................
32.MANAGEMENT CONFERENCES......................................................
33.BILL
OF
QUANTITIES.................................................................
34.INSTRUCTIONS, INSPECTIONS
AND
AUDITS......................................
35.IDENTIFYING DEFECTS...............................................................
36.COST
OF
REPAIRS....................................................................
37.CORRECTION
OF
DEFECTS..........................................................
38.UNCORRECTED DEFECTS............................................................
39.ADVANCE PAYMENT..................................................................
40.PROGRESS PAYMENTS...............................................................
41.PAYMENT CERTIFICATES.............................................................
42.RETENTION............................................................................
43.VARIATION ORDERS..................................................................
44.CONTRACT COMPLETION............................................................
45.SUSPENSION
OF
46.PAYMENT
TERMINATION........................................................
ON
47.EXTENSION
OF
WORK.............................................................
CONTRACT TIME...................................................
48.PRICE ADJUSTMENT..................................................................
49.COMPLETION..........................................................................
50.TAKING OVER.........................................................................
51.OPERATING
1.
AND
MAINTENANCE MANUALS......................................
Definitions
For purposes of this Clause, boldface type is used to identify defined terms.
.1.1.
The Arbiter is the person appointed jointly by the Procuring Entity and the
Contractor to resolve disputes in the first instance, as provided for in GCC
Clause .1.84..
.1.2.
Bill of Quantities refers to a list of the specific items of the Work and their
corresponding unit prices, lump sums, and/or provisional sums.
.1.3.
.1.4.
The Contract is the contract between the Procuring Entity and the Contractor
to execute, complete, and maintain the Works.
.1.5.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter to be paid by the Procuring Entity to the Contractor for the
execution of the Works in accordance with this Contract.
.1.6.
.1.7.
The Contractor is the juridical entity whose proposal has been accepted by
the Procuring Entity and to whom the Contract to execute the Work was
awarded.
.1.8.
.1.9.
.1.10. Dayworks are varied work inputs subject to payment on a time basis for the
Contractors employees and Equipment, in addition to payments for associated
Materials and Plant.
.1.11. A Defect is any part of the Works not completed in accordance with the
Contract.
.1.12. The Defects Liability Certificate is the certificate issued by Procuring
Entitys Representative upon correction of defects by the Contractor.
.1.13. The Defects Liability Period is the one year period between contract
completion and final acceptance within which the Contractor assumes the
responsibility to undertake the repair of any damage to the Works at his own
expense.
.1.14. Drawings are graphical presentations of the Works. They include all
supplementary details, shop drawings, calculations, and other information
provided or approved for the execution of this Contract.
.1.15. Equipment refers to all facilities, supplies, appliances, materials or things
required for the execution and completion of the Work provided by the
Contractor and which shall not form or are not intended to form part of the
Permanent Works.
.1.16. The Intended Completion Date refers to the date specified in the SCC when
the Contractor is expected to have completed the Works. The Intended
Completion Date may be revised only by the Procuring Entitys
Representative by issuing an extension of time or an acceleration order.
.1.17. Materials are all supplies, including consumables, used by the Contractor for
incorporation in the Works.
.1.18. The Notice to Proceed is a written notice issued by the Procuring Entity or the
Procuring Entitys Representative to the Contractor requiring the latter to
begin the commencement of the work not later than a specified or
determinable date.
.1.19. Permanent Works all permanent structures and all other project features and
facilities required to be constructed and completed in accordance with this
Contract which shall be delivered to the Procuring Entity and which shall
remain at the Site after the removal of all Temporary Works.
.1.20. Plant refers to the machinery, apparatus, and the like intended to form an
integral part of the Permanent Works.
.1.21. The Procuring Entity is the party who employs the Contractor to carry out
the Works stated in the SCC.
.1.22. The Procuring Entitys Representative refers to the Head of the Procuring
Entity or his duly authorized representative, identified in the SCC, who shall
be responsible for supervising the execution of the Works and administering
this Contract.
.1.23. The Site is the place provided by the Procuring Entity where the Works shall
be executed and any other place or places which may be designated in the
SCC, or notified to the Contractor by the Procuring Entitys Representative as
forming part of the Site.
.1.24. Site Investigation Reports are those that were included in the Bidding
Documents and are factual and interpretative reports about the surface and
subsurface conditions at the Site.
.1.25. Slippage is a delay in work execution occurring when actual accomplishment
falls below the target as measured by the difference between the scheduled and
actual accomplishment of the Work by the Contractor as established from the
work schedule. This is actually described as a percentage of the whole Works.
.1.26. Specifications mean the description of Works to be done and the qualities of
materials to be used, the equipment to be installed and the mode of
construction.
.1.27. The Start Date, as specified in the SCC, is the date when the Contractor is
obliged to commence execution of the Works. It does not necessarily coincide
with any of the Site Possession Dates.
.1.28. A Subcontractor is any person or organization to whom a part of the Works
has been subcontracted by the Contractor, as allowed by the Procuring Entity,
but not any assignee of such person.
.1.29. Temporary Works are works designed, constructed, installed, and removed
by the Contractor that are needed for construction or installation of the
Permanent Works.
.1.30. Work(s) refer to the Permanent Works and Temporary Works to be executed
by the Contractor in accordance with this Contract, including (i) the furnishing
of all labor, materials, equipment and others incidental, necessary or
convenient to the complete execution of the Works; (ii) the passing of any tests
before acceptance by the Procuring Entitys Representative; (iii) and the
carrying out of all duties and obligations of the Contractor imposed by this
Contract as described in the SCC.
.1.1. Interpretation
.1.2.
.1.3.
apply to any Section of the Works (other than references to the Completion Date
and Intended Completion Date for the whole of the Works).
This Contract has been executed in the English language, which shall be the
binding and controlling language for all matters relating to the meaning or
interpretation of this Contract. All correspondence and other documents
pertaining to this Contract which are exchanged by the parties shall be written
in English.
.1.6.
This Contract shall be interpreted in accordance with the laws of the Republic
of the Philippines.
.1.7. Communications
Communications between parties that are referred to in the Conditions shall be
effective only when in writing. A notice shall be effective only when it is received by
the concerned party.
On the date specified in the SCC, the Procuring Entity shall grant the
Contractor possession of so much of the Site as may be required to enable it to
proceed with the execution of the Works. If the Contractor suffers delay or
incurs cost from failure on the part of the Procuring Entity to give possession
in accordance with the terms of this clause, the Procuring Entitys
Representative shall give the Contractor a Contract Time Extension and certify
such sum as fair to cover the cost incurred, which sum shall be paid by
Procuring Entity.
.1.10. If possession of a portion is not given by the date stated in the SCC Clause .
1.9., the Procuring Entity will be deemed to have delayed the start of the
relevant activities. The resulting adjustments in contact time to address such
delay shall be in accordance with GCC Clause .1.181..
.1.11. The Contractor shall bear all costs and charges for special or temporary rightof-way required by it in connection with access to the Site. The Contractor
shall also provide at his own cost any additional facilities outside the Site
required by it for purposes of the Works.
.1.12. The Contractor shall allow the Procuring Entitys Representative and any
person authorized by the Procuring Entitys Representative access to the Site
and to any place where work in connection with this Contract is being carried
out or is intended to be carried out.
.1.15. The Contractor shall commence execution of the Works on the Start Date and
shall carry out the Works in accordance with the Program of Work submitted
by the Contractor, as updated with the approval of the Procuring Entitys
Representative, and complete them by the Intended Completion Date.
.1.16. The Contractor shall be responsible for the safety of all activities on the Site.
.1.17. The Contractor shall carry out all instructions of the Procuring Entitys
Representative that comply with the applicable laws where the Site is located.
.1.18. The Contractor shall employ the key personnel named in the Schedule of Key
Personnel, as referred to in the SCC, to carry out the supervision of the Works.
The Procuring Entity will approve any proposed replacement of key personnel
only if their relevant qualifications and abilities are equal to or better than
those of the personnel listed in the Schedule.
.1.19. If the Procuring Entitys Representative asks the Contractor to remove a
member of the Contractors staff or work force, for justifiable cause, the
Contractor shall ensure that the person leaves the Site within seven (7) days
and has no further connection with the Work in this Contract.
.1.20. During Contract implementation, the Contractor and his subcontractors shall
abide at all times by all labor laws, including child labor related enactments,
and other relevant rules.
.1.21. The Contractor shall submit to the Procuring Entity for consent the name and
particulars of the person authorized to receive instructions on behalf of the
Contractor.
.1.22. The Contractor shall cooperate and share the Site with other contractors,
public authorities, utilities, and the Procuring Entity between the dates given
in the schedule of other contractors particularly when they shall require access
to the Site. The Contractor shall also provide facilities and services for them
during this period. The Procuring Entity may modify the schedule of other
contractors, and shall notify the Contractor of any such modification thereto.
.1.23. Should anything of historical or other interest or of significant value be
unexpectedly discovered on the Site, it shall be the property of the Procuring
Entity. The Contractor shall notify the Procuring Entitys Representative of
such discoveries and carry out the Procuring Entitys Representatives
instructions in dealing with them.
.1.28. The performance security may be released by the Procuring Entity and
returned to the Contractor after the issuance of the Certificate of Final
Acceptance subject to the following conditions:
()a
()b
The Contractor has no pending claims for labor and materials filed
against it; and
()c
.1.29. The Contractor shall post an additional performance security following the
amount and form specified in ITB Clause .1.126. to cover any cumulative
increase of more than ten percent (10%) over the original value of the contract
as a result of amendments to order or change orders, extra work orders and
supplemental agreements, as the case may be. The Contractor shall cause the
extension of the validity of the performance security to cover approved
contract time extensions.
.1.30. In case of a reduction in the contract value or for partially completed Works
under the contract which are usable and accepted by the Procuring Entity the
use of which, in the judgment of the implementing agency or the Procuring
Entity, will not affect the structural integrity of the entire project, the
Procuring Entity shall allow a proportional reduction in the original
performance security, provided that any such reduction is more than ten
percent (10%) and that the aggregate of such reductions is not more than fifty
percent (50%) of the original performance security.
.1.31. Unless otherwise indicated in the SCC, The Contractor, by entering into the
Contract with the Procuring Entity, acknowledges the right of the Procuring
Entity to institute action pursuant to Act 3688 against any subcontractor be
they an individual, firm, partnership, corporation, or association supplying the
Contractor with labor, materials and/or equipment for the performance of this
Contract.
.1.32. Subcontracting
.1.33. Unless otherwise indicated in the SCC, the Contractor cannot subcontract
Works more than the percentage specified in ITB Clause .1.28..
.1.34. Subcontracting of any portion of the Works does not relieve the Contractor of
any liability or obligation under this Contract. The Contractor will be
responsible for the acts, defaults, and negligence of any subcontractor, its
agents, servants or workmen as fully as if these were the Contractors own
acts, defaults, or negligence, or those of its agents, servants or workmen.
.1.35. Subcontractors disclosed and identified during the bidding may be changed
during the implementation of this Contract, subject to compliance with the
required qualifications and the approval of the Procuring Entity.
one-tenth (1/10) of a percent of the cost of the unperformed portion for every
day of delay. The total amount of liquidated damages shall not exceed ten
percent (10%) of the amount of the contract. The Procuring Entity may deduct
liquidated damages from payments due to the Contractor. Payment of
liquidated damages shall not affect the Contractor. Once the cumulative
amount of liquidated damages reaches ten percent (10%) of the amount of this
Contract, the Procuring Entity shall rescind this Contract, without prejudice to
other courses of action and remedies open to it.
.1.38. If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer of the Procuring Entity shall correct any overpayment
of liquidated damages by the Contractor by adjusting the next payment
certificate. The Contractor shall be paid interest on the overpayment,
calculated from the date of payment to the date of repayment, at the rates
specified in GCC Clause .1.150..
()b
()c
()d
()e
Cash or letter of
credit issued by Universal or
Commercial bank: provided, however,
that the letter of credit shall be
confirmed or authenticated by a
Amount of Performance
Security
(Equal to Percentage (%) of the
Total Contract Price)
Ten Percent (10%)
.1.48. The warranty security shall be stated in Philippine Pesos and shall remain
effective for one year from the date of issuance of the Certificate of Final
Acceptance by the Procuring Entity, and returned only after the lapse of said
one year period.
.1.49. In case of construction defects/failure occurring during the applicable
warranty period provided in GCC Clause .1.46., the Procuring Entity shall
undertake the necessary restoration or reconstruction works and shall be
entitled to full reimbursement by the parties found to be liable for expenses
incurred therein upon demand, without prejudice to the filing of appropriate
administrative, civil, and/or criminal charges against the responsible persons
as well as the forfeiture of the warranty security posted in favor of the
Procuring Entity.
()b
()ii
.1.53. Insurance
.1.54. The Contractor shall, under his name and at his own expense, obtain and
maintain, for the duration of this Contract, the following insurance coverage:
()a
()b
()c
()d
become bankrupt;
()ii
()iii
()iv
()v
()b
does not actually have on the project Site the minimum essential
equipment listed on the Bid necessary to prosecute the Works in
accordance with the approved Program of Work and equipment
deployment schedule as required for the project;
()c
()d
()e
.1.65. All materials on the Site, Plant, Equipment, and Works shall be deemed to be
the property of the Procuring Entity if this Contract is rescinded because of the
Contractors default.
()a
()b
The Contractor stops work for twenty eight (28) days when no
stoppage of work is shown on the current Program of Work and the
stoppage has not been authorized by the Procuring Entitys
Representative;
()b
()c
()d
()e
()f
()g
()h
()ii
()iii
()iv
.1.72. The Funding Source or the Procuring Entity, as appropriate, will seek to
impose the maximum civil, administrative and/or criminal penalties available
under the applicable law on individuals and organizations deemed to be
involved with corrupt, fraudulent, or coercive practices.
.1.73. When persons from either party to this Contract gives notice of a fundamental
breach to the Procuring Entitys Representative in order to terminate the
existing contract for a cause other than those listed under GCC Clause .1.71.,
the Procuring Entitys Representative shall decide whether the breach is
fundamental or not.
.1.74. If this Contract is terminated, the Contractor shall stop work immediately,
make the Site safe and secure, and leave the Site as soon as reasonably
possible.
()b
()i
()ii
()iii
()iv
Within a period of seven (7) calendar days from receipt of the Notice
of Termination, the Contractor shall submit to the Head of the
Procuring Entity a verified position paper stating why the contract
should not be terminated. If the Contractor fails to show cause after
the lapse of the seven (7) day period, either by inaction or by default,
the Head of the Procuring Entity shall issue an order terminating the
contract;
()d
()e
()f
.1.77. Pursuant to Section 69(f) of RA 9184 and without prejudice to the imposition
of additional administrative sanctions as the internal rules of the agency may
provide and/or further criminal prosecution as provided by applicable laws,
the procuring entity shall impose on contractors after the termination of the
contract the penalty of suspension for one (1) year for the first offense,
suspension for two (2) years for the second offense from participating in the
public bidding process, for violations committed during the contract
implementation stage, which include but not limited to the following:
()a
()b
()ii
()iii
()iv
()v
()c
()d
()e
()i
()ii
majeure shall be interpreted to mean an event which the Contractor could not
have foreseen, or which though foreseen, was inevitable. It shall not include
ordinary unfavorable weather conditions; and any other cause the effects of
which could have been avoided with the exercise of reasonable diligence by
the Contractor.
.1.80. If this Contract is discontinued by an outbreak of war or by any other event
entirely outside the control of either the Procuring Entity or the Contractor, the
Procuring Entitys Representative shall certify that this Contract has been
discontinued. The Contractor shall make the Site safe and stop work as
quickly as possible after receiving this certificate and shall be paid for all
works carried out before receiving it and for any Work carried out afterwards
to which a commitment was made.
.1.81. If the event continues for a period of eighty four (84) days, either party may
then give notice of termination, which shall take effect twenty eight (28) days
after the giving of the notice.
.1.82. After termination, the Contractor shall be entitled to payment of the unpaid
balance of the value of the Works executed and of the materials and Plant
reasonably delivered to the Site, adjusted by the following:
()a
any sum to which the Contractor is entitled under GCC Clause .1.106.;
()b
()c
.1.83. The net balance due shall be paid or repaid within a reasonable time period
from the time of the notice of termination.
()b
If the Contractor has not received sums due it for work already done within
forty five (45) days from the time the Contractors claim for payment has been
certified by the Procuring Entitys Representative, the Contractor may
immediately issue a suspension of work notice in accordance with GCC
Clause .1.174..
.1.101. The Procuring Entitys Representative shall extend the Intended Completion
Date if a Variation is issued which makes it impossible for the Intended
Completion Date to be achieved by the Contractor without taking steps to
accelerate the remaining work, which would cause the Contractor to incur
additional costs. No payment shall be made for any event which may warrant
the extension of the Intended Completion Date.
.1.102. The Procuring Entitys Representative shall decide whether and by how much
to extend the Intended Completion Date within twenty one (21) days of the
Contractor asking the Procuring Entitys Representative for a decision thereto
after fully submitting all supporting information. If the Contractor has failed
to give early warning of a delay or has failed to cooperate in dealing with a
delay, the delay by this failure shall not be considered in assessing the new
Intended Completion Date.
()b
()c
()d
.1.107. Dayworks
.1.108. Subject to GCC Clause .1.165. on Variation Order, and if applicable as
indicated in the SCC, the Dayworks rates in the Contractors Bid shall be used
for small additional amounts of work only when the Procuring Entitys
Representative has given written instructions in advance for additional work to
be paid for in that way.
.1.109. All work to be paid for as Dayworks shall be recorded by the Contractor on
forms approved by the Procuring Entitys Representative. Each completed
form shall be verified and signed by the Procuring Entitys Representative
within two days of the work being done.
.1.110. The Contractor shall be paid for Dayworks subject to obtaining signed
Dayworks forms.
review the plans for remaining work and deal with matters raised in
accordance with the early warning procedure.
.1.123. The Procuring Entitys Representative shall record the business of
Management Conferences and provide copies of the record to those attending
the Conference and to the Procuring Entity. The responsibility of the parties
for actions to be taken shall be decided by the PROCURING ENTITYs
Representative either at the Management Conference or after the Management
Conference and stated in writing to all who attended the Conference.
.1.148. The Procuring Entity will provide an Advance Payment on the Contract Price
as stipulated in the Conditions of Contract, subject to the maximum amount
stated in SCC Clause .1.144..
()b
()c
()d
()e
.1.152. Payments shall be adjusted by deducting there from the amounts for advance
payments and retention. The Procuring Entity shall pay the Contractor the
amounts certified by the Procuring Entitys Representative within twenty eight
(28) days from the date each certificate was issued. No payment of interest for
delayed payments and adjustments shall be made by the Procuring Entity.
.1.153. The first progress payment may be paid by the Procuring Entity to the
Contractor provided that at least twenty percent (20%) of the work has been
accomplished as certified by the Procuring Entitys Representative.
.1.154. Items of the Works for which a price of 0 (zero) has been entered will not be
paid for by the Procuring Entity and shall be deemed covered by other rates
and prices in the Contract.
()b
()c
.1.159. The Procuring Entitys Representative may exclude any item certified in a
previous certificate or reduce the proportion of any item previously certified in
any certificate in the light of later information.
.1.160. Retention
.1.161. The Procuring Entity shall retain from each payment due to the Contractor an
amount equal to a percentage thereof using the rate as specified in SCC
Clause .1.162..
.1.162. Progress payments are subject to retention of ten percent (10%), referred to as
the retention money. Such retention shall be based on the total amount due
to the Contractor prior to any deduction and shall be retained from every
progress payment until fifty percent (50%) of the value of Works, as
determined by the Procuring Entity, are completed. If, after fifty percent
(50%) completion, the Work is satisfactorily done and on schedule, no
additional retention shall be made; otherwise, the ten percent (10%) retention
shall again be imposed using the rate specified therefor.
.1.163. The total retention money shall be due for release upon final acceptance of
the Works. The Contractor may, however, request the substitution of the
retention money for each progress billing with irrevocable standby letters of
credit from a commercial bank, bank guarantees or surety bonds callable on
demand, of amounts equivalent to the retention money substituted for and
acceptable to the Procuring Entity, provided that the project is on schedule and
is satisfactorily undertaken. Otherwise, the ten (10%) percent retention shall
be made. Said irrevocable standby letters of credit, bank guarantees and/or
surety bonds, to be posted in favor of the Government shall be valid for a
duration to be determined by the concerned implementing office/agency or
Procuring Entity and will answer for the purpose for which the ten (10%)
percent retention is intended, i.e., to cover uncorrected discovered defects and
third party liabilities.
.1.164. On completion of the whole Works, the Contractor may substitute retention
money with an on demand Bank guarantee in a form acceptable to the
Procuring Entity.
()b
()c
()d
If, after review of the plans, quantities and estimated unit cost of the
items of work involved, the proper office of the procuring entity
empowered to review and evaluate Change Orders or Extra Work
Orders recommends approval thereof, Head of the Procuring Entity or
his duly authorized representative, believing the Change Order or Extra
Work Order to be in order, shall approve the same.
()e
()b
()c
()d
()e
.1.175. In case of total suspension, or suspension of activities along the critical path,
which is not due to any fault of the Contractor, the elapsed time between the
effective order of suspending operation and the order to resume work shall be
allowed the Contractor by adjusting the contract time accordingly.
completing the contract work when, in the Procuring Entitys opinion, the
findings of facts justify an extension.
.1.183. No extension of contract time shall be granted the Contractor due to (a)
ordinary unfavorable weather conditions and (b) inexcusable failure or
negligence of Contractor to provide the required equipment, supplies or
materials.
.1.184. Extension of contract time may be granted only when the affected activities
fall within the critical path of the PERT/CPM network.
.1.185. No extension of contract time shall be granted when the reason given to
support the request for extension was already considered in the determination
of the original contract time during the conduct of detailed engineering and in
the preparation of the contract documents as agreed upon by the parties before
contract perfection.
.1.186. Extension of contract time shall be granted for rainy/unworkable days
considered unfavorable for the prosecution of the works at the site, based on
the actual conditions obtained at the site, in excess of the number of
rainy/unworkable days pre-determined by the Procuring Entity in relation to
the original contract time during the conduct of detailed engineering and in the
preparation of the contract documents as agreed upon by the parties before
contract perfection, and/or for equivalent period of delay due to major
calamities such as exceptionally destructive typhoons, floods and earthquakes,
and epidemics, and for causes such as non-delivery on time of materials,
working drawings, or written information to be furnished by the Procuring
Entity, non-acquisition of permit to enter private properties within the right-ofway resulting in complete paralyzation of construction activities, and other
meritorious causes as determined by the Procuring Entitys Representative and
approved by the Head of the Procuring Entity. Shortage of construction
materials, general labor strikes, and peace and order problems that disrupt
construction operations through no fault of the Contractor may be considered
as additional grounds for extension of contract time provided they are publicly
felt and certified by appropriate government agencies such as DTI, DOLE,
DILG, and DND, among others. The written consent of bondsmen must be
attached to any request of the Contractor for extension of contract time and
submitted to the Procuring Entity for consideration and the validity of the
Performance Security shall be correspondingly extended.
.1.188. Completion
.1.22.
.1.23.
.1.27.
.1.30.
.1.3.
.1.9.
.1.18.
.1.28.()c
7.7
.1.33.
10
12.3
.1.46.
.1.50.
18.3(h)(i)
.1.86.
.1.108.
.1.115.
.1.117.
.1.132.
.1.144.
.1.150.
.1.191.
The CIAC address is at the 2/F Executive Building Center, 369 Sen. Gil
J. Puyat Ave., cor. Makati Ave., Makati City, with Tel. Nos. 897.0853,
897.9313 and Facsimile 897.9313.
No dayworks are applicable to the contract.
The Contractor shall submit the Program of Work to the UPOU
Representative within ten (10) calendar days of delivery of the Letter of
Acceptance.
The period between Program of Work updates is thirty (30) calendar
days.
The amount to be withheld for late submission of an updated Program of
Work is one tenth (1/10) of one percent (1%) per day of delay for the
current progress billing.
The Funding Source is the General Appropriations Act (GAA) 2015 in
the amount of One Million, Two Hundred Eight Seven Thousand
Pesos (PhP 1,287,000.00) only.
The amount of the advance payment is fifteen percent (15%) of the total
contract price subject to the requirements of the Revised IRR of RA
9184 and additional conditions, if any.
Materials and equipment delivered on the site but not completely put in
place shall not be included for payment.
(a) The date by which operating and maintenance manuals are required
is not later than thirty (30) calendar days prior to conducting the
acceptance test.
(b) The date by which as built drawings are required is thirty (30)
calendar days upon the project completion.
.1.192.
(c) In addition, for every Progress of Work the contractor must submit an
As-Built drawings as supporting document for the approval of
Progress Payment.
The amount to be withheld for failing to produce as built drawings
and/or operating and maintenance manuals by the date required is two
percent (2%) of the Contract Price or the non-issuance of the Retention
Money.
B. SITEWORK..................................................................................................73
1. SITE PREPARATION............................................................................73
2. EARTHWORKS.....................................................................................74
C. CONCRETE..................................................................................................76
1. CONCRETE
FORMWORKS..................................................................76
2. CONCRETE REINFORCEMENT..........................................................78
3. CONCRETE CAST-IN-PLACE.............................................................80
4. CONCRETE FINISHING.......................................................................84
D. MASONRY...................................................................................................85
1. MORTAR..............................................................................................85
2. UNIT MASONRY..................................................................................87
E. METAL WORKS..........................................................................................88
F. ALUMINUM FRAMED GLASS WALL........................................................90
1. ALUMINUM FRAMES..........................................................................90
2. GLASS AND GLAZING.........................................................................92
G. FINISHES.....................................................................................................96
1. CEMENT PLASTER FINISH.................................................................96
2. TILE WORK.........................................................................................98
3. METAL FURRING..............................................................................101
4. FIBER CEMENT BOARD...................................................................102
5. PAINTING...........................................................................................103
H. ELECTRICAL WORKS..............................................................................106
A. GENERAL REQUIREMENTS
1.
2.
SUMMARY OF WORKS
1.1.
1.2.
SCOPE The work includes the furnishing of all materials, labor, tools and
equipment and the performance of all operations necessary for the Proposed
Elevator Shaft (UPOU Administration Building), all in accordance with
Plans and Specifications and subject to the terms and conditions of the
Contract Documents.
1.3.
CONTRACT DOCUMENTS
3.
2.1.
GENERAL The Contractor shall use the English language and the Modern
Metric System of weights and measurements in all documents, drawings and
correspondence related to the Contract.
2.2.
2.3.
COORDINATION
3.1.
SUPERVISION The contractor must have in his employ only competent and
efficient architect, engineer or superintendent duly licensed to practice their
respective professions, with at least three (3) years experience in their fields of
specialization.
3.2.
4.
QUALITY CONTROL
5.
The Contractor shall at all times be fully equipped with necessary standard sampling
facilities on all materials needed for the project. The Contractor shall employ
competent technicians to monitor all samples in the Contract Documents.
REGULATORY AND OTHER REQUIREMENTS
6.
5.1.
5.2.
The Contractor and others working under his jurisdiction shall perform work
in compliance with the rules and regulations and ordinances of any kind
required by the governmental authority or other agency having jurisdiction
over his work.
PROJECT MEETINGS
7.
6.1.
6.2.
SUBMITTALS
7.1.
7.2.
7.3.
8.
CLEANING
8.1.
B. SITEWORK
1. SITE PREPARATION
1.1.
GENERAL
(a) Scope This section includes labor, materials, equipment, plant and other
facilities and the satisfactory performance of all work necessary to
complete dismantling, clearing, stripping and all other site preparation
work as indicated on drawings and this specification.
(b) Protection
(b.1) Workmen: Provide adequate measures to protect workmen and
public in the site.
(b.2) Surrounding Area: Protect existing buildings and other structures
such as ceilings, rooms and hallways, which are indicated to remain,
from damage and repair damage caused by this work at no
additional cost to the UPOU.
(b.3) Utility Lines: Existing utility lines indicated or locations of which
are made known to the Contractor prior to execution of works, and
that which are indicated to be retained, as well as utility lines
constructed during operations, shall be protected from damage
during execution of the work, and if damaged, shall be repaired at
no extra cost. Site survey shall be conducted by the Contractor to
acquaint with existing utility lines. Proper measures shall be taken
and immediate information forwarded to the Architect when utility
lines are encountered within the area of operation.
(b.4) Survey and Grades The drawings indicate layout of existing
building components. Contractor shall be responsible for verifying
the actual and the proposed settings in complete conformity with the
drawings.
(b.5) Disposal of Cleared and Grubbed Materials Logs, stumps, roots,
bush, rotten wood, and other refuse resulting from the clearing and
grubbing operations shall be disposed of by removing from the site
at the Contractors expense. Materials shall be disposed outside the
limits of the project site.
2.
EARTHWORKS
2.1.
GENERAL
(a) Scope - This section includes all materials, labor, equipment and the
performance of all operations in connection with the excavation, filling
and backfilling and compaction complete in accordance with the drawings
and specifications stated herein.
(b) Protection
(b.1) Existing Structures: Protect existing buildings, streets and other
structures, which are indicated to remain, from damage and repair
damage caused by this work at no additional cost to the UPOU.
(b.2) Utility Lines: Where utility lines are encountered within the area of
operations, the Contractor shall notify the Architect in ample time
for the necessary measures to be taken interruption of the service.
2.2.
MATERIALS
(a) Barrow materials shall be selected, laboratory approved material obtained
from off-site sources and having a 3.5 percent liquid limit, and 4 to 12
percent plasticity index.
(b) Granular fill to form a capillary water barrier shall be clean, crushed nonuniformly graded and of a size which will pass a 25 millimeter mesh
screen and be retained on a No. 4 mesh screen.
(c) Excavated material approved for use as backfill shall be free of fibers,
vegetables or organic materials, boulders, large rocks or pockets, lumps or
other concentration of silt, debris, or cinders.
(d) No fill material shall be placed when free water is standing in the area
where fill is to be placed.
2.3.
EXECUTION
(a) Preparation
(a.1) Stakes and Batter Boards
(i) Stake out the building accurately and establish grades. Secure
the approval of the UPOU and/or Architect.
(ii) Erect batter boards and reference mark where they will not be
disturbed during construction.
(iii) Store materials and conduct work in such a manner as to
preserve all reference marks.
(iv) Re-establishment of lines and grades where necessary shall be
done at the Contractors expense.
(a.2) Rough Grading
(i) Cut and fill and machine grade the site area.
(ii) Deposit materials in horizontal layers not exceeding 0.20
meters (8 inches) in depth and compact to 95% of maximum
density.
(b) Excavation
(b.1) Foundations
(i) Excavate to grade indicated.
(ii) Excavate trenches to a neat size, leveled to line at the bottom
ready to receive the foundation.
C. CONCRETE
1.
CONCRETE FORMWORKS
1.1.
GENERAL
(a) Scope This section includes all labor, materials, equipment and
satisfactory performance of all operations necessary to complete setting of
all concrete formworks and other related works in accordance with the
Contract Document.
Work shall be done in accordance with the SPECIFICATIONS FOR
CONCRETE AND REINFORCED CONCRETE as adopted by the
Department of Public Works, Philippines and the REQUIREMENTS
FOR REINFORCED CONCRETE (ACE 318-63), insofar as they do not
conflict with specific provision.
(b) Protection
(b.1) Provide forms that will produce correctly aligned concrete.
(b.2) Choice of fitting shall be done correctly.
1.2.
(b.3) Support of forms shall be done rigid and extra care must be
exercised in considering weights and side pressure.
MATERIALS
(a) Form Lumber shall be stress graded or merchantable; shall be of nonstaining species and dressed on concrete forming side if to be used for
exposed surfaces.
(a.1) For unexposed concrete surface, use class 2 common lumber or
better.
(a.2) For exposed concrete surface, use dressed lumber or uniform
thickness not more than 250 mm wide.
(b) Plywood shall be commercial standard, moisture resistant, not less than
five (5)-ply and at least 10 mm thick conforming to PHILSA 1-2-68.
Plywood shall conform to the following minimum quality standard, which
is herein specified for purposes of establishing quality: U.S. Product
Standard 1-66, concrete Form, Class 1, minimum 19 mm, B-B Exterior
Type, edge-sealed and mill-oiled. Plywood, which is equal to this
standard, is acceptable for minor miscellaneous formwork.
(c) Form Oil: Use colorless mineral oil conforming to ASTM D-1500.
Required viscosity is equal to 70 seconds but not more than 110 seconds
at 38C and to be determined as per ASTM Standards RD-88 and D-92
respectively.
1.3.
EXECUTION
(a) Construction of Forms Formwork shall have adequate cleanest opening
to permit inspection and cleaning. Joints shall located at the junction of
formwork panels where feasible. Formwork joints shall be solidly backed
and leakproofed. Form surfaces on concrete side shall be given one coat
of form oil after fabrication or cleaning and second coat just prior to rebar
placing. Excess oil shall be wiped off. Form oil shall be kept off from
reinforcement and embedded items. Forms shall be properly maintained
throughout the concrete work to accommodate rate and methods of
CONCRETE REINFORCEMENT
2.1.
GENERAL
(a) Scope This section includes all materials, labor, equipment and the
performance of all operations necessary to complete all reinforcing steel
works as indicated in the drawings and specifications.
(b) Protection
(b.1) Storage of Materials: Steel reinforcements shall be stored under
cover or otherwise prevented from rusting.
(b.2) Concrete cover shall be determined before concrete pouring is
started.
2.2.
MATERIALS
(a) Reinforcing steel bars to be used shall be new and free from rust, oil,
grease, kinks and bents and shall conform to the latest edition of the
ASTM Designation A615-68 Specifications.
(b) Reinforcements shall be: Intermediate grade for 16 mm diameter and
above, Structural grade for 12 mm diameter and below.
(c) All bars shall be deformed unless noted in the plan of specified herein.
(d) Tie wire shall be Ga. 16 galvanized.
2.3.
EXECUTION
(a) Preparation
(a.1) Remove all loose rust or scale, adhering materials and oil or other
materials, which tend to destroy bond between concrete and
reinforcement before steel is placed or before pouring.
(a.2) All bars shall be bent cold.
(b) Placing of Reinforcements
(b.1) Placing shall be in accordance with the plans furnished. Refer to
the Architect in case of doubt or ambiguity in placing of steel.
(b.2) Reinforcing bars shall be accurately placed and adequately secured
by concrete metal wires or metal chair spacers.
(b.3) Spacing of bars shall be done in accordance with the ACI Building
Code or as follows: Clear distance between parallel bars shall be
one and one-half (1-1/2) times the diameter for round bars, and
twice the side dimension for square bars.
(b.4) Clear distance shall not be less than 2.54 cm (1 inch) nor more than
1-1/3 times the minimum size of aggregates.
(b.5) Where bars are used in two or more layers, the bars in the upper
layers shall be placed directly above those in the lower layers at a
clear distance of not less than 2.54 cm (1 inch).
(c) Tolerances
(c.1) Maximum Concrete Cover: Maximum requirements shall take
precedence over permissible variations.
(c.2) Maximum Free Extension of Standard Hooks and Bends: Shall be
as follows:
(i) 180 degree BEND: Four bar diameters but not less than 63
mm.
(ii) 90 degree BEND: Twelve bar diameters
(iii) STIRRUP and 90 degree and 135 degree BENDS: Six bar
diameters but not less than 112 mm
(c.3) Minimum Diameter of Bends: Shall be 6 bar diameters for 10 mm
through 25 mm through 36 mm bars. Minimum diameter of bends
of stirrups and ties shall be 37.5 mm for 10 mm bars, 50 mm for 12
mm bars and 62 mm for 50 mm bars.
(c.4) Splicing
(i) In slabs, beams and girders, splices shall be avoided at points of
maximum stress and may be allowed only upon written
approval of splice details by the Designing Engineer.
(ii) Reinforcing bars 36 mm diameter and smaller shall have a
minimum lap of 24 bar diameter for compression and 40 bar
diameter for tension bars.
3.
CONCRETE CAST-IN-PLACE
3.1.
GENERAL
(a) Scope This section includes all labor, materials, equipment and
performance of all operations to complete all cast-in-place concrete works
in accordance with the drawings and these specifications.
(b) Protection
(b.1) Cement and aggregate shall be stored in such a manner as to prevent
deterioration on intrusion by foreign matter.
(b.2) Deteriorated or damaged materials shall not be used for concrete.
(c) Testing All tests shall be done by an approved private testing laboratory,
Certificates of calibration from a ready-mix concrete contractor shall be
issued by an approved laboratory. The Contractor shall provide the
samples to be taken at the place of deposit and as specified by the
Engineer and shall take care of transporting the samples to the approved
testing laboratory without cost to UPOU.
(d) Storage of Materials Storage accommodations accessible for inspection
and identification shall be subject to approval. Store cement on platform
off ground; protect stored cement against the elements. Handle and store
fine and coarse aggregates separately in a manner to provide for good
drainage and the exclusion of foreign matter. Cement shall be stacked in
a seven-bag pile maximum storage.
(e) Authority to Pour Concrete No pouring of concrete shall be done by the
Contractor unless bearing surfaces and bar reinforcement have been
inspected and approved by the Architect, Structural Engineer or Project
Inspector and the authority to proceed has been received by the
Contractor.
(f) Environmental Requirements Concrete shall not be poured during hot
weather over 90 degrees F in direct sunlight and during rainstorm unless
protection is provided.
3.2.
PRODUCTS
(a) Materials
(a.1) Cement: Portland cement shall conform to the Standard
Specifications for Portland Cement (ASTM Designation C-150,
Latest Revision) for Type I Portland Cement.
(a.2) Sand: Clean, hard properly graded uncoated grains free from
deleterious substances, conforming with ASTM C 33 or PNS 18.
(d.3) Placing of material in mixer shall be done in such a way that first
batch of concrete materials placed in the mixer shall contain
sufficient excess of cement, sand and water to coat the inside of the
drum without reducing the cement content of the mix to be
discharged.
(d.4) Re-tempering of concrete shall not be permitted.
3.3.
EXECUTION
(a) Preparation Before placing concrete, remove all debris, water and other
foreign materials from the places to be occupied by the concrete.
Reinforcements shall be secured in position and inspected and approved.
(a.1) Inspection
(i) Formworks shall be cleaned and rechecked with respect to all
established line and grade references so as to ensure completed
work within the allowable tolerances specified. Pertinent
design assumptions including assumed values of live loads, rate
of placement, height of drop, weight of moving equipment, and
other pertinent information prior to designing formworks shall
be reviewed. Surfaces shall be thoroughly wet and grouted
before placing concrete. All laitance from previous pouring
shall be renew pouring.
(ii) Reinforcement: The Contractor shall verify that reinforcement
is free of loose scale or rust and contaminants and shall be
fabricated in accordance with fabrication requirements, and
shall be kept in its proper position during placement of
concrete. The Contractor shall also check that all samples and
certificates are submitted and approved. All items to be
embedded in concrete shall be complete and in their proper
position.
(a.2) Installation
(i) Depositing Concrete: All earth excavation shall be free of mud
and earth and fill surfaces shall be properly wetted, but not
muddy, before depositing. Before depositing new concrete,
existing surfaces shall be cleaned of laitance and loose
particles, shall retighten forms against existing surfaces, shall
thoroughly wet and slush existing surfaces with coat of neat
cement grout, and shall place new concrete before grout attains
initial set. Depositing shall be done without segregation,
rehandling or flowing of concrete. It shall be done with the use
of buggies, buckets, or wheelbarrows. Use of chutes will not
be allowed except to transfer concrete from hoppers to buggies,
wheelbarrows or buckets in which case shall not exceed 6
meters in aggregate length. Placing of concrete with a free
drop or fall of more than 1.5 meters is not allowed. Conveyors
when used shall be kept full of concrete and ends shall be kept
buried in the newly placed concrete as pouring progresses.
CONCRETE FINISHING
4.1.
GENERAL
(a) SCOPE This section includes all materials, labor, equipment and the
performance of all operations necessary for the completion of all concrete
finishing works as indicated on the drawings and specifications.
All items not stated in this section but covered by the previous sections
shall govern. All necessary works not stated but necessary for the
completion of the work shall be included in this section.
4.2.
4.3.
EXECUTION
(a) Application
(a.1) Finishing Vertical Surfaces
(i) Patchwork: Remove all loose materials immediately after
removal of forms. Wet thoroughly all honeycomb and
aggregate pockets, brush coat with neat cement grout and/or
cement mortar. Use mortar mixture of one part of cement to
two parts of fine aggregates. Treat all patchwork to match the
color of adjacent surface with burlap and keep damp for at least
seventy-two (72) hours.
(ii) Smooth Finished Work: Use smooth finished work for all
surfaces exposed to view. Prepare cement grout of one (1) part
light colored Portland Cement to two (2) parts fine aggregate
and brush coat to the concrete surface with burlap and keep
dam for at least seventy-two (72) hours.
(iii) Plaster Finish Work: When stucco or metallic waterproofing is
used, apply directly to chipped surface of the concrete. Depth
D. MASONRY
1.
MORTAR
1.1.
GENERAL
(a) Scope This section includes all labor, materials, equipment, plant and
other facilities and the satisfactory performance of all work necessary to
complete all cement and masonry work shown on the drawings and
specified herein.
(b) Handling and Storage of Materials Handle and store materials in a
manner to avoid damage, breakage or intrusion of foreign materials.
Store cement and prepared mortars in watertight sheds with elevated
floors.
1.2.
PRODUCTS
(a) Materials
(a.1)
(a.2)
(a.3)
(a.4)
EXECUTION
(a) Preparation Examine the substrates, adjoining construction and the
conditions under the work is to be installed. Do not proceed with the
work until satisfactory conditions have been corrected.
Verify dimensions before proceeding with the work. Obtain field
measurements for work required to be accurately fitted to other
construction. Be responsible for the accuracy of such measurements and
precise fittings and assembly of finished work.
(b) Cleaning and Protection Protect the mortar from damage. Remove from
the site and legally dispose of at the end of each day, all debris resulting
from the work of this section.
2.
UNIT MASONRY
2.1.
GENERAL
(a) Scope This section includes all materials, labor, equipment and the
satisfactory performance of all operations necessary for the completion of
concrete masonry units works as indicated in drawings and the
specifications mentioned herein.
(b) Protection (Handling and Storage) Concrete masonry unit shall be
handled with care to prevent undue chipping and breakage. Protect
storage piles, stacks or bins from traffic and operations. Provide flatforms
to protect bottom piles from contact with soil and exposure to the weather.
Cement shall be stored off the ground under watertight cover and away
from sweating walls and other damp surfaces until ready for use.
Damaged or deteriorated materials shall be removed from the premises.
2.2.
PRODUCTS
(a) Materials
(a.1) Concrete Hollow Blocks 100 mm 200 mm 400 mm and
150 mm 200 mm 400 mm.
EXECUTION
(a) Erection Lay all masonry units plumb, true to line, level and with
accurately spaced courses. Bond shall be kept plumb throughout.
Corners and reveals shall be plumb and true. Built-in anchors, wall plugs,
and accessories to masonry as erection progresses. Each course shall be
solidly bedded in Portland Cement mortar. All must be damp when laid.
Units terminating against beam or slab soffits shall be wedged tight with
mortar and reinforcement properly secured to dowels.
Reinforcement shall be as shown in drawings.
(b) Unfinished Work Unfinished work shall be stepped back for joining
with new works. Before new work is started all loose mortar shall be
removed and the exposed joint thoroughly wetted not less than one hour
before laying new work.
(c) Openings Provide beam blocks over or above openings not exceeding
1.20 meters span with same height and width as unit masonry blocks
exceeding at least two masonry block lengths beyond the edge of the
opening into the wall. Provide 2 4 longitudinal reinforcing bars (12.5
millimeters diameter) each at top and bottom of beam blocks with ties at
25 centimeters (10 inches on center).
(d) Plastering Grout wall to be plastered and generously and let dry. Apply
scratch coat. Final plaster finish shall be 1 part Portland Cement and 2
parts sand. Plaster shall conceal all joints and even-out wall surface to a
uniform smooth finish using Manila paper or rubber sponge.
(e) Cleaning Wash finish wall with a solution of 10 percent by volume of
muriatic acid applied with stiff fiber brushes. Rinse surfaces with clean
water.
E. METAL WORKS
1.
GENERAL
1.1.
2.
Scope This section includes all materials, labor, equipment, tools and the
performance of all operations necessary to complete furnishing and
installation of steel column, trusses complete with purlins, sag bolts, cross
bracing and accessories as indicated on drawings and specifications.
PRODUCTS
3.
2.1.
All structural steel shapes shall be ASTM A-36 for all structural steel unless
otherwise indicated.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
High strength bolts and high strength bearing bolts, nuts and washers shall
comply with the provisions of ASTM A325 & AISC Specification for
Assembly of Structural Joints Using High Strength Bolts. For anchor bolts,
use A354 Grade BC.
2.8.
For prime paint, use two (2) coats epoxy primer (gray).
2.9.
EXECUTION
3.1.
The work shall be well formed to the shape and size shown and assembled as
detailed. Steel members shall be fabricated and assembled in the shop to the
greatest extent as possible.
3.2.
Shearing and punching shall produce clean, pure lines and surfaces with burrs
removed. Connection shall be welded or bolted as indicated. Unless
otherwise shown, screws in exposed work shall be countersunk. Joints, which
are to be exposed to the weather shall be weathertight. Nuts shall be drawn up
tight.
3.3.
Holes shall be cut, drilled or punched at right angles to the surface of the metal
and shall not be made to enlarge by burning.
3.4.
Welding shall be in accordance with the standard code of Arc and Gas
Welding in Building Construction of the American Welding Society. All
welding work shall be performed by qualified operators only.
3.5.
Introduce bracings and supports to take care of all the loads to which the
structure may be subjected. Provide steel edges or shims as support to base
plates and large bearing plates until the supported members have been
plumbed. Surface to receive grouting mortar shall be cleaned and moistened
thoroughly immediately before placing the mortar.
3.6.
Immediately after the supported members have been plumbed, the entire
bearing area at base plates and bearing plates shall be grouted solid with nonshrink cement grout.
3.7.
The use of a gas cutting torch for any purpose shall only be done upon express
approval of the Engineer.
ALUMINUM FRAMES
1.1.
GENERAL
(a) Scope This section shall include all management, labor, materials, tools,
equipment and services required to furnish and install all items and
components forming any portion of the aluminum frames including
hardware provisions glass and glazing, etc. and all work to install same in
place as specified herein and shown in Drawings required to perform all
works in accordance to the General Conditions of the Contract
Documents.
(b) Submittals
(b.1) Shop Drawings: Submit shop drawings, brochures and installation
instructions. Clearly show details of each frame type, elevations of
each frame type, conditions of openings with various wall thickness
and materials, typical and special details of frames construction,
methods of assembling sections, location reinforcement and
installation requirements for hardware; size, shape and thickness of
materials.
(b.2) Brochures/ shop drawings: Manufacturers Descriptive data
including materials, construction of sections, finishing system, etc.
(c) Quality Assurance
(c.1) Comply with quality assurance requirements under General
Conditions of the Contract Documents and Manufacturers
instructions.
(c.2) Facilities shall be provided by the Contractor as needed for the
proper inspection of all specified work.
PRODUCTS
(a) Materials
(a.1) Aluminum shall be of commercial quantity and of proper alloy for
window construction, free from defects impairing strength and/or
durability. Detached hardware and hinges having component parts
(screws, nuts, washers, bolts, rivets, clips, etc.) which are exposed
shall be of aluminum or non-magnetic stainless steel compatible
with aluminum and of sufficient tensile strength of not less than
22,000 psi to perform the functions for which they are used. Plated
or coated materials not compatible with aluminum are not permitted
unless properly insulated from the aluminum.
(a.2) Accessories
(i) Anchors: Provide appropriate type of anchors as required for
secure attachments.
(ii) Caulking and sealant: All joints shall be securely fixed and
sealed with approved weather sealant.
(iii) Weather Stripping: All weather strips shall be silicone or
EPDM Gasket. No vinyl gaskets will be accepted.
(a.3) Finishes: Shall be on a powder-coated finish; submit sample
swatches for Architects approval.
1.3.
EXECUTION
(a) Comply with Manufacturers Standard installation procedures.
(b) Fabricate accurately with neat mitered corner joints, smooth surfaces free
from warp, wave, buckle, or other defects.
(c) The framing members must be square and true and properly designed to
resist any load they will have to support they shall be of tubular shape
mullion type with a wall thickness of 2mm (refer to drawings for design
& details) except for glazing beads, stops, and add-ons. Any framing
member should not deflect more than 1/175 of its span, with a maximum
of 20mm at any point. Glazing stop or any other fitting should be
designed to resist any load transmitted to the glazing.
(d) Cleaning: Frame should be wiped with a soft cloth, sponge, or brush and
cleaned with a mild solution of detergent every six (6) months. In the
industrial, marine, or other aggressive atmosphere, the period should be
reduced to three (3) months. Harsh cleaning materials such as steel wool
or abrasive scouring powders should be avoided and strong acid or alkali
cleaners should not be used.
(e) Clean Aluminum promptly after installation. Avoid damage to finishes.
Remove excess glazing and sealant compounds, dirt and other substances.
Lubricate hardware and other moving parts. Clean glass of pre-glazed
units promptly after installation.
(f) Protect all glazing works as per Manufacturers recommended protective
cover instruction until final acceptance of the Owner.
GENERAL
(a) Scope This section shall include all labor, materials, appliances, tools,
equipment, facilities, transportation and services necessary for and
incidental to performing operations in connections with furnishing,
delivery and installing the glass panels as shown and specified.
(b) Submittals All Shop Drawings and Sample Sections shall be submitted
prior to purchasing and installing of materials for review and approval of
the Architect.
(b.1) Shop Drawings: Show complete details of setting methods of
materials for each type of glazing material specified.
(b.2) Samples: Two (2) 300mm square, factory labeled.
(b.3) Manufacturers Data: Include glass manufacturers
recommendations for setting and sealing materials and for
installation of each type of glazing specified.
(c) Quality Assurance
PRODUCTS
(a) Refer to drawings for sizes and thickness of panels, area of application,
tint and texture. Dimension, fabrication and installation of Glass Panels
shall be based on the actual measurements and conditions of the site.
(b) Glass shall be provided in locations as indicated and the corresponding
type specified on architectural drawings. All standard procedure on glass
and glazing work must be implemented to ensure correct fitting and
glazing in order to preserve the physical strength of the glass when used
as intended on any building exterior and interior application.
(c) The use of non-skinning compounds, non-resilient type preformed sealers,
and preformed impregnated type gaskets will not be permitted. When
flexible vinyl gasket channels are used, the material shall conform to
Commercial Standard CS230. Materials used with aluminum frames shall
be aluminum colored, non-staining, and do not require painting. Other
materials which will be exposed to view and unpainted shall be gray or
neutral color. Glazing materials shall be as specified herein and as
recommended by the glass the manufacturer as approved.
(d) Elevator shaft glass wall shall be 12 mm thick tempered tinted glass.
Submit samples for Architects approval.
(e) Glazing Sealant: Shall be one component, neutral cure, high tensilestrength elastomeric silicone sealant and adhesive for structural bonding
glass, metal and building components.
(f) Glazing accessories: As required to supplement the installation shall be
provided on the items to be glazed and provide a complete work. These
include glazing points, clips, shim, angles, and beads, setting blocks, edge
spacer, back up material, primer and masking tapes. Ferrous metal
accessories which will be exposed in the finished work shall have a finish
that will not corrode or stain while in service.
(g) Masking tape: Shall be adhesive paper type and used to prevent
contamination of glass or sash during application of primer or filling of
sealant, and to maintain neat edge line of sealant.
(h) Norton Tape: Shall be 6mm thick x 13mm x 50 LF Norton Thermal Bond
high density structural glazing space tape double sided adhesive.
2.3.
EXECUTION
(a) Install glass in accordance with manufacturers recommended
instructions.
(b) The contractor shall secure an adequate storage space for his materials,
tools, and equipment. Where aluminum is to be installed in contact with
masonry or other similar materials, aluminum shall be back-painted with
one coat of heavy bonded bituminous paint. All preservations to be
applied shall be required quality or correct consistency and of sufficient
thickness.
(c) Verify surfaces and adjacent work prior installation and setting of glass.
Determine the sizes to provide the required edge clearances by measuring
the actual to receive the glass. Grind smooth all edges of glass that will
be exposed to a finished work. Leave labels in place until the installation
is approved. Secure fix movable items or keep in a closed and locked
position until glazing compounds has thoroughly set.
(d) Items to be glazed shall be either shop or field glazed using glass or the
quality and thickness specified or indicated. Handle and install glazing
materials in accordance with the manufacturers instructions. Use beads
or stops, which are furnished with items to be glazed to secure the glass in
place.
(e) Determine actual sizes of glass required by measuring frames to receive
glass at Project Site, or from guaranteed dimensions provided by frame
supplier. Dimensions for glass and glass holding surrounds shall be
coordinated to provide the following minimum clearances.
(f) Make edge cuts clean. Do not nip, seam, swipe, stone or strike edges. Do
not knock-off flares. Do not bump, drag, or brush the edges of lites
against frame or other hard objects.
(g) Set glass in rebates using manufacturers standard glazing fittings and as
specified herein. Place setting blocks at quarter points of glass panels.
Seal exterior side of each glass lite with sealant type specified.
(h) No attempt shall be made to change size of tempered or laminated glass
units after they leave the factory. Glass panels shall be clean cut.
Nipping to remove flares or to reduce oversized dimensions of any type of
glass will not be permitted.
(i) The contractor shall carry out a water-tightness test upon completion of
all installation works under the Supervision of the Architect. The
windows shall be hosed under direction of and in a manner approved by
the Architect for a period of not less than ten (10) minutes closed state
form the exterior of the building. Test shall be made by applying a water
spray to all joints and surfaces exposed to the weather, after all caulking
and sealing has been completed.
(j) The water infiltration testing shall be made immediately after the setting
or curing period prescribed for the sealants used.
(k) Absolute water tightness shall be achieved in the interior of the building
in any case. Should any form of leakage occur, the Contractor shall be
responsible for rectifying same at his own expense and retested to the
satisfaction of the Architect.
(l) The Contractor shall provide all necessary labor and materials require to
carry out water testing of these frames prior to acceptance.
(m) The Contractor shall carry out such modifications, as are necessary,
including additional sample frames if required, to these frames to satisfy
the Architect that the details for fabrication and installation of all frames
will produce a watertight result.
(n) Attach crossed streamers away from glass face. Do not apply markers to
glass surface.
(o) Replace damaged glass which is broken, chipped, cracked, abraded or
damaged during construction.
G. FINISHES
1.
GENERAL
(a) Scope This section includes all materials, labor, equipment and
performance of all operations necessary to complete all plastering works
indicated on drawings and specifications herein.
(b) Submittals
(b.1) Samples: Submit samples of materials for Architects approval.
Match these samples with the delivered material prior to use.
(c) Storage and Protection Manufactured materials shall be delivered in
original unbroken packages, containers or bundles bearing the name of the
manufacturers brand. Cement shall be stored off the ground under
watertight cover and away from leaking walls and damp surfaces until
ready for use. Damage or deteriorated materials shall be removed from
the premises.
1.2.
PRODUCTS
(a) Materials
(a.1) Portland Cement: Shall conform with ASTM C 150, Type I or PNS
07 of an approved brand.
(a.2) Sand: Shall be natural and shall be retained between No. 50 and
No. 100 sieves.
(b) Mixed and Proportion Except where specified otherwise, materials are
specified on a volume basis and shall be measured in approved containers,
which will insure that the specified proportions will be controlled and
accurately maintained during the progress of work. Measuring materials
with shovels will not be permitted.
(b.1) Proportioning
(i) Portland Cement Plaster Scratch Coat: Mix scratch coat in the
proportion of one part by volume of Portland Cement to not
less than 2-1/2 nor more than 4 parts by volume of damp loose
sand.
(ii) Scratch Coat or Ceramic Tile Backing: Mix scratch coat in the
proportion of one part by volume of Portland cement to 4 parts
by volume of damp loose sand.
(iii) Portland Cement Plaster Finish Coat: Mix finish in the
proportion of one part by volume of Portland cement to not
more than 3 parts by volume of damp loose sand. Allow plaster
to set up to the extent that it does not flow ahead or under the
trowel. If finish coat has not yet solidified, then trowel the face
lightly to embed the granules. Do not overtrowel or burnish the
surface.
(b.2) Mixing Mix materials in approved mechanical mixes of the type
in which the quantity of water can be controlled accurately and
uniformly except that finish coats containing lime may be handmixed. While the mixer is in continuous operation, add
approximately 90 percent of the estimated quantity of water, half of
the sand, all of the sand shall be introduced into the mixer in that
sequence and mixed thoroughly with the remainder of the water
until the mixture is uniform in color and consistency. Avoid
excessive mixing and agitation. Discard plaster which has begun to
set before it is used; retempering will not be permitted. Do not use
caked or lumped materials. Mixed ready-mixed plaster in
accordance with the manufacturers printed instructions.
1.3.
EXECUTION
(a) Preparation After removal of formworks, reinforce concrete surfaces
shall be roughened to improve adhesion of cement plaster. Surfaces to
receive plaster shall be clean and free from structural defects and shall be
thoroughly damped prior to application of plaster.
(b) Application
(b.1) Scratch coat mortar mix shall be applied with sufficient pressure
starting from the lower portion of the surface to fill the grooved and
to prevent air pockets in the reinforced concrete/masonry work and
avoid mortar mix drooping. The scratch coat shall be lightly
broomed or scratch before surface had properly set and allowed to
cure. Scratch coat shall be applied, not less than 9 mm thick and
allowed to dry slowly, then this finish coat shall be applied to a
thickness of not less than 3 mm.
(b.2) Finish coat shall not be applied until corrective measures had been
done by the Contractor on surfaces that are defective. Just before
the application of the finish coat, the scratch coat surface shall be
evenly moistened with potable water. Finish coat shall be floated
first to a true and even surface, then troweled in a manner that will
force the mixture to penetrate into the scratch coat. Surfaces
applied with finish coat shall then be smooth with paper in a
circular motion to remove trowel marks, checks and blemishes. All
TILE WORK
2.1.
GENERAL
(a) Scope This includes all materials, labor, equipment and performance of
all operations to complete ceramic glazed and vitrified ceramic tile work
as indicated on drawings and specifications herein.
(b) Submittals
(b.1) Samples: Before tiles are purchased, samples of materials with their
accessories shall be submitted to the Architect for approval as to
quality, color, design and shade. Samples submitted will be
matched with delivered materials prior to installation.
(c) Delivery of Materials Deliver all materials in original cartons and
containers with labels intact and seals unbroken.
(d) Protection and Storage Materials shall be stored in dry, weather tight
enclosures and shall be handled in a manner that will prevent the
inclusion of foreign materials and damage by water or dampness.
2.2.
PRODUCTS
(a) Materials
(a.1) Tiles
(i) Ceramic glazed/unglazed tiles shall be homogenous ceramic
tiles, class A, color as approved by the Architect. Trim shall be
EXECUTION
(a) Preparation
(a.1) Laying-Out of Work: Lay-out work to minimize cutting of tiles.
Use no less than one-half size. Locate cut tiles where they will be
least objectionable. Align joints in wall tile vertically and
horizontally, except where other patterns are shown or specified.
Determine exact locations of accessories before installing wall tiles.
(b) Installation
(b.1) Setting Tile on Adhesive Two Methods: Note: There are two
methods of setting tiles with adhesive.
(i) Floating Method: Combing adhesive over the entire foundation
surface is called the Floating method. The floating method is
generally preferred because it is faster, gives a more uniform
appearance, uses less adhesive and give better waterproofing
treatment to the wall.
METAL FURRING
3.1.
GENERAL
(a) Scope Furnish all materials, equipment, appliances and labor necessary
to complete all metal furring.
(b) Delivery and Storage of Materials Deliver all manufactured materials in
the original packages, containers, and bundles bearing the name of the
manufacturer and the brand.
3.2.
PRODUCTS
(a) Materials
(a.1) Ceiling Suspension System: galvanized steel 0.6 millimeters thick,
19 millimeters deep by 50 millimeters wide double furring channel.
(a.2) Hangers and other fastening: hangers for the support of ceiling
runners shall be hot dipped galvanized steel or soil steel straps,
sized 19 millimeters deep by 50 millimeters wide double furring
channel unless otherwise specified.
3.3.
EXECUTION
(a) Hangers: space not more than 1200 millimeters on center unless otherwise
shown. Provide sufficient hangers for runners on each side of light
fixtures.
(b) Furring Channels: space not over 600 millimeters on center.
(c) Installation:
(c.1) Fix and align accurately all furring channel framings.
(c.2) Fasten hanger to the framing by the use of blind rivets.
(c.3) Leave ready to receive the ceiling boards.
4.
GENERAL
(a) Scope Furnish materials and equipment, and perform labor require to
complete all fiber cement board finishes and related accessories. See
drawings and details for location, extent and other requirements.
(b) Storage and Protection Protect all materials both in transit and at the
jobsite. Material shall not be delivered unduly long before it is required
for proper conduct of work. Store flat on a smooth level surface. Protect
edges and corners from chipping. Provide and maintain temporary
protection of the work as required to safeguard completed work during the
progress of construction.
4.2.
PRODUCTS
(a) Materials
(a.1) Fiber cement board shall be a cellulose fiber reinforced cement
building sheet with one smooth face. It shall be manufactured as per
ISO-DIS 8336. HARDIFLEX, FICEM, or TEKTITE brand.
Thickness, design and pattern as per Architects selection and detail.
(a.2) Framing: non-corrosive metal framing spaced as per manufacturers
recommendation with Architects approval.
(a.3) Fasteners: wood screw, common wire nails or blind rivet as per
manufacturers recommendation.
(a.4) Adhesives to conceal joints and fasteners: tape and joint compound
and putty as per manufacturers recommendation.
(a.5) Finish: Painting.
(b) Quality Fiber cement board shall be durable, asbestos free, resistant to
weather, fire, rust, water and termite, warp and rot free and efficient
thermal insulation.
(c) Composition Portland cement, refined sand and specially treated
cellulose fibers.
4.3.
EXECUTION
(a) All works shall be done in accordance with the generally accepted
standard installation procedures as recommended by the manufacturer.
(b) Use score and snap method, or nail and punch method to cut the boards to
shape.
(c) Use 40 grit sand paper to file the edges to a smooth finish.
(d) Fasteners:
(d.1) On wood: galvanized flat head nails
(d.2) On steel: screw or liquid nails for 4.5 millimeter thick; countersunk
screws for 6.0 millimeters thick.
(d.3) In nailing, allow 12 millimeters distance from the edge, 50
millimeters from the corners. Fasten along the edge of the board at
200 millimeters on centers and at 300 millimeters on centers at the
inner portions.
(e) Joints: Exposed with 3 millimeters gaps, concealed or butt joints
(f) Finishing: Water based paint (no need for primer nor sanding): Apply 2
coats permacoat latex, semi-gloss or flat.
5.
PAINTING
5.1.
GENERAL
(a) Scope This section includes all materials, labor, equipment and
performance of all operations necessary to complete painting and
varnishing work as indicated on drawings and specifications herein.
(b) Submittals
(b.1) Samples and Color Scheme: Submit each kind of materials to the
Architect for approval 30 days before painting works. Match these
samples with the delivered materials prior to use. Reject said
materials if found inferior with respect to approved samples.
5.2.
(d) Protection Provide all drop cloth and other coverings requisite to
protection of floors, walls, aluminum, glass finishes and other works.
PRODUCTS
(a) Materials
(a.1) Painting Materials shall conform to requirements of the standard
specifications of the Standardization Committee on Supplies and the
National Institute of Science and Technology. All paint and paint
materials shall be BOYSEN, DAVIES, DESTINY (for flooring
paint) or any approved equal.
(a.2) Tinting Colors shall be first grade quality, pigment ground in alkyd
resin that disperses and mixes easily with paint to produce the color
desired. Use the same brand of paint and tinting color to effect
good paint body.
(b) Schedule
(b.1) Interior and Exterior
5.3.
Concrete or masonry
Ficemboard
Ferrous metal
EXECUTION
(a) Preparation of Surfaces All surfaces shall be in proper condition to
receive the finish.
H. ELECTRICAL WORKS
1. GENERAL
1.1.
SCOPE The work under this section consists of the furnishing of all
materials, labor, equipment, tools and all services necessary to complete and
make ready for operation electrical works as indicated on electrical plans and
in accordance with the Drawings, Specifications and the Contract.
1.2.
The work shall include the furnishing and installing of the following each
complete and in proper operating condition unless otherwise stated in this
specification:
(a) Panel boards, safety switches and all necessary main and branch circuit
breakers corresponding ratings and number of poles as indicated in the
Electrical Plans;
(b) All necessary pull boxes, junction boxes, splice boxes, utility boxes and
other type of box as required and/or as indicated in the Drawings;
(c) All the necessary feeder and branch circuit with all the necessary
conductors, conduits, fittings and other items as indicated in the
Drawings;
(d) All the necessary wiring devices, such as utilization outlets, wall switches,
receptacles all complete with their appropriate cover plates;
(e) All lighting fixtures and accessories including necessary supports;
(f) Grounding system as shown in the Drawings;
(g) Supply and installation of all materials not shown on the Drawings nor
mentioned in this Specification but are necessary to complete the project.
1.3.
1.4.
COORDINATION
It shall be the sole responsibility of the Contractor to conduct coordination of
his activities with the following:
(a) Other trades and suppliers
(b) Architect / UPOU / Engineer
(c) Local Government Authority
1.5.
1.6.
GUARANTEE
(a) The Contractor shall guarantee that the electrical system is free from all
grounds and defective materials and workmanship for a period of one (1)
year from the date of acceptance of the work. All defects arising within
the guarantee period shall be remedied by the Contractor at his own
expense.
(b) The Contractor shall indemnify and save harmless the UPOU, Architect
from all claims, suit actions, liabilities for damages arising from injuries,
disabilities or loss of life to persons or damage to public or private
properties resulting from fault or any act of Contractor or his
representative in the execution of this work.
(c) The partial acceptance of the work for the purpose of making partial
payments, based on the estimated cost satisfactorily completed by the
Electrical Contractor, shall not be considered as final acceptance of that
portion of the work.
1.7.
1.8.
2. PRODUCTS
2.1.
MATERIALS All materials shall be unused, brand new and shall be of the
approved type meeting all the requirements of the Philippine Electrical Code
and bearing the Philippine Standard Agency (PSA) mark.
(a) Panel and Cabinets Nema 3R type/enclosure ga. 16 min. thickness
unless noted, PEC rules and regulations. Panelboards shall contain a
single brand of circuit breakers.
(b) Circuit Breaker shall be bolt on type molded case, thermal magnetic
protective, quick make, quick break, trip free from handle, trip indicating,
number and size as shown in the schedule, GE brand or approved equal.
(c) Wires and Cables Phelps Dodge, THWN, THHN, or as specified in
the drawings, stranded copper wire, soft drawn and annealed, 98%
conductivity.
(d) Rigid Steel Conduits (RSC) and Intermediate Metal Conduit (IMC)
standard trade sizes, hot dipped galvanized with inside enamel or epoxy
coating, Matsushita or approved equal.
(e) Polyvinyl Chloride (PVC) Conduits standard trade sizes, thick walls,
manufactured to NEMA TC-2, type 40, rated for 90C manufactured by
Neltex brand.
(f) Junction, Utility and Square Boxes PVC boxes of approved brand.
Provide removable covers attached with round head machine screws.
(g) Splicing boxes not less than 1.35 mm thk. galvanized sheet metal as
specified in the drawings.
(h) Convenience Outlet Ground Fault Circuit Interrupter (GFCI), universal
type, National brand or approved equal.
(i) Outlet Plate National brand.
(j) Wiring Devices / Switches National brand. Only one (1) brand wiring
devices shall be used for the project. All wiring devices shall be standard
products of reputable electrical manufacturers. Wall switches shall be
rated at least 10A, 250 volts and shall be spring operated, flush, tumbler
type.
(k) Lighting Fixtures
(k.1) All lighting fixtures shall be as specified in the drawings complete
with accessories including necessary supports.
(l) Insulation: All splices shall be properly insulated using 3M Brand
electrical type. Application of insulation tape shall be equivalent to the
insulation of the wire concerned, edges to provide smooth surface before
taping.
3. EXECUTION
3.1.
prevent the entrance of white ants and dirt within the conduit
system. Pull wires shall be inserted in the empty ducts before they
are closed with lead or pipe caps and shall be left therein for future
use.
(a.4) On expose work, all pipes and outlet boxes shall be secured by
means of galvanized metal clamps, which shall be held in place by
means of machine screws. Install conduit clamps at the end of each
run and at each elbow. When running over concrete surfaces, the
screws shall be held in place by means of expansion sleeves for big
pipes and rolled lead sheet for small pipes. All pipes shall be run at
right angles to and parallel with the surrounding walls. No diagonal
run shall be allowed and all bends and offsets shall be avoided as
much as possible. Conduits shall be supported at 1500 mm
intervals maximum.
(a.5) Provide independent conduit supports using hangers, supports or
fastenings spaced in accordance with good engineering practice and
PEC. Hangers are must be adequate to support combined weight of
conduit, conductors and hangers. Paint hangers one prime coat of
red lead or zinc chromate and one finish coat of an approved color.
Use adjustable trapeze hangers for horizontal parallel runs. Submit
shop drawings for approval.
(a.6) All splices, taps and junctions, except those for feeder and service
conductors, shall be soldered or provided with spring lock type
connectors, with rubber tape and protected with friction tape.
(b) Conduits Boxes and Fittings
(b.1) Provide conduit boxes for pulling and splicing wires and outlet
boxes for installation of wiring devices.
(b.2) As a rule, provide junction boxes or pull boxes in all runs greater
than 30 meters in length, for horizontal runs. For other lengths,
provide boxes as required for splices or pulling. Pull boxes shall be
installed in inconspicuous but accessible locations.
(b.3) Support boxes independently of conduits entering by means of
bolts, red hangers or other suitable means.
(b.4) Conduit boxes shall be installed plumb and securely fastened. They
shall be set on surface of the structure in which they are installed.
(b.5) All convenience and wall switch outlet boxes shall be surface
mounted type.
(b.6) All conduits shall be lifted with approved standard galvanized
bushing and locknuts where they enter cabinets and conduit boxes.
(b.7) Junction and pull boxes shall be provided as indicated or as required
to facilitate pulling of wires and cables.
THE CONTRACT..............................................................................................................128
YES
NO
Name of
Project
Amount of
Project
Duration
Start/End
(Dates)
Status
(On-going/
completed)
b)
Has your company ever been suspended or
blacklisted by
the University of the Philippines System?
YES
NO
c)
Name of Project
Status
(On-going/
lifted)
YES
NO
d)
Name of Project
Status
(On-going/
completed)
YES
NO
Name of Project
Date of
termination
e)
f)
YES
NO
YES
Where
Filed
Date
Filed
Status
(On-going/
resolved)
Remarks
For Personnel
Name of
Personnel &
Designation
Case Filed
Where
Filed
Date Filed
Status
(On-going/
resolved)
Remarks
NO
I hereby certify that all statements and information provided herein are complete, true
and correct.
Name & Signature of Bidders: _____________________________________
Authorized Representative
: _____________________________________
Official Designation
: _____________________________________
Name of Company
: _____________________________________
Date
:____________________________________
ACKNOWLEDGEMENT
SUBSCRIBED AND SWORN to before me this ________________________ day of
________________, 20_____, affiant exhibited to me his/her Government Issued ID No.
__________________________ issued on _________ at ____________________________,
Philippines.
Notary Public
Until 31 December 20_______
PTR No. : ______________________
Issued at : ______________________
Issued on : ______________________
TIN No. : ______________________
Doc. No. __________________
Page No. __________________
Book No. __________________
Series of __________________
LIST OF ALL ONGOING GOVERNMENT & PRIVATE CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED
Business Name
: ______________________________________________
Business Address
: ______________________________________________
a. Owner's Name
Name of Contract/
Project Cost
b. Address
Contractors Role
Nature of Work
c. Telephone Nos.
Description
a. Date Awarded
b. Date Started
c. Date of
Completion
% of
Accomplishment
Planned
Actual
Government
Private
Total Cost
Note: This statement shall be supported with:
1. Notice of Award and/or Contract
2. Notice to Proceed issued by the Owner
3. Certificate of Accomplishments signed by the Owner
Submitted by
: __________________________________________________
(Printed Name & Signature)
Designation
Date
: __________________________________________________
: __________________________________________________
Valu
Outsta
Wor
Undel
Por
STATEMENT OF ALL GOVERNMENT & PRIVATE CONTRACTS COMPLETED WHICH ARE SIMILAR IN NATURE
Business Name
: ___________________________________________________
Business Address
: ___________________________________________________
Name of Contract
a. Owner's Name
b. Address
c. Telephone Nos.
Contractors Role
Nature of Work
Government
Private
: __________________________________________________
(Printed Name & Signature)
Designation
Date
: __________________________________________________
: __________________________________________________
Description
a. Amount at Award
b. Amount at
% Completion
c. Date of
Completion
a. Date Awarded
b. Contract
Effectivity
c. Date Complete
Total Assets
Current Assets
Total Liabilities
Current Liabilities
Net Worth (1-3)
Net Working Capital (2-4)
B. The Net Financial Contracting Capacity (NFCC) based on the above data is computed as
follows:
NFCC = [(current asset minus current liabilities) (K)] minus value of all outstanding or
uncompleted portions of the projects under ongoing contracts including awarded contracts
yet to be started coinciding with the contract to be bid.
NFCC = PhP_____________________________________________________________
Where: K = 10 for a contract duration of one year or less, 15 for more than one year up to
two years and 20 for more than two years
Herewith attached are certified true copies of the Income Tax Return (filed through the
Electronic Filing and Payments System (EFPS) and Audited Financial Statement: stamped
RECEIVED by the BIR or BIR authorized collecting agent for the immediately preceding
year.
Submitted by:
_____________________________________
Name of the Bidder
_________________________________________
Signature of Authorized Representative
Date : _____________________________
NOTE:
1. If Partnership or Joint Venture, each Partner or Member Firm of Joint Venture shall submit the above
requirements.
CONTRACT AMOUNT
That both parties agree to be jointly and severally liable for their participation in the
Eligibility Check, Bidding and Undertaking of the said contract.
That both parties agree that __________________________ and/or ______________
______________________ shall be the Official Representative of the Joint Venture, and are
granted full power and authority to do, execute and perform any and all acts necessary and/or
to represent the Joint Venture in the Eligibility Check, Bidding and Undertaking of the said
contract, as fully and effectively and the Joint Venture may do and if personally present with
full power of substitution and revocation.
That this Joint Venture Agreement shall remain in effect only for the above stated
Contracts until terminated by both parties.
Done this _____ day of _____________________, in the year of our Lord ________.
Attach the required Proposed Organizational Chart for the Contract as stated above
Note: This organization chart should represent the Constructors Organization required for the Project,
and not the organizational chart of the entire firm.
That I/we have engaged the services of ___(Name of Employee/Key Personnel)___, to be the
___(Designation) of the ___(Name of Contract)
____________
,
who is a ___(Profession)___ with Professional License Certificate No. _______ issued on
____________________ and who has performed the duties in the construction of the
Contracts enumerated in the duly filled Form ______.
2.
3.
That said Engineer/Employee/Key Personnel shall employ the best care, skill and ability in
performing his duties in accordance with the Contract Agreement, Conditions of Contract,
Plans, Specifications, Special Provisions, and other provisions embodied in the proposed
contract.
4.
5.
That, in order to guarantee that said Engineer/Employee/Key Personnel shall perform his
duties properly and be personally present in the Job Site, he is hereby required to secure a
certificate of appearance for the Procuring Entity Engineer/Authorized Representative at the
end of every month.
That, in the event that I/we elect or choose to replace said (Designation) with another
Engineer/Employee/Key Personnel, the Procuring Entity will be accordingly notified by us in
writing at least twenty one (21) days before making the replacement. We will submit to the
Procuring Entity, for prior approval, the name of the proposed new (Designation), his
qualifications, experience, list of projects undertaken and other relevant information.
6.
That any willful violation on my/our part of the herein conditions may prejudice my/our
standing as a reliable contractor in future bidding of the Procuring Entity.
CONCURRED IN:
_____________________________________
(Name of Engineer/Employee/Key Personnel)
_____________________________________
(Address)
Resident
Engineer
Project
Registered
Electrical
Engineer
Project Registered
Mechanical
Engineer
Name
Address
Date of Birth
Employed Since
Experience
(a) Total Experience Required
(Years)
Actual
(b) Experience in
Required
Similar Project
Actual
(Years)
Previous Employment
Education
PRC Registration & License/
Accreditation/ Certification
(as required)
Note: This form is applicable to all required List of Key Personnel for the Contract to Bid
Safety Officer/
Engineer
Materials
Engineer
CADD Operator
General
Foreman
Length of Service
__________________________
__________________________
__________________________
10. Experience:
This should cover the past ten (10) years of experience. (Attached as many pages as necessary to
show involvement of personnel in projects using the format below).
1. Name: ________________________________________________________________
2. Name and Address of Owner: _____________________________________________
3. Name and Address of the Owners Engineer: _________________________________
(Consultant)
4. Indicate the Features of Project (particulars of the project components and any other particular
interest connected with the project): ________________________________
5. Contract Amount Expressed in Philippine Currency: ___________________________
6. Position: ______________________________________________________________
7. Structures for which the employee was responsible: ____________________________
8. Assignment Period: from _______ (months) _______ (years)
: to _______ (months) _______ (years)
________________________________________
Name and Signature of Employee/Key Personnel
It is hereby certified that the above personnel can be assigned to this project, if the contract is
awarded to our company.
_______________________________
(Place and Date)
__________________________________
(Bidders Authorized Representative)
Dear Madame:
I am
(Name of Nominee)
a Licensed __(profession)__ with Professional License No.
______________ issued on
(date of issuance)
at
(place of issuance)__.
I hereby certify that (Name of Bidder) has engaged my services as (Designation) for (Name
of the Contract), if awarded to it.
As
(Designation)
contract under bidding):
NAME OF PROJECT
OWNER
__________________
__________________
__________________
__________________
_______________
_______________
_______________
_______________
COST
_____________
_____________
_____________
_____________
DATE
COMPLETED
______________
______________
______________
______________
OWNER
_______________
_______________
_______________
_______________
COST
_____________
_____________
_____________
_____________
DATE
COMPLETED
______________
______________
______________
______________
In case of my separation for any reason whatsoever from the above-mentioned Contractor, I
shall notify the
(Name of the Procuring Entity)
at least twenty one (21) days before the
effective date of my separation.
As (Designation) , I know I will have to stay in the job site all the time to supervise and
manage the Contract works to the best of my ability, and aware that I am authorized to handle only
one (1) contract at a time.
I do not allow the use of my name for the purpose of enabling the above-mentioned
Contractor to qualify for the Contract without any firm commitment on my part to assume the
post of (Designation) therefor, if the contract is awarded to him since I understand that to
do so will be a sufficient ground for my disqualification as (Designation)
in any future
(Name of the Procuring Entity) bidding or employment with any Contractor doing business with the
(Name of the Procuring Entity) .
_____________________________
(Signature of Engineer)
DRY SEAL
Republic of the Philippines)
_______________________) S.S.
SUBSCRIBED AND SWORN TO before me this _________ day of _________ 2016 affiant
exhibiting to me his Government Issued ID No. _________ issued on _____________ at
_______________.
Notary Public
Until December 31, 20___
Model/Year
Capacity/
Performance/Size
Plate
No.
Motor No./
Body No.
Location
Proof of Ownership/
Lessor or Vendor
Condition
A. Owned
i.
ii.
iii.
iv.
v.
B. Leased
i.
ii.
iii.
iv.
v.
C. Under Purchase Agreements
i.
ii.
iii.
iv.
v.
List of minimum equipment required for the Project:
Submitted by : ___________________________________________________
(Printed Name & Signature)
Designation :____________________________________________________
Date
:____________________________________________________
MONTHLY EQUIPMENT UTILIZATION
Item
No.
Description/Particular
10
11
12
13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Submitted by:
Name of Bidders Authorized Representative & Signature:
Date:________________
Position:________________________________________
Description
Month 2
4
Month 3
4
Month 4
4
MANPOWER SCHEDULE
Description/Particular
Project Manager
Resident Engineer
Project Registered Electrical Engineer
Project Registered Mechanical Engineer
Safety Officer/Engineer
Materials Engineer
CADD Operator
General Foreman
Bidders Name:
Submitted by:
Name of Authorized Bidders Representative & Signature
Date: ________________
Position: ________________________________________
Contract Name
CONSTRUCTION METHODS
1.0
INTRODUCTION
Refer to nature of the Project.
2.0
3.0
3.1
4.0
b.
c.
d.
e.
Specialty Work
Financial Program
4.1
Submitted by : ___________________________________________________
(Printed Name & Signature)
Designation :____________________________________________________
Date
:____________________________________________________
AUTHORITY OF SIGNATORY
SPECIAL POWER OF ATTORNEY
________________________
ACKNOWLEDGMENT
REPUBLIC OF THE PHILIPPINES)
QUEZON CITY
)SS.
BEFORE ME, a Notary Public for and in Quezon City, Philippines, this _______ day of
_______________, 20______, personally appeared:
NAME
__________________________
__________________________
ISSUED AT/ON
_______________________
_______________________
____________________
____________________
known to me and known to be the same person who executed the foregoing instrument consisting of
________ ( ) pages, including the page whereon the acknowledgments is written and acknowledged
before me that the same is his free and voluntary act and deed and that of the Corporation he
represents.
WITNESS MY HAND AND NOTARIAL SEAL, at the place and on the date first above
written.
Notary Public
Until 31 December 20____
PTR No._______________
Issued at:_______________
Issued on:_______________
TIN No. ________________
Doc. No. _______
Page No. _______
Book No. _______
Series of _______
AUTHORITY OF SIGNATORY
SECRETARYS CERTIFICATE
I, ________________________________, a duly elected and qualified Corporate Secretary of
____________________________, a corporation duly organized and existing under and by virtue of
the law of the __________________________________, DO HEREBY CERTIFY, that:
I am familiar with the facts herein certified and duly authorized to certify the same;
At the regular meeting of the Board of Directors of the said Corporation duly convened and
held on ______________ at which meeting a quorum was present and acting throughout, the
following resolutions were approved, and the same have not been annulled, revoked and amended in
any way whatever and are in full force and effect on the date hereof:
RESOLVED, that ________________________be, as it hereby is, authorized to participate in
the bidding of Construction of Elevator Shaft at the Administration Building, Project Reference No.
16-02-001 by the UP Open University and that if awarded the project shall enter into a contract with
the UP Open University; and in connection therewith hereby appoint _____________________,
acting as duly authorized and designated representatives of __________________, are granted full
power and authority to do, execute and perform any and all acts necessary and/or to represent
______________________
in
the
bidding
as
fully
and
effectively
as
the
_________________________________ might do if personally present with full power of
substitution and revocation and hereby satisfying and confirming all that my said representative shall
lawfully do or cause to be done by virtue hereof;
RESOLVED FURTHER THAT, the ___________________ hereby authorizes its President
to:
(1)
(2)
execute a waiver that the __________________________ shall not seek and obtain
writ of injunctions or prohibition or restraining order against the AFP or any other
agency in connection with this project to prevent and restrain the bidding procedures
related thereto, the negotiating of and award of a contract to a successful bidder, and
the carrying out of the awarded contract.
such
officer
of
the
said
____________________________
(Corporate Secretary)
ACKNOWLEDGEMENT
SUBSCRIBED AND SWORN to before me this _____ day of _____________, 20___ affiant
exhibited to me his/her Government Issued ID No. ______________ issued on _________________
at _____________________, Philippines.
Notary Public
Until 31 December 20____
PTR No._______________
Issued at:_______________
Issued on:_______________
_______________________
Date
This is to certify that this Company, through its authorized representative, _______________,
has conducted the inspection of the site for the project Construction of Elevator Shaft at the
Administration Building located at UP Open University Headquarters, Los Baos, Laguna,
on this ______ day of __________________, 2016, in connection with our desire to
participate in the bidding for the above project.
______________________________
(Printed Name & Signature of Bidder)
_____________________________
(Notary Public)
Until 31 December 20____
PTR No._______________
Issued at:_______________
Issued on:_______________
TIN No. ________________
(c) Our Bid shall be valid for a period of one hundred twenty (120) calendar days from the
date fixed for the Bid submission deadline in accordance with the Bidding Documents,
and it shall remain binding upon us and may be accepted at any time before the
expiration of that period;
(d) If our Bid is accepted, we commit to obtain a Performance Security in the amount of
[insert percentage amount] percent of the Contract Price for the due performance of the
Contract;
(e) Our firm, including any subcontractors or suppliers for any part of the Contract, have
part of the Contract, has not been declared ineligible by the Funding Source;
(h) We understand that this Bid, together with your written acceptance thereof included in
your notification of award, shall constitute a binding contract between us, until a formal
Contract is prepared and executed; and
(i) We understand that you are not bound to accept the Lowest Evaluated Bid or any other
NOTE:
This form is for inclusion in the Financial Proposal (Envelope 2)
Prepared/Estimated By:
Date:
Submitted By:
Date:
Name of Bidder
Date:
ITEM
NO.
MATERIALS
DESCRIPTION
Address of Bidder:
INDIRECT COST
LABOR
UNIT QTY
PER UNIT
TOTAL
PER UNIT
TOTAL
(PHP)
(PHP)
(PHP)
(PHP)
TOTAL DIRECT
COST
TOTAL
OVERHEAD/
CONT.
PROFIT
TAXES
AMOUNT
GRAND TOTAL
SUBMITTED BY:
__________________________________________________
Name of Bidder
__________________________________________________
(Printed Name and Signature of Authorized Managing Officer)
__________________________________________________
Date
SUMMARY OF BREAKDOWN OF TOTAL LUMPSUM BID PRICE
A. ESTIMATED DIRECT COST (EDC)
A.1 MATERIALS AND EQUIPMENT COST (EXCLUSIVE OF 5% VAT)
P______________________
A.2 LABOR COST AND EQUIPMENT RENTAL (EXCLUSIVE OF 5%
P______________________
VAT)
SUB-TOTAL (EDC)
P______________________
A.3 MOBILIZATION AND DEMOBILIZATION (1% of EDC)
P______________________
TOTAL (A)
P______________________
B. INDIRECT COST
B.1 MARK-UP (OVERHEAD EXPENSES, UNFORESEEN
CONTINGENCIES, MISCELLANEOUS EXPENSES,
CONTRACTOR'S PROFIT)
P______________________
B.2 TAXES
B.2.1 5% VAT OF [(A) + (B.1)]
P______________________
B.2.2 MUNICIPAL TAX OF [(A) + (B.1)]
P______________________
(PER MUNICIPAL TAX TABLE OF LOS BAOS)
SUB-TOTAL (B.2)
P______________________
TOTAL (B)
P______________________
GRAND TOTAL
P______________________
________________________________________________________________________________________
(IN WORDS)
SUBMITTED BY:
__________________________________________________
Name of Bidder
__________________________________________________
(Printed Name and Signature of Authorized managing Officer)
__________________________________________________
Date
CASH FLOW BY QUARTER AND PAYMENT SCHEDULE
PARTICULAR
% WT.
1ST QUARTER
ACCOMPLISHMENT
CASH FLOW
CUMULATIVE
ACCOMPLISHMENT
CUMULATIVE CASH FLOW
SUBMITTED BY:
__________________________________________________
Name of Bidder
__________________________________________________
(Printed Name and Signature of Authorized managing Officer)
__________________________________________________
Date
2ND QUARTER
3RD QUARTER
4TH QUARTER