7. Following are the assumptions we have considered while preparing the offer and any
change may affect civil costing:
SECTION -I
1.0.
DESIGN DATA
I)
FLOW
450 m3/day.
II)
SOURCE OF EFFLUENT
III)
TREATMENT PLANT
CAPACITY
19 M3 / Hr.
IV)
V)
:
Unit
Value
mg/lt.
mg /lt.
mg /lt.
mg /lt.
mg /lt.
4
10500
33500
20350
27500
15
Parameter
Unit
pH
-Suspended Solids
mg/lt.
COD
mg /lt.
0
BOD 3 days at 27 C
mg /lt.
TDS
mg /lt.
Oil & Grease
mg /lt.
^Inorganic TDS may interfere in the value of COD
^^If Inorganic TDS is < 2100 ppm in raw effluent.
VI)
DESIGN OF ETP PROCESS
Value
7.0 to 8.0
< 30
< 250^
< 100
< 2100^^
< 10
Proposed Effluent Treatment Plant will treat 450,000 liters per day waste water by
Physical, Chemical and Biological process.
Scheme for biological treatment is anaerobic treatment followed by aerobic treatment.
SECTION -II
2.0.
I)
II)
PROCESS DESIGN
The process design involves Physical, Chemical and Biological processes.
PHYSICAL AND CHEMICAL PROCESS
Screening, Collection, Equalization, Neutralization, Clarification, Drying.
BIOLOGICAL PROCESS
Converting organic pollutant into harmless by-products with the help of Anaerobic and
Aerobic Microorganisms.
Flow sheet is enclosed for ready reference.
PROPOSED TREATMENT PROCESS SCHEME
Effluent coming from the factory shall be first screened through bar screen chamber.
Over from screen chamber collected in Oil & Scum removal tank. Mechanically Oil &
Scum shall be scraped from Oil & Scum removal tank. By gravity effluent over flow is
collected in Collection cum Equalisation Tank. Floating mixer shall be provided at
equalisation tank for mixing of effluents. From this unit effluent is transferred to Buffer
tank by pump. At Buffer tank suitable chemical solutions are added to neutralise the
effluent. From buffer tank effluent is sent to UASB by pumping. At buffer tank floating
mixer shall be provided for mixing.
BIOLOGICAL TREATMENT
UASB SYSTEM
From buffer tank effluent shall be pumped to Up flow Anaerobic Sludge Blanket Digester
(UASB). Major part of organic load shall be removed here. The anaerobic organisms will
degrade the high concentrated organic matter present in the effluent. In this digester
bacterial granules will be formed which is used as a medium for attachment of
microorganisms, which will in turn convert the complex organic matter into simple
compounds like methane gas, CO2 & H2O. On top of the digester-Gas Liquid Solid
separation system shall be provided.
Gas separately collected in Gas Holder and send to Boiler as a fuel. Excess gas will be
flared with Gas flare system. Necessary safety devises and instrumentation shall be
provided for UASB reactor. The overflow from UASB is sent to the Bio- tower-I.
BIO- TOWERS
Bio tower-I, II have designed as a roughening tower for organic matter reduction from
the influent. Bio tower is constructed with civil columns and beam supports. Bio tower
is filled with PVC structured Bio fill media. The overflow effluent from the UASB, is fed
to the top of the bio tower-I by gravity. At bio tower-I recirculation pumps are
provided to recirculate the effluent from bottom sump to top of the tower to maintain
the surface overflow rate required for the media. The media attached micro-organisms
will degrade the organic matter as BOD in the effluent. One part of the effluent from
recycling feed line is collected at the top of the Bio tower-II. Recycling pumps are also
provided at BT-II for recirculation and also transfer effluent to next unit i.e., Aeration
Tank. Excess biomass on the Bio-tower plastic media is automatically removed due to
the recirculation flow.
ASP SYSTEM
Activated Sludge Process comprises of Aeration tank followed by Secondary Clarifier,
which are, proposed to meet the requirements. In aeration tank organic load as BOD will
be degraded with the help of cultivated microbial culture. Constant Mixed Liquor
Suspended Solids (MLSS) will be maintained in aeration tank in definite proportions by
recycling the bio sludge trapped by the secondary clarifier. At aeration tank air is
supplied from air blower to supply oxygen for the microorganisms.
SECTION -III
3.0.
3.1.
CIVIL UNITS
Sr.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
3.2.
Sr.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Particulars
Quantity
One No
One No.
One No.
One No.
One No.
Two Nos.
One No.
One No.
One No.
Six Nos.
One No.
Lot
Lot
Particulars
Bar Screen
Oil & scum Scraper Mechanism
ET - Effluent Transfer Pump (1W+1Sb)
Floating Mixer
Chemical Dosing System
UASB Feed Pump (1W+1Sb)
GLS system
UASB Feed Distribution Grid
Bio-fill media
BT Distribution Grid
BT Recycling Pump (2W+2Sb)
Air Blower (2W+1Sb)
Quantity
One No.
One No.
Two Nos.
Two Nos.
Two Nos.
Two Nos.
One Lot.
One Lot.
Lot.
One No.
Four Nos.
Three Nos.
13.
14.
15.
16.
17.
18.
19.
3.3.
Sr.No.
1.
3.4.
Sr.No.
1
2
3
3.5.
Sr.No.
1.
2.
3.
4.
5.
6.
One Lot.
One No.
Two Nos.
One No.
Two Nos.
One No.
One No.
Particulars
Interconnecting Piping between all proposed ETP
units within battery limits with all necessary Valves &
other fittings.
Quantity
Lot
ELECTRICAL WORKS
Particulars
Quantity
One No.
Lot
Lot
Particulars
Quantity
Pressure Gauges
Liquid Flow Meter
Flame Arrester
Moisture Trap
Pressure Relief Valve
Gas Flare Stack
Lot
One No.
Two Nos.
Two Nos.
Two Nos.
One No.
3.6.
Sr.No.
1.
2.
3.
OPTIONAL UNITS/EQUIPMENTS
Particulars
Quantity
Gas Holder
Gas flow Meter
Gas Blower (1W+1Sb)
One No.
One No.
Two Nos.
10
SECTION -IV
4.0.
4.1.
1.
2.
:
:
:
:
Rectangular
RCC M30
0.60 M3
One No.
:
:
:
:
Rectangular
RCC M30
12 M3
One No.
3.
4.
BUFFER TANK
Type
MOC
Volume
Quantity
:
:
:
:
Rectangular / Square
RCC M30
36 M3
One No.
UASB REACTOR
Type
MOC
Volume
Quantity
:
:
:
:
Circular
RCC M30
1510 M3
One No.
BIO-TOWERS
Type
MOC
Area
Quantity
:
:
:
:
Rectangular / Square
RCC M30
36 M2
Two Nos.
5.
6.
11
7.
8.
9.
10.
11.
AERATION TANK
Type
Volume
MOC
Quantity
:
:
:
:
Rectangular / Square
810 M3
RCC M30
One No
SECONDARY CLARIFIER
Type
MOC
Volume
Quantity
:
:
:
:
Circular
RCC M30
90 M3
One No.
:
:
:
:
Rectangular
RCC M30
45 M3
One No.
:
:
:
:
Square
BBM
30 M2
Six Nos
:
:
:
:
Square / Rectangular
20 M2
BBM
One No.
12.
13.
PUDDLE PIPES, LADDERS, RAILING, MANHOLES, EARTH PITS, PIPING SUPPORTS &
CABLE TRENCHES ETC.
MOC
: Ladders-MS, Railing-MS/GI, Puddle Pipes
MS/uPVC
Painting
: As required
Quantity
: Lot
12
4.2.
1.
MECHANICAL UNITS
BAR SCREEN
Type
MOC
Size
Quantity
Application
Location
:
:
:
:
:
:
Manual
SS304
Suitable to Civil Unit
One No.
Screening of floatable solids
Screen Chamber
2.
3.
:
:
:
:
:
:
:
:
FLOATING MIXER
Type of mixer
Drive
MOC
Quantity
Application
Location
:
:
:
:
:
:
Slow speed
5 HP & 2 HP
SS
Two Nos.
For mixing
At Equalization Tank &Buffer Tank
:
:
:
Cylindrical Vertical
HDPE
200 Liters
4.
5.
13
6.
7.
8.
9.
Pump capacity
MOC of pump internals
Quantity
Application
Location
:
:
:
:
:
0 to 30 LPH
PP/SS
Two Nos.
For Neutralization
Near Buffer Tank
:
:
:
:
:
:
:
Location
At UASB Reactor
GLS SYSTEM
Application
Location
MOC
Quantity
:
:
:
:
10.
:
:
:
14
Quantity
11.
12.
13.
14.
One Lot
Capacity
Drive
:
:
MOC
Accessories
:
:
Quantity
AIR BLOWERS
Type
Media Handled
Air Flow
Delivery Pressure
Duty
Cooling
Motor HP
Accessories
Quantity
Application
Location
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Grid MOC
Location
:
:
15
15.
16.
Size
Access Bridge
:
:
Motor
Drive
Gear Box & Motor
Scraping
:
:
:
:
Feed well
Painting
Quantity
Capacity
Drive
:
:
MOC
Accessories
:
:
Quantity
:
:
:
:
:
:
:
:
:
Cylindrical, Vertical
HDPE
200 Liters
One No.
0 to 10 LPH
PP/SS
One No.
For Disinfection
Near Chlorine Contact Tank
16
17.
18.
19.
4.3.
1.
:
:
:
:
:
:
:
:
Monoblock, Centrifugal
CI
22.5 M3/Hr
30 Meters
5.0 HP
2 Nos (1 W + 1 S )
Feed to Dual Media Filter
Chlorine Contact Tank
:
:
:
:
:
:
:
:
Vertical ,Cylindrical
MSEP
22.5 M3/Hr.
Suitable
Sand, Pebbles, Gravel, Anthracite
One No.
Removal of SS
After Chlorine Contact Tank
17
4.4.
1.
2.
3.
ELECTRICAL WORKS
MCC PANEL
Type
MOC
Painting
Size
Mounting
:
:
:
:
:
Incomer with
Quantity
Compartmental
14 swg / 16 swg CRCA sheet
Painting and surface coating as required.
As per design
Floor mounting, cable entry at bottom/top with
back access
Ammeter, Volt meter, Digital type energy
meter
One No.
ELECTRICAL CABLING
Type
MOC
Size
Quantity
:
:
:
:
Armored
Copper/Al
As per design-suitable capacity
One lot
EARTHING
Type
MOC
Quantity
:
:
:
Wire/flat
GI wire/Flat,CU Plate
One Lot
PRESSURE GAUGE
Location
Application
Make
Type
Dial Size
Range
Quantity
:
:
:
:
:
:
:
:
:
Electromagnetic
To measure the flow
2.
18
3.
4.
5.
6.
Flow range
Qty.
:
:
0 to 20 M3/Hr
One No.
FLAME ARRESTOR
Quantity
Application
Location
Size
MOC
:
:
:
:
:
Two Nos.
To arrest flames
Gas pipeline
Suitable as per design
MS/SS
MOISTURE TRAP
Quantity
Application
Location
MOC
Size
Drain valve
Process medium
:
:
:
:
:
:
:
Two Nos.
To trap the moisture
Gas pipeline
MS epoxy
Suitable as per design
To be provided
Biogas
:
:
:
:
:
Two Nos
To relieve pressure
Top of the Digester
Suitable
CI
:
:
:
:
:
:
One No.
To flare the biogas
At one corner of ETP plant
MS-EP Basin with MS C and SS pipe as flare
Suitable as per design
Manual
19
4.6.
1.
2.
3.
:
:
:
:
:
One No.
Suitable
To store the gas
Near Digester
MS & RCC
:
:
:
One No.
200 M3/Hr.
Feed to Boiler
GAS BLOWERS
Quantity
Medium Handled
Gas Flow
Duty
:
:
:
:
20
SECTION -V
5.0.
QTY.
One No.
Two Nos.
One No.
One No.
Two Nos.
Two Nos.
Four Nos.
Three Nos.
One No.
Two Nos.
One No.
Two Nos.
WORKING LOAD
HP
0.5
3.0
5.0
2.0
1.0
3.0
10.0
30
0.5
3.0
0.5
5.0
STAND BY LOAD
HP
3.0
3.0
10.0
15
3.0
5.0
21
SECTION -VI
6.0
6.1.
PARAMETER
UNIT
VALUE
BOD
Mg/lt.
20500
PARAMETER
UNIT
VALUE
BOD
Mg/lt.
< 100
Treatment System
BOD
% Reduction
Raw Effluent
--
Mg/Lt.
Outlet
20500
UASB Treatment
85
3075
Aerobic Treatment
BT System
Aerobic Treatment
ASP System
Tertiary system
70
923
95
47
<30
c
d
22
SECTION -VII
7.0.
MAKES
Fabricated items
Air Diffusers
Air Blower
Motors
Effluent Pumps
Dosing System
Piping
Biofills
Panel Components
Cables
Pressure Gauges
Level Switches
Flow meter
Valves
SAI
Rehau ,Germany / SSI-USA/Nipon
Everest /Kay/KPT/Usha
Crompton/Siemens/Kirloskar
Johnson /Kirloskar
SR Metering / E-Dose/Positive Metering
uPVC- Supreme/Finolex/MS-Zindal/TATA
Cool deck / MM Aqua/ Equivalent
Siemens / L & T/Schneider/Equivalent
Fine cab/Polycab
H Guru/Waree
Techtrol/Fisher
Forbes Marshall /E & H
Intervalve/ Omkar/BDK/Equivalent
23
SECTION -VIII
8.0. SCHEDULE OF EXCLUSIONS
Plant/Area Lighting.
Unloading of the equipments at your factory and transportation to the ETP Site/ Area.
All consumable oil, grease, chemicals for testing and commissioning.
Charging of electric panel. Wiring, lighting and other fixtures in panel room./sheds
All apparatus, chemicals, materials and other necessary equipment required for
laboratory for analysis.
Arrangements to bring the influent up to the battery limits of the treatment plant as
well as the treated effluent from the treatment plant to the final discharge.
Water, electricity and other utilities at one centre point of ETP for Erection, Fabrication,
Testing and Commissioning.
Water pipeline arrangement for dosing systems
Skilled or unskilled Manpower, Tools & tackles, Operators, Chemicals, Oil & grease,
Nutrients and bacterial culture (cow dung) etc. required at the time of testing &
commissioning.
Approach Roads, Internal Roads, Green belt development, Plant lighting, Security cabin,
Boundary walls, Fencing, Gate and other infrastructure facilities inside and outside the
ETP area
Unloading, Safe Storage for our equipments
Instrument air /Compressed air
All utilities / consumables like chemicals, spares, steam, power, water as required to ETP
as per process requirement to be arranged to battery limit of the units/equipments
24
All civil related works, tanks, foundations, cable trenches, piping support pedestals,
earth pits, earthing, Structural Design & drgs etc.(If civil construction work excluded
from our scope)
Any change in flow & characteristics of effluent.
Any supply which is not specifically mentioned as part of our offer.
25
SECTION - IX
9.0
TERMINATION POINTS
26
SECTION -X
10.0. PROJECT SCHEDULE -BAR CHART
Specific Confirmation on project execution schedule.
Time period provided to execute the proposed ETP is 150 days. This ETP project involves
different types of engineering activities with civil, mechanical and electrical works etc.
PROJECT EXECUTION PLAN
WORK OF ETP
Site survey ,design drawings, approval etc.
TIME PERIOD
30 Days
Civil Works
90 Days
Mechanical units/ equipments Delivery at
site
Erection of ETP
30 Days
150 Days
27
SECTION -XI
11.0. PRICE, TERMS & CONDITIONS
PRICE
Civil Works
:
Electro-mechanical Supplies :
Service Jobs
:
P&F
@ 2%
FREIGHT
TAXES
INSURANCE
0.5%
PAYMENT
DELIVERY
The delivery period will be 150 days time from the date of
receipt of Purchase Order along with advance and clear site to
start work.
VALIDITYOF
OFFER
30 days.
WARRANTY
Mechanical:
28
:
Suitable lodging, boarding and local conveyance to our engineers
to be provided for two persons.
FORCE MAJEURE
As applicable
EXTRA WORK
GENERAL
29
ERECTION &COMMISSIONING:
It will be the responsibility of the purchaser to make all the arrangements and provide all
facilities and materials for carrying out erection and pre-commissioning test, before the date of
readiness for such tests as intimated by us. In the event of delay on the part of purchaser in
making these arrangements including operators, water, power, effluent, analysis as per design
basis and consequent delay in erection or commissioning of equipment/ system, the purchaser
will release all such payment, which could have been due to us on erection/commissioning of
equipment/system. Any delay from client for arranging required facilities/materials more than
four weeks from the last major equipment supplied to site, client ahs to release all dues
against erection and commissioning to us.
OPERATING PERSONNEL
The purchaser will ensure that his operating personnel is made available before pre
commissioning to enable them witness all commissioning test and satisfy themselves about all
guarantee parameters.
ORDER CANCELLATION
The purchaser cannot cancel the purchase order without taking written consent from the
Supplier/contractor. For any reason order is cancelled by purchaser advance will be forfeited
and if there is any losses arises due to procurement or work progress at site suitable
compensation to be done by Purchaser.
PAYMENTS
The purchaser will ensure that payments released as per purchase order. Any delay is payments
against submitted bills or work progress Purchaser has to pay @18% interest on unsettled bill
amount on daily calculation basis.
DELAY
For any reason attributed to the Purchaser project delays more than three months from the
date of completion as per the purchase order, mainly due to delay in civil works or delay in
giving clearance for supplies or location finalization etc. Purchaser should amend and
compensate @ 1% increment on Total Price of the Purchase Order for every one month delay
to compensate the price escalations and overheads .
30
WAREHOUSING CHARGES
Should dispatches be delayed on our purchasers instructions or any other reason attributable
to purchaser, warehousing expenses shall be payable by the purchaser @ 2% of the
consignment value per month of part thereof.
EXCESS MATERIAL
Since we shall be sending to site a number of items in spare for smooth and uninterrupted
construction, erection and commissioning, such items which remain unused, will be our
property and will be removed by us as and when required.
PRICE BASIS & ESCALATIONS
Our commercial offer is based on present (the date of offer) market rate pricing for Steel,
Cement, Sand, Metal, Labor rates, Piping and electricals, Diesel etc. For any reason major
fluctuations or changes on any particular or total items change of price may impact the project.
Our price will be firm for the committed delivery period however any change due to the delay
of the project attributed to you to be compensating suitably with mutual understanding.
Any changes/amendments related to all taxes, duties and statutory requirements etc. area
applicable at actual at the time of billing.
Our technical offer and commercial offer with all terms, conditions etc should be part of the
Purchase order.