Beruflich Dokumente
Kultur Dokumente
Temperature
Chloride,
Conductivity
Hardness
Phosphate
Rainfall
: Twice in Week
Evaluation Area
: 10 km Radius
No of Location
Settlements
(having
significant
probability of pollution)
ii
4. SOCIO-ECONOMIC ENVIRONMENT:Inventory on social and economical condition, based on data available from
secondary source and limited primary survey.
5. NOISE POLLUTION:5.1 Details regarding potential noise sources of the project. This shall include
vehicular traffic noise also.
5.2 To monitor noise levels at at-least 5 locations within the study area and to
establish an existing noise level pattern.
6. PREDICTIONS AND ASSESSMENT OF IMPACT:To predict and assess the impacts on environment after establishing existing
base line conditions of the environment. This shall include
6.1 Predict and assess the impacts on water environment due to raw water
consumption and effluent disposal if any.
6.2 Predict and assess the impact on air due to emissions from different source
by calculating predicated incremental increase through mathematical model.
6.3 Impact Assessment Statement for Different Environmental Attributes.
7. ENVIRONMENT MANAGEMENT PLAN:7.1 To prepare an Environment Management Plan after identifying potential
pollution factors and risk associated with the project.
7.2 To identify environmental and safety hazards and suggest the measures for
prevention and control it.
7.3 Preparation of detail Environmental Monitoring Plan, during construction
and operation phase.
iii