Series 300
Automatic Transfer Switches
Gdesign, 1000 through 3200 A
Rating Label
Each automatic transfer switch contains a rating label to
define the loads and fault circuit withstand / closing ratings.
Refer to the label on the transfer switch for specific values.
3-1
3-1
3-1
3-1
3-2
3-2
ADJUSTMENTS . . . . . . . . . . . . . . . . . . . . . . . 4-1
Time Delay and Sensor Adjustments . . . . . 4-1
How to Change a Setting . . . . . . . . . . . . . . . 4-2
CONTROL FEATURES . . . . . . . . . . . . . . . . . 5-1
Engine Exercisers . . . . . . . . . . . . . . 5-1, 5-2, 5-3
Motor Load Transfer . . . . . . . . . . . . . . . . . . . 5-4
Load Disconnect & Remote Control . . . . . . 5-4
INDEX . . . . . . . . . . . . . . . . . . . . . back of manual
381333122 G
ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3
Nameplate
G 300
Neutral
B switched
C overlapping
blank solid
neutral
connections
Phase Poles
2 single
3 three
2000
Amperes
Voltage
Controller
Enclosure
1000
1200
1600
2000
2600
3000
3200
C 208 K 415
D 220 L 440
E 230 M 460
F 240 N 480
1 standard
C type 1
F type 3R
G type 4 *
L type 12 *
H 380 Q 575
J 400 R 600
1X if
accessories
ordered
power
connections
Controller
membrane
controls
Transfer
Switch
power
connections
neutral
connections
SECTION 1
INSTALLATION
Testing Power Conductors
Supporting Foundation
The supporting foundation for the enclosure must be
level and straight. Refer to the applicable enclosure
outline drawing included with the Series 300 for all
mounting details including door opening space.
NOTICE
Protect the automatic transfer switch from
construction grit and metal chips to prevent
malfunction or shortened life of the ATS.
Mounting
Refer to the applicable enclosure outline drawing
furnished with this switch and mount the Series 300
according to details and instructions shown on diagram.
Controller Ground
A grounding wire must be connected to the controllers
lower left mounting stud. Because the controller is
mounted on the enclosure door, a conductive strap must
be used between the enclosure and the door. This
connection provides proper grounding which does not
rely upon the door hinges.
NOTICE
Do not route the power cables along the sides of
the Transfer Switch.
Line Connections
Refer to the Wiring Diagram provided with your Series
300 ATS. All wiring must be made in accordance with
the National Electrical Code and local codes.
Harnesses
The transfer switch is connected to the left side of the
controller by a plugin harness (two plugs).
1--1
INSTALLATION (continued)
Engine Starting Contacts
TS Auxiliary Contacts
Feature 14A & 14B
5 amps, 32 V DC
5 amps resistive 28 V DC
or 120 V AC max.
10 amps, 32 V DC
10 amps 250 V AC
general purpose
FEATURE 7
closes to start
When normal
source fails
contact closes
contact opens
Engine Starting
Signals
Auxiliary Circuits
Connect auxiliary circuit wires to appropriate terminals
on transfer switch terminal block TB as shown on the
wiring diagram provided with this Series 300 Automatic
Transfer Switch. Make the necessary auxiliary connections by referring to Section 5, Control Features.
FEATURE 8
opens to start
TB Terminal Block
(field connections)
accepts wire range
2212 AWG
for factory
use only
Figure 1-2. Input / output label on the Controller showing possible connections to the lower terminal block.
1--2
INSTALLATION (continued)
Functional Test
The Functional Test consists of three checks: manual
operation, voltage checks, and electrical operation.
Turn counterclockwise
to Emergency.
NOTICE
Turn clockwise
to Normal.
slide hub
onto shaft
2.
3.
Normal
CLOSED
4.
CLOSED
OPEN
NOTICE
Emergency
insert
handle
into hole
Grasp
handle
firmly
Emergency
contacts
window
indicators
OPEN or
CLOSED
Normal
contacts
contact position
indicators (left side)
counterclockwise DOWN
closes the Emergency
source contacts (upper)
and opens the Normal
source contacts (lower)
INSTALLATION (continued)
2 Voltage Checks
Source Accepted
Normal
Emergency
Source Accepted
Normal
Emergency
A B C
Source Accepted
Normal
Emergency
1--4
INSTALLATION (continued)
3 Electrical Operation
Transfer Test
Both normal and emergency sources must be available
and the emergency source generator (if used) must be
capable of being started in this procedure.
1--5
Source Accepted
Normal
Emergency
Transfer
Test
Source Accepted
Normal
Emergency
Transfer Switch
Position
Normal
Emergency
Bypass
Time Delay
Transfer Switch
Position
Normal
Emergency
Bypass
Time Delay
Source Accepted
Normal
Emergency
2---1
SECTION 3
PREVENTIVE MAINTENANCE
4.
TROUBLE-SHOOTING
Note the control features that are activated or
furnished on the switch and review their operation.
Refer to Section 5, Control Features.
3 VOLTAGE
If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies
sales office, representative, or ASI. In the United States, call 18008002726. Furnish the Serial No., Bill of
Material (BOM) No., and Catalog No. from transfer switch nameplate.
3---2
SECTION 4 ADJUSTMENTS
Time Delay Adjustment
LABELS
FACTORY
SETTING
Override Momentary
Normal Source Outages
TD ES
3 seconds
Transfer to Emergency
TIMER
N/E
Unloaded Running
(Engine Cooldown)
1 second
Actuator 1 on
3 seconds
Actuator 1 off
0 minutes
(full ccw)
0 to 5
minutes
P2
4 seconds
non-adjustable
TIMER
E/N
30 minutes
(full cw)
1 second to
30 minutes
P1
5 minutes
non-adjustable
Sensor Adjustments
PU / N
Pickup
90 %
95 % *
Actuator 3 off
90 %
Actuator 3 on
80 %
Emergency Source
Voltage
60 / 50 Hz
60 Hz
3 1
3,
3/1
60 Hz
Actuator 4 off
50 Hz
Actuator 4 on
3 phase
Actuator 6 off
1 phase
Actuator 6 on
60 / 50
Hz
non-adjustable
non-adjustable
non-adjustable
non-adjustable
90 %
75 %
95 %
85 %
Voltage Phases
Pickup
Dropout
Pickup
Dropout
Emergency Source
Frequency
eque cy
1 2
70 %
1 2
Dropout
85 %
1 2
DO / N
85 %
Actuator 1 off
Actuator 2 off
Actuator 1 on
Actuator 2 off
Actuator 1 off
Actuator 2 on
Actuator 1 on
Actuator 2 on
1 2
90 % *
Normal Source Voltage
S1 DIP
SWITCH
SETTING
% of nominal
FACT. SET
ADJ RANGE
LABELS
NOTICE
DESCRIPTION
ADJUSTMENT
POTENTIOMETER
Retransfer to Normal
S3 DIP
SWITCH
1
Override Momentary
Emergency S. Outages
ADJUSTMENT
RANGE
* If dropout voltage is set to 90%, the pickup voltage must be set to 95%.
Table 4-3. Transformer Voltage Adjust.
(Low setting shifts all voltage settings down 4.2%; for example, 240 V to 230 V, or 480 V to 460 V)
FACTORY SETTING
LOW /
HI
HI
4---1
ADJUSTMENT
S3 DIP SWITCH
LOW
Actuator 2 off
HI
Actuator 2 on
LABELS
DESCRIPTION
ADJUSTMENTS
NOTICE
(continued)
cover
thumb
latch
b.
hook on
left side
9 volt
alkaline
battery
J5 battery
on/off
jumper
harness
plugs
P1
retransfer
to normal
time delay
S1 DIP
switch
S2 DIP
switch
counterclockwise
to decrease
Figure 4-3. Changing time delay potentiometers.
b.
P2
transfer to
emergency
time delay
S3 DIP
switch
DIP
switches
SW1
SW2
SW3
actuator
(8 on each DIP switch)
off
on
Actuator
8 on
Fill in day and time set. Week Day ______ Time _______.
Actuator
8 off
S2 DIP
SWITCH
Actuator
5 on
Actuator
5 on
Std. Timer
Enabled
Std. Timer
Disabled
Exercise
without
Load
Exercise
with Load
S1 DIP
SWITCH
Actuator
7 on
Actuator
7 off
FUNCTION
Select below either Exercise without Load or Exercise with Load according to the setting of DIP switch S1, actuator 8. The
load transfers from the Normal source to Emergency source (generator) and back again if Exercise with Load is selected.
Step
1
2
3
4
Push Button
Set Engine
Exerciser
hold 5 sec.
release
press Bypass
Time Delay
Explanation
blinks rapidly
OPOPOP
blinks slowly
OPPOPP
O stays on
Generator stops.
O stays on
generator off
Status Light
Step
Function
Push Button
Set Engine
Exerciser
hold 5 sec.
Function
Explanation
blinks rapidly
OPOPOP
Status Light
release
blinks slowly
OPPOPP
press Bypass
Time Delay
blinks slowly
OPPOPP
O stays on
generator off
NOTE: Every time SET ENGINE EXERCISER push button is pressed (held 5 seconds) the exercise period is changed.
5---1
2line
display
connections
for source
availability
signal contacts
3 buttons
Figure 52. Accessory 11BG module (mounted behind operator interface and connected to the controller)
includes source availability signal contacts and a programmable engine exerciser.
SOURCE
AVAILABILITY SIGNALS
2 AMPS @ 30 VDC, resistive
0.5 AMP @ 125 VAC, resistive
contacts shown deenergized
Contact ratings:
2 amps @ 30 Vdc, 0.5 amp. @ 125 Vac resistive
Actuator
8 on
S2 DIP
SWITCH
Actuator
5 off
Actuator
5 on
5---2
Actuator
8 off
Opt. Timer
Enabled
Opt. Timer
Disabled
Exercise
without
Load
Exercise
with
Load
S1 DIP
SWITCH
Actuator
7 off
Actuator
7 off
FUNCTION
Time Display
The Time Display shows the present system time. The
format is hours:minutes:seconds.
Fast/Slow Adjust
Daylight Saving
Time Adjust
Date
Date Display
Time
Run TIme
Start TIme
Engine Exerciser
Day of Week
Start Time
Every = weekly
Alt = biweekly
0 23 hour
0 59 minute
5---3
Run Time
0 23 hour
0 59 minute
30 min. is default setting
S1 DIP SWITCH
enable
Actuator 5 on
disable
Actuator 5 off
LD TDBT
7 8
20 seconds
7 8
10 seconds
7 8
3 seconds
7 8
0 (disable)
Note
S2 DIP SWITCH
Actuator 7 on
Actuator 8 on
Actuator 7 on
Actuator 8 off
Actuator 7 off
Actuator 8 on
Actuator 7 off
Actuator 8 off
S2 DIP SWITCH
enable
Actuator 6 on
disable
Actuator 6 off
S2 DIP SWITCH
enable
Actuator 2 off
Actuator 3 off
Actuator 2 on
enable
disable
Actuator 3 on
S2 DIP SWITCH
Actuator 4 on
enable
Actuator 4 off
Actuator 1 off
S2 DIP SWITCH
disable
enable
N/E INHIB.
Actuator 1 on
disable
S2 DIP SWITCH
disable
RT /E
5---4
thermostat
dial
turn counterclockwise
to lower temperature
turn clockwise
to raise temperature
AVAILABLE KITS
Controls
Description
Accessory
Kit
Description
Accessory
Kit
11BG
K629830
120 volt
customer supplied voltage
(without transformer)
44A
K613127001
72A
K601110
208 480 volt
ATS derived voltage
(with transformer)
44G
K613127002
380 volt
ATS derived voltage
(with transformer)
44G
K613127
44G
K613127003
5---5
A
accessories, 52, 55
auxiliary circuits, 12
B
battery, 42, 51
buttons, push, 31
bypass time delay, 15, 21, 31
INDEX
ground, controller, 11
installation, 11
E
electrical operation, 15
engine exerciser, 51, 52, 53
engine starting contacts, 12
F
features, see control features
frequency, pickup and dropout
settings, 41
functional test, 13, 14, 15
Printed in U.S.A.
cleaning, 31
HELP
8008002726 (ASCO)
customercare@asco.com
inspection, 31
controller, 41, 42
codes, cover
cover removal, 42
disconnecting, 31
time delay potentiometers, 42
harness, 12
disconnect plugs, 31
control features, 51
load disconnect, 54
motor load transfer, 54
plant exerciser, 51, 52, 53
problem, 32
handle, maintenance, 13
warning, 13
inphase monitor, 54
contacts
auxiliary, 12
engine control, 12
main, 13, 31
source availability signal, 52
parts, 31
cable
lugs, preparation, 11
connections
engine control contact, 12
line, 11
replacement parts, 31
labels,
engine starting contacts, 12
inputs / outputs, 12
rating, cover
settings
changing, 41
factory, 41
frequency, 41
phase, 41
time delay, 41
voltage, 41
lights, 14, 51
load disconnect feature, 54
lubrication, 31
maintenance, preventive, 31
manual load transfer, 32
warning, 32
terminal block, 12
test, functional, 13, 14, 15
manual operation, 13
illustration of, warning, 13
time delay
adjustment, 41
genset cooldown, 41
how to change, 42
override momentary outages, 41
settings, 41
transfer to emergency, 41
transfer to normal, 41
N
nameplate, inside cover
operation
electrical, 15
manual, 13
illustration of, 13
warning, 13
sequence of, 21
optional accessories
programmable engine exerciser
& source availability signal
contacts, 52, 53
serial communication module, 55
strip heater, 55
V
voltage, phase, 41
voltage, pickup and dropout settings,
41