Beruflich Dokumente
Kultur Dokumente
Vedanta - Jharsuguda
138-02-043
Group 410 C
DE-060300
8
8.1
8.1.1
8.1.2
8.1.3
8.2
8.2.1
8.2.2
8.3
8.3.1
8.3.2
8.1
Process
8.1.1
Revision: 0
Date: 29.09.2006
Page 1 of 7
138-02-043
Group 410 C
DE-060300
Revision: 0
Date: 29.09.2006
file: 138-02-043_08_0.doc, Codeword: Vedanta
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
1 (2)
Rev. 00
132-01-075 UB
P&I Diagram:
The Liquid Pitch Stirring Process Group 410 C stirs liquid pitch in tank 1 (410 A 200) and /or in
Tank 2 (410 A 300) and/or in tank 3 (410 A 400) or transfers liquid pitch between tank 1, tank
2 and tank 3.
Group 410 C consists of a set of three pitch pumps and three basket filters. Each pump is
connected to a tank discharge nozzle. Pitch is stirred in one tank or transferred to another tank
using one pump. This operation is only possible if the basket filter upstream the pump is
available and is not plugged. The differential pressure across the basket filters is monitored
continuously.
Pitch pump (410 C 030) keeps the pitch in tank 1 homogenous by circulation and thereby
stirring the pitch in tank 1 or transfers the pitch to tank 2 or tank 3. Pitch pump (410 C 130)
keeps the pitch in tank 2 homogenous by circulation and thereby stirring the pitch in tank 2 or
transfers the pitch to tank 1 or tank 3. Pitch pump (410 C 230) keeps the pitch in tank 3
homogenous by circulation and thereby stirring the pitch in tank 3 or transfers the pitch to tank
1 or tank 2. For operation in automatic mode, however only the main combinations are
foreseen, which results in 12 different routes that can be selected by the operator in the central
control room. Pitch pump (410C 030) is connected to the bottom suction nozzle of tank 1 via
basket filter (410 C 015). Pitch pump (410 C 030) circulates pitch within tank 1 via the stirring
nozzles (410 C 041, 042, 043, 044) or via nozzle (410 C 055) or to tank 2 via nozzle (410 C
155) or to tank 3 via nozzle (410 C 255). Four route selections Route 51,52,53,54 can be
made for pitch pump (410 C 030), which are described in detail under chapter 2.2.2. Pitch
pump (410C 130) is connected to the bottom suction nozzle of tank 2 via basket filter (410 C
115). Pitch pump (410 C 130) circulates pitch within tank 2 via the stirring nozzles (410 C 141,
142, 143, 144) or via nozzle (410 C 155) or to tank 1 via nozzle (410 C 055) or to tank 3 via
nozzle (410 C 255). Four route selections Route 61,62,63,64 can be made for pitch pump
(410 C 130), which are described in detail under chapter 2.2.3. Pitch pump (410C 230) is
connected to the bottom suction nozzle of tank 3 via basket filter (410 C 215). Pitch pump (410
C 230) circulates pitch within tank 3 via the stirring nozzles (410 C 241, 242, 243, 244) or via
nozzle (410 C 255) or to tank 1 via nozzle (410 C 055) or to tank 2 via nozzle (410 C 155).
Four route selections Route 71,72,73,74 can be made for pitch pump (410 C 230), which
are described in detail under chapter 2.2.4.
The selections of simultaneous routes are described under chapter 2.2.
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
2 (2)
Rev. 00
The local operator has to open and close the corresponding pitch valves required for the
selected route. With valves in the correct position the control room operator receives the
confirmation by a signal on the operator display. Simultaneously the local operator receives
the confirmation for the corresponding pump by a pilot light on the local panel [410 LOP-B2].
He has to start the pump from the local panel. The local operator should always start the pump
at slow speed by pushing the "START SLOW" pushbutton. In this case the pump will only run
at slow speed. Slow speed is used to flush the piping system from possible obstructions
caused by cold spots. Slow speed should also be used as long as the pitch temperature is low
(160C). If the operator pushes the START FAST pushbutton the pump speed is controlled in
auto mode. In this case the pump will start at slow speed and will change to fast speed after a
pre-set time delay (setting in PLC: 4 minutes) if the pitch temperature in the tank where the
pump is sucking from has a level above 160C. According to the route selection the level of
the corresponding tank where the pitch is directed to has to be below maximum.
Should the pitch temperature drop below 160C during circulation the pump speed is changed
automatically back to slow speed.
If pitch shall be pumped from one tank to another with route 52/53/62/63/72/73 selected the
corresponding pump can only be started if the tank is not full, which the pitch is directed to.
The actual tank level is displayed on the local control panel.
138-02-043
Group 410 C
DE-060300
Revision: 0
Date: 29.09.2006
Page 3 of 7
All liquid pitch valves (with exception to the tank drain valves) have to be operated at
regular intervals by the local operator in agreement with the central control room
operator. This has to be done when the corresponding routes for unloading allow the
manipulation of manual valves, normally during interruptions in production.
Frequent cleaning is absolutely necessary for a safe and healthy operation. The
operators and maintenance people have to make sure that no foreign material (e.g.
bags, tools, debris, rags, petrol coke dust, etc.) spoils the area of the liquid pitch
unloading, the pitch pumps and liquid pitch tanks and other floors where heated
equipment is located. In case of a leakage foreign material may get soaked with oil,
which increases a hazard of a fire and may hinder the access to the equipment,
especially in case of emergency.
The tank drain valves are only opened for maintenance of an empty tank or in case
that samples for testing purpose have to be drawn from the tank. These valves should
be tagged and locked for unintentional operation. In case that these valves have to be
opened for maintaining the empty tank the other valves on the pipe connections to
this tank have to be safely locked in order to avoid unintended re-filling.
Smoking and open fire is strictly prohibited in the pitch unloading area and on and
around the pitch storage tanks.
In case that maintenance work like grinding, burning or welding has to be done,
special rules have to be established by VEDANTA that have to be strictly obeyed.
The operators have to be aware that the facility includes heated equipment avoid
burns on hot machine parts, tanks, valves, pipes, etc.
138-02-043
Group 410 C
DE-060300
Revision: 0
Date: 29.09.2006
file: 138-02-043_08_0.doc, Codeword: Vedanta
8.2
Process Control
8.2.1
138-02-043
Group 410 C
DE-060300
(work copies)
Revision: 0
Date: 29.09.2006
Page 5 of 7
138-02-043
Group 410 C
DE-060300
Revision: 0
Date: 29.09.2006
file: 138-02-043_08_0.doc, Codeword: Vedanta
CONTROL PHILOSOPHY
05.10.2006
1 (23)
Rev. 00
Control Philosophy
of
Process Group 410 C
- Liquid Pitch Stirring Reference:
Process Flow Sheet:
132-01-075 UB
P&I Diagram:
2
2.1
2.2
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.5
2.5.1
2.5.2
2.6
2.6.1
2.6.2
2.6.3
2.6.4
2.7
2.8
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
2 (23)
Rev. 00
Pitch pump (410 C 030) keeps the pitch in tank 1 homogenous by circulation and thereby
stirring the pitch in tank 1 or transfers the pitch to tank 2 or tank 3. Pitch pump (410 C 130)
keeps the pitch in tank 2 homogenous by circulation and thereby stirring the pitch in tank 2 or
transfers the pitch to tank 1 or tank 3. Pitch pump (410 C 230) keeps the pitch in tank 3
homogenous by circulation and thereby stirring the pitch in tank 3 or transfers the pitch to tank
1 or tank 2. For operation in automatic mode, however only the main combinations are
foreseen, which results in 12 different routes that can be selected by the operator in the central
control room. Pitch pump (410C 030) is connected to the bottom suction nozzle of tank 1 via
basket filter (410 C 015). Pitch pump (410 C 030) circulates pitch within tank 1 via the stirring
nozzles (410 C 041, 042, 043, 044) or via nozzle (410 C 055) or to tank 2 via nozzle (410 C
155) or to tank 3 via nozzle (410 C 255). Four route selections Route 51,52,53,54 can be
made for pitch pump (410 C 030), which are described in detail under chapter 2.2.2. Pitch
pump (410C 130) is connected to the bottom suction nozzle of tank 2 via basket filter (410 C
115). Pitch pump (410 C 130) circulates pitch within tank 2 via the stirring nozzles (410 C 141,
142, 143, 144) or via nozzle (410 C 155) or to tank 1 via nozzle (410 C 055) or to tank 3 via
nozzle (410 C 255). Four route selections Route 61,62,63,64 can be made for pitch pump
(410 C 130), which are described in detail under chapter 2.2.3. Pitch pump (410C 230) is
connected to the bottom suction nozzle of tank 3 via basket filter (410 C 215). Pitch pump (410
C 230) circulates pitch within tank 3 via the stirring nozzles (410 C 241, 242, 243, 244) or via
nozzle (410 C 255) or to tank 1 via nozzle (410 C 055) or to tank 2 via nozzle (410 C 155).
Four route selections Route 71,72,73,74 can be made for pitch pump (410 C 230), which
are described in detail under chapter 2.2.4.
The selections of simultaneous routes are described under chapter 2.2.
The local operator has to open and close the corresponding pitch valves required for the
selected route. With valves in the correct position the control room operator receives the
confirmation by a signal on the operator display. Simultaneously the local operator receives
the confirmation for the corresponding pump by a pilot light on the local panel [410 LOP-B2].
He has to start the pump from the local panel. The local operator should always start the pump
at slow speed by pushing the "START SLOW" pushbutton. In this case the pump will only run
at slow speed. Slow speed is used to flush the piping system from possible obstructions
caused by cold spots. Slow speed should also be used as long as the pitch temperature is low
(160C). If the operator pushes the START FAST pushbutton the pump speed is controlled in
auto mode. In this case the pump will start at slow speed and will change to fast speed after a
pre-set time delay (setting in PLC: 4 minutes) if the pitch temperature in the tank where the
pump is sucking from has a level above 160C. According to the route selection the level of
the corresponding tank where the pitch is directed to has to be below maximum.
Should the pitch temperature drop below 160C during circulation the pump speed is changed
automatically back to slow speed.
If pitch shall be pumped from one tank to another with route 52/53/62/63/72/73 selected the
corresponding pump can only be started if the tank is not full, which the pitch is directed to.
The actual tank level is displayed on the local control panel.
CONTROL PHILOSOPHY
05.10.2006
3 (23)
Rev. 00
2.1
AUTOMATIC
MAINTENANCE
MAINTENANCE
HORN OFF
ALARM ACKNOWLEDGEMENT
PB resets alarm
LAMP TEST
*AUTOMATIC / MAINTENANCE
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
Rev. 00
*PUMP STOP
*ROUTE OK
**FILTER PLUGGED
LI-410 A 200
LI-410 A 300
LI-410 A 400
4 (23)
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
2.2
5 (23)
Rev. 00
The exchange of control signals is described in the following chapters and especially under 2.8
below.
2.3
Selections
2.3.1
2.3.2
CONTROL PHILOSOPHY
05.10.2006
6 (23)
Rev. 00
(410 B 010)
(410 C 010)
(410 C 025)
(410 C 035)
(410 C 040)
a minimum of two of the following valves (410 C 041), (410 C
042), (410 C 043), (410 C 044)
CLOSE:
(410 A 230)
(410 B 017)
(410 C 020)
(410 C 050)
pump (410 C 030) is in operation with a different route (Route 52/53/54 SE 2-2/2-3/2-4)
pump (410 B 065) is in operation with route 11 (SE 2-1)
pump (410 B 165) is in operation with route 21 (SE 3-1) or 24 (SE 3-4)
pump (410 B 125) is in operation with route 31 (SE 4-1)
With the verification of the above valve positions this route is set in the PLC.
SE 2-2:
Route 52: Stirring Pump 410 C 030 from tank 410 A 200 to tank 410 A 300
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 010)
(410 C 010)
(410 C 025)
(410 C 035)
(410 C050)
(410 C 155)
CLOSE:
(410 A 330)
(410 B 017)
(410 C 020)
CONTROL PHILOSOPHY
05.10.2006
7 (23)
Rev. 00
(410 C 040)
(410 C 055)
(410 C 150)
(410 C 250)
(410 C 255)
This Route Selection cannot be made:
pump (410 C 030) is in operation with a different route (Route 51/53/54 SE 2-1/2-3/2-4)
pump (410 B 065) is in operation with route 11 (SE 2-1)
pump (410 B 165) is in operation with route 21 (SE 3-1) or 24 (SE 3-4)
pump (410 B 125) is in operation with route 31 (SE 4-1)
With the verification of the above valve positions this route is set in the PLC.
SE 2-3:
Route 53: Stirring Pump 410 C 030 from tank 410 A 200 to tank 410 A 400
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 010)
(410 C 010)
(410 C 025)
(410 C 035)
(410 C 050)
(410 C 255)
CLOSE:
(410 A 430)
(410 B 017)
(410 C 020)
(410 C 040)
(410 C 055)
(410 C 150)
(410 C 155)
(410 C 250)
pump (410 C 030) is in operation with a different route (Route 51/52/54 SE 2-1/2-2/2-4)
pump (410 B 065) is in operation with route 11 (SE 2-1)
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
8 (23)
pump (410 B 165) is in operation with route 21 (SE 3-1) or 24 (SE 3-4)
pump (410 B 125) is in operation with route 31 (SE 4-1)
With the verification of the above valve positions this route is set in the PLC.
SE 2-4;
Route 54: Stirring Pump 410 C 030 from tank 410 A 200 to tank 410 A 200
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 010)
(410 C 010)
(410 C 025)
(410 C 035)
(410 C 050)
(410 C 055)
CLOSE:
(410 A 230)
(410 B 017)
(410 C 020)
(410 C 040)
(410 C 150)
(410 C 155)
(410 C 250)
(410 C 255)
pump (410 C 030) is in operation with a different route (Route 51/52/53 SE 2-1/2-2/2-3)
pump (410 B 065) is in operation with route 11 (SE 2-1)
pump (410 B 165) is in operation with route 21 (SE 3-1) or 24 (SE 3-4)
pump (410 B 125) is in operation with route 31 (SE 4-1)
With the verification of the above valve positions this route is set in the PLC.
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
9 (23)
Route 71 (SE 4-1) and/or Route 51/52/53/54 (SE 2-1/2-2/2-3/2-4) or Route 51 (SE 2-1)
and/or Route 72/73/74 (SE 4-2/4-3/4-4)
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 020)
(410 C 110)
(410 C 125)
(410 C 135)
(410 C 140)
a minimum of two of the following valves (410 C 141), (410 C
142), (410 C 143), (410 C 144)
CLOSE:
(410 A 330)
(410 B 027)
(410 C 120)
(410 C 150)
pump (410 C 130) is in operation with a different route (Route 62/63/64 SE 3-2/3-3/3-4)
pump (410 B 065) is in operation with route 12 (SE 2-2)
pump (410 B 165) is in operation with route 22 (SE 3-2) or 25 (SE 3-5)
pump (410 B 125) is in operation with route 32 (SE 4-2)
With the verification of the above valve positions this route is set in the PLC.
SE 3-2:
Route 62: Stirring Pump 410 C 130 from tank 410 A 300 to tank 410 A 200
This material route can be selected simultaneous with following Routes:
CONTROL PHILOSOPHY
05.10.2006
10 (23)
Rev. 00
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 020)
(410 C 055)
(410 C 110)
(410 C 125)
(410 C 135)
(410 C 150)
CLOSE:
(410 A 230)
(410 B 027)
(410 C 050)
(410 C 120)
(410 C 140)
(410 C 155)
(410 C 250)
(410 C 255)
pump (410 C 130) is in operation with a different route (Route 61/63/64 SE 3-1/3-3/3-4)
pump (410 B 065) is in operation with route 12 (SE 2-2)
pump (410 B 165) is in operation with route 22 (SE 3-2) or 25 (SE 3-5)
pump (410 B 125) is in operation with route 32 (SE 4-2)
With the verification of the above valve positions this route is set in the PLC.
SE 3-3:
Route 63: Stirring Pump 410 C 130 from tank 410 A 300 to tank 410 A 400
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 020)
(410 C 110)
(410 C 125)
(410 C 135)
(410 C 150)
(410 C 255)
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
11 (23)
(410 A 430)
(410 B 027)
(410 C 050)
(410 C 055)
(410 C 120)
(410 C 140)
(410 C 155)
(410 C 250)
pump (410 C 130) is in operation with a different route (Route 61/62/64 SE 3-1/3-2/3-4)
pump (410 B 065) is in operation with route 12 (SE 2-2)
pump (410 B 165) is in operation with route 22 (SE 3-2) or 25 (SE 3-5)
pump (410 B 125) is in operation with route 32 (SE 4-2)
With the verification of the above valve positions this route is set in the PLC.
SE 3-4:
Route 64: Stirring Pump 410 C 130 from tank 410 A 300 to tank 410 A 300
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 020)
(410 C 110)
(410 C 125)
(410 C 135)
(410 C 150)
(410 C 155)
CLOSE:
(410 A 330)
(410 B 027)
(410 C 050)
(410 C 055)
(410 C 120)
(410 C 140)
(410 C 250)
(410 C 255)
CONTROL PHILOSOPHY
05.10.2006
12 (23)
Rev. 00
pump (410 C 130) is in operation with a different route (Route 61/62/63 SE 3-1/3-2/3-3)
pump (410 B 065) is in operation with route 12 (SE 2-2)
pump (410 B 165) is in operation with route 22 (SE 3-2) or 25 (SE 3-5)
pump (410 B 125) is in operation with route 32 (SE 4-2)
With the verification of the above valve positions this route is set in the PLC.
2.3.4
Route 51 (SE 2-1) and/or Route 61/62/63/64 (SE 3-1/3-2/3-3/3-4) or Route 61 (SE 3-1)
and/or Route 52/53/54 (SE 2-2/2-3/2-4)
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 030)
(410 C 210)
(410 C 225)
(410 C 235)
(410 C 240)
a minimum of two of the following valves (410 C 241), (410 C
242), (410 C 243), (410 C 244)
CLOSE:
(410 A 430)
(410 B 037)
(410 C 220)
(410 C 250)
pump (410 C 230) is in operation with a different route (Route 72/73/74 SE 4-2/4-3/4-4)
pump (410 B 065) is in operation with route 13 (SE 2-3)
pump (410 B 165) is in operation with route 23 (SE 3-3) or 26 (SE 3-6)
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
13 (23)
With the verification of the above valve positions this route is set in the PLC.
SE 4-2:
Route 72: Stirring Pump 410 C 230 from tank 410 A 400 to tank 410 A 200
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 030)
(410 C 055)
(410 C 210)
(410 C 225)
(410 C 235)
(410 C 250)
CLOSE:
(410 A 230)
(410 B 037)
(410 C 050)
(410 C 150)
(410 C 155)
(410 C 220)
(410 C 240)
(410 C 255)
pump (410 C 230) is in operation with a different route (Route 71/73/74 SE 4-1/4-3/4-4)
pump (410 B 065) is in operation with route 13 (SE 2-3)
pump (410 B 165) is in operation with route 23 (SE 3-3) or 26 (SE 3-6)
pump (410 B 125) is in operation with route 33 (SE 4-3)
With the verification of the above valve positions this route is set in the PLC.
SE 4-3:
Route 73: Stirring Pump 410 C 230 from tank 410 A 400 to tank 410 A 300
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
Outokumpu Technology GmbH
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
14 (23)
(410 B 030)
(410 C 155)
(410 C 210)
(410 C 225)
(410 C 235)
(410 C 250)
CLOSE:
(410 A 330)
(410 B 037)
(410 C 050)
(410 C 055)
(410 C 150)
(410 C 220)
(410 C 240)
(410 C 255)
pump (410 C 230) is in operation with a different route (Route 71/72/74 SE 4-1/4-2/4-4)
pump (410 B 065) is in operation with route 13 (SE 2-3)
pump (410 B 165) is in operation with route 23 (SE 3-3) or 26 (SE 3-6)
pump (410 B 125) is in operation with route 33 (SE 4-3)
With the verification of the above valve positions this route is set in the PLC.
SE 4-4:
Route 74: Stirring Pump 410 C 230 from tank 410 A 400 to tank 410 A 400
This material route can be selected simultaneous with following Routes:
The local operator has to verify this Route Selection by manual control of the following valve
positions:
OPEN:
(410 B 030)
(410 C 210)
(410 C 225)
(410 C 235)
(410 C 250)
(410 C 255)
CLOSE:
(410 A 430)
(410 B 037)
CONTROL PHILOSOPHY
05.10.2006
15 (23)
Rev. 00
(410 C 050)
(410 C 055)
(410 C 150)
(410 C 155)
(410 C 220)
(410 C 240)
This Route Selection cannot be made if:
pump (410 C 230) is in operation with a different route (Route 71/72/73 SE 4-1/4-2/4-3)
pump (410 B 065) is in operation with route 13 (SE 2-3)
pump (410 B 165) is in operation with route 23 (SE 3-3) or 26 (SE 3-6)
pump (410 B 125) is in operation with route 33 (SE 4-3)
With the verification of the above valve positions this route is set in the PLC.
2.4
Group Start
2.4.1
2.4.2
Start Preconditions
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
16 (23)
Rev. 00
Start pitch pump (410 C 130): Route 61, 62, 63 or 64 have to be set.
Start pitch pump (410 C 230): Route 71, 72, 73 or 74 have to be set.
2.4.4
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
17 (23)
Rev. 00
Normal Operation
2.5.1
2.5.2
2.6
Shut Down
2.6.1
2.6.2
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
2.6.3
18 (23)
Rev. 00
2.6.3.1 Fast Shut Down of pump (410 C 030) from local operating panel [410 LOP-B2]
The operator actuates the STOP pushbutton for stirring pump (410 C 030)
Pump (410 C 030) is stopped immediately.
2.6.3.2 Fast Shut Down of pump (410 C 130) from local operating panel [410 LOP-B2]
The operator actuates the STOP pushbutton for stirring pump (410 C 130).
Pump (410 130) is stopped immediately.
2.6.3.3 Fast Shut Down of pump (410 C 230) from local operating panel [410 LOP-B2]
The operator actuates the STOP pushbutton for stirring pump (410 C 230).
Pump (410 C 230) is stopped immediately.
2.6.4
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
-
19 (23)
Rev. 00
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
Rev. 00
20 (23)
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
21 (23)
Rev. 00
2.6.4.16 Pitch Filter 410 C 015 Low Differential Pressure [410 C 015-PDSL]
[410 C 015-PDSL] differential pressure at the filter is too low <0,5 mbar
2.6.4.17 Pitch Filter 410 C 115 Low Differential Pressure [410 C 115-PDSL]
[410 C 115-PDSL] differential pressure at the filter is too low <0,5 mbar
CONTROL PHILOSOPHY
05.10.2006
Vedanta Alumina Ltd.
Jharsuguda Green Anode Plant
Client ref.: VJ/SML/PO/032/1
OTK ref.:
DE-060300
Doc. No.:
133-50-063
22 (23)
Rev. 00
2.6.4.18 Pitch Filter 410 C 215 Low Differential Pressure [410 C 215-PDSL]
[410 C 215-PDSL] differential pressure at the filter is too low <0,5 mbar
2.6.4.19 Pitch Filter (410 C 015) High Differential Pressure [410 C 015-PDSH]
[410 C 015-PDSH] differential pressure at the filter is too high >10 mbar
2.6.4.20 Pitch Filter (410 C 115) High Differential Pressure [410 C 115-PDSH]
[410 C 115-PDSH] differential pressure at the filter is too high >10 mbar
2.6.4.21 Pitch Filter (410 C 215) High Differential Pressure [410 C 215-PDSH]
[410 C 215-PDSH] differential pressure at the filter is too high >10 mbar
2.7
CONTROL PHILOSOPHY
05.10.2006
Rev. 00
Signal Exchange with Sub-Groups of this Group and Other Process Groups
Signal
Description
Sort of Signal
HTM SECONDARY 5 IN
OPERATION Group 431 S / 410 S is
running in AUTOMATIC mode,
minimum 2 primary pumps in
operation, minimum 1 pump of
secondary 5 in operation, minimum 1
Heater no Common Fault
HTM SECONDARY 6 IN
OPERATION Group 431 S / 410 S is
running in AUTOMATIC mode,
minimum 2 primary pumps in
operation, minimum 1 pump of
secondary 6 in operation, minimum 1
Heater no Common Fault
Pitch Valve 410 A 230 closed
DRAIN TANK 1 CLOSED
Pitch Valve 410 A 330 closed
DRAIN TANK 2 CLOSED
Pitch Valve 410 A 430 closed
DRAIN TANK 3 CLOSED
High-high level [410 A 210-LSHH] in
Seal pot tank 1 OVERFLOW TANK
1
High-high level [410 A 310-LSHH] in
Seal pot tank 2 OVERFLOW TANK
2
High-high level [410 A 410-LSHH] in
Seal pot tank 3 OVERFLOW TANK
3
High-high level [410 A 200-LSHH] in
tank 1 HIGH-HIGH LEVEL TANK 1
High-high level [410 A 300-LSHH] in
tank 2 HIGH-HIGH LEVEL TANK 2
High-high level [410 A 400-LSHH] in
tank 3 HIGH-HIGH LEVEL TANK 3
High level [410 A 200-LSH] in tank 1
HIGH LEVEL TANK 1
High level [410 A 300-LSH] in tank 2
HIGH LEVEL TANK 2
High level [410 A 400-LSH] in tank 3
HIGH LEVEL TANK 3
Actual level [410 A 200-LI] in tank 1
LEVEL TANK 1
Actual level [410 A 300-LI] in tank 2
LEVEL TANK 2
Actual level [410 A 400-LI] in tank 3
LEVEL TANK 3
Pitch Valve 410 B 010 open
Pitch Valve 410 B 017 closed
Pitch Valve 410 B 020 open
Pitch Valve 410 B 027 closed
Pitch Valve 410 B 030 open
Pitch Valve 410 B 037 closed
Pitch Valve 410 C 010 closed
Pitch Valve 410 C 110 closed
Pitch Valve 410 C 210 closed
23 (23)
8.3
Main Equipment
8.3.1
8.3.2
138-02-043
Group 410 C
DE-060300
Revision: 0
Date: 29.09.2006
Page 7 of 7