Beruflich Dokumente
Kultur Dokumente
Info / Stage
Responsibilities
Sr. No.
Nozzle to
Project No. Nozzle No. Shell / D'end
Seam No.
1
2
3
4
5
12283A
12283A
12283C
12283C
12283E
NW201/A
NW201/B
NW201/A
NW201/B
NW201/A
12283E
NW201/B
T1
Shell / D'end
Material
Nozzle Material
channel side
T1 & T2
8
T2
17037A
S3
shell side
S3 & S4
10
S4
shell side
S3 & S4
10
S4
11
T3
channel side
T4 & T3
12
T4
17037B
13
S1
shell side
S1 & S2
14
S2
15
T3
channel side
T3 & T4
16
T4
17033B
17
S1
shell side
S1 & S2
18
S2
19
T1
channel side
T1 & T2
19
T1
channel side
T1 & T2
20
T2
17033A
21
S3
shell side
S3 & S4
22
S4
23
T1
17038
channel side
T1 & T2
24
T2
25
17016
26
27
28
N1
NW261
28
29
30
31
32
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Welding
To be filled/given by Shop
(Before Set-up
stage will be added)
LN)
Shell/D'end
Thickness
actual
81
81
Shell/D'end
actual I/d at
Nozzle Location
To be filled/given by QC
(Stage will be added )
Nozzle
Nozzle sub
Nozzle sub
Nozzle
Nozzle actual
actual I/d
assembly height assembly height
Thickness
Length
& O/d
at setup
after welding
Lip thk. actual
NA
ID-325.4
1127.5
OD-514
1127.5
ID-325.4
1127.5
OD-514
NA
ID-215.8
1077
OD-380
1077
ID-225.8
460
505
493
448
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
448
81
81
1078
OD-380
NA
ID-325.4
1129
OD-514
1129
ID-325.4
1129
OD-514
NA
ID-215.8
1083
OD-380
1087
ID-225.8
1080
OD-380
NA
ID-215.8
1258
OD-362
1257
ID-215.8
1258
OD-362
NA
ID-325.4
1207
OD-528
1208
ID-325.4
1206
OD-528
NA
ID-215.8
505
460
448
493
805
755
556.4
606.4
755
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
755
1256
OD-362
1256
ID-215.8
1256
OD-362
NA
ID-325.4
1206
OD-528
1212
ID-325.4
1206
OD-528
1123
ID-325.4
1124
OD-514
1123
ID-325.4
1124
OD-514
805
606.4
556.4
586.7
634.7
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
Nozzle Type
WEP Side
Seton/Setthru (I/s or O/s)
I/S
1-2mm
934/935
SET THROUGH
I/S
1-2mm
980/81
SET THROUGH
I/S
1-3mm
976/977
I/S
0-3mm
932/935
SET THROUGH
SET THROUGH
SET THROUGH
I/S
SET THROUGH
I/S
1-2mm
932/934
SET THROUGH
I/S
1-3mm
935
SET THROUGH
I/S
1-3mm
978
SET THROUGH
I/S
1-5mm
1124/25
SET THROUGH
I/S
1-3mm
1073/75
SET THROUGH
I/S
1-3mm
1069/71
SET THROUGH
I/S
2-3mm
1126mm
I/S
1-3mm
1074mm
SET THROUGH
1-2mm
975/977
SET THROUGH
I/S
SET THROUGH
I/S
1-2mm
1124/1125
SET THROUGH
I/S
1-2mm
1076mm
SET THROUGH
I/S
0-2mm
1060mm
I/S
0-1mm
1108mm
SET THROUGH
0-4mm
1125mm
To be filled/given by Shop
(After welding
stage will be added)
Distortion Cotrol
Temperory
Fixture Provided at attachment used
Setup stage (Y / N)
(Y / N)
Weld Process
(GTAW / SMAW /
SAW)
To be filled/given by QC a
welding at a time of Visual I
(No separate stage in ER
Projection After
Final welding
NO
NO
SMAW
YES
1125/1124
NO
NO
SMAW
YES
1074
NO
NO
SMAW
YES
1072/1074
NO
NO
SMAW
YES
1123
NO
NO
SMAW
YES
1076
NO
NO
SMAW
YES
1120/1124
NO
NO
SMAW
YES
1122.5/1122
NO
NO
SMAW
YES
1075/1075
SMAW
SMAW
Retainer Ring
SMAW
YES
1306/07
led/given by QC at after
a time of Visual Inspection
parate stage in ERP-LN)
Projection Before
PWHT
By QC
Repair in Nozzle
weld (Y / N)
Remarks
Sr. No.
Project
No.
Shell / D'end
Overlay seam
No.
Shell / D'end
Material
LAS
LAS
D'end Type
(Hemispherical,
Ellipsoidal)/
(Single Piece, Petal type)
1
2
17037A
17033C
OW204
OW201
NA
NA
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
17033B
17037A
17017A
17033D
17033C
17037B
17017B
17033B
17033B
OW203
LAS
NA
OW203
LAS
NA
As only after Overlay inspection done in SFS-Data saved in CMF folder w
OW203
LAS
NA
OW202
LAS
NA
OW201
LAS
NA
As only after Overlay inspection done in SFS-Data saved in CMF folder w
OW204
LAS
NA
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
te stage in ERP-LN)
Overlay
Thickness
(Reqd.)
Overlay
Material
5 SS347
5 SS347
Shell / D'end
Thickness
actual (avg)
81.5 NA
81 NA
5 SS347
82MM
NA
5 SS347
81.5 NA
d in CMF folder where before Overlay data saved.
5 SS347
80 NA
5 SS347
80 NA
5 SS347
80 NA
d in CMF folder where before Overlay data saved.
5 SS347
81.5 NA
3801
3796
BALANCE
4314
4314
3916
4316
4317
3918
efore overlay
rlay dimension stage)
ference (actual) at 3
ore overlay
NCE
Another End
To be fi
(Stage wi
Overlay Process
(SMAW / ESSC /
SASC / FCAW)
Subsequent /
Final Layer
3803 2-3MM
ESSC
4MM & 1MM
6 MM
4318 2-3MM
4316 4MM
3917 3-4 MM
2-3mm
ESSC
290 NA
ESSC
290 NA
NA
ESSC
ESSC
ESSC
340kg
290
O/D Ring
Provided at
End of
Shell / D'end
No
Not Apllicable
No
Not Apllicable
YES
Not Apllicable
Not Apllicable
Not Applicable
Not Applicable
3918
3916
Not Applicable
Not Applicable
3920
4305
3918
4307
4305
4305
By QC
4308
3910
3920
4306
Repair in
weld overlay
Remarks
Sr. No.
1
2
3
4
5
6
1
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
To be filled/given by Shop at s
stage only
(No separate stage in ERP-L
Project
No.
Shell Long
Seam No.
Shell
Material
Shell
Required
I/D
17045 LW201
SA387 GR22 C
1052
17045 LW203
SA387 GR22 C
1400
17045 LW202-CONE SA387 GR22 C1400/1053
17044 LW201
SA387 GR11
2153
17044 LW203
SA387 GR11
2500
17044 LW204
SA387 GR11
2500
17025 LW202
SA387 GR22
1152
17008A LW201
SA387 GR22 CL2
17019A
17018A
LW204
SA 387-22-2
1290
SA
387-22-2
1539
17019A LW205
Shell
Required
Thickness
Thick. At
Plate stage
(actual)
from PPS
record
30
30
30
50
50
54
72
84
95
6921
8011
8010
3845
85
96
4316
5133
6921
8011
8010
3845
4317
5134
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
by Shop at setup
only
age in ERP-LN)
Type of Rolling
(Hot / Warm /
Normal)
Normal
Normal
Normal
NORMAL
NORMAL
NORMAL
Warm
WARM
WARM
One End
Open End At 100mm
i/s-4406
i/s-3315
3314
6772
7868
7868
3634
WEP Type
Thickness
1)Single 'V'
after
2)Double 'V'
Rolling at
3)Narrow Groove
setup
Open End At 100mm
4)'J' Type
Another End
Middle
4400
3307
4399
3307
4398.5
3307
6767
7861
7861
3618
6766
7858
7858
3616
6768
7859
7859
3618
4063
5445
4057
5445
4404.5
3315
4402
6771
7867
7867
3624
4070
5449
Double
Double
Double
Double
Double
Double
Double
85
96
V
V
V
V
V
V
V
Double V
Double V
WEP
Angle
(Actual)
60
65-70
65-70
45OS , 60IS
45OS , 60IS
45OS , 60IS
45OS , 60IS
45OS , 60IS
45OS , 60IS
Root Gap
at Set-Up
Stage
0-1mm
0-2mm
0-2mm
0-2
0-2
0-2
0-2
0-2
0-3
Offset in
WEP
ok
ok
ok
0-1
0-1
0-1
0-1
Weld Process
(GTAW/
SMAW/
SAW)
SMAW+SAW
SMAW+SAW
SMAW+SAW
SMAW+SAW
SMAW+SAW
SMAW+SAW
SMAW+SAW
0-1
0-1
SMAW+SAW
SMAW+SAW
SMAW+SAW
Type of
Re-Rolling
(Hot /
Warm /
Normal)
To be filled/given by QC at dimensio
(No separate stage in
COLD
COLD
COLD
NOT DONE
10-11 MM
12-14 MM
10-12 MM
4-4mm
2-3 MM
2-2 MM
2-2 MM
NA
8185
8211
4086.5
8178
8206
4082
COLD
Balance welding
Balance welding
Balance welding
4-4mm
2-4 MM
3-4 MM
3mm
NA
NA
5446
4600
5446
5439
4594
5443
No
No
By QC
Repair in
Welding
8176
8208
4080.5
8176
8207
4081
8181
8213
4086
5440
4596
5442
5442
4593
5443
5446
4599
5447
Remarks
Sr. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
To be filled/given by QC at dimensio
(No separate stage in
Project
No.
17045
Tubesheet
Part No.
Tubesheet
Overlay
Seam No.
301 OW301
Tubesheet
Material
Tubesheet Type
(Drum / Flat /
Lip)
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
t after Overlay
Overlay Process
Overlay
(SMAW / ESSC /
Material
SASC / FCAW)
ESSC + SMAW
Subsequent /
Final Layer
80
NO
NO
By QC
By QC
(Stage will be add
after PWHT )
Id of
Overlay
Bow of
O/d of
tubesheet
Repair in
Bow in Tubesheet
Thickness
Tubesheet
Tubesheet
after overlay weld overlay
after PWHT
(Actual Avg.) after overlay after Overlay
(Lip type)
12mm
2mm
NA
NO
2mm
Remarks
Sr. No.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Project No.
Nos. of
Supports
Material of Thickness of
Base Ring / Base Plate /
Bracket
Ring
Full / Partial
penetration weld
17038 On 90
SA387M
GR22
CL2/SA387M
GR22 CL2
18mm
10X45 chamfer to
Base Plate & fillet weld
of 9CFW
17038 On 270
SA387M
GR22
CL2/SA387M
GR22 CL2
18mm
10X45 chamfer to
Base Plate & fillet weld
of 9CFW
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Shell/D'end O/s
circumference
At Ring/Bracket
location
To be filled
(Stage will be add
Root Gap
at Setup
stage
Elevation at
Flatness
Distortion Cotrol
Level of
Setup Stage
at setup
Fixture Provided at
Base Ring
on 4
stage
Setup stage (Y / N)
orientation
Single V
NA
1mm
within 2
mm
658.5mm
Single V
NA
1mm
within 2
mm
660mm
Weld Process
(GTAW / SMAW /
SAW)
Weld
ISR Required for
Deposition
welding (Y / N)
(in kg)
To be filled/given by QC at visual
stage
(No separate stage in ERP-LN)
Elevation after
Final welding
Level after
welding
By QC
Repair in
Support Bracket
welding (Y / N)
Remarks