Name of Work :Package N.FDPR/PTN/35/15-16.Taluka- Radhanpur Dist.

-Patan

ASPHALT (RS-1 ) CONSUMPTION STATEMENT


Sr.N It.
o. No
1
1

Description of Item

Qty.

Rate of
consunption in
Kg.

Actual
requirment in
Kg.

5
33.60
Kg./ MT

6
1344.00

37 Providing and laying 25 mm thick premix asphalt carpet using 0.66 cmt per 1 MT.mix with M.C.
stone agg. using asphalt 33.60 kg .ie. 3.36 % and mixing water proofing material ZYCOTHERM of
Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt
and aggregate by hot laid process using drum mix pant ,transporting themix, spreading the same by
paver finisher with vibratory roller 80 to 100 KN. static wt. incl. providing all equipments tools and
plants, fire wood, oil, kerosene, labour charges etc. complete with contractor's own machineries, etc.
complete.

40.00

38 Providing & laying 37.50mm thick Bituminous macadam with VG-30 bitumen for and mixing water proofing

368.00

material ZYCOTHERM of Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating
the asphalt at the rate of 3.50 % i.e. 35.0 Kg/ M.T. by weight mix including heating & mixing in drum mix plant
transporting the mix spreading the same by paver finisher and consolidation by vibratory roller as per MORT&H
specification including cost of all materials fuel, labours, tools and plant etc using contractors own drum mix plant
etc. comp.

39 Providing and laying bitumenous Seal coat 0.18 cmt / 10 smt. with machine crushed aggregate
using 45.00 kg. of bitumen per M.T. of total weight of mix agg. (4.50 % of total weight of mix) mixing
by continuous batching of drum mix plant and mixing water proofing material ZYCOTHERM of
Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt
and aggregate by hot laid process using drum mix pant ,transporting themix, spreading the same by
paver finisher and consolidation with vibratory roller 8 to 10 tonne incl. providing all materials
equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. comp & flushind sand @
rate of 0.30 cmt / 100 smt.

35

Kg./

12880.00

MT

142.00

45

Kg./
MT

6390.00

Providing and laying bitumenous Seal coat 0.24 cmt / 10 smt. with machine crushed aggregate
using 45.00 kg. of bitumen per M.T. of total weight of mix agg. (4.50 % of total weight of mix) mixing
by continuous batching of drum mix plant and mixing water proofing material ZYCOTHERM of
Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt
and aggregate by hot laid process using drum mix pant ,transporting themix, spreading the same by
paver finisher and consolidation with vibratory roller 8 to 10 tonne incl. providing all materials
equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. comp & flushind sand @
rate of 0.30 cmt / 100 smt.

Providing and laying c.c. 1:2:4 (1 cement : 4 coarse sand : 4 M.C. Stone Agg. 20 mm size ) and
providing necessary vertical pin headers including formwork, vibrating, complete.

Bulk Asphalt S-90


Say

Dy.Executive Engineer
R & B (P) Sub Division,
Radhanpur

20614.00
K.G.
20.61
M.T.

Executive Engineer
R & B Division, Gandhinagar
Patan

26.03