Engineer:
Contractor:
Contract No : RDA/DW/CP/GOSL/2012/233
08
Ref No
SPEC. CLAUSE(s)
PAY ITEM(s)
103
103(1)
CHAINAGE
Work / Item Description :
It was observed that no any safety equipments (safety Jackets, Helmets, etc)
provided to staff working in Culvert reconstruction at 57+010 from 01-122013. Hence arrange safety equipments for all staff work in Construction
immediately. Also you are advised to follow "Safety Inspection Form" in Site
instruction No. 02. Also you are required to follow weightings for monitoring
safety arrangement as per the Contract Document (Ref. Page 069).
No of Pages..
Payment :
Information only
General contract requirement
Measure and value at contract rates
Dayworks
Provisional Sum
For items to be measured under DAYWORKS - records shall be kept, agreed and signed at the end of
each days work (Q A Plan Proforma 3.1.1) and submitted for payment with a copy of this instruction.
Signed :
Name:
Designation:
Date
Time
Date
Engineer:
Contractor:
Contract No : RDA/DW/CP/GOSL/2012/233
09
Ref No
Culvert Reconstructions
PAY ITEM(s)
Bill No. 06
58/1 - 57+006.8, 58/2 - 57+049, 58/3 - 57+281.8, 58/4 - 57+402.5, 58/5 57+529.3, 58/6 - 57+543.2, 58/7 - 57+625.1, 58/8 - 57+846.4, 58/9 57+965.3, 59/1 - 58+019.25, 59/2 - 58+919
No of Pages..
Payment :
Information only
General contract requirement
Measure and value at contract rates
Dayworks
Provisional Sum
For items to be measured under DAYWORKS - records shall be kept, agreed and signed at the end of
each days work (Q A Plan Proforma 3.1.1) and submitted for payment with a copy of this instruction.
Signed :
Name:
Designation:
Date
Time
Date
Engineer:
Contractor:
Contract No : RDA/DW/CP/GOSL/2012/233
10
Ref No
Other Structures
PAY ITEM(s)
Bill No. 06
With reference to above pay items, you are informed to construct Retaining
wall on B-312 road from 59+660 to 59+900 at the LHS. Follow RDA Typical
Drawings, 'Typical Section of Mass Concrete Retaining Walls and Head
Walls' M.C.R-2, M.C.R-3 & M.C.R-4 that submitted on 26 th December 2013.
Details are attached.
No of Pages01
Payment :
Information only
General contract requirement
Measure and value at contract rates
Dayworks
Provisional Sum
For items to be measured under DAYWORKS - records shall be kept, agreed and signed at the end of
each days work (Q A Plan Proforma 3.1.1) and submitted for payment with a copy of this instruction.
Signed :
Name:
Designation:
Time
Date