Sie sind auf Seite 1von 33

Bentec GmbH Drilling & Oilfield Systems

Deilmannstrae 1, D- 48455 Bad Bentheim


Germany

Technical Bulletin
Top Drive TD-500-HT
Top Drive TD-350-HT

TD-500-HT

DE
P01
Technische Information

Page 1 of 33

Technical Bulletin Top Drive

Introduction............................................................. 4
1.1

Index

Overview ........................................................................... 5

Technical Data ......................................................... 6


2.1

Dimension drawing ........................................................... 6

2.2

General.............................................................................. 7

2.3

Performance Data ............................................................. 7

2.3.1 Torque Speed Diagram...................................................... 8

2.4

Connection values ............................................................. 9

2.5

Operation conditions ......................................................... 9

Setup and Function ................................................... 10


3.1

Module description.......................................................... 10

3.1.1 Drilling Unit..................................................................... 11


3.1.2 Pipehandler ..................................................................... 16
3.1.3 Carriage Package............................................................. 20
3.1.4 Torque Beam Assembly................................................... 20
3.1.5 Hoisting equipment ......................................................... 21
3.1.6 Tool Kit............................................................................ 21
3.2

Top Drive Control ............................................................ 22

3.2.1 Service Loop ................................................................... 22


3.3

Drillers Control................................................................ 23

3.4

VFD Power control System.............................................. 23

3.4.1 VFD Power Supply ....................................................... 24


3.4.2 VFD Power Stack & VFD Controls ................................ 24
3.4.3 VFD Motor Control center (MCC) ................................. 24
3.4.4 VFD Braking Chopper Module & Resistor..................... 24
3.4.5 VFD Transformer.......................................................... 25
3.4.6 VFD UPS System.......................................................... 25
3.4.7 VFD ESD System.......................................................... 25
3.4.8 VFD Air Conditioning Unit............................................. 25
3.5

Incoming Power Cable .................................................... 25

Transport............................................................... 26

Recommended Option - Rig survey ................................ 27

Recommended Option - Implementation Kit...................... 27

Option - Training...................................................... 28
7.1

Training Course Operation............................................ 28

7.2

Training Course Hydraulics .......................................... 28

7.3

Training Course Electrics.............................................. 28

7.4

Training Course Mechanics .......................................... 29


Page 2 of 33

Technical Bulletin Top Drive

Index

Option - Yearly Maintenance Service.............................. 29

Option - Recommended Spare Parts for one year ............... 29

10

Option - Lubricants for one year.................................... 29

11

Option - Service Loop Container.................................... 30

12

Option Saver Sub Set .............................................. 30

13

Option Tool Joint Adapter Kit ..................................... 30

14

Option Wireline Adapter........................................... 30

15

Option Top Drive Control Drillers Chair implementation .... 30

16

Option Color Camera system ..................................... 31

17

Option Top Drive Genset (Independent Power source)........ 32

18

Option Offshore Certification ..................................... 32

19

Contact ................................................................. 33

Page 3 of 33

Technical Bulletin Top Drive

Introduction

Pos: 1.1.1 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/Technical Bulletin/1000 1. Einfhrung @ 4\mod_1279695641388_581.doc @ 38564

1 Introduction
Pos: 1.1.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4001 4.0.0 Einfhrung @ 4\mod_1279025442084_581.doc @ 37340

The Bentec Top Drive is designed as transportable as well as permanent installed


unit for deep drilling rigs with different mast types. The System is powered by an
AC motor. The Top Drive is controlled by a separate control panel.
The standard Top Drive version includes the following items:

Hanger assembly with integrated Counterbalance cylinders

Standard washpipe

Link-tilt-system with position monitoring designed for high impacts

Remote-controlled and manual IBOP

Backup Clamp to make up and break the Top Drive drill pipe connection

Guide rail system inducing the torque within the mast.

Electrical service loop

Onboard hydraulic unit.

The blower rate for the motor cooling is variable and depends on the motor
temperature.
The drives of the system have been carefully chosen to meet current noise
protection regulations.

Page 4 of 33

Technical Bulletin Top Drive

Introduction

Pos: 1.1.3.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/4. Aufbau und Funktion/4100 4.1. bersicht @ 4\mod_1278926224268_581.doc @ 36606

1.1

Overview

Pos: 1.1.3.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4100 4.1.0 bersicht _Bild @ 4\mod_1279025653859_581.doc @ 37360

Rear

Left side
Right Side

Front

Abb. 1
Pos: 1.2 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 5 of 33

Technical Bulletin Top Drive

Technical Data

Pos: 1.3.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3000 3. Technische Daten @ 4\mod_1278919879993_581.doc @ 36436

2 Technical Data
Pos: 1.3.2.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3100 3.1. Mablatt @ 4\mod_1278920457472_581.doc @ 36449

2.1

Dimension drawing

Pos: 1.3.2.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3100 3.1.0 Mablatt @ 4\mod_1279023392166_0.doc @ 37256

535

764

1708
1600
660

843

865

Abb. 2

Page 6 of 33

Technical Bulletin Top Drive

Technical Data

Pos: 1.3.3.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3200 3.2. Allgemeine Angaben @ 4\mod_1278920832597_581.doc @ 36466

2.2

General

Pos: 1.3.3.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3200 3.2.0 Allgemeine Angaben @ 4\mod_1279023470335_581.doc @ 37261

Description

Value

Dimension

Weight

16200

kg

Length

6730

mm

Width

1780

mm

Height

1540

mm

Pos: 1.3.4.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3500 3.5. Leistungswerte @ 4\mod_1278924144825_581.doc @ 36536

2.3

Performance Data

Pos: 1.3.4.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3500 3.5.0 Leistungswerte Tabelle @ 4\mod_1279024204468_581.doc @ 37296

Description

Value

Dimension

API Load Capacity (350t Top Drive)

350

ton

3125

kN

500

ton

4480

kN

500

bar

7500

PSI

758

kW

1030

HP

Drill Speed

0 to 115/230

1 min-1

Drilling Torque

63.000

Nm

46.500

ft lbs

100.000

Nm

73.760

Ft lbs

105.000

Nm

77.440

ft lbs

2500 kg

@1,4 m

5500 lbs

@4

API Load Capacity (500t Top Drive)

Pressure Rating

Power Rating

Make up / Break out Torque

Static Break Torque

Link Tilt Lifting Capacity

Gear box Ratio 1. Gear

14:1

Page 7 of 33

Technical Bulletin Top Drive

Technical Data

Pos: 1.3.4.3 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/3510 3.5.1. Drehmoment Geschwindigkeitskurve @ 4\mod_1279024483787_581.doc @ 37310

2.3.1

Torque Speed Diagram

Pos: 1.3.4.4 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3510 3.5.1.0 Drehmoment Geschwindigkeits kurve @ 4\mod_1279024399758_581.doc @ 37306

Abb. 3
Pos: 1.3.5.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3300 3.3. Anschlusswerte @ 4\mod_1278922039727_581.doc @ 36480

Page 8 of 33

Technical Bulletin Top Drive

2.4

Technical Data

Connection values

Pos: 1.3.5.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3301 3.3.0 Hauptantrieb-elektrisch @ 4\mod_1279023631471_581.doc @ 37266

Main drive electric

Description

Value

Dimension

Voltage

D 575

V AC

Current load (max.)

880

Power input (max.)

750

kW

Description

Value

Dimension

Voltage

D 400 / S690

V AC

Current load (max.)

14,3 / 8,3

Power input (max.)

7,5

kW

Description

Value

Dimension

Voltage

D 400 / S690

V AC

Current load (max.)

14,3 / 8,3

Power input (max.)

7,5

kW

Description

Value

Dimension

Voltage

D 400 / S690

V AC

Current load (max.)

14,3 / 8,3

Power input (max.)

7,5

kW

Description

Value

Dimension

Temperature range

-45...+ 55

Pos: 1.3.5.3 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3302 3.3.0 Motorlfter-elektrisch @ 4\mod_1279023682516_581.doc @ 37271

Main drive cooling electric

Pos: 1.3.5.4 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3303 3.3.0 Antrieb Hydraulikaggregat-elektrisch @ 4\mod_1279023752545_581.doc @ 37276

Hydraulic Power Unit


electric

Pos: 1.3.5.5 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3304 3.3.0 Antrieb Getriebeschmierung-elektrisch @ 4\mod_1279023839105_581.doc @ 37281

Gearbox Lubrication
electric

Pos: 1.3.6.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3400 3.4. Betriebsbedingungen_Titel @ 4\mod_1278923125180_581.doc @ 36504

2.5

Operation conditions

Pos: 1.3.6.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3400 3.4.0 Umgebung Temperatur @ 4\mod_1279024098112_581.doc @ 37291

Environment

Pos: 1.4 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 9 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/4. Aufbau und Funktion/4000 4. Aufbau und Funktion @ 4\mod_1278925574849_581.doc @ 36582

3 Setup and Function


Pos: 1.5.2 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/4. Aufbau und Funktion/4200 4.2. Baugruppenbeschreibung @ 4\mod_1278926559989_581.doc @ 36620

3.1

Module description

Pos: 1.5.3 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4200 4.2.0 Baugruppenbeschreibung_Bild @ 4\mod_1279025724825_581.doc @ 37370

The Machine is divided in subassemblies as follows:

Carriage Package

Drilling Unit

Service Loop

Pipehandler

Elevator/Links

Guide Rails

Abb. 4
Pos: 1.5.4 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 10 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.5 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4210 4.2.1.0 Drilling unit @ 4\mod_1279025726107_581.doc @ 37375

3.1.1

Drilling Unit
The Drilling Unit consists of the following subassembly groups:

Hanger Assembly

Drive

Mud Supply

Protection Frame

Hydraulic Unit

Abb. 5

Page 11 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.6 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4211 4.2.1.1 Aufhngung @ 4\mod_1279026404233_581.doc @ 37395

3.1.1.1

Hanger Assembly
The Hanger Assembly consists of:
1

Yoke (1)

Two upper links (2)

Counterbalance system (3).


The counterbalance system (3) is integrated within the Upper Links and
consists of:

two Hydraulic cylinders


two hydraulic accumulators

The cylinders are assembled between Yoke (1) and Upper Links (2). The
Counterbalance System can compensate a maximum distance of 200 mm. When
starting the operation the counterbalance system is charged by the hydraulic
system. During operation the hydraulic system refills the counterbalance system
to the adjusted pressure.

Abb. 6
Pos: 1.5.7 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4212 4.2.1.2 Antrieb @ 4\mod_1279026462857_581.doc @ 37399

3.1.1.2

Drive

Drive
1

The drive system contains of the following


components:
1
2
3
4
5

Engine Cooling System


Brake
AC motor
Gearbox
Mainshaft

4
5

Abb. 7

Page 12 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.8 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42121 4.2.1.2.0 Motorkhlung @ 4\mod_1279026560245_581.doc @ 37403

1
2
3
4

Motor Cooling System


A frequency controlled motor (2) drives the engine fan (1). The fan speed
depends on the motor temperature which is determined by sensors. (COD)
Cooling on Demand. Cooling air is conducted via a noise reduced suction
hood (3) through a blower channel (4) into the ac motor of the Top Drive and
transmission oil cooler. (5).

Abb. 8
Pos: 1.5.9 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42122 4.2.1.2.0 Drehstrommotor @ 4\mod_1279026663023_581.doc @ 37407

AC Motor
The rated power of the motor is 758 KW / 1030HP. It is controlled by a
frequency drive and temperature monitored. The maximum operating
temperature is controlled by sensors in the motor.

Abb. 9
Pos: 1.5.10 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42123 4.2.1.2.0 Drehgeber Haltebremse @ 4\mod_1279026733959_581.doc @ 37411

1
2

Rotary encoder(1)
The rotary encoder is assembled to the holing brake and - via shaft extension
- directly connected to the engine shaft
Brake (2)
The disc brake is hydraulic closed and spring force opened. It can absorb a
torque of 105.000 Nm.

Abb. 10

Page 13 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.11 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42124 4.2.1.2.0 Getriebe @ 4\mod_1279026804645_581.doc @ 37415

Gearbox
The two-stage gearbox is helical cut with a total transmission ratio of 14:1.
The speed of the engine is reduced twice before it is transferred to the
bullgear (1) of the gearbox. The bullgear is located on the thrust bearing. The
mainsahft is concentrically located in the bullgear and connected to it via
multiple splining.
The gearbox is lubricated with combined splash/pressure lubrication (3). If the
gear oil has reached its maximum temperature it is piped via a bypass
through an oilcooler. The oilcooler is included in the ventilation system of the
motor.

1
2
Abb. 11
Pos: 1.5.12 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42125 4.2.1.2.0 Mainshaft @ 4\mod_1279026871377_581.doc @ 37419

1
2
3

Mainshaft
The mainshaft (4) powered by the bullgear - is located in the gearbox
together with the thrust bearing (2). It is conducted via lower bearing (3). In
order to execute drilling fluid a washpipe (1) is connected. At the bottom of the
mainshaft there is an API pin as connection to the drill string. The drill string is
powered by the mainshaft. The mainshaft holds the load collar (5) which
bears the link adapter the drill pipe during elevator operation.

4
5

Abb. 12
Pos: 1.5.13 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4213 4.2.1.3 Splungszufuhr @ 4\mod_1279027224570_581.doc @ 37423

3.1.1.3

Mud Supply
1
2

The mud feeding comprises a 3 washpipe and a goose neck with 2 Fig 1502
input for wireline operation as well as a 4 Fig 1002 mud hose connection. The
mud feeding disposes of a pressure rating of 7500 PSI.

3
4

Abb. 13
Pos: 1.5.14 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4214 4.2.1.4 Integriete Hydraulikeinheit @ 4\mod_1279027344582_581.doc @ 37427

Page 14 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.27 /Bentec Produkte/Top Drive /TD-500-HT/4. Aufbau und Funktion/421 4.2.1.4 Baugruppe Hydraulikeinheit @ 1\mod_1259752821452_581.doc @ 24520

3.1.1.4

Onboard Hydraulic Unit


1
2
3
4
5

The hydraulic unit disposes of

Speed controlled internal gear pump(1)

Valve block for the hydraulic unit (2)

Valve block for the pipehandler (3).

Main valve block (4)

Valves are operated by robust 24 volt coil. A low-noise pump is integrated in the
stainless steel system tank (5).

Abb. 14
Pos: 1.5.15 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4215 4.2.1.5 Schutzrahmen @ 4\mod_1279027429641_581.doc @ 37431

3.1.1.5

Protection Frame
The protection frame is fixed at the front of the Top Drive. A service platform(1)
can be swung out for installation and repair work

Abb. 15
Pos: 1.5.16 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 15 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.17 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4220 4.2.2.0 Pipehandler @ 4\mod_1279028087730_581.doc @ 37435

3.1.2

Pipehandler
The Pipehandler consists of the following sub assembly groups:

Linkadapter housing

Support
Rotary Actuator /
Arresting Device

Hydraulic Swivel

Link tilt

IBOP / Saversub
Back Up Clamp
Abb. 16
Pos: 1.5.18 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 16 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.19 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4221 4.2.2.1. Drehantrieb @ 4\mod_1279028184883_581.doc @ 37439

3.1.2.1

Rotary Actuator
1

Hydraulic Rotary Actuator


The pipehandler is infinitely rotatable by 360 . The main gear wheel (3)
is run by the pinion. The pinion is moved by a hydraulic drive.

2
3

Abb. 17
Pos: 1.5.20 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4222 4.2.2.2. Feststeller @ 4\mod_1279028265677_581.doc @ 37443

3.1.2.2

Arresting device
1

Arresting Device
The gear segment (2) is moved by a hydraulic cylinder (1). It grabs at the
main gear wheel(3) and arrests the pipehandler in intervals of 3.

2
3

Abb. 18
Pos: 1.5.21 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4223 4.2.2.3 Drehdurchfhrung @ 4\mod_1279028306863_581.doc @ 37447

3.1.2.3

Hydraulic Swivel
Hydraulic swivel
Hydraulic lines of the consumer of the Pipehandler are transferred through the
hydraulic swivel. Free channels are available, enabling the connection of
additional consumers.

Abb. 19
Pos: 1.5.22 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4224 4.2.2.4. Linkadapterhousing @ 4\mod_1279028366362_581.doc @ 37451

3.1.2.4

Linkadapterhousing
Linkadapterhousing
The linkadapter (2) positioned in the linkadapterhousing (1). The link adapter
is supported by the Liftingspring (3). While drilling the liftingspring raises the
linkadapter thus enabling free rotation of the mainshaft. The load collar (4)
holds the linkadapter during elevator operation. The load collar transfers the
load into mainshaft. The load collar consists of two half-shells with grooves
that grap into the mainshaft. A housing keeps the shells together..

Abb. 20

Page 17 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.23 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4225 4.2.2.5 Linktilt @ 4\mod_1279028676383_581.doc @ 37455

3.1.2.5

Linktilt
Linktilt
Two hydraulic cylinders (2) move Links and Elevator. Hereby the elevator can
be placed in any position necessary for picking the pipes.
The system can lift a maximum of 2,5 t at a distance
of 1,4 m to centre well.

Abb. 21
Pos: 1.5.24 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42251 4.2.2.5.0 Linktilt Reichweite Tabelle @ 4\mod_1279028770661_581.doc @ 37459

The Link tilt system is able to move Links with in the following Limits
Link Typ

[mm]

[``]

[mm]

[``]

[mm]

[``]

108``

2743

108

1473

58

2013

79

120``

3048

120

1637

64

2237

88

132``

3353

132

1081

71

2460

97

144``

3658

144

1964

77

2684

106

168``

4267

168

2292

90

3131

123

180``

4572

180

2455

97

3355

132

Pos: 1.5.25 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42252 4.2.2.5.0 Linktilt Reichweite Abb @ 4\mod_1279028858033_581.doc @ 37463

Abb. 22

Page 18 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.26 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4226 4.2.2.6 Linktilt berwachung @ 4\mod_1279028969186_581.doc @ 37467

3.1.2.6

Pipe handler Monitoring

1
2
3

Pipe handler Monitoring


The position of the elevator is determined at all times. A hydraulic cylinder (3)
communicates via hydraulic swivel (2) with a measuring cylinder (1)
transferring the elevator position to a connected Drawworks Anti Collision
System. Depending on the Anti Collision System a number of different link
positions can be teached in, to be approached during drilling operation.

Abb. 23
Pos: 1.5.27 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4227 4.2.2.7 Haltezange @ 4\mod_1279029119916_581.doc @ 37471

3.1.2.7

Back up Clamp

The purpose of the backup Clamp(2) is making up and breaking drill pipe
connections between Top Drive (Saversub) and drill string. The back up
clamp is connected to the Linkadapterhousing via torque beam.(1)

Abb. 24
Pos: 1.5.28 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42271 4.2.2.7.0 Backeneinstze @ 4\mod_1279029214834_581.doc @ 37475

Abb. 25

The Jaw Assemblies(1) are moved by a hydraulic cylinder(2).


Using different kinds of jaw assemblies allows making up and breaking of drill
pipe with various OD`s. The Top Drive is equipped with one Jaw size. Additional
Sizes for other Tool Joint ODs are available as the option Tool Joint Adapter Kit
Jaw size

Tool Joint OD

4 5

II

5 6

III

6 7

IV

7 8
Page 19 of 33

Technical Bulletin Top Drive

Setup and Function

/Betriebsanleitungen-Mechanisch/Bentec
Produkte/Top
Drive/TD-Module/4228
4.2.2.8. IBOP,Saversub,
IBOP Saver Sub Load
@ 4\mod_1279029762582_581.doc
@ 37491 @ 24940
Pos: 1.5.29
1.39 /Bentec
Produkte/Top Drive /TD-500-HT/4. Aufbau
und Funktion/422
4.2.2.7 Baugruppe
Collar @ 1\mod_1260947387369_581.doc

3.1.2.8

IBOP/ Saversub
1
2
3
4

The IBOP (2) is connected to the mainshaft via API pin


Internal
Blow
Out
Preventer
The saver sub (4) is screwed between IBOP (2) and pipe. Dielocks (1,3) prevent
the threaded joints from over torque from the mainshaft to the IBOP and
accordingly from the IBOP to the saver sub.

Abb. 26
Pos: 1.5.30 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4230 4.2.3. Fhrungswagen @ 4\mod_1279029308425_581.doc @ 37479

3.1.3

Carriage Package
The Top drive is guided by a carriage package. It transfers the torque from the top
drive into the Guide rails.
The Carriage Package consists of a frame(1) with slide shoes(2), it transfers the
Torque it to the Mast structure. The glide shoes are equipped with vibration
dampers (3). Adjustment to centre well is performed by adjusting devices(4)

Abb. 27
Pos: 1.5.31 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4240 4.2.4. Fhrungsschiene @ 4\mod_1279029433655_581.doc @ 37483

3.1.4

Torque Beam Assembly


The Torque beam assembly absorbs the torque of the guide dolly and transfer it
to the mast structure. The Torque beam assembly is segmented into 4 sections
and delivered within a transport frame. The Transport frame allows easy and safe
handling during transport and Rig up.

Abb. 28

Page 20 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.32 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4250 4.2.5. Hoisting equipment @ 4\mod_1279029563808_581.doc @ 37487

3.1.5

Hoisting equipment
The Top Drive can be equipped with the following Links(1) and elevators(2)
Load

Size

350 ton

2 x 120 (recommended)

350 ton

2 x 132

500 ton

3 x 120 (recommended)

500 ton

3 x 144

Other elevator link sizes are available on request.

Abb. 29

Elevator links for Casing running Tools are available on request.


Manual Elevators are available in the following sizes:
350 ton
500 ton
A Bushing set of the for the following Drillpipe sizes will be attached:
3 , 4 , 5 , 5 , 6 5/8
Bushings for other Drillpipe sizes are available on request.
Hydraulic elevators are available on request. Hydraulic connections for a
hydraulic elevator are already available.
Pos: 1.5.33 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

3.1.6

Tool Kit
The top drive will be delivered with

IBOP Hex wrench

IBOP repair tools

Manual oil pump

Page 21 of 33

Technical Bulletin Top Drive

Setup and Function

Pos: 1.5.34 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4260 4.2.6. Topdrive Control - Konsole @ 4\mod_1279721650920_581.doc @ 38630

3.2

Top Drive Control


The Top Drive Control System consist of the following parts

Service Loop

Drillers Control
Drillers Control Cable
Drillfloor

Terminalbox

Supply Cable

Incoming
Power Cable

Drillers Control Cable


Ground Level

VFD Power Control System


Abb. 30
Pos: 1.5.35 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

3.2.1

Service Loop
The Top drive has a Power Loop (1) that supplies electrical power to the motor
and a Control Loop (2). The control Loop holds all control lines and the electrical
power supply for the auxiliary drives.
The Loop Length is based on the existing rig specifications.
The Length of the Supply Cable is determined by customer or recommended by
Bentec.

Abb. 31

The Length of the Incoming Power Cable is determined by customer or


recommended by Bentec.

Page 22 of 33

Technical Bulletin Top Drive

Setup and Function

1.5.36 /Betriebsanleitungen-Mechanisch/Bentec
Drive/TD-Module/4261 4.2.6.2
4.2.6.1.VFD
Service
Loop
@
4\mod_1279030085626_581.doc
@ 37499 @ 38600
Pos: 1.5.37
Power
Control
System
@ 4\mod_1279030274654_581.doc
@ 37503
Pos:
1.5.38
/Betriebsanleitungen-Mechanisch/Bentec Produkte/Top
Produkte/Top Drive/TD-Module/4262
Drive/TD-Module/4263
4.2.6.3.
Driller
Control
Konsole
@ 4\mod_1279703324803_581.doc

3.3

Drillers Control
The Top Drive is controlled by the Panel shown below. This panel is used as a
standalone unit installed within the doghouse.
An implementation within the Drillers Chair is available on request.

Abb. 32
Pos: 1.5.39 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

3.4

VFD Power control System


The VFD Power Control contains all control devices and frequency converters
that are needed to operate the Top drive.

Abb. 33

Container Dimensions: Width: 3m / Length: 3,4m / Height: 3m

ISO Container with Lifting Edges & Pad eyes for rigging

Sun shed roof, entrance door and removable front

Heat insulation

Environmental temperature -45C to +55C

2 Air conditions 15kW each

1 heating unit 2kW

Incoming switchboard 600V/60Hz or 690V/50Hz 3Phase

1000A draw out circuit breaker

Plug panel 400mm power pins 6 each

Power choke and rectifier

Air cooled VFD Inverter 1600A for main motor

MCC for all auxiliary drives with VFDs for support drives

Chopper unit 200kW intermittent

Default incoming power cable

Page 23 of 33

Technical Bulletin Top Drive

3.4.1

Setup and Function

VFD Power Supply


The Power Supply consists of an AC Bus (600/690V) to feed the transformer, the
MCC Consumers a Diode Bridge with choke and fuses and the incoming circuit
breaker (which feeds the DC Bus). The DC Bus feeds the VFD-Unit for the TD
Main Motor.
Technical Data:
Supply Voltage:
DC Current:
Diode Bridge B6U

600/690V
1700A

The plug panel for Power Supply is installed outside of the container. For each
Phase there are two (2) Power Pins available. (3x2 Power Pins)

3.4.2

VFD Power Stack & VFD Controls


The BENTEC VFD Units are designed not only to meet but exceed the customer
requirements. The fool-proof design allows an easy & safe operation for the staff,
field-bus connected PLC's are used to offer a comfortable maintenance, even via
Internet (Option).
Technical Data:
Supply Voltage:
Output Voltage:
Output Current:
Programmable Logic Controller:
Cooling System:

820950 V DC
575 V AC
1600A
MODICON Schneider
Air Cooled

Alarms are displayed in clear languages including histogram and display of actual
system data for maintenance and troubleshooting purpose in one central Display.
All controls for the Top Drive like Link tilt, etc. are included in the VFD System.
The plug panel for the connection of the Top Drive is installed outside of the
container.

3.4.3

VFD Motor Control center (MCC)


The MCC is equipped with starters and feeders to the requirements of the Bentec
Top Drive. Each starter will be complete with a magnetic only breaker, a contactor
and an ambient compensated overload element (heater). All Status and Alarm
messages will be indicated on a separate Human machine interface.

3.4.4

VFD Braking Chopper Module & Resistor


The braking chopper module is installed to feed the braking resistor for
regenerative braking.
Technical Data:
Chopper Module 200kW intermittent
Braking resistor 50kW continuous

Page 24 of 33

Technical Bulletin Top Drive

3.4.5

Setup and Function

VFD Transformer
One transformer fed by AC Supply panel to fed 460/400/230V consumers of the
MCC and small power distribution.
Technical Data:
Rated power: 50kVA
Primary voltage: 600/690V
Secondary voltage: 400/460V

3.4.6

VFD UPS System


One battery buffered UPS system to feed all control systems with uninterruptable
stable power supply to allow for safe operation.
Technical Data:
Input 400VAC, 50/60Hz
Output: 24-28V DC / 40A
Buffer battery capacity: 24V50Ah

3.4.7

VFD ESD System


This safety system is split in two parts as follows:
Emergency Shut Down:
Single systems VFD, MCC, TD Control will be shut down in a controlled safe way
Blackout:
All systems will be shut down in a safe way and all power will be shut off.

3.4.8

VFD Air Conditioning Unit


Two air conditioners are installed inside of the container to monitor and control
the temperature inside of the container at a level of 25C. The air is also used to
cool all controls as well as the air cooled VFD.

3.5

Incoming Power Cable


Cables for connection of the VFD container with the Existing SCR unit. Other
lengths are available on request. The Cables are pluggable on both sides.
Customer supply power 690V/50Hz or 600V/60Hz 760kW

Page 25 of 33

Technical Bulletin Top Drive

Transport

Pos: 1.5.40 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4300 4.3. Tool Kit @ 4\mod_1279030454400_581.doc @ 37511

Pos: 1.6
/Standardmodule
/nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc
@ 805
Pos:
1.7.1
/Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/5.
Transport und Zwischenlagerung/5000
5.Transport @ 4\mod_1278928593693_581.doc @ 36659

4 Transport
Pos: 1.7.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/5001 5.0.0. Tarnsportmae-Dubble Rail-Rahmen @ 4\mod_1279095056207_581.doc @ 37578

Transport Data

Description

Value

Dimension

Length

7400

mm

Width

2880

mm

Height

2880

mm

Weight

20.000

kg

Pos: 1.7.3 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/5002 5.0.0 Transortmae-Dartsellung Double Rail Rahmen @ 4\mod_1279095056488_0.doc @ 37583

28
80

7400

Abb. 34
Pos: 1.8 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 26 of 33

Technical Bulletin Top Drive

Recommended Option - Rig survey

Pos: 1.9.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/Technical Bulletin/Z000 Z. Schulung @ 4\mod_1279691844542_581.doc @ 38541

5 Recommended Option - Rig survey


For a turnkey Top Drive implementation Bentec recommends a rig survey in
advance to fit the Top Drive system in an optimal way into the existing rig. The
Rig survey takes two days and will be performed by two Bentec engineers. The
Following Points will be surveyed.
Survey Contents:

Measurements at Mast

Measurements on Drill floor

Measurements on fingerboard Level

Measurements for Tieback kit

Check of Mast for Service Loop implementation

Check of Mast for possible collisions with the Top Drive

Check of Doghouse for control implementation

Check of Power supply

Pos: 1.10 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

6 Recommended Option - Implementation Kit


An Implementation kit can be offered after a rig survey to provide a turnkey
implementation for the Bentec Top Drive. The Implementation kit includes the
following parts. Size and design of these parts are depends on the results of the
rig survey.
Implementation kit Contents:

Hang off Links for Crown Block Section

Intermediate Tiebacks

Lower Tieback

Misc. Beams for implementation

The Implementation of Bentec Top Drives may influence the statics of the Mast.
Bentec will submit static relevant datas within a confirmation drawing after
purchase order. The client is responsible for the verification of the Mast statics.
To implement the Top Drive in an efficient way Bentec need the following
technical Drawings (CAD-File or scanned file):

Mast / Derrick detailed Drawings

A-Frame (if available)

Drillfloor Layout

Fingerboard

Crown Block

Rig Layout

Standpipe Information

Drillpipe sizes which should be use on the Rig

Elevator Links & Elevator Information

Travelling Block Information

Page 27 of 33

Technical Bulletin Top Drive

Option - Training

7 Option - Training
The following Training courses are available in advance or onsite.
Pos: 1.9.2 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/Technical Bulletin/Z100 Z.1. Bedienerschulung beim Hersteller @ 4\mod_1279691999830_581.doc @ 38545

7.1

Training Course Operation


This training course includes the complete operation of the Top Drive System.
This course contains one theoretical part and one practical part.
Training Contents:

Top Drive commissioning & decommissioning

Top Drive operational functions

Detailed training of the mechanical systems

Detailed training of the electrical systems

System safety

Participants:
This Course is provided for: Driller, Toolpusher, Repair- and Maintenance
Crews or people who are directly responsible for the Top Drive
Pos: 1.9.3 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/Technical Bulletin/Z200 Z.2. Bedienerschulung An der Bohranlage @ 4\mod_1279692449776_581.doc @ 38549

7.2

Training Course Hydraulics


This training course includes a deep training of the hydraulic system and their
parts of the Top Drive.
Training Contents:

Hydraulic plans

Hydraulic pressure unit (HPU)

Operation of all hydraulic circuits.

Maintenance of the hydraulic system

Installation of the hydraulic pump

Installation of control elements

Participants:
This Course is provided for: Repair- and Maintenance Crews or people who are
directly or indirectly responsible for the hydraulic functions of the Top Drive.

7.3

Training Course Electrics


This training course includes a deep training of the electric system and their parts
of the Top Drive.
Training Contents:

Electrical plans

Power Supply

AC-Motors VFD-Technology / PLC Controls

Maintenance of the Electrical System

Safe operation at the electrical systems

Participants:
This Course is provided for: Electric Crews or people who are directly or indirectly
responsible for the electrical functions of the Top Drive.

Page 28 of 33

Technical Bulletin Top Drive

7.4

Option - Yearly Maintenance Service

Training Course Mechanics


This training course includes a deep training of the mechanic system and their
parts of the Top Drive.
Training Contents:

Mechanical plans

Load Path

Main Assemblies

Sub Assemblies

Lubrication & hydraulic System

Recommended Maintenance

Safe operation at the mechanical systems

Participants:
This Course is provided for: mechanic & maintenance Crews or people who are
directly or indirectly responsible for the mechanical functions of the Top Drive.

8 Option - Yearly Maintenance Service


The Yearly Maintenance service will be done by Bentec onsite. Within the yearly
Maintenance Service Our Top Drive Maintenance Specialists will be check all the
Top Drive Parts, systems and functions. The following points are all points that
have to be done according to the technical documentation. If there are some parts
or systems need to be repaired or replaced Bentec will charge the costs
separately
Maintenance Service Contents:

Maintenance of all Motors

Maintenance of the gearbox

Maintenance of the complete hydraulic system

Maintenance of the complete mechanical system

Maintenance of the complete electrical system

Function Test

9 Option - Recommended Spare Parts for one year


The recommenced spare part package contains wear parts and spare parts that
needed during normal operation for one year. The Spare Part kit guarantees a
safe uptime of the Top Drive due to spare parts availability at the rig or base.

10 Option - Lubricants for one year


Lubricants for the Top Drive are
Summer Lubricants

Hydraulic Oil: Shell Omala HD 150

Gear Oil: Shell Tellus 32

Winter Lubricants (recommended for Temperatures <0C)

Hydraulic Oil: Shell Tivela 150

Gear Oil: Shell Tellus 32 Arctic


Page 29 of 33

Technical Bulletin Top Drive

Option - Service Loop Container

11 Option - Service Loop Container


The Service Loop Container is an open Top 20 ft open top container. The Service
Loop and Service Loop saddle can be stored within this container during rig
move. The Service loop will be stored within this container in optimal
environments and avoid any damages during transport and storage.

12 Option Saver Sub Set


The Top Drive is equipped with a one Saver Sub Set + one Saver sub for spare.
The Thread Connection to the Drillpipe is NC50. Additional Saver subs and
thread Connections are available on Request. The Following sizes are available.
Saver subs quality control is according to API 7-1

NC 38

NC 40

NC 46

NC 50

5 FH

6 5/8 FH

Special threads are available on request.

13 Option Tool Joint Adapter Kit


To clamp different Tool Joint sizes an Adapter Kit is available. The Adapter Kit
consist a Jaw Assembly and a stabbing guide which fits to the Tool Joint Range.
The Following Tool Joint ODs are possible:

4-5

5 6

6 7

7 8

14 Option Wireline Adapter


The Wireline adapter allows using Wireline Tools with the Bentec Top Drive. The
Wireline Adapter will be mounted below the Pipehandler Main Frame.

15 Option Top Drive Control Drillers Chair implementation


The Top Drive controls can be implemented into an existing Drillers Chair. The
Implementation work onsite will be executed by a Bentec Service engineer.
Technical Informations about the Drillers chair are necessary in advance

Page 30 of 33

Technical Bulletin Top Drive

Option Color Camera system

16 Option Color Camera system


A Color Camera system is a fixed or pan- and tiltable Color Camera. This Camera
can be installed at any position on the rig to monitor hazardous areas like finger
board level, drillfloor level, and crown block level. The preferred position of the
camera needs to be determined by the customer. The Monitor the Camera is
mounted in the Drillers Cabin. The Number of Cameras and Cable Lengths has
to be determined by the customer. The printed boards for the controls are
mounted in a separate Exd box. Cablings from the camera to the Exd box is
directly connected without plugs. ATEX certified plugs are available on request.
Specifications Camera

EX de housing with temperature controlled space heater

Stainless steel weather protection hood

Size: 120 x 120 x 400 mm / 5kg

Automated brightness control

Motor operated zoom & Autofocus

Excellent clear picture even bad light conditions

Specifications Monitor & Control

Housing IP65, made in stainless steel with installation holder

Size: ca. 450 x 350 x 280 mm / 10kg

12'' (1024x768) TFT Color Screen Panel - IP65

Light intensity 1.300 candelas

Galvanic separation of video signal

50m multicore control cable halogen free for connect each camera

Camera selection switch

Zoom in/out / pan left & right / tilt up & down

Switches military standard

Specifications Pan/Tilt Unit

Pan angle: 356 Tilt Angle 176 & end stop limits

Size: 165 x 286 x 228 mm / 18kg / max. load 35 kg / Ex 'd' housing

Power Supply

230V AC 50/60Hz

Page 31 of 33

Technical Bulletin Top Drive

Option Top Drive Genset


(Independent Power source)

17 Option Top Drive Genset (Independent Power source)


The Top Drive can be equipped with a Genset Module to operate the Top Drive
an independent unit.

18 Option Offshore Certification


For Offshore applications the Top Drive system will be certified by a third-party
organisation. This Certificate is formally known as a Case-by-Case approval.
Supported Certification Organisations

DNV Det Norske Veritas

ABS American Bureau of Shipping

Lloyds British

The Certification includes design verification and product verification. Furthermore


all load-path included parts will be Type approved. Interface related points
between the existing rig system and the Top Drive System need to be clarified
during an interface clarification meeting between Bentec and client.

Page 32 of 33

Technical Bulletin Top Drive

Contact

Pos: 1.11 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/13. Adressen/16. Adressen @ 4\mod_1279544177034_581.doc @ 38495

19 Contact
Germany
Headquarters
Production
Service
Sales

Bentec GmbH Drilling & Oilfield


Systems
Deilmannstrae 1
48455 Bad Bentheim
Postfach 1253 48443 Bad Bentheim

Phone: +49-5922/72-80
Fax: +49-5922/72-457

E-Mail: info@bentec.de
Web: www.bentec.com

Bentec GmbH Drilling & Oilfield


Systems
Respubliki str. 252, bild.1 office 1-06
625014 Tyumen
Bentec GmbH Drilling & Oilfield
Systems
Russia Representation Office
1. Kasatschij per. 7, room 13
109017 Moscow

Phone: +73452261479

E-Mail: info@bentec.de

Phone: +7 495 234 42 38


or 39
Fax: +7 495 234 42 40

E-Mail: bentec@yandex.ru

Bentec GmbH Drilling & Oilfield


Systems
Turkmenistan Representation Office
Azadi Street 95 / 2011
744000 Ashgabat

Phone: +99 312 395 561


Fax: +99 312 352 169

E-Mail:
bentec.ashgabat@mail.ru.de

Bentec GmbH Drilling & Oilfield


Systems
Kazakhstan Branch
Kabanbai Street 172
RK 480012 Almaty

Phone: +7 32 92 571 321


Fax: +7 3292 571 321

E-Mail: benteckz@gmx.de

IDTEC
International Drilling Technology
Co.LLC
P.O.Box 1278
PC 133 Al Khuwair

Phone: +968-2459-0103
Fax: +968-2459-0163

E-Mail:
mick@idtecoman.com

Russia

Turkmenistan

Kazakhstan

Oman

===== Ende der Stckliste =====

Page 33 of 33

Das könnte Ihnen auch gefallen