Beruflich Dokumente
Kultur Dokumente
1 z 15
http://danyk.cz/reg60v_en.html
2016-03-06 08:32
2 z 15
http://danyk.cz/reg60v_en.html
2016-03-06 08:32
3 z 15
http://danyk.cz/reg60v_en.html
The front panel of the switching power supply - voltage control, current limit control, standby switch S1 and LEDs.
Box from the 56V supply ready for installation of my 3 - 60V supply.
2016-03-06 08:32
4 z 15
http://danyk.cz/reg60v_en.html
2016-03-06 08:32
5 z 15
http://danyk.cz/reg60v_en.html
Heatsink, Tr1, L1 and C17 of the old power supply that will be used for construction of my supply.
2016-03-06 08:32
6 z 15
http://danyk.cz/reg60v_en.html
2016-03-06 08:32
7 z 15
http://danyk.cz/reg60v_en.html
2016-03-06 08:32
8 z 15
http://danyk.cz/reg60v_en.html
2016-03-06 08:32
9 z 15
http://danyk.cz/reg60v_en.html
Production of auxiliary 17V transformer Tr4 (left frame with the core, primary on right)
2016-03-06 08:32
10 z 15
http://danyk.cz/reg60v_en.html
The board out of the old supply with LED 1 and LED 2.
2016-03-06 08:32
11 z 15
http://danyk.cz/reg60v_en.html
Dummy load for testing of of the switching power supply: Spiral 230V 2000W from boiler adjusted to 57.5 V 2000W. I joined three branches,
middle and both ends of the spiral are one outlet. The second outlet are tapped to the 1/4 and 3/4. This spiral is divided into 4 equal parts connected
in parallel. The rated voltage is reduced the quarter, the resistance of the sixteenth and power is maintained.
2016-03-06 08:32
12 z 15
http://danyk.cz/reg60v_en.html
The glowing spiral after connected to the tested switching power supply.
2016-03-06 08:32
13 z 15
http://danyk.cz/reg60v_en.html
Testing the switching power supply with the bottom of the box.
2016-03-06 08:32
14 z 15
http://danyk.cz/reg60v_en.html
Video - testing the switching power supply, drawing arcs in a series with the spiral and regulation shown on 2x 500W 230V lamps.
2016-03-06 08:32
15 z 15
http://danyk.cz/reg60v_en.html
2016-03-06 08:32