11
Apr 7, 2015
DATE OF AWARD
~P~R~O
~J~E~C~T
~:~
F~o~
re~s~t~T~h~e~a~te~r~R~e~n~o~v~a~ti~o~
n _________________________________________ SHEET ____~
1 ~o~
f ~1____
,CONTRACTOR
You are hereby requested to make the herein described changes from the plans and specifications or do the
following described work not included in the plans and specifications on this contract.
NOTE: THIS CHANGE IS NOT EFFECTIVE UNTIL FULLY EXECUTED.
Description:
1
1,362.00
1,362.00
CONTRACT PRICE
CONTRACT TIME
No additional days
1,362.00
Increase
Decrease
Estimated
Exact
$
$
$
1,462,236.00
60,171.00
61
3.00
4.2%
Contractor:
Title:
Submitted By:
Andy Vanderford
Approval
Recommended
Date
Project Manager
Approved:
Authorized:
Authorized:
[E)
Attachments:
/ITJ*
Rob Mullane
Date
City Administrator
Doug Schmitz
Dp- o~r ~
City Council
OTTO
Project
Forest Theater Renovation
Re lated RFP # :
14
6
NIA
Related RFI #
27
DATE:
10/13/15
PCOII:
15-3 141~0
Description of Change
Attached and below pricing is in relation to RFI #27. Pricing includes labor and
material to remove existing folgers custom drain line and install per RFI #27's
response.
CHANGE ESTIMATE ITEM
COST
M/U %
MIU TOTAL
GC DIRECT COSTS
GC DIRECT LABOR
GC DIRECT MATERIALS
GC DIRECT EQUIPMENT
GC OTHERIINDIRECTS
$89
$0
$0
$0
TOTAL L, M, & E DIRECT COST
$89
$89
$0
$0
$0
10.0%
10.0%
10.0%
10.0%
$9
$0
$0
$0
TOTAL MARKUP ON DIRECT COST
$9
GC SUBCONTRACT(S) OR 'OTHERS'
$1 ,185
OCG Plumbing
$1,185
GC FEE ON SUBCONTRACT(S)
$1 ,1 85
5.0%
$59
TOTAL GC FEE ON SUBCONTRACT(S)
$59
$0
$ 1,342
$20
$1 ,362
Otto Construction
2150 Garden Road , Suite A-1
Monterey, CA 93940
TEL 831.657.9805 FAX 831.657.9820
License #178809
10 Description
Hrs
1.5
Rate
Labor
59
Mat I
Equip
Sub/Mise
TOTAL
89
89
2
4
0
0
5
6
0
0
7
8
0
0
0
9
10
0
0
--
11
..
.-
12
13
14
0
0
15
16
17
0
0
18
19
0
0
20
21
0
0
22
23
24
0
0
27
28
29
30
31
33
34
0
0
Totals
"CHECK L,M,E,S": 89
Notes:
1.5
. -
89
--
---
..
..
0
0
0
32
--
0
0
25
26
..
89
p aqe 1 0 f2
Change Proposal
FOREST THEATER
Description:
Proposal#:
Project Manager:
#3
OCG
Date:
09/30/15
DESCRIPTION
Materials
SEE ATTACHED DETAIL
QUANTITY
TOTAL COST
$
Tax@ 8%
Subtotal
TOTAL
565.89
$
$
45.27
611 .16
611 .16
Subcontractor
-
$
$
$
$
$
$
Subtotal
Labor
Rate
$
Foreman
Mechanic
Apprentice
Excavation
Project Manager
Foreman 5% of Sub
Subtotal
87.25
85.16
71 .60
$
$
442.24
-
71 .60
93.00
Flat Rate
Subtotal
Payroll Taxes , Insurance, Burden included
Job Costs
Permit Fee Schedule
Material Handling
Small tools 3%
Drawing Reproduction
General Conditions
Vehicle Expense
Subtotal
Total Cost
Overhead
Subtotal
Markup
Subtotal
5.193
442.24
$
442.24
1,053.40
23.80
$
$
1,077.20
Percent
Percent
$
$
1,077.20
107.72
1,185.02
13.27
INCLUDED
$
$
10.53
-
23.80
10.00%
Bond
Total Days Added to Schedule
Total
$
$
Date
1 '185.02
Page 2 of 2
3
2
1
2
19
Description
NH Cl Soil1/8 Bend
No-Hub Cast Iron Soil Pipe
4
No-hub Couplings
4
Plain Std Riser Clamp
NA
SMCN SHEET METAL CAN ADAPTOR
1 5/8x1 5/8 Strut Double Slot Chnl12 Ga GR
(TOTAL)
26.55
0.8
0.0
0.8
1.0
1.793
5.193
City ofCarmel-by-the-Sea
PUBLIC WORKS DEPARTMENT
POST OFFICE BOX CC
CARMEL-BY-THE-SEA, CA 93921
(831) 620-2070 OFFICE
August13,2015
DATE:
PROPOSAL
PROJECT 10.
CONTRACT:
TO:
6
13-70904
John Garayalde
Otto Construction
FROM:
Andy Vanderford
City of Carmel-by-the-Sea
SUBJECT:
Description of Proposed Changes
Please find attached RFI #27, which contains direction to change-out existing
leader-head and related piping within the costume storage room.
This request for proposal is neither a change in the subject Contract, nor an order to the Contractor to
perform any work. However, it pertains to certain proposed modifications to the work covered by said
contract. The provisions, drawings and specifications of said Contract and previous modifications thereto
will apply, as applicable, unless specifically indicated otherwise herein.
The City of Carmel-by-the-Sea hereby requests that the Contractor submit within ten (10) working days
after receipt of th is request a proposal to make the changes described herein. All changes to the Contract
Price and Contract Time should be detailed for each separate item listed. Detailed breakdown must include
deductive or added cost for all labor, equipment, materials and all applicable mark-ups.
Nothing written in this Request for Proposal will obligate the City of Carmel-by-the-Sea to incur any costs nor
change the Contract Time unless such changes are included in an approved Contract Change Order.
Signed
Enclosure:
Oistri bution:
CAW
Joe Headley, Building Official
Matt Wetmore, Otto
Oscar Cisneros, Otto
Yuri Rodriguez, Otto
OTTO
CO STRUC ION
RFI
To:
Andrew Vanderford
RFI #: 27
Date: 7/9/2015
P.O. Box CC
Carmel By the Sea, CA 93921
Ph: 831-620-2078
cc:
John Garayalde (Otto Construction), Jilian Cadouri (Cody Anderson Wasney), Monique Wood (Cody Anderson W asney),
Oscar Cisneros (Otto Construction)
Subject:
Coffee Can
Spec Section:
Drawing:
Cost Impact:
None
Date Required :
Request:
Located in the costume room (below the dressing room), there is an existing coffee can that is part of the storm drainage system.
Contractor is uncerta in of the point of origin for this drainage system, but recommends that the existing line inside this room to be
replaced and corrected . Attached are photos.
Requested by :
Yuri Rodriguez
OTTO CONSTRUCTION
Response:
Demo c.offee can and existing line inside room. Instal, sheet tnd'il leadcr box and new cast
iron line. See <~tlached CA-23 for deti'iil.
REVIEWED
By Andy Vanderford at 8:48am, Ju/21, 2015
J.Cadoun
Answered by
CAW Architects
Company
07/20/15
Date
Page 1 of 1
s-o~GE
E) CON C . WA...L
1..:::.
t 20
L::.
""'\
,_"
I
- -L-~
....:.
gauge mn
-ro CON C .
I
I
I
I
I
WALL
-'
A
.....,
!:
S-:"RAP -:"0 COI'.C. \X/A :..i...
-'
~
=~c=~~A=~~~~~~-~~,-~~~~@~(E~>~S~T~O~R~M~D~R~A~I~N~---------------------------~
ARCHITECTS
C o d y A n d e r s o n W a s n e y A r c h i t e c t s, I n c.
455 L a m b e r t A v e n u e P a I o A I t o, CA 94306
650.328 . 1818
Fax
328 . 1888
FOREST THEATER
rroJedName--- oo ---oo---oo-oooo--oooo--oooooo--oo.-oooo-- --oooo
00
14017
Profei:i'Ni.lm&ei
00
00
00 00 00
7120115
Date.............
00 .
. . . 00 00
00
00
00 0 0 . 0 0 . 00
CA-23
00 0 0 . 00 . . . . 00 . . . . . 0 0 . 00
00
5fieei Number.