Beruflich Dokumente
Kultur Dokumente
03
Title:
Module Name
Overview:
Business Process Procedure Overview
For BSNL actual cost collected in cost centres within circle and business area will be allocated
within business area either if required through period end processing or through manual
allocation process. As such purpose of actual period end allocation of cost is to collect the cost
from reporting prospective to the correct cost centre. At the month end after running the
allocation cycle this actual cost will be copied to planning version 1. Based on the plan cost
copied from actual allocation, assessment cycle for plan cost will be run. This will post the plan
cost to different cost centre at circle level from where same will be allocated to COPA segment.
Flow of cost will be as under:
From Cost centre at SSAs to Cost centre at Circle.
From Cost centre at Non-territorial circle to Cost Centre at Circles.
From Cost centre at Corporate Office to Cost centre at Circles.
From Cost Centre at Territorial Circle to COPA segments.
Period
Cycle
Output Results
Comments
Document Posted
Version: 1.0
Release: ECC 6.0
Page:
1 of 9
Procedural Steps
FI10.03.01 - Access to create distribution of cost by:
Via Menus
From the SAP R/3 Easy Access Screen, access as shown below
Version: 1.0
Release: ECC 6.0
Page:
2 of 9
Field Name
Period
Cycle
Description
Distribution Period (month)
Distribution Cycle Name
R/O/C
R
R
Start Date
Test Run
R
O
Detail List
Comments
These cycle will be
pre-configured to
be available to the
user
Tick test run for
first time executing
the transaction, if
output is desired
one un-tick the
same and execute
EXECUTE
Version: 1.0
Release: ECC 6.0
Page:
3 of 9
Click on Receiver
Click on sender
Version: 1.0
Release: ECC 6.0
Page:
4 of 9
Procedural Steps
FI10.03.02 - Access to create assessment of cost by:
Via Menus
From the SAP R/3 Easy Access Screen, access as shown below
Version: 1.0
Release: ECC 6.0
Page:
5 of 9
Field Name
Period
Cycle
Description
Assessment Period (month)
Assessment Cycle Name
R/O/C
R
R
Start Date
Test Run
R
O
Detail List
Comments
These cycle will be
pre-configured to
be available to the
user
Tick test run for
first time executing
the transaction, if
output is desired
one un-tick the
same and execute
EXECUTE
Version: 1.0
Release: ECC 6.0
Page:
6 of 9
Click on Receiver
Click on Sender
Version: 1.0
Release: ECC 6.0
Page:
7 of 9
Procedural Steps
Access to create indirect activity allocation of cost by:
Via Menus
From the SAP R/3 Easy Access Screen, access as shown below
Version: 1.0
Release: ECC 6.0
Page:
8 of 9
Field Name
Period
Cycle
Description
Allocation Period (month)
Indirect Activity Allocation Cycle
Name
R/O/C
R
R
Start Date
Test Run
R
O
Detail List
Comments
These cycle will be
pre-configured to
be available to the
user
Tick test run for
first time executing
the transaction, if
output is desired
one un-tick the
same and execute
EXECUTE
Version: 1.0
Release: ECC 6.0
Page:
9 of 9