RURAL ELECTRICATION WORK IN MIZORAM

POWER & ELECTRICITY DEPARTMENT , GOVT OF MIZORAM

EXTRA PAYEMENT & TIMELY


S.NO. WORK DESCRIPTION UNIT UNIT RATE (Rs.) TOTAL(Rs.)
COMPLETION (Rs.) Rate Offer
A 33kV LINE Km 59900.00 4992.00 64892.00 68136.60
Detailed Route Survey , Erection of Poles. Fixing of Cross arm/Channnel , Insulators ,stringing of
conductors.Testing & Commissioning of O/H New 11kV ,3Ph O/H Line (R.L.110.0CKT-Km on
assorted places on 9.5mtr. Long Steel Tubular Pole (SP-35) by ASCR RACCON Conductor for
identified locations. Numbering of poles, Painting of all iron materials and Prepartion of Actual
Route map as per AQS and TS
B NEW 11kV LINE Km 59900.00 4992.00 64892.00 68136.60

Detailed Route Survey , Erection of Poles. Fixing of Cross arm/Channnel , Insulators ,stringing of
conductors.Testing & Commissioning of O/H New 11kV ,3Ph O/H Line (R.L.388.0CKT-Km on
assorted places on 9.5mtr. Long Steel Tubular Pole (SP-35) by ASCR RACCON Conductor for
identified locations. Numbering of poles, Painting of all iron materials and Prepartion of Actual
Route map as per AQS and TS

C 25kVA DISTRIBUTION TRANSFORMER No. 19697.00 1641.00 21338.00 22404.90


Erection, Testing and commissioning of all equipmentrs including 3PH,25KVA
DistributuionTransformers along with 9.0 Mtr. Long Steel Tibular Pole (SP-29), Mounting
Km
structures, all other components and Accessories. (Consisting of but not limited to the following
items). Total Nos.:390.
D NEW LT LINE BY AAC( 3PHASE 5WIRE) Km 51636.00 4303.00 55939.00 58735.95
Detailed Route Survey , Erection of Poles. Fixing of Cross arm/Channnel , Insulators ,stringing of
conductors.Testing & Commissioning of O/H New 11kV ,3Ph O/H Line (R.L.188.58CKT-Km on
assorted places on 8.5mtr.& 8.0 mtr. Long Steel Tubular Pole (SP-17 &SP-29) by AAC ANT( for
PHaseConductors) & AAC GNAT(for Neutral & Street Light) for identified locations. Numbering of
poles, Painting of all iron materials and Prepartion of Actual Route map as per AQS and TS

E NEW LT LINE BY AAC( 1PHASE 3WIRE) Km 49816.00 4151.00 53967.00 56665.35

Detailed Route Survey , Erection of Poles. Fixing of Cross arm/Channnel , Insulators ,stringing of
conductors.Testing & Commissioning of O/H New 11kV ,3Ph O/H Line (R.L.119.42CKT-Km on
assorted places on 8.5mtr.& 8.0 mtr. Long Steel Tubular Pole (SP-10 &SP-10) by AAC ANT( for
PHaseConductors) & AAC GNAT(for Neutral & Street Light) for identified locations. Numbering of
poles, Painting of all iron materials and Prepartion of Actual Route map as per AQS and TS

NEW LT SERVICE CONNECTION FOR BPL RHh(TOTAL NOS.:15891) No. 270.00 30.00 300.00 315.00