Sie sind auf Seite 1von 129

Pobla

TC
0.01680424
0.00331979
0.04211329
0
0
0.0101291
0.0101291

CENTRO POBLADO

2007

2008

2
2009

122

3
2010

124

4
2011

Taulish

120

126

128

Fortaleza Andina

350

351

352

353

355

Hacienda Alpamarca

975

1016

1059

1103

1150

Villa Florida

160

160

160

160

160

Olgoyaco

194

194

194

194

194

Cajaspampa

309

312

315

318

322

Tinyabamba

206

208

210

212

214

POBLACIN DEM
1

DISTRITO/
CENTRO POBLADO

0.01680424

Taulish

2007

2008

2009

2010

2011

22

22

22

22

24

0.008143 03 aos

0.01068 04 aos

0.000 05 aos

0.00331979

Fortaleza andina

0.0000 03 aos

30

30

30

30

30

11

11

11

11

11

0.0000 04 aos

0.0000 05 aos

10

10

10

10

10

101

103

105

107

110

0.04211329

Hacienda alpamarca

0.023588 03 aos
0.016067 04 aos
0.021657 05 aos

0.000

14

14

14

14

14

0.0000 03 aos

0.0000 04 aos

0.0000 05 aos

15

15

15

15

15

0.0000 03 aos

0.0000 04 aos

Villa florida

Olgoyaco

0.0000 05 aos

34

34

35

35

35

0.0000 03 aos

0.0000 04 aos

13

13

13

13

14

0.0022 05 aos

17

17

17

18

18

25

25

26

26

26

0.0101291

0.0101291

Cajaspampa

Tinyabamba

0.0000 03 aos

0.0000 04 aos

16

16

16

16

17

0.0022 05 aos

Poblacin de Referencia.
5
2012
130

6
2013

7
2014

133

135

Ao 0
2015
137

10

PERIODO DE POST INVERSION


Ao 1

Ao 2

137

Ao 3

139

142

Ao 4
144

Ao 5
147

Ao 6
149

Ao 7 Ao 8
152

154

Ao 9 Ao 10
157

159

356

357

358

359

359

361

362

363

364

365

367

368

369

370

1198

1249

1301

1356

1356

1413

1473

1535

1599

1667

1737

1810

1886

1966

160

160

160

160

160

160

160

160

160

160

160

160

160

160

194

194

194

194

194

194

194

194

194

194

194

194

194

194

325

328

332

335

335

338

342

345

349

352

356

359

363

367

217

219

221

223

223

226

228

230

232

235

237

240

242

244

POBLACIN DEMANDANTE POTENCIAL


5

8
Ao 0

2012

2013

2014

2015

PERIODO DE POST INVERSION


Ao 1

Ao 2

Ao 3

Ao 4
26

Ao 5
26

Ao 6
26

Ao 7 Ao 8
26

26

Ao 9 Ao 10

24

24

25

25

25

25

26

27

27

10

10

10

10

10

10

10

31

31

31

31

31

31

31

31

31

31

31

31

31

31

11

11

11

11

11

11

11

11

11

11

11

11

11

11

10

10

10

10

10

10

10

10

10

10

10

10

10

10

112

114

75

78

80

81

83

85

86

88

90

90

93

95

18

19

19

20

20

21

21

22

22

23

23

24

32

33

34

34

35

36

36

37

37

38

38

39

25

26

27

27

28

28

29

30

30

31

32

32

14

14

14

14

14

14

14

14

14

14

14

14

14

14

15

15

15

15

15

15

15

15

15

15

15

15

15

15

36

36

36

37

37

37

37

37

37

37

37

37

37

37

14

14

14

14

14

14

14

14

14

14

14

14

14

14

18

18

18

18

18

19

19

19

19

19

19

19

19

19

26

27

27

27

27

27

27

27

27

27

27

27

27

27

17

17

17

17

17

17

17

17

17

17

17

17

17

17

Ao 10

PRORRATEO

0.024

TASA DE COBERTU

DEMANDA EFE
DISTRITO/
CENTRO
POBLADO

Ao 10

aulish
03 aos
04 aos
05 aos
fortaleza andina
03 aos
04 aos
05 aos
Hacienda Alpamarca

2.3588%
1.6067%
2.1657%

03 aos
04 aos
05 aos
villa florida

Tasa cobertura meta: 86%


Tasa asistencia Alpamarca: 77%
Tasa para los 10 aos: 9%
Tasa anual: 0.90%

03 aos
04 aos
05 aos
Olgoyaco
03 aos

Tasa crecimiento

1.009

04 aos
05 aos
cajaspampa
03 aos
04 aos
05 aos
tinyabamba
03 aos
04 aos
05 aos

Nota: La Demanda con proyecto en el CP Hacienda Alpamarca la proyecta

TOTAL

DEMANDA EFE
DISTRITO/
CENTRO
POBLADO
Taulish

Tasa
tasa % distrital incremental
a utilizar
1.68040

03 aos

0.8143

0.8143

04 aos

1.068

1.0680

0.000

0.0000

05 aos
fortaleza andin

0.33200

03 aos

-0.4765

0.0000

04 aos

-1.4193

0.0000

-1.8979

0.0000

05 aos
Hacienda Alp

4.2113

03 aos

2.3588

2.3588

04 aos

1.6067

1.6067

05 aos

2.1657

2.1657

villa florida

-1.036

03 aos

0.0000

04 aos

0.0000

0.0000

05 aos
Olgoyaco

-0.7107

03 aos

-2.5996

0.0000

04 aos

-1.9539

0.0000

05 aos

-1.9733

0.0000

cajaspampa

1.0129

03 aos

-0.5371

0.0000

04 aos

-0.9442

0.0000

05 aos

0.2232

0.2232

tinyabamba

1.0129

03 aos

-0.5371

0.0000

04 aos

-0.9442

0.0000

05 aos

0.2232

0.2232

1
86%

TASA DE COBERTURA

2016

2
3
4
5
6
88.4% 90.8% 93.2% 95.6% 98.0%
2017

2018

2019

2020

2021

7
98%

8
98%

9
98%

10
98%

2022

2023

2024

2025

DEMANDA EFECTIVA CON PROYECTO


Nomina
s

Ao 0

2014

2015

PERIODO DE POST INVERSION


Ao 1

Ao 2

Ao 3

Ao 4

Ao 5

Ao 6

Ao 7

26

Ao 8

26

26

Ao 9

Ao 10

19

19

22

23

23

24

25

26

26

10

10

10

10

10

16

16

26

27

28

29

29

30

30

30

30

30

10

10

10

11

11

11

11

11

11

11

10

10

10

10

10

10

10

58

60

61

63

65

66

68

70

72

74

77

79

12

12

13

13

14

14

15

15

16

16

17

17

26

27

27

28

28

29

30

31

31

32

33

34

20

21

21

22

22

23

24

24

25

26

27

28

12

12

12

12

13

13

13

14

14

14

14

14

10

10

13

13

14

14

14

15

15

15

15

15

16

16

32

33

34

35

35

36

36

36

36

37

12

12

13

13

13

14

14

14

14

14

16

16

17

17

18

18

18

18

18

18

11

11

23

24

25

25

26

27

27

27

27

27

15

15

16

16

17

17

17

17

17

17

a Alpamarca la proyectaremos utilizando solo la tasa de cobertura del 86% para todo el horizonte del proyecto.

189

195

200

206

212

218

220

222

224

227

DEMANDA EFECTIVA SIN PROYECTO


Nmina
s

Ao 0

2014

2015

PERIODO DE POST INVERSION


Ao 1

Ao 2

Ao 3

Ao 4

Ao 5

Ao 6

Ao 7

Ao 8

Ao 9

Ao 10

19

19

19

19

19

20

20

20

20

20

20

20

16

16

16

16

16

16

16

16

16

16

16

16

58

59

60

61

63

64

65

66

68

69

70

72

12

12

13

13

13

13

14

14

14

15

15

16

26

26

27

27

28

28

29

29

30

30

30

31

20

20

21

21

22

22

23

23

24

24

25

25

12

12

12

12

12

12

12

12

12

12

12

12

10

10

10

10

10

10

10

10

10

10

10

10

16

16

16

16

16

16

16

16

16

16

16

16

11

11

11

11

11

11

11

11

11

11

11

11

142

OFERTA OPTIMIZADA DEL SERVICIO DE LAS I.E.I.


AULAS

1.3

DISTRITO/

Nominas

Ao 0

CENTRO POBLADO

2014

2015

Taulish

03 aos

04 aos

0.7
1.4
1.1
0.7

0.7

16

03 aos

04 aos

05 aos

58

03 aos

12

04 aos

26

05 aos

20

12

03 aos

04 aos

05 aos

10

03 aos

04 aos

Fortaleza andina

Hacienda alpamarca

1
2
1
1

Villa florida

Olgoyaco

05 aos

1.8

1.3

14

onte del proyecto.

2113

16

03 aos

04 aos

05 aos

11

03 aos

04 aos

05 aos

Cajaspampa

Tinyabamba

AULAS

Ao 1 Ao 2 Ao 3 Ao 4

19

05 aos

1.5

PERIODO DE POST INV

SERVICIO DE LAS I.E.I.

BALANCE OFERTA

PERIODO DE POST INVERSION


Ao 5 Ao 6 Ao 7 Ao 8 Ao 9 Ao 10
0

DISTRITO/

Nominas

Ao 0

CENTRO
POBLADO

2014

2015

Taulish

Ao 1

-19

-19

-22

03 aos

-6

-6

-7

04 aos

-5

-5

-8

05 aos

-8

-8

-7

-16

-16

-26

03 aos

-6

-6

-10

04 aos

-5

-5

-8

05 aos

-5

-5

-9

-58

-60

-61

03 aos

-12

-12

-13

04 aos

-26

-27

-27

05 aos

-20

-21

-21

-12

-12

-12

03 aos

-4

-4

-3

04 aos

-5

-5

-3

05 aos

-3

-3

-5

Olgoyaco

-10

-10

-13

03 aos

-3

-3

-5

04 aos

-3

-3

-3

Fortaleza andina

Hacienda alpamar

Villa florida

05 aos

-4

-4

-5

-16

-16

-32

03 aos

-5

-5

-4

04 aos

-8

-8

-12

05 aos

-3

-3

-16

-11

-11

-23

03 aos

-4

-4

-2

04 aos

-6

-6

-15

05 aos

-1

-1

-7

Cajaspampa

Tinyabamba

-189

BALANCE OFERTA - DEMAND

DESCRIPCIN

I.E.I. 2172 I.E.I. 82191

OFERTA
INFRAESTRUCTURA
OPTIMIZADA

2
-2

2
-2

DEMANDA DE

INFRAESTRUCTURA
BRECHA POR N AULAS

BALANCE OFERTA - DEMANDA SITUACIN CON PROYECTO.


PERIODO DE POST INVERSION
Ao 2

Ao 3

Ao 4

Ao 5

Ao 6

Ao 7
-26

-26

Ao 8

Ao 9

-26

Ao 10

-23

-23

-24

-25

-26

-26

-7

-7

-8

-8

-8

-8

-8

-8

-9

-8

-9

-9

-9

-10

-10

-10

-10

-10

-7

-7

-7

-8

-8

-8

-8

-8

-8

-27

-28

-29

-29

-30

-30

-30

-30

-30

-10

-10

-11

-11

-11

-11

-11

-11

-11

-8

-8

-9

-9

-9

-9

-9

-9

-9

-9

-9

-10

-10

-10

-10

-10

-10

-10

-63

-65

-66

-68

-70

-72

-74

-77

-79

-13

-14

-14

-15

-15

-16

-16

-17

-17

-28

-28

-29

-30

-31

-31

-32

-33

-34

-22

-22

-23

-24

-24

-25

-26

-27

-28

-12

-13

-13

-13

-14

-14

-14

-14

-14

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-4

-5

-5

-6

-6

-6

-6

-6

-6

-6

-13

-14

-14

-14

-15

-15

-15

-15

-15

-5

-5

-6

-6

-6

-6

-6

-6

-6

-3

-3

-3

-3

-3

-3

-3

-3

-3

-5

-5

-6

-6

-6

-6

-6

-6

-6

-33

-34

-35

-35

-36

-36

-36

-36

-37

-4

-4

-4

-4

-4

-4

-4

-4

-4

-12

-13

-13

-13

-14

-14

-14

-14

-14

-16

-17

-17

-18

-18

-18

-18

-18

-18

-24

-25

-25

-26

-27

-27

-27

-27

-27

-2

-2

-2

-2

-2

-2

-2

-2

-2

-15

-16

-16

-17

-17

-17

-17

-17

-17

-7

-7

-7

-7

-8

-8

-8

-8

-8

-195

-200

-206

-212

-218

-220

-222

-224

-227

ALANCE OFERTA - DEMANDA POR NUMERO DE AULAS.

I.E.I. 2174 I.E.I. 81937 I.E.I. 80518

I.E.I.80761

I.E.I. 80472

4
-4

1
-1

1
-1

2
-2

2
-2

14

-2113

Pobla
1

TC
0.01680424
0.00331979
0.04211329
0
0
0.0101291
0.0101291

CENTRO POBLADO

2007

2008

2
2009

122

3
2010

124

4
2011

Taulish

120

126

128

Fortaleza Andina

350

351

352

353

355

Hacienda Alpamarca

975

1016

1059

1103

1150

Villa Florida

160

160

160

160

160

Olgoyaco

194

194

194

194

194

Cajaspampa

309

312

315

318

322

Tinyabamba

206

208

210

212

214

POBLACIN DEM
1

DISTRITO/
CENTRO POBLADO

0.01680424

Taulish

2007

2008

2009

2010

2011

22

22

22

22

24

0.008143 03 aos

0.01068 04 aos

0.000 05 aos

0.00331979

Fortaleza andina

0.0000 03 aos

30

30

30

30

30

11

11

11

11

11

0.0000 04 aos

0.0000 05 aos

10

10

10

10

10

101

103

105

107

110

0.04211329

Hacienda Alpamarca

0.023588 03 aos
0.016067 04 aos
0.021657 05 aos

0.000

14

14

14

14

14

0.0000 03 aos

0.0000 04 aos

0.0000 05 aos

15

15

15

15

15

0.0000 03 aos

0.0000 04 aos

Villa florida

Olgoyaco

0.0000 05 aos

34

34

35

35

35

0.0000 03 aos

0.0000 04 aos

13

13

13

13

14

0.0022 05 aos

17

17

17

18

18

25

25

26

26

26

0.0101291

0.0101291

Cajaspampa

Tinyabamba

0.0000 03 aos

0.0000 04 aos

16

16

16

16

17

0.0022 05 aos

Poblacin de Referencia.
5
2012
130

6
2013

7
2014

133

135

Ao 0
2015
137

10

PERIODO DE POST INVERSION


Ao 1

Ao 2

137

Ao 3

139

142

Ao 4
144

Ao 5
147

Ao 6
149

Ao 7 Ao 8
152

154

Ao 9 Ao 10
157

159

356

357

358

359

359

361

362

363

364

365

367

368

369

370

1198

1249

1301

1356

1356

1413

1473

1535

1599

1667

1737

1810

1886

1966

160

160

160

160

160

160

160

160

160

160

160

160

160

160

194

194

194

194

194

194

194

194

194

194

194

194

194

194

325

328

332

335

335

338

342

345

349

352

356

359

363

367

217

219

221

223

223

226

228

230

232

235

237

240

242

244

POBLACIN DEMANDANTE POTENCIAL


5

8
Ao 0

2012

2013

2014

2015

PERIODO DE POST INVERSION


Ao 1

Ao 2

Ao 3

Ao 4
26

Ao 5
26

Ao 6
26

Ao 7 Ao 8
26

26

Ao 9 Ao 10

24

24

25

25

25

25

26

27

27

10

10

10

10

10

10

10

31

31

31

31

31

31

31

31

31

31

31

31

31

31

11

11

11

11

11

11

11

11

11

11

11

11

11

11

10

10

10

10

10

10

10

10

10

10

10

10

10

10

112

114

75

78

80

81

83

85

86

88

90

90

93

95

18

19

19

20

20

21

21

22

22

23

23

24

32

33

34

34

35

36

36

37

37

38

38

39

25

26

27

27

28

28

29

30

30

31

32

32

14

14

14

14

14

14

14

14

14

14

14

14

14

14

15

15

15

15

15

15

15

15

15

15

15

15

15

15

36

36

36

37

37

37

37

37

37

37

37

37

37

37

14

14

14

14

14

14

14

14

14

14

14

14

14

14

18

18

18

18

18

19

19

19

19

19

19

19

19

19

26

27

27

27

27

27

27

27

27

27

27

27

27

27

17

17

17

17

17

17

17

17

17

17

17

17

17

17

75

58

77%

Ao 10

PRORRATEO

0.024

TASA DE COBERTURA

DEMANDA EFECTIVA CO
DISTRITO/
Ao 10

CENTRO
POBLADO
Taulish
03 aos
04 aos
05 aos
Fortaleza andina
03 aos
04 aos
05 aos
Hacienda Alpamarca
03 aos
04 aos
05 aos
villa florida
03 aos
04 aos
05 aos
Olgoyaco
03 aos
04 aos
05 aos
Cajaspampa
03 aos
04 aos
05 aos
Tinyabamba
03 aos
04 aos
05 aos

Nota: La Demanda con proyecto en el CP Hacienda Alpamarca la proyectaremos uti

TOTAL
143

DEMANDA EFECTIVA SI
DISTRITO/
CENTRO
POBLADO

Tasa
tasa % distrital incremental
a utilizar

Taulish

1.68040

03 aos

0.8143

0.8143

04 aos

1.068

1.0680

05 aos

0.000

0.0000

fortaleza andin

0.33200

03 aos

-0.4765

0.0000

04 aos

-1.4193

0.0000

05 aos

-1.8979

0.0000

Hacienda Alpa

4.2113

03 aos

2.36%

2.3588

04 aos

1.61%

1.6067

05 aos

2.17%

2.1657

villa florida

-1.036

03 aos

0.0000

04 aos

0.0000

0.0000

05 aos
Olgoyaco

-0.7107

03 aos

-2.5996

0.0000

04 aos

-1.9539

0.0000

05 aos

-1.9733

0.0000

cajaspampa

1.0129

03 aos

-0.5371

0.0000

04 aos

-0.9442

0.0000

05 aos

0.2232

0.2232

tinyabamba

1.0129

03 aos

-0.5371

0.0000

04 aos

-0.9442

0.0000

05 aos

0.2232

0.2232

2014

Hacienda alpamarca
03 aos
04 aos
05 aos

2.3588%
1.6067%
2.1657%

12
26
20

58

0
2015
12
27
21
60

Ao 1

2016
13
27
21
61

Ao 2

2017
13
28
22
63

Ao 3 Ao 4

2018 ###
14 14
29 29
23 23
65 67

TASA DE COBERTURA META

86%

TASA ASISTENCIA ALPAMARCA

77%

TASA PARA LOS 10 AOS

9%

TASA ANUAL

0.90%
1.009

ASA DE COBERTURA

1
2
3
4
5
6
86% 88.4% 90.8% 93.2% 95.6% 98.0%

7
98%

8
98%

9
98%

10
98%

2016

2022

2023

2024

2025

2017

2018

2019

2020

2021

DEMANDA EFECTIVA CON PROYECTO


Nomina
s

Ao 0

2014

2015

PERIODO DE POST INVERSION


Ao 1

Ao 2

Ao 3

Ao 4

Ao 5

Ao 6

Ao 7

26

Ao 8

26

Ao 9

26

Ao 10

19

19

22

23

23

24

25

26

26

10

10

10

10

10

16

16

26

27

28

29

29

30

30

30

30

30

10

10

10

11

11

11

11

11

11

11

10

10

10

10

10

10

10

58

60

69

70

71

73

74

76

77

79

80

82

12

12

17

17

17

18

18

19

19

19

20

20

26

27

29

30

30

31

31

32

32

33

33

34

20

21

23

23

24

24

25

25

26

27

27

28

12

12

12

12

13

13

13

14

14

14

14

14

10

10

13

13

14

14

14

15

15

15

15

15

16

16

32

33

34

35

35

36

36

36

36

37

12

12

13

13

13

14

14

14

14

14

16

16

17

17

18

18

18

18

18

18

11

11

23

24

25

25

26

27

27

27

27

27

15

15

16

16

17

17

17

17

17

17

marca la proyectaremos utilizando solo la tasa de cobertura del 86% para todo el horizonte del proyecto.

197

202

207

212

218

223

225

226

228

230

10

DEMANDA EFECTIVA SIN PROYECTO


Nmina
s

Ao 0

2014

2015

PERIODO DE POST INVERSION


Ao 1

Ao 2

Ao 3

Ao 4

Ao 5

Ao 6

Ao 7

Ao 8

Ao 9

Ao 10

19

19

19

19

19

20

20

20

20

20

20

20

16

16

16

16

16

16

16

16

16

16

16

16

58

60

61

63

64

65

66

68

69

70

72

73

12

12

13

13

13

13

14

14

14

15

15

16

26

27

27

28

28

29

29

30

30

31

31

32

20

21

21

22

22

23

23

24

24

25

25

26

12

12

12

12

12

12

12

12

12

12

12

12

10

10

10

10

10

10

10

10

10

10

10

10

16

16

16

16

16

16

16

16

16

16

16

16

11

11

11

11

11

11

11

11

11

11

11

11

142

144

Ao 5

2020
15
30
24
69

Ao 6

2021
15
31
25
71

Ao 7

2022
16
32
26
73

Ao 8

2023
16
33
26
75

Ao 9

2024
17
33
27
77

Ao 10

2025
17
34
28
79

1
2
1
4 AULAS

AULAS

1.3

1.5

0.8
1.3
1.1
0.7

2
2
2
1

0.7

1.8

1.3

16

e del proyecto.

2167

AULAS

I.E.I. N 2172 TAULISH


Unidad
Medida

Metrado

Precio
Unitario

Transporte de materiales a lugar de


Construccion de Aula 01 de 3 a 5 a
Construccion de Aula 02 de 3 a 5 a
Infraestructura Complementaria
Cocina
Vivienda Docente
Servicios Higienicos para nios y ni
Infraestructura Administrativa

glb
m2
m2

1.00
58.98
58.43

56,000.00
1,899.75
1,899.75

m2
m2
m2

10.95
18.31
12.60

1,899.75
1,899.75
1,990.33

Direccion

m2

14.44

1,899.75

RUBRO
OBRAS
Infraestructura Pedagogica

Servicios Higienicos docentes y admi


m2
4.12
Muros
de contencion
H. MAX 2
Infraestructura
de Proteccion,
limpieza y drenaje
M( Incluye mov. Tierras,
Cerco perimetrico
ml
94.65
mejoramiento de terreno, capas de
hormigon , cimentacion,
pantalla,
Evacuacion
Pluvial (incluye
acero,
encofrado,
curado,
ml
110.00
canaletas en los techos, etc)
montantes, cajas de
registro,derivacion
y evacuacion)
glb
1.00
Area
exterior(Vereda
de concreto
e=4"
,patio
de concreto
e=6",piso
Zona de
circulacion,
juegos,
jardines
adoquinado, rampas, etc), incluye
mov. Tierras, capas de
conformacion y concreto u adoquin
segn corresponda
m2
1,145.56
Jardines, incluye mov. de tierras, t
m2
170.43
Cobertura , incluye tensionadas tra
m2
109.33
Area de ingreso con Hito Instituciona
glb
1.00
Tanque septico y Pozo Percolador
glb
1.00
Tanque elevado y cisterna
glb
1.00
Instalaciones Sanitarias Exteriores
glb
1.00
Instalaciones Electricas Exteriores
Costo Directo
Gasto generales (10%CD)
Utilidad (05%CD)
Sub total Presupuesto sin IGV

glb

1.00

1,990.33
939.45
1,000.00
25,000.00

136.09
65.00
353.86
8,000.00
10,000.00
38,000.00
22,911.30
34,366.95

IGV(18%)
I). COSTO TOTAL DE INFRAESTRUCTURA

II). COSTO EXPEDIENTE TECNICO

Elaboracion del Expediente

und

1.00

31,828.73

und

1.00

44,560.22

III). COSTO SUPERVISION

Supervision

IV). COSTO MITIGACION AMBIENTAL Y MEDIDAS DE REDUCCION DE RIESG

Mitigacion Ambiental

glb

1.00

17,876.48

Medidas de Reduccion de Riesgo

glb

1.00

9,425.25

V). COSTO TOTAL DE EQUIPAMIENTO, MOBILIARIO Y MATERIALES

Equipamiento, mobiliario
Material educativo
Total Presupuesto a Precio de Mercado

Total a
Precios de
Metrado

56,000.00
112,046.96
111,002.10
20,802.21
34,784.33
25,078.10
27,432.32
8,200.14
88,918.94
110,000.00
25,000.00

155,899.93
11,077.95
38,687.51
8,000.00
10,000.00
38,000.00
22,911.30
34,366.95
938,208.73
93,820.87
46,910.44
###

194,209.21
1,273,149.25

31,828.73

31,828.73
44,560.22

44,560.22
27,301.73

17,876.48
9,425.25
40,817.54

26,498.00
14,319.54
1,417,657.47

I.E.I. N 92191 FORTALEZA ANDINA


RUBRO

Unidad
Metrado
Medida

OBRAS
Infraestructura Pedagogica
Transporte de materiales a lugar de la Obra (FLETE
Construccion de Aula 01 de 3 aos incl.Deposito
Construccion de Aula 02 de 4 a 5 aos incl.Deposit
Construccion de sala de psicomotricidad incl.Depos
Infraestructura Complementaria
Cocina
Vivienda Docente
Servicios Higienicos para nios y nias
Infraestructura Administrativa

glb
m2
m2
m2

1.00
58.98
58.43
64.30

m2
m2
m2

10.95
17.65
12.60

Direccion

m2

14.20

Servicios Higienicos docentes y administrativos

m2

3.78

Cerco perimetrico

ml

116.00

Muros de contencion
H. MAXcanaletas
4M
Evacuacion
Pluvial (incluye
en los
techos, montantes, cajas de registro,derivacion y
evacuacion)

ml

49.00

glb

1.00

Zona de circulacion, juegos, jardines


Area exterior(Vereda de concreto e=4" ,patio de
concreto e=6",piso adoquinado, rampas, etc),
incluye mov. Tierras, capas de conformacion y
concreto u adoquin segn corresponda
Jardines, incluye mov. de tierras, tierra de chacra
Cobertura , incluye tensionadas traslucidas y apoy
Area de ingreso con Hito Institucional
Tanque septico y Pozo Percolador
Tanque elevado y cisterna
Instalaciones Sanitarias Exteriores

m2
m2
m2
glb
glb
glb
glb

134.07
290.63
110.18
1.00
1.00
1.00
1.00

glb

1.00

Infraestructura de Proteccion, limpieza y drenaje

Instalaciones Electricas Exteriores


Costo Directo
Gasto generales (10%CD)
Utilidad (05%CD)
Sub total Presupuesto sin IGV

IGV(18%)
I). COSTO TOTAL DE INFRAESTRUCTURA
II). COSTO EXPEDIENTE TECNICO
Elaboracion del Expediente

und

1.00

und

1.00

III). COSTO SUPERVISION


Supervision

IV). COSTO MITIGACION AMBIENTAL Y MEDIDAS DE REDUCCION DE RIESGO


Mitigacion Ambiental

glb

1.00

Medidas de Reduccion de Riesgo

glb

1.00

V). COSTO TOTAL DE EQUIPAMIENTO, MOBILIARIO Y MATERIALES


Equipamiento, mobiliario
Material educativo
Total Presupuesto a Precio de Mercado

ANDINA
Total a
Precio
Precios de
Unitario
Metrado

56,000.00
1,755.47
1,755.47
1,755.47

56,000.00
103,537.62
102,572.11
112,876.72

1,755.47
1,755.47
1,846.05

19,222.40
30,984.05
23,260.23

1,755.47

24,927.67

1,846.05

6,978.07

939.45

108,976.20

2,000.00

98,000.00

25,000.00

25,000.00

136.09
65.00
353.86
8,000.00
10,000.00
38,000.00
2,681.46

18,245.98
18,890.95
38,988.29
8,000.00
10,000.00
38,000.00
2,681.46

4,022.19

4,022.19
851,163.94
85,116.39
42,558.20
978,838.53

176,190.94
1,155,029.47
28,875.74
28,875.74

40,426.03
40,426.03

ION DE RIESGO

ALES

28,875.74

17,876.48
9,425.25

40,426.03
27,301.73
17,876.48
9,425.25
40,817.54
26,498.00
14,319.54
1,292,450.50

I.E.I. N 2174 ALPAMARCA


Unidad
Medida

Metrado

Transporte de materiales a lugar de la Obra (FLETE)

glb

1.00

Construccion de Aula para Tres aos incl.Deposito - A1


Construccion de Aula para cuatro aos incl. Deposito -

m2
m2

71.93
71.68

Construccion de Aula para Cinco Aos incl.Deposito - A

m2

72.90

Construccion de Aula para cuatro aos incl.Deposito - A

m2

72.49

Construccion de sala de psicomotricidad


Infraestructura Complementaria
Cocina
Servicios Higienicos para nios y nias
Infraestructura Administrativa

m2

78.80

m2
m2

10.90
21.59

Direccion

m2

13.73

Sala de Profesores

m2

14.65

Secretaria y sala de espera

m2

7.52

Servicios Higienicos docentes y administrativos

m2

4.43

Cerco perimetrico

ml

160.00

Muros de contencion H. MAX 3 M( Incluye mov. Tierras,


mejoramiento de terreno, capas de hormigon ,
cimentacion, pantalla, acero, encofrado, curado, etc)
Evacuacion Pluvial (incluye canaletas en los techos,
montantes, cajas de registro,derivacion y evacuacion)

ml

89.00

glb

1.00

Zona de circulacion, juegos, jardines


Area exterior(Vereda de concreto e=4" ,patio de
concreto e=6",piso adoquinado, rampas, etc), incluye
mov. Tierras, capas de conformacion y concreto u
adoquin segn corresponda
Jardines, incluye mov. de tierras, tierra de chacra y se

m2
m2

265.40
658.41

Cobertura , incluye tensionadas traslucidas y apoyos


Area de ingreso con Hito Institucional
Tanque septico y Pozo Percolador
Tanque elevado y cisterna
Instalaciones Sanitarias Exteriores

m2
glb
glb
glb
glb

129.39
1.00
1.00
1.00
1.00

RUBRO
OBRAS
Infraestructura Pedagogica

Infraestructura de Proteccion, limpieza y drenaje

Instalaciones Electricas Exteriores

glb

1.00

und

1.00

und

1.00

Costo Directo

Gasto generales (10%CD)


Utilidad (05%CD)
Sub total Presupuesto sin IGV
IGV(18%)
I). COSTO TOTAL DE INFRAESTRUCTURA

II). COSTO EXPEDIENTE TECNICO

Elaboracion del Expediente


III). COSTO SUPERVISION

Supervision

IV). COSTO MITIGACION AMBIENTAL Y MEDIADAS DE REDUCCION DE RIESGO

Mitigacion Ambiental

glb

1.00

Medidas de Reduccion de Riesgo

glb

1.00

V). COSTO TOTAL DE EQUIPAMIENTO, MOBILIARIO Y MATERIALES

Equipamiento, mobiliario
Material educativo
Total Presupuesto a Precio de Mercado

RCA
Precio
Unitario

Total a Precios
de Metrado

160,000.00

160,000.00

1,755.47
1,755.47

126,270.96
125,832.09

1,755.47

127,973.76

1,755.47

127,254.02

1,755.47

138,331.04

1,755.47
1,846.05

19,134.62
39,856.22

1,755.47

24,102.60

1,755.47

25,717.64

1,755.47

13,201.13

1,846.05

8,178.00

939.45

150,312.00

1,500.00

133,500.00

45,000.00

45,000.00

136.09
65.00

36,118.95
42,796.65

353.86
8,000.00
20,000.00
50,000.00
15,924.29

45,785.95
8,000.00
20,000.00
50,000.00
15,924.29

23,886.44

23,886.44
1,507,176.37

150,717.64
75,358.82
1,733,252.82
311,985.51
2,045,238.33

51,130.96

51,130.96

51,130.96
71,583.34

71,583.34
RIESGO

71,583.34
27,301.73

17,876.48
9,425.25

17,876.48
9,425.25
86,355.08
57,716.00
28,639.08
2,281,609.44

I.E.I. N 80772 TINYABAMBA


Unidad
Medida

Metrado

Transporte de materiales a lugar de la Obra (FLETE


Construccion de Aula 01 de 3 aos incl.Deposito
Construccion de Aula 02 de 4 a 5 aos incl.Deposit
Construccion de sala de psicomotricidad
Infraestructura Complementaria
Cocina
Vivienda Docente
Servicios Higienicos para nios y nias
Infraestructura Administrativa

glb
m2
m2
m2

1.00
58.43
58.98
64.30

m2
m2
m2

10.90
17.49
12.60

Direccion

m2

14.44

Servicios Higienicos docentes y administrativos

m2

3.66

RUBRO
OBRAS
Infraestructura Pedagogica

Infraestructura de Proteccion, limpieza y drenaje


Cerco perimetrico
Muros
de contencion H. MAX 3 M ( Incluye mov.
Tierras, mejoramiento de terreno, capas de
hormigon , cimentacion, pantalla, acero,
encofrado, curado,
etc)
Evacuacion
Pluvial (incluye
canaletas en los
techos, montantes, cajas de registro,derivacion y
evacuacion)
Zona de circulacion, juegos, jardines
Area exterior(Vereda de concreto e=4" ,patio de
concreto e=6",piso adoquinado, rampas, etc),
incluye mov. Tierras, capas de conformacion y
concreto u adoquin segn corresponda
Jardines, incluye mov. de tierras, tierra de chacra
Cobertura , incluye tensionadas traslucidas y apoy
Area de ingreso con Hito Institucional
Tanque septico y Pozo Percolador
Tanque elevado y cisterna
Instalaciones Sanitarias Exteriores
Instalaciones Electricas Exteriores
Costo Directo
Gasto generales (10%CD)
Utilidad (05%CD)
Sub total Presupuesto sin IGV

ml

135.17

ml

70.50

glb

1.00

m2
m2
m2
glb
glb
glb
glb

1,254.83
342.96
199.83
1.00
1.00
1.00
1.00

glb

1.00

IGV(18%)
I). COSTO TOTAL DE INFRAESTRUCTURA

II). COSTO EXPEDIENTE TECNICO

Elaboracion del Expediente

und

1.00

und

1.00

III). COSTO SUPERVISION


Supervision

IV). COSTO MITIGACION AMBIENTAL Y MEDIDAS DE REDUCCION DE RIESGO

Mitigacion Ambiental

glb

1.00

Medidas de Reduccion de Riesgo

glb

1.00

V). COSTO TOTAL DE EQUIPAMIENTO, MOBILIARIO Y MATERIALES

Equipamiento, mobiliario
Material educativo
Total Presupuesto a Precio de Mercado

MBA
Precio
Unitario

56,000.00
1,899.75
1,899.75
1,899.75

Total a
Precios de
Metrado

56,000.00
111,002.10
112,046.96
122,153.60

1,899.75
1,899.75
1,990.33

20,707.22
33,226.54
25,078.10

1,899.75

27,432.32

1,990.33

7,284.59

939.45

126,985.46

1,500.00

105,750.00

25,000.00

25,000.00

136.09
65.00
353.86
8,000.00
10,000.00
38,000.00
25,096.50

170,769.13
22,292.40
70,711.84
8,000.00
10,000.00
38,000.00
25,096.50

37,644.75

37,644.75
###
115,518.15
57,759.08
###

239,122.57
1,567,581.31

39,189.53

39,189.53

54,865.35
54,865.35

N DE RIESGO

LES

39,189.53

17,876.48
9,425.25

54,865.35
27,301.73

17,876.48
9,425.25
47,017.54

32,698.00
14,319.54
###

I.E.I. N 80761 CAJASPAMPA


Unidad
Medida

Metrado

Transporte de materiales a lugar de la Obra (FLETE)


Construccion de Aula 01 de 3 aos incl.Deposito
Construccion de Aula 02 de 4 a 5 aos incl.Deposito
Construccion de sala de psicomotricidad incl.Deposito
Infraestructura Complementaria
Cocina
Vivienda Docente
Servicios Higienicos para nios y nias
Infraestructura Administrativa

glb
m2
m2
m2

1.00
57.65
57.37
63.20

m2
m2
m2

10.40
17.62
14.03

Direccion

m2

14.44

Servicios Higienicos docentes y administrativos

m2

4.12

Cerco perimetrico

ml

108.00

Muros de contencion H. MAX 2 M( Incluye mov.


Tierras, mejoramiento de terreno, capas de hormigon ,
cimentacion, pantalla, acero, encofrado, curado, etc)
Evacuacion Pluvial (incluye canaletas en los techos,
montantes, cajas de registro,derivacion y evacuacion)

ml

28.00

glb

1.00

Zona de circulacion, juegos, jardines


Area exterior(Vereda de concreto e=4" ,patio de
concreto e=6",piso adoquinado, rampas, etc), incluye
mov. Tierras, capas de conformacion y concreto u
adoquin segn corresponda
Jardines, incluye mov. de tierras, tierra de chacra y se
Cobertura , incluye tensionadas traslucidas y apoyos
Area de ingreso con Hito Institucional
Tanque septico y Pozo Percolador
Tanque elevado y cisterna
Instalaciones Sanitarias Exteriores

m2
m2
m2
glb
glb
glb
glb

222.34
198.92
162.46
1.00
1.00
1.00
1.00

glb

1.00

RUBRO
OBRAS
Infraestructura Pedagogica

Infraestructura de Proteccion, limpieza y drenaje

Instalaciones Electricas Exteriores


Costo Directo
Gasto generales (10%CD)
Utilidad (05%CD)

Sub total Presupuesto sin IGV


IGV(18%)
I). COSTO TOTAL DE INFRAESTRUCTURA

II). COSTO EXPEDIENTE TECNICO

Elaboracion del Expediente

und

1.00

und

1.00

III). COSTO SUPERVISION

Supervision

IV). COSTO MITIGACION AMBIENTAL Y MEDIDAS DE REDUCCION DE RIESGO

Mitigacion Ambiental

glb

1.00

Medidas de Reduccion de Riesgo

glb

1.00

V). COSTO TOTAL DE EQUIPAMIENTO, MOBILIARIO Y MATERIALES

Equipamiento, mobiliario
Material educativo
Total Presupuesto a Precio de Mercado

PA
Precio
Unitario

56,000.00
1,755.47
1,755.47
1,755.47

Total a
Precios de
Metrado

56,000.00
101,202.85
100,711.31
110,945.70

1,755.47
1,755.47
1,846.05

18,256.89
30,931.38
25,900.08

1,755.47

25,348.99

1,846.05

7,605.73

939.45

101,460.60

1,000.00

28,000.00

25,000.00

25,000.00

136.09
65.00
353.86
8,000.00
10,000.00
38,000.00
4,446.90

30,258.90
12,929.80
57,488.10
8,000.00
10,000.00
38,000.00
4,446.90

6,670.34

6,670.34
799,157.57
79,915.76
39,957.88

919,031.20
165,425.62
1,084,456.82

27,111.42

27,111.42

27,111.42
37,955.99

37,955.99

IESGO

37,955.99
27,301.73

17,876.48
9,425.25

17,876.48
9,425.25
40,817.54

26,498.00
14,319.54
###

I.E.I. N 81937 VILLA FLORIDA


Unidad
Medida

Metrado

Transporte de materiales a lugar de la Obra (F


Construccion de Aula 01 de 3 a 5 aos incl.Dep
Construccion de sala de psicomotricidad incl.D
Infraestructura Complementaria
Cocina
Vivienda Docente
Servicios Higienicos para nios y nias
Infraestructura Administrativa

glb
m2
m2

1.00
58.98
71.18

m2
m2
m2

10.96
17.55
12.60

Direccion

m2

14.44

Servicios Higienicos docentes y administrativos

m2

4.12

RUBRO

OBRAS
Infraestructura Pedagogica

Infraestructura de Proteccion, limpieza y drenaje


Cerco perimetrico
Muros de contencion H. MAX 3 M( Incluye
mov. Tierras, mejoramiento de terreno, capas
de hormigon , cimentacion, pantalla, acero,
encofrado, curado,
etc)
Evacuacion
Pluvial (incluye
canaletas en los
techos, montantes, cajas de
Area exterior(Vereda de concreto e=4" ,patio
registro,derivacion y evacuacion)
de concreto e=6",piso adoquinado, rampas,
Zonaincluye
de circulacion,
juegos,
etc),
mov. Tierras,
capasjardines
de
conformacion y concreto u adoquin segn
corresponda
Jardines, incluye mov. de tierras, tierra de ch

ml

188.00

ml

93.00

glb

1.00

m2
m2

246.80
1,493.30

Cobertura , incluye tensionadas traslucidas y


Area de ingreso con Hito Institucional
Tanque septico y Pozo Percolador
Tanque elevado y cisterna
Instalaciones Sanitarias Exteriores

m2
glb
glb
glb
glb

274.83
1.00
1.00
1.00
1.00

Instalaciones Electricas Exteriores


Costo Directo

glb

1.00

Gasto generales (10%CD)


Utilidad (05%CD)
Sub total Presupuesto sin IGV
IGV(18%)

I). COSTO TOTAL DE INFRAESTRUCTURA

II). COSTO EXPEDIENTE TECNICO

Elaboracion del Expediente

und

1.00

und

1.00

III). COSTO SUPERVISION

Supervision

IV). COSTO MITIGACION AMBIENTAL Y MEDIDAS DE REDUCCION DE RIESGO

Mitigacion Ambiental

glb

1.00

Medidas de Reduccion de Riesgo

glb

1.00

V). COSTO TOTAL DE EQUIPAMIENTO, MOBILIARIO Y MATERIALES

Equipamiento, mobiliario
Material educativo
Total Presupuesto a Precio de Mercado

FLORIDA
Precio
Unitario

80,000.00
1,899.75
1,899.75

Total a Precios
de Metrado

80,000.00
112,046.96
135,223.85

1,899.75
1,899.75
1,990.33

20,821.21
33,340.52
25,078.10

1,899.75

27,432.32

1,990.33

8,200.14

939.45

176,616.60

1,500.00

139,500.00

25,000.00

25,000.00
701.35

136.09
65.00

33,587.22
97,064.50

353.86
8,000.00
10,000.00
38,000.00
4,936.03

97,251.34
8,000.00
10,000.00
38,000.00
4,936.03

7,404.05

7,404.05
1,079,502.83
107,950.28
53,975.14
1,241,428.25
223,457.08

175.3375
701.35

1,464,885.33

36,622.13

36,622.13

51,270.99

51,270.99

CION DE RIESGO

RIALES

do

36,622.13

17,876.48
9,425.25

51,270.99
27,301.73

17,876.48
9,425.25
36,257.77

29,098.00
7,159.77
1,616,337.95

361818.65
625806.65
0.57816364

I.E.I. N 80518 OLGOYACO


Unidad
Medida

Metrado

Transporte de materiales a lugar de la Obra (FLETE)


Construccion de Aula 01 de 3 aos incl.Deposito
Construccion de sala de psicomotricidad
Infraestructura Complementaria
Cocina
Vivienda Docente
Servicios Higienicos para nios y nias
Infraestructura Administrativa

glb
m2
m2

1.00
58.99
70.25

m2
m2
m2

10.95
16.37
12.60

Direccion

m2

14.39

Servicios Higienicos docentes y administrativos

m2

4.17

ml

124.00

RUBRO
OBRAS
Infraestructura Pedagogica

Infraestructura de Proteccion, limpieza y drenaje


Cerco perimetrico
Muros de contencion H. MAX 3 M( Incluye mov.
Tierras, mejoramiento de terreno, capas de hormigon
, cimentacion, pantalla, acero, encofrado, curado,
etc)
Evacuacion Pluvial (incluye canaletas en los techos,
montantes, cajas de registro,derivacion y
evacuacion)

ml

89.00

glb

1.00

Zona de circulacion, juegos, jardines


Area exterior(Vereda de concreto e=4" ,patio de
concreto e=6",piso adoquinado, rampas, etc),
incluye mov. Tierras, capas de conformacion y
concreto u adoquin segn corresponda
Jardines, incluye mov. de tierras, tierra de chacra y
Cobertura , incluye tensionadas traslucidas y apoyos
Area de ingreso con Hito Institucional
Tanque septico y Pozo Percolador
Tanque elevado y cisterna
Instalaciones Sanitarias Exteriores

m2
m2
m2
glb
glb
glb
glb

238.29
419.22
115.52
1.00
1.00
1.00
1.00

glb

1.00

Instalaciones Electricas Exteriores


Costo Directo
Gasto generales (10%CD)
Utilidad (05%CD)
Sub total Presupuesto sin IGV

IGV(18%)
I). COSTO TOTAL DE INFRAESTRUCTURA

II). COSTO EXPEDIENTE TECNICO

Elaboracion del Expediente

und

1.00

und

1.00

III). COSTO SUPERVISION

Supervision

IV). COSTO MITIGACION AMBIENTAL Y MEDIDAS DE REDUCCION DE RIESGO

Mitigacion Ambiental

glb

1.00

Medidas de Reduccion de Riesgo

glb

1.00

V). COSTO TOTAL DE EQUIPAMIENTO, MOBILIARIO Y MATERIALES

Equipamiento, mobiliario
Material educativo
Total Presupuesto a Precio de Mercado

YACO
Precio
Unitario

56,000.00
1,755.47
1,755.47

Total a Precios
de Metrado

56,000.00
103,555.18
123,321.77

1,755.47
1,755.47
1,846.05

19,222.40
28,737.04
23,260.23

1,755.47

25,261.21

1,846.05

7,698.03

939.45

116,491.80

1,500.00

133,500.00

25,000.00

25,000.00

136.09
65.00
353.86
8,000.00
10,000.00
38,000.00
4,765.84

32,429.17
27,249.30
40,877.91
8,000.00
10,000.00
38,000.00
4,765.84

7,148.76

7,148.76
830,518.64
83,051.86
41,525.93
955,096.43

171,917.36
1,127,013.79

28,175.34

28,175.34

28,175.34
39,445.48

39,445.48
RIESGO

39,445.48
27,301.73

17,876.48
9,425.25

17,876.48
9,425.25
35,657.77

28,498.00
7,159.77
1,257,594.12

ANALISIS UNITARIOS
DESCRIPCION
CIMENTACION (CAPACIDAD PORTANTE DE
0.20 A 0.50 KG/CM2)
MUROS Y COLUMNAS
TECHOS
COBERTURA DE LADRILLO PASTELERO EN
PISOS
PUERTAS Y VENTANAS
REVESTIMIENTOS
BAOS
INSTALACIONES ELECTRICAS Y SANITARIAS
TOTAL

DESCRIPCION
CIMENTACION (CAPACIDAD PORTANTE DE
0.50 A 1.00 (KG/CM2) O MAYOR
MUROS Y COLUMNAS
TECHOS
COBERTURA DE LADRILLO PASTELERO EN
PISOS
PUERTAS Y VENTANAS
REVESTIMIENTOS
BAOS
INSTALACIONES ELECTRICAS Y SANITARIAS
TOTAL

EN UN SS.HH EN EDIFICACION
1,009.93

1,009.93

288.55
173.38
50.63
79.18
55.38
159.70
39.95
133.63
1,990.33

288.55
173.38
50.63
79.18
55.38
159.70
133.63
1,899.75

EN UN SS.HH EN EDIFICACION
865.65

865.65

288.55
173.38
50.63
79.18
55.38
159.70
39.95
133.63
1,846.05

288.55
173.38
50.63
79.18
55.38
159.70
133.63
1,755.47

REFERENCIA 01 : NORMAS LEGALES DE FECHA 30/10/2014 , PUBLICADO EN EL PERUAN


CUADRO VALORES UNITARIOS OFICIALES DE EDIFICACION PARA LA S
REFERENCIA 02 : PREOPERATIVOS GRLL
MOVIMIENTO DE TIERRAS, ENCOFRADOS, ACERO, CONCRETO,
ETC

CADO EN EL PERUANO
DIFICACION PARA LA SIERRA

2348.5835

2241.6991

2178.339

2071.4546

VALOR REFERENCIAL
ITEM

DESCRIPCION

01

HONORARIOS, SUELDOS Y SALARIOS DEL


PERSONAL PROFESIONAL Y TECNICO
JEFE DE PROYECTO
ESPECIALISTA 01 - ESPECIALISTA EN ARQUITECTURA
ESPECIALISTA 02 - ESPECIALISTA EN GEOTECNIA
ESPECIALISTA 03 - ESTRUCTURAL
ESPECIALISTA 04 - ESPECIALISTA EN METRADOS ,
COSTOS , PRESUPUESTOS Y PROGRAMACION DE OBRA
SANITARIAS
ELECTRICAS
ESPECIALISTA 07 - ESPECIALISTA EN SEGURIDAD Y
MEDIO AMBIENTE
DIBUJANTE CAD
ESTUDIOS TECNICOS
LEVANTAMIENTO TOPOGRAFICO
ESTUDIO DE MECANICA DE SUELOS
ESTUDIO DE IMPACTO AMBIENTAL
CIRA
OTROS
GASTOS DE OFICINA , ALQUILER DE EQUIPOS Y OTROS
IMPRESIONES PLANOS (01 ORIGINAL Y 03 COPIAS)
IMPRESIONES, COPIAS , ANILLADOS Y FEDATEOS (01
ORIGINAL Y 03 COPIAS)
MOVILIDAD

02

03

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
====================

SUBTOTAL
IGV 18%
===================

TOTAL

% PRTICIP. UND CANTIDAD

100%
100%
100%
100%

MES
MES
MES
MES

4
2
1
1

100%
100%
100%

MES
MES
MES

1
1
1

100%
100%

MES
UND

1
4

100%
100%
100%
100%

UND
UND
UND
UND

1
1
1
1

100%
100%

MES
GLB

4
1

100%
100%

GLB
MES

1
4

P.U (S/.) PARCIAL

TOTAL
92,000.00

8,000.00 32,000.00
6,000.00 12,000.00
6,000.00 6,000.00
6,000.00 6,000.00
6,000.00
6,000.00
6,000.00

6,000.00
6,000.00
6,000.00

8,000.00 8,000.00
2,500.00 10,000.00

47,000.00
16,000.00 16,000.00
10,000.00 10,000.00
6,000.00 6,000.00
15,000.00 15,000.00

32,563.46
3,000.00 12,000.00
1,000.00 1,000.00
1,500.00 1,500.00
4,515.87 18,063.46

###
17,156.35
17,156.35
==========
###
37,057.70
===========
###

171,563.46

VALOR REFERENCIAL
ITEM

DESCRIPCION

01

HONORARIOS, SUELDOS Y SALARIOS DEL


PERSONAL PROFESIONAL Y TECNICO
JEFE DE SUPERVISION
ASISTENTE DE SUPERVISION
ARQUITECTURA
ESPECIALISTA 02 - ESPECIALISTA EN GEOTECNIA
ESPECIALISTA
ESPECIALISTA 03
04 -- ESTRUCTURAL
ESPECIALISTA EN METRADOS ,
COSTOS , PRESUPUESTOS Y PROGRAMACION DE
OBRA
ESPECIALISTA 05 - ESPECIALISTA EN
INSTALACIONES SANITARIAS
ESPECIALISTA 06 - ESPECIALISTA EN
INSTALACIONES ELECTRICAS
ESPECIALISTA 07 - ESPECIALISTA EN SEGURIDAD Y
MEDIO AMBIENTE
DIBUJANTE CAD
ESTUDIOS TECNICOS
TOPOGRAFIA - CHEQUEO DE NIVELES
ESTUDIO DE SUELOS - PRUEBAS - ENSAYOS
OTROS
GASTOS DE OFICINA , ALQUILER DE EQUIPOS Y
OTROS
IMPRESIONES PLANOS
IMPRESIONES, COPIAS , ANILLADOS
MOVILIDAD

02

03

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
====================

SUBTOTAL
IGV 18%
===================

TOTAL

% PRTICIP. UND CANTIDAD

100%
100%
100%
90%
90%

MES
MES
MES
MES
MES

6
6
3
3
3

90%

MES

70%

MES

70%

MES

100%
100%

MES
UND

2
3

100%
100%

UND
UND

1
1

100%
100%
100%
100%

MES
GLB
GLB
MES

6
1
1
6

P.U (S/.) PARCIAL

TOTAL
###

8,000.00
5,000.00
6,000.00
6,000.00
6,000.00

48,000.00
30,000.00
18,000.00
16,200.00
16,200.00

6,000.00 16,200.00
6,000.00

8,400.00

6,000.00

8,400.00

6,000.00 12,000.00
2,500.00 7,500.00

13,000.00
8,000.00
5,000.00

240,188.84

8,000.00
5,000.00

46,288.84
3,000.00 18,000.00
500.00
500.00
693.65
693.65
4,515.87 27,095.20

###
24,018.88
24,018.88
==========
###
51,880.79
===========
###

298775.99
435204.42
0.68651874

RESUMEN GENERAL DEL PRESUPUESTO

ITEMS

NOMBRE

COSTO
COSTO TOTAL DE EXPEDIEN
COSTO
INFRAESTRUCTUR
TE
SUPERVISIO
A
TECNICO
N

1
2
3
4
5
6

I.E.I. N 81937 VILLA FLORIDA


I.E.I. N 2174 ALPAMARCA
I.E.I. N 80761 CAJASPAMPA
I.E.I. N 80518 OLGOYACO
I.E.I. N 92191 FORTALEZA ANDINA
I.E.I. N 2172 TAULISH

1,464,885.33
2,045,238.33
1,084,456.82
1,127,013.79
1,155,029.47
1,273,149.25

36,622.13
51,130.96
27,111.42
28,175.34
28,875.74
31,828.73

51,270.99
71,583.34
37,955.99
39,445.48
40,426.03
44,560.22

I.E.I. N 80772 TINYABAMBA

1,567,581.31

39,189.53

54,865.35

TOTAL

NOMBRE
PROYECTO

COSTO
COSTO TOTAL DE EXPEDIEN
COSTO
INFRAESTRUCTUR
TE
SUPERVISIO
A
TECNICO
N
9,717,354.30

242,933.86

340,107.40

SUPUESTO
COSTO
MITIGACION
AMBIENTAL
Y MEDIDAS
DE
REDUCCION
DE RIESGO

COSTO TOTAL
DE
EQUIPAMIENT
O,
MOBILIARIO
Y
MATERIALES

27,301.73
27,301.73
27,301.73
27,301.73
27,301.73
27,301.73

36,257.77
86,355.08
40,817.54
35,657.77
40,817.54
40,817.54

27,301.73

47,017.54

PARCIAL
###
###
###
###
###
###
###
###

242,933.86
340,107.40

COSTO
MITIGACION
AMBIENTAL
Y MEDIDAS
DE
REDUCCION
DE RIESGO

COSTO TOTAL
DE
EQUIPAMIENT
O,
MOBILIARIO
Y
MATERIALES

191,112.11

327,740.78

TOTAL
###

COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO


I.E.I. N 2174 ALPAMARCA
CONCEPTO

UNIDAD

CANTIDAD/A
O

PRECIO (S/.)
MENSUAL

COSTO ANUAL
(S/.)

COSTOS DE
OPERACIN

39,381.60

Remuneraciones

39,264.00

Docente

Und

Servicios
Agua
Luz

Mes
Mes

COSTOS DE
MANTENIMIENTO
Mantenimiento
rutinario

TOTAL

de

12.00
12.00

1,636.00

39,264.00

0.93

0.50
9.30

117.60
6.00
111.60

0.85
0.85

4,938.96

Mantenimiento
periodico
Mantenimiento
Infraestructura

2.00

F.C

Mes

12.00

411.58

4,938.96
4,938.96

44,320.56

0.85

ROYECTO

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROYECTO


I.E.I. N 2174 ALPAMARCA
P.Sociales

36,458.07

CONCEPTO

CANTIDAD/AO

PRECIO (S/.)
MENSUAL

Und

4.00

1,636.00

Mes
Mes

12.00
12.00

20.00
60.00

Mes

12.00

100.00

Mes

12.00

400.00

Mes

12.00

700.00

UNIDAD

COSTOS DE OPERACIN

36,358.46 Remuneraciones
36,358.46

Docente

99.61 Servicios
5.08 Agua
94.53 Luz
4,183.30

COSTOS DE MANTENIMIENTO
Mantenimiento rutinario
Mantenimiento de limpieza
Reparacin, y mantenimiento
mobiliario

de

4,183.30 Mantenimiento periodico


4,183.30

40,641.37

Mantenimiento de infraestructura

TOTAL

TENIMIENTO CON PROYECTO

LPAMARCA
COSTO ANUAL (S/.)

P.Sociales

F.C

79,488.00

73,530.05
72,716.93

78,528.00
78,528.00

0.926

960.00
240.00
720.00

0.847
0.847

14,400.00

72,716.93
813.12
203.28
609.84
12,196.80

6,000.00

5,082.00

1,200.00

0.847

1016.4

4,800.00

0.847

4065.6

8,400.00
8,400.00

93,888.00

7,114.80
0.847

7,114.80

85,726.85

COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO


I.E.I. N 80761 CAJASPAMPA
CONCEPTO

UNIDAD

CANTIDAD/A
O

PRECIO (S/.)
MENSUAL

COSTOS DE OPERACIN

COSTO ANUAL
(S/.)

20,469.60

Remuneraciones

20,352.00

Docente

Und

1.00

1,696.00

20,352.00

Servicios
Agua
Luz

Mes
Mes

12.00
12.00

0.50
9.30

117.60
6.00
111.60

COSTOS DE MANTENIMIENTO

Mantenimiento rutinario
Mantenimiento de Infraestructura

Mantenimiento periodico

TOTAL

Mes

12.00

20,469.60

SIN PROYECTO

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROY


I.E.I. N 80761 CAJASPAMPA

F.C

P.SOCIALES

18,945.56

CONCEPTO

CANTIDAD/AO

PRECIO (S/.)
MENSUAL

Und

2.00

1,696.00

Mes
Mes

12.00
12.00

15.00
45.00

Mes

12.00

30.00

Mes

12.00

120.00

Mes

12.00

250.00

UNIDAD

COSTOS DE OPERACIN

18,845.95 Remuneraciones
0.93
0.85
0.85

18,845.95

0.85

Docente

99.61 Servicios
5.08 Agua
94.53 Luz
COSTOS DE MANTENIMIENTO

Mantenimiento rutinario

Mantenimiento de limpieza
Reparacin,
mobiliario

mantenimiento

de

Mantenimiento periodico
Mantenimiento de infraestructura

18,945.56

TOTAL

TENIMIENTO CON PROYECTO

AJASPAMPA
COSTO ANUAL (S/.)

F.C

P.SOCIALES

41,424.00

38,301.74
37,691.90

40,704.00
40,704.00

0.926

720.00
180.00
540.00

0.847
0.847

4,800.00

37,691.90
609.84
152.46
457.38
4065.6

1,800.00

1524.6

360.00

0.847

304.92

1,440.00

0.847

1219.68

3,000.00
3,000.00

46,224.00

2541
0.847

2541

42,367.34

COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO


I.E.I. N 82191 FORTALEZA ANDINA
CONCEPTO

UNIDAD

CANTIDAD/A
O

PRECIO (S/.)
MENSUAL

COSTOS DE OPERACIN

COSTO ANUAL
(S/.)

20,469.60

Remuneraciones

20,352.00

Docente

Und

1.00

1,696.00

20,352.00

Servicios
Agua
Luz

Mes
Mes

12.00
12.00

0.50
9.30

117.60
6.00
111.60

COSTOS DE
MANTENIMIENTO

Mantenimiento rutinario
Mantenimiento
Infraestructura

de

Mantenimiento periodico

TOTAL

Mes

12.00

20,469.60

TO SIN PROYECTO

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROY

I.E.I. N 82191 FORTALEZA ANDINA


F.C

P.SOCIALES

18,945.56

CONCEPTO

CANTIDAD/AO

PRECIO (S/.)
MENSUAL

Und

2.00

1,696.00

Mes
Mes

12.00
12.00

15.00
45.00

Mes

12.00

30.00

Mes

12.00

120.00

Mes

12.00

250.00

UNIDAD

COSTOS DE OPERACIN

18,845.95 Remuneraciones
0.93
0.85
0.85

18,845.95

0.85

Docente

99.61 Servicios
5.08 Agua
94.53 Luz
COSTOS DE MANTENIMIENTO

Mantenimiento rutinario

Mantenimiento de limpieza
Reparacin,
mobiliario

mantenimiento

de

Mantenimiento periodico
Mantenimiento de infraestructura

18,945.56

TOTAL

TENIMIENTO CON PROYECTO

TALEZA ANDINA
COSTO ANUAL (S/.)

F.C

41,424.00

P.SOCIALES

38,301.74

40,704.00
40,704.00

0.926

720.00
180.00
540.00

0.847
0.847

37,691.90
37,691.90
609.84
152.46
457.38

4,800.00

4065.6

1,800.00

1524.6

360.00

0.847

304.92

1,440.00

0.847

1219.68

0.847

2541
2541

3,000.00
3,000.00

46,224.00

42,367.34

COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO


I.E.I. N 2172 TAULISH
CONCEPTO

UNIDAD

CANTIDAD/A
O

PRECIO (S/.)
MENSUAL

COSTOS DE OPERACIN

COSTO ANUAL
(S/.)

25,269.60

Remuneraciones

25,152.00

Docente

Und

1.00

2,096.00

25,152.00

Servicios
Agua
Luz

Mes
Mes

12.00
12.00

0.50
9.30

117.60
6.00
111.60

COSTOS DE
MANTENIMIENTO

Mantenimiento rutinario
Mantenimiento
Infraestructura

de

Mantenimiento periodico

TOTAL

Mes

12.00

25,269.60

TO SIN PROYECTO

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROY


I.E.I. N 2172 TAULISH

F.C

P.SOCIALES

23,390.36

CONCEPTO

CANTIDAD/AO

PRECIO (S/.)
MENSUAL

Und

2.00

2,096.00

Mes
Mes

12.00
12.00

15.00
45.00

Mes

12.00

30.00

Mes

12.00

120.00

Mes

12.00

250.00

UNIDAD

COSTOS DE OPERACIN

23,290.75 Remuneraciones
0.93
0.85
0.85

23,290.75

0.85

Docente

99.61 Servicios
5.08 Agua
94.53 Luz
COSTOS DE MANTENIMIENTO

Mantenimiento rutinario

Mantenimiento de limpieza
Reparacin,
mobiliario

mantenimiento

de

Mantenimiento periodico
Mantenimiento de infraestructura

23,390.36

TOTAL

TENIMIENTO CON PROYECTO


TAULISH
COSTO ANUAL (S/.)

F.C

P.SOCIALES

47,191.34

51,024.00
50,304.00
50,304.00

0.926

720.00
180.00
540.00

0.847
0.847

46,581.50
46,581.50
609.84
152.46
457.38

4,800.00

4065.6

1,800.00

1524.6

360.00

0.847

304.92

1,440.00

0.847

1219.68

0.847

2541
2541

3,000.00
3,000.00

55,824.00

51,256.94

COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO


I.E.I. N 80472 TINYABAMBA
CONCEPTO

UNIDAD

CANTIDAD/A
O

PRECIO (S/.)
MENSUAL

COSTOS DE OPERACIN

COSTO ANUAL
(S/.)

16,869.60

Remuneraciones

16,752.00

Docente

Und

1.00

1,396.00

16,752.00

Servicios
Agua
Luz

Mes
Mes

12.00
12.00

0.50
9.30

117.60
6.00
111.60

COSTOS DE
MANTENIMIENTO

Mantenimiento rutinario
Mantenimiento
Infraestructura

de

Mantenimiento periodico

TOTAL

Mes

12.00

16,869.60

TO SIN PROYECTO

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROY


I.E.I. N 80472 TINYABAMBA

F.C

P.SOCIALES

15,611.96

CONCEPTO

CANTIDAD/AO

PRECIO (S/.)
MENSUAL

Und

2.00

1,396.00

Mes
Mes

12.00
12.00

15.00
45.00

Mes

12.00

30.00

Mes

12.00

120.00

Mes

12.00

250.00

UNIDAD

COSTOS DE OPERACIN

15,512.35 Remuneraciones
0.93
0.85
0.85

15,512.35

0.85

Docente

99.61 Servicios
5.08 Agua
94.53 Luz
COSTOS DE MANTENIMIENTO

Mantenimiento rutinario

Mantenimiento de limpieza
Reparacin,
mobiliario

mantenimiento

de

Mantenimiento periodico
Mantenimiento de infraestructura

15,611.96

TOTAL

TENIMIENTO CON PROYECTO

INYABAMBA
COSTO ANUAL (S/.)

F.C

P.SOCIALES

34,224.00
33,504.00
33,504.00

0.926

720.00
180.00
540.00

0.847
0.847

4,800.00

31,634.54
31,024.70
31,024.70
609.84
152.46
457.38
4,065.60

1,800.00

1524.6

360.00

0.847

304.92

1,440.00

0.847

1219.68

0.847

2541
2541

3,000.00
3,000.00

39,024.00

35,700.14

COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO


I.E.I. N 81937 VILLA FLORIDA
CONCEPTO

UNIDAD

CANTIDAD/A
O

PRECIO (S/.)
MENSUAL

COSTOS DE OPERACIN

COSTO ANUAL
(S/.)

25,269.60

Remuneraciones

25,152.00

Docente

Und

1.00

2,096.00

25,152.00

Servicios
Agua
Luz

Mes
Mes

12.00
12.00

0.50
9.30

117.60
6.00
111.60

COSTOS DE
MANTENIMIENTO

Mantenimiento rutinario
Mantenimiento
Infraestructura

de

Mantenimiento periodico

TOTAL

Mes

12.00

25,269.60

TO SIN PROYECTO

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROY


I.E.I. N 81937 VILLA FLORIDA

F.C

P.SOCIALES

CONCEPTO

CANTIDAD/AO

PRECIO (S/.)
MENSUAL

Und

1.00

2,096.00

Mes
Mes

12.00
12.00

15.00
45.00

Mes

12.00

30.00

Mes

12.00

50.00

Mes

12.00

120.00

UNIDAD

23,390.36 COSTOS DE OPERACIN


23,290.75 Remuneraciones
0.93
0.85
0.85

23,290.75

0.85

Docente

99.61 Servicios
5.08 Agua
94.53 Luz
COSTOS DE MANTENIMIENTO

Mantenimiento rutinario

Mantenimiento de limpieza
Reparacin, y mantenimiento
mobiliario

de

Mantenimiento periodico
Mantenimiento de infraestructura

23,390.36

TOTAL

TENIMIENTO CON PROYECTO

LLA FLORIDA
COSTO ANUAL (S/.)

F.C

P.SOCIALES

23,900.59

25,872.00
25,152.00
25,152.00

0.926

720.00
180.00
540.00

0.847
0.847

23,290.75
23,290.75
609.84
152.46
457.38

2,400.00

2032.8

960.00

813.12

360.00
600.00

0.847
0.847

304.92
508.2

0.847

1219.68
1219.68

1,440.00
1,440.00

28,272.00

25,933.39

COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO


I.E.I. N80518 OLGOYACO
CONCEPTO

UNIDAD

CANTIDAD/A
O

PRECIO (S/.)
MENSUAL

COSTOS DE OPERACIN

COSTO ANUAL
(S/.)

16,869.60

Remuneraciones

16,752.00

Docente

Und

1.00

1,396.00

16,752.00

Servicios
Agua
Luz

Mes
Mes

12.00
12.00

0.50
9.30

117.60
6.00
111.60

COSTOS DE
MANTENIMIENTO
Mantenimiento rutinario
Mantenimiento
de
Infraestructura

Mantenimiento periodico

TOTAL

Mes

12.00

16,869.60

TO SIN PROYECTO

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROY


I.E.I. N 80518 OLGOYACO

F.C

P.SOCIALES

15,611.96

CONCEPTO

CANTIDAD/AO

PRECIO (S/.)
MENSUAL

Und

1.00

1,396.00

Mes
Mes

12.00
12.00

15.00
45.00

Mes

12.00

30.00

Mes

12.00

50.00

Mes

12.00

120.00

UNIDAD

COSTOS DE OPERACIN

15,512.35 Remuneraciones
0.93
0.85
0.85

15,512.35

0.85

Docente

99.61 Servicios
5.08 Agua
94.53 Luz
COSTOS DE MANTENIMIENTO

Mantenimiento rutinario

Mantenimiento de limpieza
Reparacin, y mantenimiento
mobiliario

de

Mantenimiento periodico
Mantenimiento de infraestructura

15,611.96

TOTAL

TENIMIENTO CON PROYECTO

OLGOYACO
COSTO ANUAL (S/.)

F.C

17,472.00
16,752.00
16,752.00

0.926

720.00
180.00
540.00

0.847
0.847

2,400.00

600.00

0.847
0.847

813.12
304.92
508.2

0.847

1219.68
1219.68

1,440.00
1,440.00

19,872.00

16,122.19
15,512.35
15,512.35
609.84
152.46
457.38
2,032.80

960.00
360.00

P.SOCIALES

18,154.99

A PRECIOS DE MERCADO

OK

COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO


Rubro

Anual

Costos de Operacin

I.E.I. 2172 TAULISH

25,269.60

Costos de Mantenimiento

0.00

Mantenimiento Rutinario

0.00

Mantenimiento Peridico

0.00

Rubro

Anual

Costos de Operacin

I.E.I. 82191 F. ANDINA

20,469.60

Costos de Mantenimiento

0.00

Mantenimiento Rutinario

0.00

Mantenimiento Peridico

0.00

Rubro

Anual

Costos de Operacin

I.E.I.2174 H. ALPAMARCA

39,381.60

Costos de Mantenimiento
Mantenimiento Rutinario

4,938.96
0.00

Mantenimiento Peridico

4,938.96

Rubro

Anual

Costos de Operacin

I.E.I.81937 VILLA FLORIDA

25,269.60

Costos de Mantenimiento

0.00

Mantenimiento Rutinario

0.00

Mantenimiento Peridico

0.00

Rubro

Anual

Costos de Operacin

I.E.I.80518 OLGOYACO

16,869.60

Costos de Mantenimiento

0.00

Mantenimiento Rutinario

0.00

Mantenimiento Peridico

0.00

Rubro

Anual

Costos de Operacin

I.E.I.80761 CAJASPAMPA

Costos de Mantenimiento

0.00

Mantenimiento Rutinario

0.00

Mantenimiento Peridico

0.00

Rubro
Costos de Operacin

I.E.I.80472 TINYABAMBA

20,469.60

Anual
16,869.60

Costos de Mantenimiento

0.00

Mantenimiento Rutinario

0.00

I.E.I.80472 TINYABAMBA
Mantenimiento Peridico

0.00

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROYECTO


Rubro

Anual

Costos de Operacin

I.E.I. 2172 TAULISH

51,024.00

Costos de Mantenimiento

6,600.00

Mantenimiento Rutinario

1,800.00

Mantenimiento Peridico

4,800.00

Rubro

Anual

Costos de Operacin

I.E.I. 82191 F. ANDINA

Costos de Mantenimiento

6,600.00

Mantenimiento Rutinario

1,800.00

Mantenimiento Peridico

4,800.00

Rubro

I.E.I.2174 H. ALPAMARCA

41,424.00

Anual

Costos de Operacin

79,488.00

Costos de Mantenimiento

20,400.00

Mantenimiento Rutinario

6,000.00

Mantenimiento Peridico

14,400.00

Rubro

Anual

Costos de Operacin

I.E.I.81937 VILLA FLORIDA

25,872.00

Costos de Mantenimiento

3,360.00

Mantenimiento Rutinario

960.00

Mantenimiento Peridico

2,400.00

Rubro

Anual

Costos de Operacin

I.E.I.80518 OLGOYACO

17,472.00

Costos de Mantenimiento

3,360.00

Mantenimiento Rutinario

960.00

Mantenimiento Peridico

2,400.00

Rubro

Anual

Costos de Operacin

I.E.I.80761 CAJASPAMPA

Costos de Mantenimiento

6,600.00

Mantenimiento Rutinario

1,800.00

Mantenimiento Peridico

4,800.00

Rubro
Costos de Operacin

I.E.I.80472 TINYABAMBA

41,424.00

Anual
34,224.00

I.E.I.80472 TINYABAMBA

Costos de Mantenimiento

6,600.00

Mantenimiento Rutinario

1,800.00

Mantenimiento Peridico

4,800.00

RESUMEN DE COSTOS DE OPERACIN & MANTENIMIENTO SIN PROYECTO PM

COSTOS DE OPERACIN
COSTOS DE MANTENIMIENTO

164,599.20
4,938.96

164,599.20

RESUMEN DE COSTOS DE OPERACIN & MANTENIMIENTO CON PROYECTO PM

COSTOS DE OPERACIN
COSTOS DE MANTENIMIENTO

290,928.00
53,520.00

330,192.00

53520

Mantenimiento periodico cada 5 aos

A PRECIOS SOCIALES
COSTOS DE OPERACIN Y MANTENIMIENTO SIN PROYECTO
Rubro
Costos de Operacin

I.E.I. 2172 TAULISH

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I. 82191 F. ANDINA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.2174 H. ALPAMARCA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.81937 VILLA FLORIDA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.80518 OLGOYACO

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.80761 CAJASPAMPA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.80472 TINYABAMBA

Costos de Mantenimiento
Mantenimiento Rutinario

I.E.I.80472 TINYABAMBA
Mantenimiento Peridico

COSTOS DE OPERACIN Y MANTENIMIENTO CON PROYECTO PS


Rubro
Costos de Operacin

I.E.I. 2172 TAULISH

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I. 82191 F. ANDINA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.2174 H. ALPAMARCA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.81937 VILLA FLORIDA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.80518 OLGOYACO

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.80761 CAJASPAMPA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico
Rubro
Costos de Operacin

I.E.I.80472 TINYABAMBA

I.E.I.80472 TINYABAMBA

Costos de Mantenimiento
Mantenimiento Rutinario
Mantenimiento Peridico

OK

IMIENTO SIN PROYECTO


Anual
23,390.36
0.00
0.00
0.00
Anual
18,945.56
0.00
0.00
0.00
Anual
36,458.07
4,183.30
0.00
4,183.30
Anual
23,390.36
0.00
0.00
0.00
Anual
15,611.96
0.00
0.00
0.00
Anual
18,945.56
0.00
0.00
0.00
Anual
15,611.96
0.00
0.00

RESUMEN DE COSTOS DE OPERACIN & MANTENIMIENTO SIN PROYECTO PS

COSTOS DE OPERACIN
COSTOS DE MANTENIMIENTO

152,353.83
4,183.30

0.00

IENTO CON PROYECTO PS


Anual
47,191.34
5,590.20
1,524.60

RESUMEN DE COSTOS DE OPERACIN & MANTENIMIENTO CON PROYECTO PS


4,065.60
Anual
38,301.74
5,590.20
1,524.60
4,065.60
Anual
73,530.05
17,278.80
5,082.00
12,196.80
Anual
23,900.59
2,845.92
813.12
2,032.80
Anual
16,122.19
2,845.92
813.12
2,032.80
Anual
38,301.74
5,590.20
1,524.60
4,065.60
Anual
31,634.54

COSTOS DE OPERACIN
COSTOS DE MANTENIMIENTO

268,982.21
45,331.44

5,590.20
1,524.60
4,065.60

1
2
3
4
5
6
7
8
9
10

PROYECTADA

Poblacin Beneficiada ( Incluye todas las I.E.I )


Ao

Poblacin
Beneficiada Con
Proyecto

2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025

144
189
195
200
206
212
218
220
222
224
227

Sumatoria de la Poblacin
Escolar Total Beneficiada
(por los 10 aos)

2,113.00
2,113

RESUMEN
Costo Directo Infraestructura
Gastos Generales (10%)
Utilidad (05%)

Sub Total

7,160,909.58
716,090.96
358,045.48

8,235,046.02

Igv (18%)

1,482,308.28

Costo Total de Infraestructura

9,717,354.31

Costo Total de Expediente Tecn

242,933.86

Costo Total de Supervision

340,107.40

Costo Total de Mtigacion


Ambiental y Medidas de
Reduccion de Riesgo

191,112.11

Costo Total de Equipamiento,


Mobiliario y Materiales

327,740.78

TOTAL

10,819,248.45

CUADRO N
PRESUPUESTO ALTERNATIVA UNICA

ITEM
1.00

2.00
3.00

4.00
5.00
6.00
7.00

DESCRIPCION
Componente I: INTANGIBLES
EXPEDIENTE TECNICO
SUPERVISION
Componente II: INVERSION FIJA
Infraestructura
Componente III:COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 5%
SUB TOTAL
IGV 18%
TOTAL INVERSION FIJA
Componente III: MOBILIARIO, EQUIPAMIENTO Y MATERIALES
Componente IV: MITIGACIN AMBIENTAL Y MEDIDAS DE
REDUCCIN DE RIESGO.
COSTO TOTAL GENERAL (INTANGIBLES+ TOTAL INVERSION FI

OK

TOTAL A PRECIOS
DE MERCADO

FACTOR DE
CORRECCION

TOTAL A PRECIOS

583,041.25
242,933.86
340,107.40

0.926
0.926

SOCIALES
539,896.20
224,956.75
314,939.45

7,160,909.58
7,160,909.58
716,090.96
358,045.48
8,235,046.01
1,482,308.28
9,717,354.30

0.847

8,230,599.09

0.847

277,596.44

0.926

176,969.81
9,225,061.55

327,740.78
191,112.11
10,819,248.44

176,969.81

9,225,061.55

47,191.34

38,301.74

73,530.05

23,900.59

16,122.19

5,590.20

5,590.20

17,278.80

2,845.92

2,845.92

52,781.54

43,891.94

90,808.85

26,746.51

18,968.11

23,390.36

18,945.56

36,458.07

23,390.36

15,611.96

4,183.30

23,390.36

18,945.56

40,641.37

23,390.36

15,611.96

51,024.00

41,424.00

79,488.00

25,872.00

17,472.00

6,600.00

6,600.00

20,400.00

3,360.00

3,360.00

57,624.00

48,024.00

99,888.00

29,232.00

20,832.00

25,269.60

20,469.60

39,381.60

25,269.60

16,869.60

4,938.96

25,269.60

20,469.60

44,320.56

25,269.60

16,869.60

-22

-23

-23

-24

-25

-26

-27

-28

-29

-29

-61

-63

-65

-66

-68

-12

-12

-13

-13

-13

-13

-13

-14

-14

-14

-32

-33

-34

-35

-35

-23

-24

-25

-25

-26

-189

-195

-202

-206

-210

38,301.74

31,634.54

5,590.20

5,590.20

43,891.94

37,224.74

18,945.56

15,611.96

18,945.56

15,611.96

41,424.00

34,224.00

268,982.19
45,331.44
314,313.63

152,353.83
4183.3
156,537.13

6,600.00

6,600.00

48,024.00

40,824.00

290,928.00
53,520.00
344,448.00

20,469.60

16,869.60

164,599.20

4,938.96

20,469.60

16,869.60

169,538.16

-26

-26

-26

-26

-26

-30

-30

-30

-30

-30

-70

-72

-74

-77

-79

-14

-14

-14

-14

-14

-15

-15

-15

-15

-15

-36

-36

-36

-36

-37

-27

-27

-27

-27

-27

-218

-220

-222

-225

-228

FLUJO DE COSTOS A PRECIO DE MERCADO


Flujo de Costos Alternativa Unica
RUBRO
Costos de Inversion( I+II+III+IV)

AOS
0

1. Componente I: Inversin Intangible.

583,041.25

EXPEDIENTE TECNICO

242,933.86

SUPERVISION

10,819,248.44

340,107.40

2. Componente II:Inversin Fija

9,717,354.30

Infraestructura CD ( GG+UTILIDAD+IGV)

9,717,354.30

3. Componente III:Mitigacin ambiental y medidas de reduccin de riesgo

327,740.78

4. Componente IV: Mobiliario, equipamiento y materiales

191,112.11

Costos de Operacin y Mantenimiento con PY

0.00

COSTOS DE OPERACIN
COSTOS DE MANTENIMIENTO
Costos de Operacin y Mantenimiento sin PY

0.00

COSTOS DE OPERACIN
COSTOS DE MANTENIMIENTO
TOTAL S/.

10,819,248.44

344,448.00

344,448.00

344,448.00

344,448.00

290,928.00

290,928.00

290,928.00

290,928.00

53,520.00

53,520.00

53,520.00

53,520.00

169,538.16

169,538.16

169,538.16

169,538.16

164,599.20

164,599.20

164,599.20

164,599.20

4,938.96

4,938.96

4,938.96

4,938.96

174,909.84

174,909.84

174,909.84

174,909.84

OK
AOS
5

10

344,448.00

344,448.00

344,448.00

344,448.00

344,448.00

344,448.00

290,928.00

290,928.00

290,928.00

290,928.00

290,928.00

290,928.00

53,520.00

53,520.00

53,520.00

53,520.00

53,520.00

53,520.00

169,538.16

169,538.16

169,538.16

169,538.16

169,538.16

169,538.16

164,599.20

164,599.20

164,599.20

164,599.20

164,599.20

164,599.20

4,938.96

4,938.96

4,938.96

4,938.96

4,938.96

4,938.96

174,909.84

174,909.84

174,909.84

174,909.84

174,909.84

174,909.84

FLUJO DE COSTOS A PRECIOS SOCIALES


Flujo de Costos Alternativa Unica

AO

RUBRO

Costos de Inversion( I+II+III+IV)

9,225,061.55

1. Componente I: Inversin Intangible.

539,896.20

EXPEDIENTE TECNICO

224,956.75

SUPERVISION

314,939.45

2. Componente II:Inversin Fija

8,230,599.09

Infraestructura CD ( GG+UTILIDAD+IGV)

8,230,599.09

3. Componente III:Mitigacin ambiental y medidas de reduccin de riesgo

277,596.44

4. Componente IV: Mobiliario, equipamiento y materiales

176,969.81

Costos de Operacin y Mantenimiento con PY

0.00

COSTOS DE OPERACIN

314,313.65

314,313.65

314,313.65

268,982.21

268,982.21

268,982.21

COSTOS DE MANTENIMIENTO
Costos de Operacin y Mantenimiento sin PY

0.00

COSTOS DE OPERACIN

45,331.44

45,331.44

45,331.44

156,537.13

156,537.13

156,537.13

152,353.83

152,353.83

152,353.83

4,183.30

4,183.30

4,183.30

157,776.52

157,776.52

157,776.52

COSTOS DE MANTENIMIENTO
TOTAL S/.

9,225,061.55
1.00

TOTAL COSTOS INCREMENTALES

9,225,061.55

VACTS

0.92
144,749.10

0.84
132,797.34

0.77
121,832.42

10,237,617.26

Alumnos beneficiados

2,113

CE

4,845.06
9.00%
ALT.
Indicadores

01

VACTS

10,237,617

VAE

2,113

CE

4845.06

5%
19%

N Beneficiarios

2,113

2113

CUANDO LA INVERSION AUMENTA EL 10%


TOTAL COSTOS INCREMENTALES

VACTS

1.00

0.92

0.84

0.77

10,147,567.70

157,776.52

157,776.52

157,776.52

10,147,567.70

144,749.10

132,797.34

121,832.42

11,160,123.41

Alumnos beneficiados

2,113

CE

5,281.65

CUANDO LA INVERSION AUMENTA EL 15%


TOTAL COSTOS INCREMENTALES

VACTS

1.00

0.92

0.84

0.77

10,608,820.78

157,776.52

157,776.52

157,776.52

10,608,820.78

144,749.10

132,797.34

121,832.42

11,621,376.49

Alumnos beneficiados

2,113

CE

5,499.94

CUANDO LA INVERSION AUMENTA EL 20%


TOTAL COSTOS INCREMENTALES

VACTS

1.00

0.92

0.84

0.77

11,070,073.85

157,776.52

157,776.52

157,776.52

11,070,073.85

144,749.10

132,797.34

121,832.42

12,082,629.57

Alumnos beneficiados

2,113

CE

5,718.23

CUANDO LA INVERSION AUMENTA EL 30%


TOTAL COSTOS INCREMENTALES

VACTS

1.00

0.92

0.84

0.77

11,992,580.01

157,776.52

157,776.52

157,776.52

11,992,580.01

144,749.10

132,797.34

121,832.42

13,005,135.72

Alumnos beneficiados

2,113

CE

6,154.82

CUANDO LA INVERSION AUMENTA EL -30%


TOTAL COSTOS INCREMENTALES

VACTS

1.00

0.92

0.84

0.77

6,457,543.08

157,776.52

157,776.52

157,776.52

6,457,543.08

144,749.10

132,797.34

121,832.42

7,470,098.80

Alumnos beneficiados

2,113

CE

3,535.30

CUANDO LA INVERSION AUMENTA EL -20%


TOTAL COSTOS INCREMENTALES

VACTS

1.00

0.92

0.84

0.77

7,380,049.24

157,776.52

157,776.52

157,776.52

7,380,049.24

144,749.10

132,797.34

121,832.42

8,392,604.95

Alumnos beneficiados

2,113

CE

3,971.89

CUANDO LA INVERSION AUMENTA EL -15%


TOTAL COSTOS INCREMENTALES

VACTS

1.00

0.92

0.84

0.77

7,841,302.31

157,776.52

157,776.52

157,776.52

7,841,302.31

144,749.10

132,797.34

121,832.42

8,853,858.03

Alumnos beneficiados

2,113

CE

4,190.18

CUANDO LA INVERSION AUMENTA EL -10%


TOTAL COSTOS INCREMENTALES

1.00

0.92

0.84

0.77

TOTAL COSTOS INCREMENTALES

VACTS
Alumnos beneficiados
CE

8,302,555.39

157,776.52

157,776.52

157,776.52

8,302,555.39

144,749.10

132,797.34

121,832.42

9,315,111.11
2,113
4,408.48

OK
AOS
4

10

314,313.65

314,313.65

314,313.65

314,313.65

314,313.65

314,313.65

314,313.65

268,982.21

268,982.21

268,982.21

268,982.21

268,982.21

268,982.21

268,982.21

45,331.44

45,331.44

45,331.44

45,331.44

45,331.44

45,331.44

45,331.44

156,537.13

156,537.13

156,537.13

156,537.13

156,537.13

156,537.13

156,537.13

152,353.83

152,353.83

152,353.83

152,353.83

152,353.83

152,353.83

152,353.83

4,183.30

4,183.30

4,183.30

4,183.30

4,183.30

4,183.30

4,183.30

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

0.71
111,772.87

0.71

0.65
102,543.91

0.65

0.60
94,076.99

0.60

0.55
86,309.16

0.55

0.50
79,182.72

0.50

0.46
72,644.69

0.46

0.42
66,646.51

0.42

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

111,772.87

102,543.91

94,076.99

86,309.16

79,182.72

72,644.69

66,646.51

0.71

0.65

0.60

0.55

0.50

0.46

10,237,617.26

11,160,123.41

0.42

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

111,772.87

102,543.91

94,076.99

86,309.16

79,182.72

72,644.69

66,646.51

11,621,376.49

0.71

0.65

0.60

0.55

0.50

0.46

0.42

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

111,772.87

102,543.91

94,076.99

86,309.16

79,182.72

72,644.69

66,646.51

0.71

0.65

0.60

0.55

0.50

0.46

0.42

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

111,772.87

102,543.91

94,076.99

86,309.16

79,182.72

72,644.69

66,646.51

0.71

0.65

0.60

0.55

0.50

0.46

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

111,772.87

102,543.91

94,076.99

86,309.16

79,182.72

72,644.69

66,646.51

0.65

0.60

0.55

0.50

0.46

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

111,772.87

102,543.91

94,076.99

86,309.16

79,182.72

72,644.69

66,646.51

0.65

0.60

0.55

0.50

0.46

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

111,772.87

102,543.91

94,076.99

86,309.16

79,182.72

72,644.69

66,646.51

0.65

0.60

0.55

0.50

0.46

8,392,604.95

0.42

157,776.52

0.71

7,470,098.80

0.42

157,776.52

0.71

13,005,135.72

0.42

157,776.52

0.71

12,082,629.57

0.42

8,853,858.03

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

157,776.52

111,772.87

102,543.91

94,076.99

86,309.16

79,182.72

72,644.69

66,646.51

9,315,111.11

OK

CUADRO N
EVALUACION ECONOMICA A PRECIOS SOCIALES
INDICADORES
VACT
VAE
CE
N BENEFICIADOS

ALTERNATIVA UNICA
10,237,617.26
2,113
4,845.06
2,113.00

OK
CUADRO N
ANALISIS DE SENSIBILIDAD
VARIACION
COSTOS DE
INVERSION

ALTERNATIVA UNICA
VACT

VAE

C/E

10%

11,160,123.41

2,113

5,282

15%

11,621,376.49

2,113

5,500

20%

12,082,629.57

2,113

5,718

30%

13,005,135.72

2,113

6,155

-30%

7,470,098.80

2,113

3,535

-20%

8,392,604.95

2,113

3,972

-15%

8,853,858.03

2,113

4,190

-10%

9,315,111.11

2,113

4,408

COMPONENTES

MESES
MES

MES

MES

MES

MES

MES

MES

PROCESO DE SELECCION
PARA EXPEDIENTE
TECNICO
ESTUDIOS DEFINITIVOS

60,733.46

60,733.46

60,733.46

60,733.46

PROCESO DE SELECCION
PARA LICITACION DE
OBRA
INFRAESTRUCTURA

1,619,559.05

EQUIPAMIENTO
MOBILIARIO Y
MATERIALES
MITIGACION AMBIENTAL Y
MEDIDAS DE REDUCCION
DE RIESGO

31,852.02

SUPERVISION (INCLUYE
LIQUIDACION)

56,684.57

Total por periodo

60,733.46

60,733.46

60,733.46

60,733.46

1,708,095.63

MESES
MES

MES

MES

MES

MES

10

11

12

Total por
componente

242,933.86
0.00

1,619,559.05

1,619,559.05

1,619,559.05

1,619,559.05

1,619,559.05

9,717,354.30

163,870.39

163,870.39

327,740.78

31,852.02

31,852.02

31,852.02

31,852.02

31,852.02

191,112.11

56,684.57

56,684.57

56,684.57

56,684.57

56,684.57

340,107.40

1,708,095.63

1,708,095.63

1,708,095.63

1,871,966.02

1,871,966.02

10,819,248.45

COMPONENTES

PROCESO DE SELECCION
PARA EXPEDIENTE
TECNICO
ESTUDIOS DEFINITIVOS
PROCESO DE SELECCION
PARA LICITACION DE
OBRA
INFRAESTRUCTURA

MESES
MES

MES

MES

MES

MES

MES

MES

100.00%

25.00%

25.00%

25.00%

25.00%
100.00%

16.66%

EQUIPAMIENTO
MOBILIARIO Y
MATERIALES
MITIGACION AMBIENTAL Y
MEDIDAS DE REDUCCION
DE RIESGO

16.66%

SUPERVISION (INCLUYE
LIQUIDACION)

16.66%

MESES
MES

MES

MES

MES

MES

10

11

12

Total por
componente
100.00%

100.00%
100.00%

16.66%

16.67%

16.67%

16.67%

16.67%

100.00%

50.00%

50.00%

100.00%

16.66%

16.67%

16.67%

16.67%

16.67%

100.00%

16.66%

16.67%

16.67%

16.67%

16.67%

100.00%