Table Of Content

AIRCRAFTS

9N-AKW
9N-AKX
9N-ACA
9N-ACB
9N-ABT
9N-ABU

Date:

3/4/2016

FH

FC

1008
687
84911
81741
36625
37263

458
302
29685
28089
62387
63131

TASK INTERVAL CHART OF 9N-AKW


Friday, March 04, 2016

DATE

HOME PAGE

Flight HR.

###

Flight Cycle

458

WEEKLY CHECK

FRIDAY

Filght Hour
JAR NO.

JOB TITLE

563

A3 Service Check

430

WINGS-OUTER WINGS-INSPECTION OF LH AND RH BOTTOM


SKIN FASTENERS AT MAIN LANDING GEAR RIB-5 FOOTPRINT
LOCATION FOR MIGRATED OR MISSING FASTENERS.

418
329

330

Interval

WITHIN

Calender Days

REMAINING

WITHIN DATE

750 FH
or 4M

REMAINING DAYS
8-Feb-16

Downloading and analyzing of Cockpit Voice Recorder

1 MO

27-Dec-15

-68

UPDATE of Nav Data 11508.01

28 DY

December 9, 2015

-86

Seat Inspection

500FH

5-Feb-16

-28

December 16, 2015

-79

-54

-8.00

3M

Removal of Battery for Check in Workshop


Operational test of Logics Activating ELAC 1&2, & SEC 1 STBY
PWR SPLY & Ability of SEC 1 & 2 to Achieve pitch CTL & Ability
of sidestick priority function

1000

400 FH or 80
DY

791.00

-217

Visual check of the Tamper Seal/Serviceability Indication of the


Protective Breathing Equipment

100 DY

10-Jan-16

161

Drain IDG OIL System,Discard Filter Elements and Replenish

800FH or 6M

7-Jul-15

Check IDG OIL level and differential pressure indicator

300FH or 2M

181
170

-25

at the earliest

305

167

Flight Cycle

Upload & Download of Flight management data with the


Portable Data Loader
Remove, Inspect for CONTAMINATION & replace Main Fuel Filter

6000FH or 40
M
2M

December 10, 2015

-85

6M

February 8, 2016

-25

Inspection of all fasteners tails/nuts indentified on the inboard


Inspection of all fasteners tails/nuts indentified on the outboard
229

Ground Run during Parking

230

scratch found at fwd fuselage RH SIDE Station 579 Section


211A

273

Update NAV Data RNA11506.01

28 DY

239

A1 Check Package with the MWO no. ESTD/MD/A320/01/2015


with Ref: ESTD/MD/2015/57

750FH or
M

A2 Check Package

750FH or
MOor
7508FH

OPM

A3 Check Package with the MWO no. ESTD/MD/A320/01/2015


with Ref: ESTD/MD/2015/
MLG Door Actuator PN 114122014 Greasing

OPM

Operational Check of Emergency Generating System

Friday, March 04, 2016

3 DY

April 22, 2015


August 19, 2015
4

12

MO
7 DY
1 MO or 120
FH

750

-258.00

1,008.00
1403

395.00

June 18, 2015

job done

15-Oct-15

Job Done

8-Feb-16

-25

December 16, 2015

-79

WITHIN
CYCLE

OPM

Operational test of Logics Activating ELAC 1&2, & SEC 1 STBY


PWR SPLY & Ability of SEC 1 & 2 to Achieve pitch CTL & Ability
of sidestick priority function

80DY or
400FH

OPM
OPM

Check Nitrogen Charge Pressure on Hydraulic Power


Accumulators
Check Battery Capacity

600 FH or
6MO
400 DY

OPM

Sterlization of Portable Water System and Discard of Water


Filter Elements

100DY

April 25, 2015


July 12, 2015
September 30, 2015

Flight Cycle
REMAINING CYCLE

Now to be done at
1600FH or 12Month.

Included in A Check

TASK INTERVAL CHART OF 9N-AKX


Friday, March 04, 2016
DATE
Flight HR.

HOME PAGE

Flight Cycle

JOB TITLE

493

seat Inspection

500 FH

474

Removal of Battery for Check in Workshop

6M

431

WINGS-OUTER WINGS-INSPECTION OF LH AND RH BOTTOM


SKIN FASTENERS AT MAIN LANDING GEAR RIB-5 FOOTPRINT
LOCATION FOR MIGRATED OR MISSING FASTENERS.

Update NAV Data RNA11508.01

Interval

1 MO
4 M or 750FH

331

Operational test of Logics Activating ELAC 1&2, & SEC 1 STBY


PWR SPLY & Ability of SEC 1 & 2 to Achieve pitch CTL & Ability
of sidestick priority function

400 FH or
80 Days

Visual check of the Tamper Seal/Serviceability Indication of the


Protective Breathing Equipment

100DY

241

Installation of Aircraft Protection Equipments

242

Installation of the safety Devices on the Landing Gears

243

Ground Run During Parking

Inspection of all fasteners tails/nuts indentified on the outboard


Inspection of all fasteners tails/nuts indentified on the inboard
266
272

OPM

Drain IDG Oil System ,Discard Filter Elements and Replenish


Update NAV Data RNA11506.01

MLG Door Actuator PN 114122014 Greasing

945

Flight Cycle
REMAINING
DAYS

WITHIN DATE

258.00
22-Apr-16

960.00

49

28-Dec-15
4-Jan-16

-67
-60

December 9, 2015

-86

273

28 DY

332

Removal of Battery Line Connector FIN:2PB1 and 2PB2

WITHIN

Calender Days

REMAINING
(FH) (FH)

at the earliest

6000 FH or
Remove,Inspect for Contamination and Replace Main Fuel Filter
40 MO

240

WEEKLY CHECK

Flight Hours

JAR NO.

Downloading and analyzing of Cockpit Voice Recorder


A2 Check Package

687.00
302

6148

5,461

December 2, 2018

1003

728

41.00

16-Dec-15

-79

10-Jan-16

-54
July 13, 2015

July 13, 2015

3 Days

6M

January 9, 2016

-55

2M

January 10, 2016

-54

800FH or 6 M
28 DY

7 DY

800

113.00

September 28, 2015


Job Done

December 14, 2015

-81

WITHIN
CYCLE

OPM

Inspection of all Fasteners Tails/Nuts identified on the


OUTBOARD

OPM

Inspection of all Fasteners Tails/Nuts identified on the INBOARD

120 DY
60 DY
1 MO or 120
FH

OPM

Operational Check of Emergency Generating System

OPM

Operational test of Logics Activating ELAC 1&2, & SEC 1 STBY


PWR SPLY & Ability of SEC 1 & 2 to Achieve pitch CTL & Ability
of sidestick priority function

80DY or 400FH

OPM
OPM

Check Nitrogen Charge Pressure on Hydraulic Power


Accumulators
Check Battery Capacity

600 FH or 6MO
400 DY

OPM

Sterlization of Portable Water System and Discard of Water


Filter Elements

100DY

Flight Cycle
REMAINING CYCLE

Done in every A Check.

required to perform bi weekly in every Monday

TASK INTERVAL CHART OF 9N-ACA


Friday, March 04, 2016
DATE
84,911.00
Flight HR.
29685
Flight Cycle

HOME PAGE
JAR NO.

JOB TITLE

INTERVAL

WITHIN DATE

REMAINING DAYS

Boroscope Inspection

457

Inspection of Drain Hole of MLG Truck Beam

392

Removal and Installation of Escape Slide 4LH Door

3Y

30-Dec-15

405

Removal and Installation of Escape Slide 1LH Door

3Y

30-Jan-16

Removal and Installation of Ni-CD Battery (APU)

3 Months

263

Removal and Installation of Ni.Cd. Battery(Main)


TAP TEST Engine S/N 30606
9 A Check Package
Boroscope Inspection

85356

REMAINING

458

253
260

1000FH

WITHIN

445.00
At the earliest

cockpit Voice Recorder


Update Nav Data RA1-1507-001
ELT SeLF TEST KANNARD 406S
Flight Data Record(SSFDR)Download

-34

4-Nov-15
May 17, 2015

500 FH
500FH
September 24, 2015

OPM
OPM
OPM
OPM

-65

1MO
28 DY
30 DY
7 DY

23-Dec-15
10-Dec-15
16-Dec-15
9-Dec-15

October 24, 2015

-72
-85

-79
-86

WITHIN
CYCLE

29183

REMAINING
CYCLE

-502

TASK INTERVAL CHART OF 9N-ACB


Friday, March 04, 2016
DATE
81,741.00
Flight HR.

HOME PAGE
JAR NO.

Flight Cycle

JOB TITLE

526

TAP Test

410

Fire Extinguisher(Engine) AFT Cargo

409

MLG Assy

408

portable Oxygen Bottle

407

Oxygen Generator

406

Removal and Installation of Portable Oxygen Bottle


Door FWD

398

INTERVAL

WITHIN(FH)

28089
REMAINING

WITHIN DATE

REMAINING
DAYS

300CYC
5Y

30-Jan-16

10 Y

15-Jan-16

5Y

30-Jan-16

12 Y

30-Dec-15

5Y

30-Jan-16

Door Power Assist Bottle Emergency 4LH Door

3Y

30-Sep-18

940

397

Door Power Assist Bottle Emergency 1 RH Door

3Y

30-Sep-18

940

396

Removal and Installation of Escape Slide 4 RH Door

3Y

30-Dec-15

-65

395

Removal and Installation of Escape Slide Inflate Bottle(LH Wing


Left Aft Cargo)

3Y

Sep-15

393

Removal and Installation of ELT Kannad 406 (Sing)

L1

30-Dec-15

390
100
99
101
203
204
218

Removal and Installation of SLAT ACTUATOR #13


Removal and Installation of SLAT ACTUATOR #04
Removal and Installation of LP COMPRESSOR FAN BLADE
BOROSCOPIC INSPECTION Engine S/N 30624
BOROSCOPIC INSPECTION RH Engine S/N 30656
9A Check Package.MWO no ESTD/MD/757/06/2015
Operational Check of Standby Engine Indicator
KANNAD ELT 406AS P/N S1823502-03 Self Test

20,000.0
20,000.0
17,600.0
500 FH
500 FH
500 FH
400FH
1 MO

81111.00
81115.00
81316
81058

-626.00
-425.00
-683.00
19-Apr-15

-34
-49
-34
-65
-34

-65

OPM cockpit Voice Recorder


OPM Update Nav Data RA1-1508-001
OPM ELT SeLF TEST KANNARD 406S
OPM
Flight Data Record(SSFDR)Download

1MO
1 MO
1 Mo
7 DY

6-Dec-15
1-Dec-15
18-Dec-15
28-Nov-15

-89
-94
-77
-97

REMAINING
WITHIN CYCLE CYCLE
28311

222

MEL Uplifted

Job Performed

27,879.0
27,889.0
27,991.0

-98.0

36630
JAR NO.

JOB TITLE

Interval

WITHIN

(Hours)

REMAINING Hours

opm

Gps nav data card update

28 Days

opm

CVR Readout

1Month

opm

Radio Navigation System

771

OXYGEN REGULATOR (PORT)

4800 AFH

36830

200

692

TURN & SLIP INDICATOR

3000 AFH

36678

48

781

3M AND 6M INSPECTION

782

EMMA CHECK NO. 34

WITHIN DATE
31-03-2016

100 AFH/3Month

March 15, 2016


125

36663

33

April 8, 2016

REMAINING
DAYS

WITHIN
CYCLE

REMAINING
CYCLE

DATE

TASK INTERVAL
OF 9N-ABU
Friday, March
04, 2016

JAR NO.

JOB TITLE

INTERVAL

opm

Gps nav data card update

opm

CVR Readout

28
1m

opm

Radio Navigation System

770

P3 FILTER AND OIL FILTER

1000 AFH

37367.00

94.00

772

WITHIN(Hrs)

REMAINING (AFH)

31-03-2016

100AFGH/3 M

ASI ( PORT )

3000 AFH

37426.00

153.00

767

STARTER GENERATOR ( PORT)

1500 AFH

37515.00

242.00

769

STARTER GENERATOR ( STBD)

1500 AFH

37453

180

773

OXYGEN REGULATOR (PORT)

4800 AFH

37497

224

695

OIL COOLER (STBD)

3000 AFH

37351

78

767

BURNER CLEANING (PORT)

400

37396

123

BURNER CLEANING (STBD)

400

37396

123

3M INSPECTION
EMMA CHECK NO. 40

125 AFH

37327

54

779
780

FLIGHT HOURS
WITHIN DATE
REMAINING DAYS

January 22, 2016

23-Mar-16
10-Apr-16

WEEKLY
CHECK
AT
WITHIN 37273
REMAINING
CYCLE
CYCLE
THURSDAY

HOME PAGE
JAR NO.

JOB TITLE

TOOLS AND MATERIALS AS PER TASK OF 9N-AKW


TOOLS

MATERIALS

Today's Date
SN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
31
32

Name list of Licence Holders

A.R.Pahadi
R.K.manandhar
K.B.Thapa
Sohan Maharjan
A.D.Koirala
Nabeen Manandhar
D.P.Nepal
S.R.Karanjit
S.B.thapa
K.P.Acharya
p.K.karwal
R.Thapa
D.K.Sanjel
Prakash Joshi
R.N.Baral
C.M.Basyal
R.P.Shrestha
R.P.Bhandari
Prajwal Shrestha
R.K.Chaudhary
Babu Ram Bhattari
D.M.Dangol
Ishwori Giri
Jitendra Thakur
Lok Bahadur Shrestha
Sunil jayana
Gautam Prasad Khanal
Nicki Larsen
Mikael Classeon
Anders Brunstrom

3/4/2016
Licence No
119
126
127
129
141
142
155
161
172
174
175
178
179
180
183
185
186
188
199
201
240
241
242
243
244
246
282
670
2417
9036

Validity

Remaining
Days