Beruflich Dokumente
Kultur Dokumente
1.
If a PMP colleagues offers you exam questions, just refuse to take it and DO NOT report him to the PMI.
2.
Each subsidiary plan contains a part include identification of this specific knowledge area change control
procedures.
3.
All control thresholds must be exist in the PM plans (Cost, Time, Quality, Risk)- the max. amount of
variance that after it a corrective action must be taken.
4.
Work Authorization System, PMIS { change control system, configuration management system} are an EEF
not OPA.
5.
EEF may be sometimes an opportunity or may be sometimes a threat or constraints.
6.
EEF: company culture and existing systems= company baggage that comes with the project outside PM
modifications control (exclude manage and develop team).
7.
Work Authorization system (EEF) ensures that work is started at RIGHT TIME and in proper sequence
only when approved, also defines how work is assigned to people
8.
Objectives are determined in initiation and refined in planning.
9.
Audit used in execution (inspect sample), Inspection used in M&C (inspect all, appeared only twice:
control quality (attribute) , verify scope (deliverables))
10.
Scope management plan determines the stability of the project through expected changes.
11.
Each subsidiary plan contains a part include identification of this specific knowledge area change control
procedures.
12.
"Journey to Abilene" is a situation when we all agree with each other, but the decision doesn't please
anyone. The result of this "journey" will be bad for everybody.
13.
Laissez-faire is a management style: a manager of this type is not directly involved in the work of the
team, but manages and consults as necessary, this can be appropriate for highly skilled people.
14.
If a buyer needs are changes, the buyer may issue a change order to the contract.
15.
Generally, only the buyer can terminate a contract.
16.
Recommended corrective or preventive actions can come from the team or stakeholders in addition to
the project manager.
17.
18.
Operations and maintenance are considered ongoing activities, not temporary. Therefore, such work is
not considered a project or part of a project.
19.
Scope, time, cost, quality, risk, resources, and customer satisfaction is the most accurate list of
constraint.
20.
if PM report false info, meet him first, before meeting with his boss.
21.
ROI It is the time when cumulated net income is equal to the investment.
22.
In project management, the sequence of project phases and phase gates is often referred to as project
life cycle.
23.
lessons learned should NOT document the key persons or group cause delays or failures.
24.
effective = right time & right format.
25.
Its usually the sponsor default for not giving clear directions for project objectives.
26.
a milestone is a constraint.
27.
The contract may be considered (serve as) a project charter.
28.
Output from all 42 processes is stored in PMIS.
29.
The five areas of expertise in the project management team include
Interpersonal skills
30.
The management of interpersonal relationships includes
1) communication
2) influence
3)
4)
5)
6)
leadership
motivation
negotiation
problem solving
31.
Chart of accounts: Any numbering system that is used to monitor project costs by category such as
labor, supplies, or materials.
32.
PDCA: plan, do, control, act is a continuous process improvement
33.
Malcolm Baldrige continuous improvement.
34.
A project may be started without a contract when: the customer is internal, or the project is in hurry
instead LOI (letter of intent).
35.
Projects are authorized by someone external to the project: project sponsor, or PMO or portfolio steering
commute.
36.
Determining the initial project organization is a project initiating function.
37.
Product scope description: The documented narrative description of the product scope
38.
Deliverable: any unique and verifiable product, result or capability to perform a service that must be
produced to complete a process, phase or project.
39.
We proactively and fully disclose any real or potential conflicts of interest to the appropriate
stakeholders.We treat the appearance of conflict of interest as a conflict of interest.
40.
Joke telling MAY be inappropriate in a diff. culture.
41.
If you offered a gift from a culture that has giving gifts is custom, consult your management.
42.
One generally needs to work within the laws and customs of the host country (e.g. wage rates).
43.
Understanding the personal characteristics of a team member, is not considered to be a part of
understanding the cultural and social environment.
44.
When phases are sequential, the close of a phase ends with some form of transfer or handoff of the work
product produced as the phase deliverable. This phase end represents a natural point to reassess the
effort underway and to change or terminate the project if necessary. These points are referred to
as phase exits, milestones, phase gates, decision gates, stage gates, or kill points.
Chapter 2 & 3:
1.
Payback period: the length of time it takes for the organization to recover its investment in the
projectbefore it starts accumulating profit. (the less the better). Discount rate is not taken into account in
calculations of Payback Period
2.
IRR the rate at which the project inflows equal to project out flows (higher the better).
3.
IRR at which the net present value = 0.
4.
IRR: The inherent discount rate or investment yield rate produced by the project's
deliverables over a pre-defined period of time.
5.
IRR: The annualized effective compound return.
6.
Discount rate: used to assess the uncertainty (risk) in future cash flow.
7.
PV = FV / (1+i)^n
(PV1-PV2)/ PV1
8.
Cost Benefit Analysis: Benefit/cost benefit is revenue not profit.
9.
Opportunity cost is the value of the project that was not selected.
10.
Sunk costs: cost that has already been incurred and thus cannot be recovered. (should not be considered
when deciding whether to continue on a project or not) Costs to bring the project to its current state
11.
Working capital: Assets- liabilities (amount of money available for a company to invest).
12.
Organizational process assets: process & procedures corporate Knowledge database Historical
Information lessons learned.
1.
Project managers in weak matrix organizations acts like (project expeditor, project
coordinator, project leader) - with limited authority.
13.
Functional (( Expeditor (less) THEN coordinator (more) )).
14.
Project manger exists even in functional organization.
15.
Project manager reports to manager of project managers in the strong matrix organization.
16.
17.
In a matrix organization: the PM can request from the FM to participate in a team member annual performance
review.
18.
Composite is like strong matrix with 2 types of projects running.
19.
Phase to phase relationship:
20.
Sequential:
1.
phase can only start once the previous phase is complete
2.
The step-by-step nature of this approach reduces uncertainty, but may eliminate options for reducing
theschedule.
21.
Overlapping:
1.
Phase starts prior to completion of the previous one.
2.
Example of the schedule compression technique called fast tracking. Overlapping phases may increase risk
and rework.
22.
Iterative:
1.
Largely undefined, uncertain, or rapidly changing environments such as research.
2.
It can reduce the ability to provide long term planning.
3.
Scope is managed by continuously delivering increments of the product and prioritizing requirements.
4.
Entail having all of the project team members available throughout the project or, at a minimum, for two
consecutive phases.
5.
An iterative phasetophase relationship allows you to begin planning for the next phase before the phase
you're working on is completed.
23.
Overlapping /Fast tracking is where the work of the next phase begins before the phase you're working on is
completed.
24.
Costs and staffing levels are LOWEST early in the life cycle, peak while the project work is
underway, and then drop off as the project nears completion.
25.
Risk is highest early in the project since uncertainty is high about the projects deliverables, resource needs,
and work required.
26.
Standards are guidelines or a preferred approach (i.e. ISO) and regulations are government-imposed
requirements such as laws (i.e. EPA, contract law)
27.
Kick off meetings are conducted in the start of each phase.
28.
Company code of conduct contains: business practices, guidelines for situations.
29.
Stage
Cost and staffing Uncertainty
Cost of changes
& Risk &
stakeholder Influence
30.
Starting the project/ Initiation
Low
Low
High
31.
Organizing and preparing/Planning
Increases
Increases
Decreases
Peaks
Decreases
32.
Carrying out the work/ execution- M&C
Increases
33.
Closing the project/closing
Decreases
Low
High
34.
The project manager's influence is greatest in the project closing processes.
35.
Project life cycle can exist independent of product life cycle
36.
Project life cycle can run concurrently with product life cycle or form part of product life cycle
37.
A single product life cycle can consist of many multiple Project life cycle
38.
A product life cycle can completed during A single-phase Project.
39.
Deliverables are determined in part by the customer, not only by the project sponsor. Deliverables
are identified in the project charter.
40.
Program success is measured by meeting its benefits.
41.
The number of years is already included in the calculation of NPV. You simply pick the project with the
highest NPV.
42.
Weak matrix organizations tend to experience the least amount of stress during the Closing processes.
Integration Management
1.
Project statement of work- developed by the sponsor as input to develop project charter process:
1.
Business case.
2.
Product scope description/ deliverable.
3.
Strategic plan (organization's strategic goals).
2.
You are carrying out a project to produce either a service or product. The project work itself is the
process and the service or product you produce is the output of this process.
3.
Project selection committee/ project selection panel /Portfolio managers/ portfolio review board may
include PMO- is responsible for selecting projects.
4.
They review each project for its return on investment, the value of the project, risks associated with
taking on the project, and other attributes of the project.
5.
The project manager is not typically involved in project selection (i.e. the PM is neither involved nor
responsible for conducting neither cost benefit ratio nor any selection technique).
6.
Change Management plan defines how you will manage changes to the deliverables and resulting
documentation.
7.
Change management plan controls the project to the baseline NOT ONLY how to implement a change.
8.
Change management plan contains: change control procedures, Board, meeting attendees, authority
level, tool to control.
9.
Scoring model, peer review, murder board, economic methods (PV, NPV, Cost Benefit, IRR, payback
period) are comparative methods /benefit measurement methods for selecting a project.
10.
Constrains optimization / mathematical (programming).
11.
Whenever a large number of changes occur on a project, it is wise to confirm that the business case
(stated in the project charter) is still valid.
16.
Each; the seller and the buyer create his own project charter.
17.
When a project deviates significantly from a baseline, the project manager should revisit the risk
management process (the problem is incomplete risk identification).
18.
Most probably, the changes root cause is poor planning or risk identification.
19.
PMIS contains: change control system and configuration management system.
a.
Configuration management system: TECHNICAL procedures to identify and document the functional and
physical characteristics of a product, result, service, or component.
b.
Change control system: procedures to define how project deliverables and documentation will be controlled,
changed and approved.
c.
Change control system is subset of configuration management system.
d.
Configuration Control and Change Control are distinct in the following ways:
i.
Configuration Control addresses the management of the product (or project's deliverables), whereas
Change Control addresses the management of the project.
ii.
Configuration Control manages changes to the product baseline, whereas Change Control manages
changes to the project baseline.
iii.
Configuration Control is applied throughout the lifecycle of the product (concept->design>develop/manufacture->service->dispose), whereas Change Control is applied during the lifecycle of the
project subsequent to establishing the project baselines.
20.
The change management plan directs how changes to the process need to be done, while theconfiguration
management plan directs how changes to the output need to be done.
21.
Configuration management involves making sure that everyone is working off the same documents.
22.
Configuration management validates and improves the project by evaluating the impact of each change.
23.
Configuration management is set of procedures developed to ensure that project design criteria are met.
24.
An updated scope statement exists in a change control system, configuration management system (all
changes must be documented there).
25.
The project management plan must be approved by the project sponsor, management, project team.
26.
The PM must take the resources manager approval for the schedule to guarantee resources availability.
27.
Any (change request) corrective action/ Preventive action/ Defect repair that will require a change to the
project management plan, baselines, procedures and process, charter, contact, statement of work require
a formal change request, to be reviewed and approved or rejected as part of perform integrated change
control.
28.
Most project documents are created by the project manager for his or her use during the project, and do
not require outside approval for changes (e.g. stakeholder register, Req. trace ability matrix).
29.
Project charter and change in project charter must be approved by sponsor.
30.
Change control system includes documentation of the process for making changes.
31.
Sometimes, certain classifications of changes get automatic approval on a project by PM and do not need
a change control board's approval (e.g. in an emergency) using the outlines in the configuration
management system.
32.
The project team might have discretion to approve changes within certain parameters without CCB
approval.
33.
Change control system includes procedures to handle changes by PM (e.g. in an emergency) which is
called configuration management system.
34.
The PM may have the authority to approve a change if it doesnt require a change in one of the key
project documents (listed in the previous point).
35.
If excessive number of change requests occurs, revalue the business case or consider terminating a
project and start a new one with more complete set of requirements.
36.
One of the ways to decide if a change should be approved is to determine whether the work falls within
the project charter, project scope statement, business case, ??.
37.
Any change that has reserve (previously indentified risk event) should be handled as part of the risk
management instead of change management.
38.
It is not wise to decrease the impact of every change (thus may lead to decrease the overall project
success probability).
39.
Status of the change is recorded in the change control system {{change request status}} (output of
perform integrated change control process).
40.
In exam, assume all projects have change control board.
41.
Maintain a baseline = update
42.
Work performance information, about the completion status of the deliverables and what has been
accomplished, is collected as part of project execution (direct and manage project execution) and is fed
into the performance reporting process.
43.
Adding milestones is a control feature. (i.e. if a milestone is completed on time and on budget, the
project manager has some measure of the status of the project). CONTROL = MEASURE and
INSPECT/AUDIT
44.
Procurement/ project Closure must make sure the actual product of the project meets the requirements
for the product.
45.
PM Directing role occurs while the project management plan is being created (planning).
46.
PM integration role occurs during project execution.
47.
Once the project charter is completed (the project is formally authorized), so the cost benefit analysis
determines project is worthy.
48.
Project charter authorizes the start of a new project or a new phase.
49.
Work must be start in project charter, only if a contract is signed. (or at least letter of intent ) ta2lefa
50.
If a product of a project was not used, maybe be that either the project manager did not identify the
requirements of all the stakeholders or that the business need for the project changed dramatically and
the project manager did not notice.
51.
Documents are collected throughout the project and archived during the Close Project or Phase process.
52.
Changes MUST be approved (output from perform integrated change control- output
approved),implemented (through direct and manage project- input approved), and validated (control
quality Input approved & output validated).
53.
Work for each phase must be inspected and accepted before the phase can be closed out.
54.
There is no need to request a change request if the project is on the planning phase.
55.
The project charter should be broad enough not to change as the project progress.
56.
Management plan documents the strategy of managing the project.
57.
PM plan itself is a deliverable.
58.
Process configuration (Process flow chart) A graphic depiction of processes, with interfaces identified,
used to facilitate analysis.
59.
Using resources that do not charge against the project is unethical.
60.
The need for integration is one of the major driving forces for communication in a project.
61.
The project manager should determine if a change is needed and if the change is beneficial.
62.
Team assist in recording lessons learned, so they can't be released until the lessons learned are
documented and added to the organizational process assets.
63.
A project is complete when all work, including all project management work (e.g. lessons learned) is
complete not just deliverables, is accepted.
64.
With only the formal acceptance can the project manager be sure the project work is really
complete NOTthe project.
65.
ADMINISTRAIVE CLOSURE Closing a project (termination, stops, completion): - NO AUDIT
1.
Confirm work is done to req.
2.
Complete procurement closure (can be done even before project closure).
3.
Gain final deliverable acceptance project work is done
4.
Complete financial closure (take my money).
5.
Hand off product.
6.
Solicit feedback from the customer.
7.
Complete final performance reporting.
8.
Update lesson learned.
9.
Index & archive records (lessons learned & final report are part of project records).
10.
Release team.
11.
Close contract.
66.
A defect is any deliverable that does not meet its requirements; team members' errors only cause some
defects.
67.
Preliminary scope statement: In Initiation.
68.
The change control board approves changes only after agreeing on its impact with the customer.
69.
If a customer needs to make a change, the PM FIRST should request him to submit a request for
changebefore even meet with the team to discuss it.
70.
Change control systems are a subset of the configuration management system.
71.
The PM may write the project charter, but must be authorized by someone outside the project.
72.
Verification. The evaluation of whether or not a product, service, or system complies with a regulation
requirement, specification, or imposed condition. It is often an internal process.
73.
Validation. The assurance that a product, service, or system meets the needs of the customer and other
identified stakeholders. It often involves acceptance and suitability with external customers. Contrast
with verification.
74.
The process of making a change:
1.
2.
3.
Look for the change impact. BEFORE create a change request. ???
4.
5.
1.
2.
Look for options (and bring them to the board if they will take the decision).
3.
PM take decision on non-updated changes, board change management take the decision (accept or
reject) for the other changes. PM/sponsor may be member of change board.
4.
6.
7.
8.
1.
2.
Develop options.
3.
4.
77.
Morale is improved when smooth transitions to upcoming projects are already planned. A staff
release plan also helps mitigate human resource risks that may occur during or at the end of a
project.
Scope Management:
1.
Code of accounts: It is the collection of unique identifiers generally assigned to WBS items.
2.
WBS is All the work that must be completed for the project NOT All the tangible items that must be
delivered to the client
3.
Requirements gathered in stakeholder analysis need to be quantifiable (nothing like increase
productivity).
4.
A scope verification plan is part of the scope management plan.
5.
Scope management plan determines the stability of the project through expected changes.
6.
Historical data and lessons learned can be used to collect the requirements for a new project (what
requirements were for a similar projects).
7.
WBS and Affinity Diagram help identify new risks (scope).
8.
Product analysis/Value analysis/ value engineering: focus on finding less costly way to perform the same work
(scope).
9.
Identifying requirements can lead to identify more.
10.
Decision Making ways: unanimously , dictatorship, consensus (new diff.
agreement), plurality , majority(more than half).
11.
What is the diff. between stakeholders interests, needs, wants, and expectations?
12.
Project Scope Statement a narrative description of the project scope, contains:
1)
Project scope
2)
Product scope
3)
Deliverables
4)
Product acceptance criteria
5)
Exclusions
6)
13.
Preliminary project scope statement is done during initiation while project scope statement done duringplanning.
14.
Customers do not approve the project scope (what you are going to do to complete their requirements);
instead, they approve the product scope (their requirements).
15.
Balancing stakeholder requirements involves prioritizing requirements (by order of importance) and
resolving conflicts.
16.
To resolve competing requirements, accept the requirements that only comply with:
1)
Business case.
2)
Project charter.
3)
Project scope statement.
4)
Project constraints.
17.
WBS dictionary contains all information about activity: description, assignee, duration, cost, risk,
dependency, assumption, success criteria, due date
i.
The WBS PROOF that an end of resource, fund, time. Because WBS dictionary contains due
date/duration/assineeg of a WBS.
ii.
WBS dictionary and work authorization system prevents scope creep = uncontrolled changes. Because of
activity description.
iii.
WBS must be iterated after cost, schedule, time, risk, resources. Planning is iterative.
18.
WBS dictionary can be part of work authorization system (include when to start a task).
19.
WBS contains full project scope (not only product scope).
20.
WBS can be used to evaluate impact of other changes on project scope.
21.
WBS can be used to see if the change request is within the project scope.
22.
WBS can be structured as an outline, an organizational chart, a fishbone diagram, or other method.
23.
Verify scope is work with the customer to accept the interim deliverable (or phase deliverable) otherwise
make change request to it (accepted deliverable).
24.
Make a verify scope before moving to another phase.
25.
The 8/80 hour rule of thumb suggests that, when creating a WBS, you break down the work to work
packages of a minimum of 8 hours and a maximum of 80 hours. Applying this rule contributes to more
accurate estimates later in project planning. The better choice is to compose it until a managed
component.
26.
Req. traceability matrix helps link project requirements with other requirements or with project
objectives to ensure strategic goals are accomplished.
27.
Req. traceability matrix tracks the requirement through the project life cycle.
28.
Subdividing deliverables = creating WBS
29.
Subdividing work packages = decomposition (creating activities).
30.
Project life cycle Deliverable {{control account work packages activities}} WBS
31.
Each level of a WBS is a smaller segment of the above level.
32.
A project manager cannot be responsible for the customer's inspection process, only his own.
33.
Requirements are used to measure the completion of the product of the project (product scope).
34.
A team member has flexibility at the work package level to make some changes as long as they
are within the overall scope of the WBS dictionary.
35.
Scope verification (Verify Scope process) focuses on customer acceptance of a deliverable. Product
verification (Close Procurements process) is focused on making sure all the work is completed satisfactorily.
36.
Scope verification is monitoring and control, product verification is a closure activity.
37.
Product analysis used to analyze the product and product objectives and turn them into deliverables
(tangible deliverables).
38.
All stakeholders determine the project requirements. Thats why stakeholder register is input to collect
requ.
39.
The level of uncertainty in scope increases based on the scale of effort required to identify all the scope.
40.
If you are building a house, the house itself is the product scope. The planning, coordination and
management of the work to be done to ensure the product scope is achieved are aspects of project
scopemanagement.
41.
The scope management plan covers both product and project scope.
42.
A change request is the most effective way of handling the disconnection between what users actually
want and what management thinks they want.
43.
Project scope statement is DOU.
44.
WBS is not needed in verify scope, instead validated deliverables.
45.
Performance requirements: what the product of the project should be able to accomplish.
46.
Requirements, constraints, assumptions exist in project scope statement.
47.
Code of account identifier: code for each activity define the control account it follows.
48.
1st appearance Project assumptions in project initiation: project charter, 2nd project assumptions: project scope
statement, 3rd activity assumption: activity attribute, 4th requirements assumption: requirements documentation.
49.
Assumptions are not existing in the project charter.
50.
Quality control is generally performed before scope verification, but these two processes can be
performed in parallel.
51.
Inspection in verify scope measuring, examining, and verifying to determine whether work and deliverables
meet requirements and product acceptance criteria.
52.
Impact of scope changes can be determined through WBS NOT scope statement, as WBS dictionary
contains many many information.
53.
It is not common that all deliverables need to be audited.
54.
We may start execution and not all product requirements are known (completed product req. is done in
execution).
55.
Prototypes (collect requirements tool) support the concept of progressive elaboration because they are
used in iterative cycles of mock-up creation, user experimentation, feedback generation, and prototype
revision.
56.
Using subprojects which may be developed by organizations outside the project team is the least likely in
creating WBS.
57.
Requirements management plan: how requirements/product scope will be analyzed, documented, and
managed throughout the project.
58.
Scope management plan: how the project scope will be managed and controlled.
59.
Completion of the project scope is measured against the project management plan/scope management
plan.
60.
Completion of the product scope is measured against the product requirements / requirements management
plan.
61.
Requirements documentation:
1)
Business need.
2)
Project objective.
3)
Functional requirements.
4)
Non-functional requirements.
5)
Quality requirements.
6)
Acceptance criteria.
7)
Training requirements.
8)
Requirements assumptions and constraints.
62.
Do not simply accept project charter or project statement of work, instead first check for stakeholder
involvement.
Project Time Management
1.
2.
3.
4.
5. Sponsor may impose milestones and include it in the project charter, but generally
milestones - during initiation- in the project scope statement (form of schedule constraint). ?
6. After setting some milestones in the "define activity" process, some milestones may be
added during the "sequence activity" or "schedule activity" processes.
11. Bottom up estimation estimate activity RESOURCES divide each activity into
smaller components in order to estimate it.- Most accurate
3Used early in the estimating cycle when there is not much detail known about the activity.
5It is less costly, less time consuming than others, and least accurate.
13. The project manager needs more than an analogous (high-level) estimate to determine
whether or not the project will meet the schedule.
15.
16.
17.
18.
19.
20.
The results of parametric estimating can be rule of thumb (total var. = 0.3*dev. Var.)
Parametric estimates dont require input from team -- just historical data (3 data points)
PERT = 3 estimates
Activity with the highest variance has the highest risk.
Negative project float means that the estimated completion date is after the desired date.
Options to shorten the schedule:
a.
Re-estimate through revisiting risks (look for activity with the most unknowns and revisit risk).
b.
Compress through fast track or crash.
c.
Cut scope.
d.
Reduce quality.
e.
Stay to your ground.
f.
Work overtime.
21. Monte Carlo simulation (what if scenario analysis) use PERT (3 point estimates).
22. Resource leveling: keep the number of resources the same and letting time and cost be flexible
(e.g. limited availability, limited resources)
23. Resource leveling: when shared or critical resource are only available at certain times or are only
available in limited quantities (one team member assigned to tasks to occur at the same time).
26.
27.
28.
29.
Logic bar chart: time scaled schedule network diagram showing dependencies among activities.
Milestone chart (form of schedule) = customer and senior management.
Network diagram: shows dependency.
Project team performance is measured against project schedule.
30. Recommend terminating the project due to schedule problems is part of control schedule.
31. The only certain impact of a scope change is a schedule change to shorten or lengthen
subsequent activities.
32. Control schedule means looking for the things that are causing changes and influencing the
sources of change.
33. Expected risk did not materialize, may lead to a finish a project earlier.
34. Critical chain method focuses on managing remaining buffer duration against the remaining
duration of activity chain.
35. Critical chain is a schedule network analysis technique that modifies the project
schedule to account for limited resources. The critical chain method adds duration buffers that
are non-work schedule activities to manage uncertainty. (FS only) (project- feeding
resources buffers).
36. It is not practical to limit the scope of the changes. Each change request needs to be
evaluated as a separate entity.
37. Total float (or slack) is the amount of time an activity can be delayed without impacting the
project completion date.
43. Project float is a delay of a project that cannot delay the start of the next project.
44. When options of both free float and total float, we need to go to free float as free float
affects immediately following activities.
45. If an indentified risk occurs, which has an already contingency reserve, the PM
(not the sponsor) can approve the change, as it doesnt change the PMP.
46. To shorten the duration of a project, shorten the earliest activity on the critical path.
47. Crashing focus on critical path activity to obtain the greatest amount of compression for the
least incremental cost, even if there is a late and risky critical path activity.
48. Project schedule is a living document reflecting the actual state of the schedule and updated
frequently.
2To measure schedule performance compare schedule baseline (plan) with the project schedule (actual).
3In the beginning of project execution, the project schedule is the same as schedule baseline.
4-
52. Duration: the total number of work periods (not including holidays and non-working
periods)required to complete a schedule activity or WBS component. Usually expressed
as workdaysor workweeks. (Requirements for Duration estimation: Resource Availability and
Resource Capability).
58. when activity is completed even if completed one month later, so PV=EV, SPI =1, SV
=0
61. External (government, rules,) and mandatory = Hard (inherent in the project orproduct
nature or contractually)
62. Discretionary dependency can make arbitrary total float and limit your scheduling options.
63. Hammock activity is the one span between two points in the schedule and summarize the detailed
activities between them.
64. The schedule data for the project schedule includes at least the schedule milestones,
schedule activities, activity attributes, and documentation of all identified assumptions and
constraints.
65. Activity list is not an extension of and a component of the WBS (WBS stops at the work
package level).
1. Fringe benefits are included in overhead and are part of indirect costs.
2. ROM +-50 (initiation), definitive Budget -10 25 % (planning), Definitive +10% (-5% 10%) (planning).
3. Parametric estimates can be used in estimate cost, or can be used as sanity check in determine
budget.
4. A fixed cost is a non-recurring cost that will not change as the project progresses
5. Life Cycle Costing includes Acquisition, Operation, Maintenance, and Disposal Costs.
6. Team budgeted 3000 $ for work performed: EV. EV = BCWP
7. Team budgeted 2000 $ for work scheduled: PV. PV = BCWS = the cost of the work that has
been authorized and budgeted for a WBS component
8. AC = ACWP.
9. EAC means anticipated total cost at project completion.
10. Cost risk is the risk that project costs could go higher than planned.
11. Cost variance and schedule variance are negative, but the cost variance is lower than the
schedule variance: The project under spent because all work was not completed, but
overspent for work that was done.
12. Labor rates, resources used, and poor communications could all have contributed to the cost
overrun. Lag
13. Funding limit reconciliation concerns reconciling the funds to be spent on the project with
funding limits placed on the funding commitments for the project.
14. Funding limit reconciliation most likely will affect the project schedule, since work will need
to be moved to when funds will be available.
15. Funding limit reconciliation occurs after fast tracking the project.
16. 1st: Cost aggregation, 2nd: funding limit reconciliation, 3rd: charter constraint reconciliation
17. Schedule -Resource limit Resource leveling.
18. Cost Plus used when degree of uncertainty and require a large investment early in the project
life cycle.
1. The reason of quality activities is to make sure project meets its objective.
2. (quality assurance) Process analysis follows the steps outlined in the process improvement
plan to identify needed improvements.
5. "Quality Control Measurements" results of your inspections (e.g. numbers of defects found,
numbers of tests passed).
11. Dr. Genichi Taguchi developed the concept of 'Loss Function' when variation from
target increase, loss also increase.
12. Marginal analysis: don't want to exceed a point beyond (unnecessary quality) which the costs of
the improvements aren't offset by the anticipated increase in revenue (sales or profits).
13. Gold Plating: teams impression of what is valued by the customer, and the customer might not
agree.
14. If a project was gold plated, it is considered to be unsuccessful even if it met the
objectives.
15. Investigate root causes is process analysis/improvement which occurs during perform quality
assurance process (Root cause analysis is sort of process analysis).
18. For a good process, the control limits are within the specification limits.
19. Out of control process Stop Production !!
20. Cost benefit analysis in quality management: A business case for each quality
activity compares the cost of the quality step to the expected benefit.
21. Quality cost: conformance (appraisal, prevention), non conformance/cost of poor quality (internal,
external).
22. Grade is a category assigned to products or services having the same functional use
butdifferent technical characteristics
29. Perform Quality Assurance is the process where project managers have the greatest amount
ofinfluence over quality.
30. One of the overarching goals of the Perform Quality Assurance process is to provide a
foundation for continuous process improvements.
31. Quality control is the process responsible for ensuring that approved change requests are
implemented correctly, though a tool called approved change requests review
32. In perform quality assurance process, the team should reevaluate whether the quality
standards are valid.
35. ISO is guidelines and implementation differs from one organization to another.
36. 3 sigma is the most commonly used.
37. Quality injects risk.
38. Cause & effect diagram, process or system chart, influence diagram, domino diagram are all
diagramming techniques used to identify risk.
39.
40.
41.
42.
Risk categorization tool exist in perform qualitative risk analysis NOT identify risk.
Perform qualitative risk analysis must be redo after identify risk responses.
Hi precession and low accuracy adjust the process NOT improve it.
Quality audits can confirm the implementation of approved change requests including
corrective actions, defect repairs, and preventive actions.
HR Management plan:
4. Victor Vrooms Expectancy Theory: If workers believe their efforts are going to be successful
and rewarded, they will tend to be highly motivated and productive. He suggested that employees
are really motivated by goals only when three beliefs are present : Valence: The person wants to
achieve the goal, Expectancy: The person believes it's possible to attain the goal, Instrumentality:
Instrumentality is a judgment the person makes about whether he or she believes that the reward
will be given
5. David McLellands - Achievement Theory (Theory of three needs): this Theory says that
people need achievement, power, and affiliation (seeking approval to be motivated.
6. Douglas McGregors Theory X and Theory Y: Theory X - Team members are Selfish,
Unmotivated, Dislike work (constant supervision is required - 'authoritarian management' style).
Theory Y -Naturally motivated to do good work (manager trusts team members - 'participative
management' style).
7. Dr. William Ouchis Theory of Z Theory: Productivity can be increased by how well
theworkers and management get along and trust each other= worker need to be involved in
management practice.. Japanese style of management
9. Hersey and Blanchard's Life Cycle Theory: Leadership style must change with the maturity of
individual employees. The PM's style should move from Directing, to Coaching, to Supporting, Then to
Delegating as the project moves through its life cycle.
11. Characteristics of self-actualizing people: Don't deny or avoid facts Effective perception of
reality Spontaneous in ideas and actions Creative Problem-solving Social interest in
other people Objective Trusting Acceptance of others Independent with a need for
solitude.
15. Resource histograms: shows role, person and time period (Not Dates).
16. Coach = achieve goals.
17. Oder of preference: Confronting, compromise, smoothing, forcing, withdrawal.
18. Problem solving and compromising are considered the two best conflict techniques, in
that order.
19. Smoothing: down playing the issue, focus on positive, focusing on points of agreement(let's
calm done and got the job done).
20. Compromise is when all parties perform some give-and-take to reach a middle settlement.
LOSE LOSE.
21. Collaborating means working with other people to make sure that their viewpoints and
perspectives are taken into account. To get real commitment from every one.
25. Organization Charts and Position Descriptions (RBS,OBS, RAM) is a tool in develop
human resource plan.
E. Implement solution
F. Validate solution.
29. In matrix organization, the only power that the PM doesn't have is legitimate power.
30. Ethnocentric: look at the world primarily from the perspective of one's own culture.
31. Sponsor may solve problems that behind PM control.
32. Sponsor may review WBS.
33. Sponsor may force quality policies.
38.
39.
40.
41.
42. Accountable = sign off for approval =answerable for the satisfactory completion of the task.
43. Team-building strategies are particularly valuable when team members operate from remote
locations without the benefit of face-to-face contact.
44. One of the most important skills in developing a team environment involves handling project
team problems and discussing these as team issues.
Discussing ground rules allows team members to discover values that are important to one
another.
Sponsor role: give fund, provide and clarify scope, monitor progress.
Some roles exist in other PMPs rather than the project management plan (quality, risk,
communication, quality management plans).
(plan human resource tool): states that organization culture affects how people behave.
Communication Management plan:
1. Performance reports are created in the Report Performance process, but they are
distributed to the relevant stakeholders through the Distribute Information process.
7. Project reports - Formal and informal project reports describe project status and
include lessons learned, issues logs, project closure reports, and outputs from other
Knowledge.
9. All project team members share responsibility for enforcing the rules once they are
established.
10. Types of reports: (status-detailed/how stands now, progress report -what have
beenaccomplished, trend-over time)
11. A change log is used to document changes that occur during a project. Input to manage
stakeholder expectation because These changes and their impact to the project in terms
of time, cost, and risk, must be communicated to the appropriate stakeholders.
12. Communication technology takes into account: Urgency of the need for information,
Project environment, Duration of the project.
Risk Management:
2. Risk response occur before risk, contingency plan fallback plan after risk.
3. Any time a risk's impact is greater than planned, additional risk responses are developed and
documented.
8. Risk Breakdown Structure (RBS): It is not breaking down the actual risks, instead, we are
breaking down the CATEGORIES of risks that we will evaluate.
9. Risk tolerance levels of the organization and the stakeholder exists in EEF.
10. Risk manager , monitor and control risk.
11. The PMBOK Guide notes that the probability and impact matrix values are usually set by
the organization and are part of the organizational process assets.
12. A Tornado diagram (special type of Bar chart) where the data categories are listed
vertically instead of the standard horizontal presentation, and the categories are ordered (the
largest bar appears at the top of the chart, the second largest appears second from the top).
This diagram is useful for sensitivity analysis - comparing therelative importance of
variables.
13. Sensitivity Analysis. A quantitative risk analysis and modeling technique used to
helpdetermine which risks have the most potential impact on the project.
Itexamines the extent to which the uncertainty of each project element affects the objective
being examined when all other uncertain elements are held at their baselinevalues. The
typical display of results is in the form of a tornado diagram.
14. Monte carlo simulation takes into account path convergence on Network Diagram.
15. Simulation techniques are used to predict schedule or cost risks.
16. Normal and lognormal distributions use mean and standard deviations to quantify risk,
which also require gathering the optimistic, most likely, and pessimistic estimates.
19. Risk responses are identified in both Identify risk and Plan risk responses.
20. The risk response occurs BEFORE the risk and tries to alter the probability and/or impact whilethe
contingency plan only occurs AFTER the trigger (usually the risk event) and focuses only on changing
the impact.
21. Risk actions are of 3 types (( risk response ----(if fail) contingency plan ---(if
fail)fallback plan)):
1)
Risk response:- The risk response determines the strategy for influencing the probability and impact of
the risk before it occurs.
i.
For negative risks, its aim is to eliminate the risk or reduce its impact should it occur. For positive risks,
the response tries to increase the probability or impact of the risk.
2)
For residual risk: Contingent response/contingent plan:- it establishes what activities will take
place should a specific event or situation occur. A contingency plan aims to influence the impact of a risk
that is occurring.
3)
For residual risk: Fallback plan:- The fallback plan spells out steps will be taken to recover if the
contingency plan fails.
22. Residual risk is a leftover risk.
1)
After youve implemented a risk response strategy (e.g. mitigation, transfer)some minor risk
might still remain. The contingency reserve is set up to handle situations like this.
2)
ACCPTED RISKS {{whose probability and impact are such that they're acceptable to the performing
organization's level of risk tolerance. They can also be those risks in which there are no reasonable
responses for}}.- ACTIVE Acceptance
23. Contingency reserve is established through the concept of EVM by aggregating the EMV
for each known risk.
24. Contingency reserves are the reserves used for the identified risks occur after the response
plans are being taken {{ residual risk }}.
25. Residual risk and active acceptance risk has contingency plan contingency
reserve.
28. Reserve analysis (TT in risk control): Reserve analysis compares the amount of the
contingency reserves remaining to the amount of risk remaining.
29. work around plan to deal with passively accepted risks and unknowns risks
30. Use of non-linear values implies the organization wishes to avoid high- impact
threats or exploit high-impact opportunities even if they have relatively low
probability. In using non linear values, it is important to understand what each of
the numbers mean, their relationship to one another, how they were derived, and
the effect they may have on different objectives of the project.
31. (or ordinal scale) is the most simple and uses indicators such as low, medium, and
high.
32. A linear scale (or cardinal scale) is numeric, and is commonly used to express the
probability of the risk, so a rating of 1 would imply a very low probability while a
rating of 9 would indicate a very high probability.
33. A non-linear scale is also numeric, but the intervals between the designations aren't
equal (e.g., 1, 2, 4, 8, 16).
34. Risk audits examine and document the effectiveness of risk responses in dealing with
identified risks and their root causes, as well as the effectiveness of the risk management
process.
35. Project risk that has been occurred can be also considered as issue.
36. Prototype= mitigate risk *** Insurance = transfer risk ** joint venture = sharing a positive
risk ** Enhance = adding more resources to finish earlier ** warranty = ??
37. The risk of loss that incurred by force majeure is born by seller.
38. Data gathering (interviews) and representation technique (probability distribution) is a tool
in perform quantitative risk analysis.
40. The probability and impact matrix multiplies the probability and impact to
determine a risk score. Using this score and a predetermined matrix, you determine if
the scores is a high, medium, or low designation.
6. Buyers Risk (from Highest to Lowest) - CPFF - T&M - CPIF - FPIF FFP.
7. Cost plus transfer risk to buyer.
8. ---The Time & Materials (T&M) contract is the riskiest one for the BUYER. ??
9. --- A FIXED price contract is the riskiest sort of contract for the SELLER.
10. Administer procurement acts like execute the contract and M&C and integrated change
control.
12. Claims are documented, processed, monitored, and managed throughout the
contract life cycle, If the parties themselves do not resolve a claim, alternative
dispute resolution (ADR) typically following procedures established in the contract.
Settlement of all claims and disputes through negotiation is the preferred method.
13. A records management system is used by the project manager to manage contract and
procurement documentation and records.
16. close procurement Product validation: Validate each and every deliverable or the
final deliverable for defects-
19. Early termination of a contract is a special case of procurement closure that can
result from a mutual agreement of both parties, from the default of one party, or for
convenience of the buyer if provided for in the contract. The rights and responsibilities
of the parties in the event of an early termination are contained in a terminations
clause of the contract.
23. A procurement statement of work may be revised and refined as it moves through
the procurement process.
24. PM doesnt have the authority to change order (only the procurement manager) --> change order always initiated from the buyer side.
2)
Waivers are statements saying the rights under the contract may not be waived or modified other than
by express agreement. (The act of voluntarily giving up a right or covenant.)
28. Time is of essence, any delay considered to ma material breach (a breach that
cannot continue with).
29.
30.
31.
32.
1)
2)
Develop good relationship.
35. Constructive changes: changes occur when the buser through action or inaction get
in the sellers way to perform the work.
36. Procurement statement of work basically written by the buyer, however it might be
written by seller and the buyer review it.
Detailed:
Integration Management
Requirements management plan (Section 5.1.3.2) :describes how to identify, analyze, and document
requirements as well as how those requirements will be managed and controlled.
Configuration management plan (defines those items that are configurable and those items that
require formal change control)
Configuration identification. Selection and identification of a configuration item provides the basis for
which product configuration is defined and verified, products and documents are labeled, changes are managed, and
accountability is maintained.
Configuration status accounting. Information is recorded and reported as to when appropriate data about
the configuration item should be provided. This information includes a listing of approved configuration
identification, status of proposed changes to the configuration, and the implementation status of approved changes.
Configuration verification and audit. Configuration verification and configuration audits ensure the
composition of a projects configuration items is correct and that corresponding changes are registered,
assessed, approved, tracked, and correctly implemented. This ensures the functional requirements
defined in the configuration documentation have been met.
WPI, WPM, Performance Reports:
1)
WPI is gathered as project being executed = raw data, output of direct and manage project execution
(e.g. project deliverables, change requests status, risks status, costs incurred).
2)
WPI used to generate: WPM (e.g. CPI, SPI, CV, SV) and forecasts (e.g. ETC, EAC).
3)
WPI + WPM + budget forecast = Performance Reports.
4)
Senior management, customer, sponsor need to look at Performance reports not WPI, nor WPM, nor
forecasts.
5)
WPI used later in M&C, input to most M&C process:
i.
Perform quality assurance
ii.
Perform integrated change control
iii.
Control scope
iv.
Control schedule
v.
Control cost
vi.
Report performance
vii.
Monitor and control risk
viii.
Administer procurement
6)
WPM is input to perform quality control.
7)
Performance Reports is input to 3 process only Monitor and control process, monitor and control risk, administer
procurement.
8)
Oliver comments:
8. technical inability and poor risk management frequently leads to not meeting
customer expectation
13. best way to calculate Profit from internal project is the EVA (economic value added)
to the organization taking into account taxes and capital cost. Does the project returns
to the organization more value than the initiative costs.
14. variable sampling includes collection of quantitative data in the degree of conformity
for each item of a sample
20. Tornado diagram: comparing the relative importance of variables that have hi
degree of uncertainty with those that are more stable
2management responsibility
4continuous improvement"
27. warranty parts may not be replaced for free- but some team members must be
available to handel the customer complaints in the warranty period
28. If a procurement item is readily available from many accepted sellers, focus on the
price
33. during closing a project, a team member may be willing to move to a new projectas PM make a smooth transition even if the team member is v imp source
1. In the teaming agreement, both the buyer and the seller collectively prepare
Contract, Procurement statement of work
2. A project phase is generally concluded and formally closed with a review of the
deliverables to determine completeness and acceptance. A phase-end review can
achieve the combined goal of obtaining authorization to close the current phase and
start the subsequent one. The end of a phase represents a natural point to reassess
the effort underway and to change or terminate the project if necessary. A review
of both key deliverables and project performance to date to a) determine if
the project should continue into its next phase and b) detect and correct errors cost
effectively should be regarded as good practice.
4.
5.
4. Perform Integrated Change Control process includes coordinating changes across the entire project (las
5. Quality metrics are used in the Perform Quality Assurance and Perform Quality Control processes.
6. Common formats for performance reports include bar charts, S-curves, histograms, and tables NOT contr
7. Contingency reserves are needed to bring the risk of overrunning stated project objectives to a level accept
when compared to the $41 million US sum of the most likely estimates shown}}
8. Assigning tasks in the start of every week in a small project is not improper management.
9. Organizational theory: provides information regarding the way in which people, teams, and organizational
10. The PMI Code of Ethics and Professional Conduct require a project manager to address things with an
countries. So, it is not the responsibility of the project manager to enforce the work-ethics of one`s o
11. Rectification of a minor flaw can lead to delay of 2 months in the project: so, the project manager sho
12. the work authorization system is not created to Prevent team members from starting the work withou
13. Quality audit is structured review to determine whether product activities comply with organizatio
14. A procurement audit is a structured review of the procurement process originating from Plan Procure
15. Monitor and Control Risks is the process of implementing risk response plans, tracking identifi
process effectiveness(risk audit) throughout the project.
16. Monitor & Control Risk: Diff between risk reassessment and risk audit:
1Risk audits examine and document the effectiveness of risk responses in dealing with identified risks and their root causes
2Risk reassessment identification of new risks, reassessment of current risks, and the closing of risks that are outdated.
1. Quality assurance can be conducted throughout the project but should be conducted at regular interv
2. Project performance should be set by the stakeholders not predicted by the project manager.
78.
4 types of project closure:
a.
Starvation: withdrawal of life support.
b.
Addition: added to a parent company project.
c.
Integration: assets absorbed by a parent company project.
d.
Extinction: reach to normal closing either by success of failure
3.
4.
5.
6.
7.
8.
List of stakeholders names, positions, locations, potential influence on the project impact, and level of interest
Prioritize the change requests is the PM Job.
In a matrix organization, the functional manager does administrative functions for his staff.
Level 1 in the WBS may be deliverable, project phase, subprojects, or combinations.
Deming said that quality is 85 % of time due to management problem.
Depreciation cost is added to estimate activity cost not determine budget.
risk.
We report unethical or illegal conduct to the appropriate management without
giving the criminal 48 Hours !!.
Initiation phase can kickoff the project.
Corrective action similar to Rework.
The biggest disadvantage or parametric estimate that the solution may not scale = the
estimation that may work for a large projects may not work for a small project.
Undocumented scope creep = Gold plating.
you discovered that the change request is an enhancement, this doesnt mean that
he is really
Blanchcards: situational continuum
Senior management must be consulted when changing one of the triple
constraints(change request that affect the triple constraints).
20. Customer is the one who has the greatest influence in project scope
changes {{ cause he is the one who will pay }}.
21. Shannon weaver model is a communication model.
29. Learning curve estimation uses the principal that the cost per unit will decrease as more units
of work are manufactured.
30. Statistical Sampling is the standard technique that is used to test only a small sample of
products instead of all the products manufactured.