Sie sind auf Seite 1von 14

NO.

ITEM

CHECK POINTS

Running
hours

SATISFACTORY

MAIN ENGINE
Operate satisfactorily.
PORTSIDE
(CATERPILLAR 3412) Safety devices function properly.

Yes

No

Yes

No

Remote control function properly.

Yes

No

Check the alarm lamp operation

Yes

No

Oil pressure 0.49 to 0.64 Mpa / 5.0 to 6.5


kgf/cm2 ( during operation )

Yes

No

Oil pressure 0.2 to 0.29 mpa / 2 to 3 kgf/cm2


( standard pressure / no load )

Yes

No

Coolant temperature gauge 70 to 80 C ( during


operation )

Yes

No

Water level at expansion tank

Yes

No

Check condition and level the Engine Oil

Yes

No

The oil filter and by pass oil filter

Yes

No

Condition of The Zinc Rods

500

Yes

No

Condition of the V- Belt

250

Yes

No

Measure Deflection of The V-Belt ( 10 to 15


mm)

250

Yes

No

The primary and secondary of fuel filter

500

Yes

No

Fuel injection nozzle opening pressure ( 34.3


Mpa / 350 kgf/cm2 )

1000

Yes

No

Injection timing ( BTDC 18 )

1000

Yes

No

Valve Clearance ( inlet : 0.6 mm, exhaust : 0.8


mm )

1000

Yes

No

Damper vibration

2000

Yes

No

Color of exhaust smoke

Yes

No

Sea water discharging volume

Yes

No

Tightening torque of bolts

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

2000

Yes

No

2000

Yes

No

The Oil cooler Anodes

Yes

No

Leakage

Yes

No

GEARBOX PORT
Operate satisfactorily.
(DONG FENG D 300
Oil pressure 4.0 to 5.0 bar ( Clutch
A)
disengaged )

Oil pressure appr. 22 bar ( Clutch engaged)


Oil level ( between " Min " and " Max" ) and
condition of The Oil
Oil temperature from the Thermometer ( 30 to
60 C and max 70 C )
Check the Contamination indicator for the oil
filter standard ( indicator red = filter
contamination )
The contamination indicator for the oil filter /
duplex filter

2000

NO.

ITEM

CHECK POINTS

Running
hours

Abnormal running

Yes

No

Abnormal opeating noises

Yes

No

Yes

No

Yes

No

MAIN ENGINE
Operate satisfactorily.
STARBOARD
(CATERPILLAR 3412) Safety devices function properly.

Yes

No

Yes

No

Remote control function properly.

Yes

No

Check the alarm lamp operation

Yes

No

Oil pressure 0.49 to 0.64 Mpa / 5.0 to 6.5


kgf/cm2 ( during operation )

Yes

No

Oil pressure 0.2 to 0.29 mpa / 2 to 3 kgf/cm2


( standard pressure / no load )

Yes

No

Coolant temperature gauge 70 to 80 C ( during


operation )

Yes

No

Water level at expansion tank

Yes

No

Check condition and level the Engine Oil

Yes

No

The oil filter and by pass oil filter

Yes

No

Tightening torque of bolts

5000

The Fuel Filter and Fuel pre-Filter


2

SATISFACTORY

Condition of The Zinc Rods

500

Yes

No

Condition of the V- Belt

250

Yes

No

Measure Deflection of The V-Belt ( 10 to 15


mm)

250

Yes

No

The primary and secondary of fuel filter

500

Yes

No

Fuel injection nozzle opening pressure ( 34.3


Mpa / 350 kgf/cm2 )

1000

Yes

No

Injection timing ( BTDC 18 )

1000

Yes

No

Valve Clearance ( inlet : 0.6 mm, exhaust : 0.8


mm )

1000

Yes

No

Damper vibration

2000

Yes

No

Color of exhaust smoke

Yes

No

Sea water discharging volume

Yes

No

Tightening torque of bolts

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

GEARBOX PORT
Operate satisfactorily.
(DONG FENG D 300
Oil pressure 4.0 to 5.0 bar ( Clutch
A)
disengaged )

Oil pressure appr. 22 bar ( Clutch engaged)


Oil level ( between " Min " and " Max" ) and
condition of The Oil
Oil temperature from the Thermometer ( 30 to
60 C and max 70 C )
Check the Contamination indicator for the oil
filter standard ( indicator red = filter
contamination )

2000

2000

NO.

ITEM

CHECK POINTS
The contamination indicator for the oil filter /
duplex filter

Running
hours

Yes

No

The Oil cooler Anodes

Yes

No

Leakage

Yes

No

Abnormal running

Yes

No

Abnormal opeating noises

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Water level at Expansion Tank

Yes

No

Condition of the V - Belt

Yes

No

Measure deflection of the V - Belt ( 10 mm )

Yes

No

Yes

No

Condition The Oil and Level Oil ( Full mark )

Yes

No

Lubricating Oil Filter

Yes

No

Color of exhaust smoke

Yes

No

Sea water discharging volume

Yes

No

Air Filter

Yes

No

Tightening torque of bolts

2000

5000

The Fuel Filter and Fuel pre-Filter


3

GENERATOR
Operate satisfactorily.
ENGINES PORTSIDE
(MITSUBISHI 4D32)
Safety devices function properly.

Condition of the Impeller water pump

ALTERNATOR
( STAMFORD
UCM274E1 )

GENERATOR
ENGINES
STARBOARD
(MITSUBISHI 4D32)

SATISFACTORY

400

The Valve tip Clearance ( inlet 0.2 mm and


exhaust 0.45 mm )

2000

Yes

No

Condition of the Viscous Damper

2000

Yes

No

Lubricating Oil Pressure ( 280 kN/m2 / 2.5


kgf/cm2 )

Yes

No

Fuel injection nozzle opening pressure ( Mpa /


kgf/cm2 )

Yes

No

Operate satisfactorily.

Yes

No

Abnormal vibration

Yes

No

Synchronasation system

Yes

No

Output voltage

Yes

No

Operate satisfactorily.

Yes

No

Safety devices function properly.

Yes

No

Water level at Expansion Tank

Yes

No

Condition of the V - Belt

Yes

No

Measure deflection of the V - Belt ( 10 mm )

Yes

No

Yes

No

Yes

No

Condition of the Impeller water pump


Condition The Oil and Level Oil ( Full mark )

400

(MITSUBISHI 4D32)

NO.

ITEM

ALTERNATOR
( STAMFORD
UCM274E1 )

CHECK POINTS

Yes

No

Color of exhaust smoke

Yes

No

Sea water discharging volume

Yes

No

Air Filter

Yes

No

The Valve tip Clearance ( inlet 0.2 mm and


exhaust 0.45 mm )

2000

Yes

No

Condition of the Viscous Damper

2000

Yes

No

Lubricating Oil Pressure ( 280 kN/m2 / 2.5


kgf/cm2 )

Yes

No

Fuel injection nozzle opening pressure ( Mpa /


kgf/cm2 )

Yes

No

Operate satisfactorily.

Yes

No

Abnormal vibration

Yes

No

Synchronasation system

Yes

No

Output voltage

Yes

No

Yes

No

Yes

No

Condition of the V- Belt and tension of the Vbelt ( 10 -15 mm )

Yes

No

Sea water discharging volume

Yes

No

Abnormal noise and vibrate

Yes

No

Operate satisfactorily.

Yes

No

Abnormal noise and vibrate

Yes

No

leakage from the pump casing

Yes

No

Greasing

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Yes

No

leakage from the pump casing

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Bilge & GS Pump operate satisfactorily.

Yes

No

No heavy corrosion and leakage.

Yes

No

EMERGENCY FIRE Operate satisfactorily.


PUMP

BALLAST SYSTEM Ballast pump Operate satisfactorily.


PORT & STBD

BILGE & GS
SYSTEM

SATISFACTORY

Lubricating Oil Filter

FIRE FIGHTING
Operate satisfactorily.
ENGINE DRIVEN
(ELECTROMOTOR) Water level at expansion tank

FIRE PUMP

Running
hours

9
NO.

10

11

12

13

14

15

BILGE & GS
SYSTEM

ITEM

CHECK POINTS

Running
hours

SATISFACTORY

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

SEA WATER
Sea water cooling Pump operate satisfactorily.
COOLING SYSTEM

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Emergency stop operating satisfactorily

Yes

No

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Piping in good order.

Yes

No

Operate satisfactorily.

Yes

No

Remote and control function properly.

Yes

No

Meters and gauges in good order.

Yes

No

Operate satisfactorily.

Yes

No

Remote and control function properly.

Yes

No

Meters and gauges in good order.

Yes

No

Yes

No

Remote and control function properly.

Yes

No

Meters and gauges in good order.

Yes

No

No heavy corrosion and leakage.

Yes

No

All valves operate satisfactorily.

Yes

No

Operate satisfactorily.

Yes

No

Emergency stop operating satisfactorily

Yes

No

FUEL OIL SYSTEM Fuel oil Pump operate satisfactorily.

DIRTY OIL SYSTEM Dirty oil Pump operate satisfactorily.

SEWAGE
TREATMENT PLANT

OILY WATER
SEPARATOR

HYDRAULIC POWER Operate satisfactorily.


PACK AND CONTROL

16

PIPING

17

BLOWER P/R

18

BLOWER E/R

Operate satisfactorily.

Yes

No

19

EMERGENCY
STEERING

Operate satisfactorily.

Yes

No

20

CONTROL CONSOL

Operate satisfactorily.

Yes

No

21

COMMUNICATION
SYSTEM

Operate satisfactorily.

Yes

No

NO.
22

23

24

ITEM

CHECK POINTS

Running
hours

SATISFACTORY

CLEANLINESS of E/R

GUARDS AND
FENCING
QUICK CLOSING
VALVE

Chief Engineers
Date :

Must be clean without rubbish or waste oil.

Yes

No

Protection covers and/or guards in good order.

Yes

No

Operate satisfactorily.

Yes

No

All valves operate satisfactorily.

Yes

No

REMAKS

REMAKS

REMAKS

REMAKS

REMAKS

REMAKS

Technical Superintendent
Date :

NO

ITEM

CHECK POINTS

SATISFACTORY

All lights in good order.

Yes

No

Protection covers or guards in good order

Yes

No

All lights in good order.

Yes

No

Protection covers or guards in good order

Yes

No

All lights in good order.

Yes

No

Protection covers or guards in good order

Yes

No

Lighting in E/R

Lighting in Acc. Spaces

Lighting in working room,


steering room and other
spaces

Emergency cables

Condition in good order, no exposed wire,


heavy corrosion, especially on weather
deck.

Yes

No

Emergency lights

All lights in good order, no broken lights.

Yes

No

Anti-explosion lights in
dangerous spaces, pump
room, battery room, paint
locker etc.

All lights in good order, no broken covers


and guards, tightening handles available
on board.

Yes

No

Insulating mats around


MSB

Available on board or insulation cement


permanently laid up on the floor.

Yes

No

Main Switch Board

All gauges and indicating light are


functioning

Yes

No

The surface of panel for excessive


warmness

Yes

No

Unusual smell

Yes

No

All cable conncetion and bus

Yes

No

Gas detector at P.R

Yes

No

Fire detector

Yes

No

Sensor CO2

Yes

No

Bilges at Engine Room

Yes

No

Bilges at Pump Room

Yes

No

Bilges at Steering Room

Yes

No

Daily Oil Tank

Yes

No

Fuel Oil Tank

Yes

No

Sewage tank

Yes

No

Alarms operate
satisfactorily

Level high / low alarm


operate satisfactorily
10

Chief Engineers
Date :

REMAKS

Technical Superintendent
Date :

Das könnte Ihnen auch gefallen