GF Piping Systems
Goal
2007-01-24
GF Piping Systems
Table of Contents
2007-01-24
Jointing Methods
Basics
Socket Fusion
Butt Fusion
GF Piping Systems
Electro fusion
Compression
Push fit
Solvent cement
???
Flange Adapter
Soldering
Unions, thread
2007-01-24
GF Piping Systems
GF Piping System has the right products and can give the support
to all these questions
2007-01-24
GF Piping Systems
Installation examples
Mechanical joints
- unions / flanges
Solvent cement joints
Socket fusion
IR and BCF fusion
Electrofusion
2007-01-24
GF Piping Systems
Basics
Main parameters P T T
Main parameters
Pressure
Temperature
Time
Human factor
2007-01-24
GF Piping Systems
Subordinate parameters
Equalization pressure
Heating pressure
Jointing pressure
Temperature of the heating element
Ambient temperature
Heating and equalization time
Changeover and jointing time
Cooling time under pressure
Pipe storage and handling, Cutting,
Facing, Pipe support, Cleaning
Alignment check
Machine maintenance
etc. etc.
Basics
Handling of pipes and fitting
2007-01-24
GF Piping Systems
Basics
Working environment
2007-01-24
GF Piping Systems
Basics
Overview jointing methods
Socket fusion
PE, PP, PVDF, PB
up to d110
Butt fusion
PE, PP, PVDF, PP-n
up to d1200
Electro fusion
PE, PB
up to d630
2007-01-24
GF Piping Systems
10
Basics
Overview jointing methods (System)
IR fusion
PP, PE100, PVDF, PP-n
up to d 315
BCF fusion
PVDF, PP-n
up to d 110
2007-01-24
GF Piping Systems
11
Socket fusion
Socket fusion
Butt fusion
Electro fusion
2007-01-24
GF Piping Systems
12
Socket fusion
Preparation for fusion
Cleanser Tangit KS
for cleaning the fusion surfaces
clean lint free cleaning tissues/paper is required
2007-01-24
GF Piping Systems
13
2007-01-24
GF Piping Systems
14
Socket fusion
Principle
heater plate
spigot
pipe
pipe
fitting
fitting
finished fusion
2007-01-24
GF Piping Systems
15
Socket fusion
Heating element temperature
Temperature of heater plate
PE-HD
260C +/ - 10C
PP
260C +/ - 10C
PVDF
260C +/ - 10C
PB
260C +/ - 10C
2007-01-24
GF Piping Systems
16
Socket fusion
Time table for PP
Heating time table
Standard values for socket fusion of pipe and fittings of PP (see table of used material)
1
Outer pipediameter
2
Heating
for PN 10
SDR 11
d in mm
16
20
2)
Change over
for PN 6
SDR 17.6
s
2)
5
Cooling
(Maximum
time)
fixed
total
min
10
25
1)
32
1)
10
12
1)
20
50
12
1)
20
63
24
10
30
75
30
15
30
90
40
22
40
110
50
30
10
50
40
2007-01-24
1)
because of too small wall thickness socket fusion technology not recommended.
2)
GF Piping Systems
17
Socket fusion
Preparation
Plastic pipe cutter
ensures that the pipe is cut square
2007-01-24
GF Piping Systems
18
Socket fusion
Hand fusion tool
2007-01-24
GF Piping Systems
19
Socket fusion
Preparation for fusion
2007-01-24
GF Piping Systems
20
Socket fusion
Fusion process
2007-01-24
21
Socket fusion
Procedure with machine (d > 63mm)
2007-01-24
GF Piping Systems
22
Socket fusion
Advantages for using a machine
2007-01-24
GF Piping Systems
23
Socket fusion
Guidelines and quality check
2007-01-24
GF Piping Systems
24
Butt fusion
Socket fusion
Butt fusion
Electro fusion
2007-01-24
GF Piping Systems
25
Butt fusion
Principle
Pressure
(N/mm)
Jointing pressure
Alignment pressure
0.15
Heating pressure
0.01
2007-01-24
GF Piping Systems
Join
ting
time
Time
Cooling and
jointing time
26
Butt fusion
Preparation for fusion
Wall Offset
Ds
s
Ds max. = 0.1 x s
max. 10% wall offset allowed depending on the pipe wall thickness
Maximum
GAP (gap between the two parts to be welded)
a
Ds max. = 0.5 mm with Butt fusion
(Ds max. = 0.2 mm with IR fusion)
Wall thickness
incorrect
2007-01-24
GF Piping Systems
27
Butt fusion
Preparation for fusion
Set welding temperature at temperature control
Check temperature at the heater plate
Clean heater plate always with lint free tissue before every fusion
Set fusion force according to machine operating manual
2007-01-24
GF Piping Systems
min.
max.
200C
200C
232C
220C
220C
248C
28
Butt fusion
Pressure calculation
Material
PE
PP
PVDF
0.15 N /mm
0.10 N /mm
0.10 N /mm
0.02 N /mm
0.01 N /mm
0.01 N /mm
2007-01-24
GF Piping Systems
29
Butt fusion
Example fusion table
mm
< 4,5
2007-01-24
Equalisation
Heat Soak
Change-over
Fusion
Cooling
min
(minimum value)
mm
(minimum values)
s
(maximum time)
0,5
45
4,5 7,0
1,0
45 70
56
56
6 10
7,0 12,0
1,5
70 120
68
68
10 16
12,0 19,0
2,0
120 190
8 10
8 11
16 24
19,0 26,0
2,5
190 260
10 12
11 14
24 32
26,0 37,0
3,0
260 370
12 16
14 19
32 45
37,0 50,0
3,5
370 500
16 20
19 25
45 60
50,0 70,0
4,0
500 700
20 25
25 35
60 80
GF Piping Systems
30
Butt fusion
Equalization/Heating
Melt the pipe and fitting ends until a defined bead height is
reached under equalization pressure
Pressure
(N/mm)
0,15
Equalization
pressure
Heat soak
pressure
0,01
Equalization
time
2007-01-24
GF Piping Systems
31
Butt fusion
Fusion- /Cooling time
Time
Jointing
time
2007-01-24
GF Piping Systems
Cooling and
jointing time
32
Butt fusion
Quality check and guidelines
2007-01-24
K>0
GF Piping Systems
33
SG 110
2007-01-24
GF Piping Systems
SG 315
SG 315-S
34
WM 500
2007-01-24
GF Piping Systems
35
2007-01-24
GF Piping Systems
36
SUVI 50
SUVI 400
for GF line
up to 630 mm
SUVI WIN-WELD
2007-01-24
GF Piping Systems
37
KRA 63
KS 1600
KS 355
2007-01-24
GF Piping Systems
38
BS 450
BS 630
2007-01-24
GF Piping Systems
39