Beruflich Dokumente
Kultur Dokumente
F
pu
urposes only
Operation
ME-B operation
12/07/2011
<1>
For training
F
pu
urposes only
Operation
ME-B Operation
01/01/2012
<2>
For training
F
pu
urposes only
Access Level
ME-B Operation
01/01/2012
<3>
For training
F
pu
urposes only
Engine:
Operation
ME-B Operation
01/01/2012
<4>
For training
F
pu
urposes only
Engine:
Process Information
ME-B Operation
01/01/2012
<5>
For training
F
pu
urposes only
Engine:
Process Adjustment > Fuel Quality
ME-B Operation
01/01/2012
<6>
For training
F
pu
urposes only
Engine:
Process Adjustment > Max Pressure
ME-B Operation
01/01/2012
<7>
For training
F
pu
urposes only
Engine:
Process Adjustment > Mean Pressure
ME-B Operation
01/01/2012
<8>
For training
F
pu
urposes only
Engine:
Process Adjustment > Auto Tuning
ME-B Operation
01/01/2012
<9>
For training
F
pu
urposes only
Engine:
Process adjustment > Auto Tuning
ME-B Operation
01/01/2012
< 10 >
For training
F
pu
urposes only
Engine:
Chief Limiters
ME-B Operation
01/01/2012
< 11 >
For training
F
pu
urposes only
Engine:
Chief Limiters > Re-enable Fuel Injection
ME-B Operation
01/01/2012
< 12 >
For training
F
pu
urposes only
Auxiliaries:
Hydraulic System
ME-B Operation
01/01/2012
< 13 >
For training
F
pu
urposes only
Auxiliaries:
Cylinder Lubrication
ME-B Operation
01/01/2012
< 14 >
For training
F
pu
urposes only
To create a hydrodynamic oil film separating the piston rings from the liner
The oil amount needed to create an oil film is more or less independent of the fuel oil being used.
The optimum is kept safely down to a feedrate of 0.55 g/kWh.
2
2.
3.
01/01/2012
< 15 >
For training
F
pu
urposes only
MAN B&W guideline for small bore is 0.26 g/kWh x S%, with a minimum of 0.6 g/kWh (SL 05-455/HRJ)
Running in guideline is:
1.7 g/kWh for 5 hours
1.5 g/kWh up to 250 running hours
1.2 g/kWh up to 500 running hours
F x S%,
S% from 500 2500 running hours
hours, where F is reduced gradually from 0
0.34
34 to 0
0.26
26 g/kWh
ME-B Operation
01/01/2012
< 16 >
For training
F
pu
urposes only
ME-B Operation
01/01/2012
< 17 >
For training
F
pu
urposes only
ME-B Operation
01/01/2012
< 18 >
For training
F
pu
urposes only
Maintenance:
System View
View, I/O Test
ME-B Operation
01/01/2012
< 19 >
For training
F
pu
urposes only
Maintenance:
System View, I/O Test
CCU 1
ME-B Operation
01/01/2012
< 20 >
For training
F
pu
urposes only
Maintenance:
System View, I/O Test
CCU 1 > Channel-24
ME-B Operation
01/01/2012
< 21 >
For training
F
pu
urposes only
Maintenance:
Invalidated Inputs
ME-B Operation
01/01/2012
< 22 >
For training
F
pu
urposes only
Maintenance:
Network Status
ME-B Operation
01/01/2012
< 23 >
For training
F
pu
urposes only
Maintenance:
Function Test > Tacho > Cabling Test
ME-B Operation
01/01/2012
< 24 >
For training
F
pu
urposes only
Maintenance:
Function Test > Tacho
ME-B Operation
01/01/2012
< 25 >
For training
F
pu
urposes only
Maintenance:
Function Test > Trouble shooting
Note:
O MOP B Only
On
O l
ME-B Operation
01/01/2012
< 26 >
For training
F
pu
urposes only
Admin.:
Set Time
ME-B Operation
01/01/2012
< 27 >
For training
F
pu
urposes only
Admin.:
Version
ME-B Operation
01/01/2012
< 28 >
For training
F
pu
urposes only
Alarms:
Alarm List
ME-B Operation
01/01/2012
< 29 >
For training
F
pu
urposes only
Alarms:
Alarm List
ME-B Operation
01/01/2012
< 30 >
For training
F
pu
urposes only
Alarms:
Event Log
ME-B Operation
01/01/2012
< 31 >
For training
F
pu
urposes only
Alarms:
Event Log - Filter
ME-B Operation
01/01/2012
< 32 >
For training
F
pu
urposes only
Alarms:
Manual Cut-Out List
ME-B Operation
01/01/2012
< 33 >
For training
F
pu
urposes only
Alarms:
Channel List
ME-B Operation
01/01/2012
< 34 >
For training
F
pu
urposes only
Disclaimer
All data p
provided in these training
g materials is non-binding.
g
This data serves informational purposes only and is especially not
guaranteed in any way.
Depending on the subsequent specific individual projects
projects, the relevant data
may be subject to changes and will be assessed and determined
individually for each project. This will depend on the particular
characteristics of each individual p
project,
j , especially
p
y specific
p
site and
operational conditions.
ME-B Operation
01/01/2012
< 35 >