Warren, Mayor
Site 5
Site 4
Site 3
Site 2
Site 1
CITY OF ROCHESTER, NY
REQUEST FOR PROPOSALS INNER LOOP EAST DEVELOPMENT SITES
SITES AVAILABLE FOR SALE & DEVELOPMENT
FIVE (5) SEPARATE & DISTINCT SITES ON UNION STREET
(FORMER INNER LOOP EAST)
DATE ISSUED:
ISSUED FOR:
ISSUED BY:
CITY OF ROCHESTER
DEPT. OF NEIGHBORHOOD & BUSINESS DEVELOPMENT
30 CHURCH STREET, RM. 005-A
ROCHESTER, NY 14614
INFORMATION
SESSION:
SUBMISSION
DEADLINE:
CONTACT:
TABLE OF CONTENTS
Section 1.
Section 2.
Section 3.
Section 4.
Section 5.
Section 6.
Section 7.
Section 8.
Section 9.
Present the highest and best use for the location in general, and the Sites specifically;
Return the sites to the tax roll and increase the Citys tax base;
Integrate the neighborhoods formerly divided by the Inner Loop highway; and,
Note: While five (5) sites are available through this RFP, you may submit a proposal for one to
all five of the Sites in the same proposal). If submitting for more than one site, please discuss
each site in a distinct and separate section from the others within your proposal. Because the
City will likely select more than one Developer for the sale and development of all the sites, this
will allow easier review of proposals for each site.
Site Description
The Sites are located within the former bed of the eastern section of the Inner Loop, on the eastern
border of the central business district. It is bounded roughly by Howell Street to the south, Pitkin Street
to the west, the Haags Alley alignment to the north, and what will be the newly reconstructed Union
Street to the east. The Sites enjoy convenient access to Interstate 490. Once completed, the new
Union Street will become a two-lane street with a center turn lane. On the western side of the new
Union Street, immediately adjacent to the development sites, there will be an 8 ft. recessed parking
lane, 5 ft. grass tree lawn, 10 ft. 2-way cycle track, another 5 ft. tree lawn, followed by a minimum 5 ft.
sidewalk. There will be playful elements such as whimsical bike racks, chess pieces for bollards,
Legos, etc., incorporated in the public right of way around the Museum of Play.
-----------------------------------------------------------------------------------------------------------------------------------------RFP Inner Loop East Development Sites
Page 2
City of Rochester, NY
1
5
The Sites are in the vicinity of a mix of residential, retail, cultural, commercial, institutional, open space
and parking uses. More specifically, the Sites are within easy walking distance of vibrant
neighborhoods such as the East End, East & Alexander, Park Avenue, and Monroe Avenue. Attractive
amenities to be found around the Sites include the East and Alexander bar district, Restaurant 2-Vine,
Harts Local Grocers, The Little Theatre, Spot Coffee, Metro Center YMCA, the Eastman Theater and
The Strong Museum. This neighborhood is an expanding residential and entertainment area.
Ownership of the Sites is in the process of being transferred to the City of Rochester from the State of
New York. They were reclaimed from a former below grade expressway, which is being removed and
filled in to create several acres of shovel ready development land.
Summary of Parcel Data
Name:
Tax IDs:
Ownership:
Location:
Current Use:
Zoning:
Sites Area:
The area being offered contains five (5) sites with a combined land area of
approximately 235,224 square feet or 5.4 acres
Site 1 (Haags to Charlotte) = 0.52 acres
Site 2 (Charlotte to East) = 1.37 acres
Site 3 (East to Broad) = 0.68 acres bisected by a driveway easement for 255
East Avenue
Site 4 (Broad to Savannah) = 0.97 acres
Site 5 (Savannah to Howell) = 1.99 acres
Access:
Direct access is available from Charlotte Street, Pitkin Street, Union Street and
Howell Street. Vehicular access from Union Street is discouraged.
6 combined sewer tunnel (underground at approx. 20 depth); this will create restrictions on
foundation design, weight and access near the easement imposed by Monroe County Pure
Waters Development Review Office
Vehicular access restrictions all access must be from Charlotte Street; parcel is without
access along Union Street;
Inner Loop Phase 2 may eliminate Pitkin Street along this parcel; and
Future utility connects will be made from Charlotte Street not Union Street.
6 combined sewer tunnel (underground at approx. 20 depth); Manhole access point for 6
combined sewer tunnel (surface level approx. 75 sf; disrupts the Union Street frontage); The
sewer tunnel will create restrictions on foundation design, weight and access near the
easement imposed by Monroe County Pure Waters Development Review Office
Vehicular access restrictions all access must be from Pitkin Street;
Utility easement for Monroe County Pure Waters; and
Future utility connects will be made from Pitkin Street not Union Street.
Nationally Renowned Destination for Play & Music filling a Growing Market Niche;
A New Neighborhood Center & Urban Village Main Street Filled with a Density of New Residents;
Connected Neighborhoods & Destinations;
Both Visionary (Iconic & Critical Mass) Development and Incremental Development Opportunities;
Heavily Programmed Neighborhood and Streets;
Residents with Healthy & Lively Lifestyles;
A Reputable & Proud Address to Live and to Work; and
Unique Urban Shopping Experience with Convenience, Specialty Retail, Play, Sports, Music and
other Themed Retail.
Philip Michael Brown Studio also prepared a document titled Inner Loop East Design Vision and
Recommended Principles (see Resources) that provides an overall conceptual design vision for the
future development of the Sites. He contends that high standards of architectural and urban design
quality should be achieved in the careful development of the Sites. The rendering below is an
example of what the corner of Union Street and the new Charlotte Street extension could look like,
when looking southwest from Union.
Additionally, designs should promote healthy, playable, engaging and interactive walkable
environments. Play elements promote community building, health, tourism, and bring families, young
professionals and economic development to the area. For examples of play infrastructure, please visit
"playable city" resources at www.playrocs.org.
Connect to and reinforce adjacent neighborhoods and public spaces, especially Dr. Martin Luther
King Jr. Memorial Park and the future expansion of Strong Museum of Play;
6. Not propose additional vehicular crossing of the new Union Street separated bicycle lane (cycle
track);
7. Have architectural features to reinforce prominent corners and gateways, especially the
intersection of East and Union;
8. Use high quality materials;
a.
b.
c.
d.
e.
f.
9. Support and build upon the Strong National Museum of Play: a nationally and internationally known
institution located within the neighborhood.
Approvals
Development of the Sites will require a number of approvals from the City of Rochester. At a minimum, the
following approvals will be required:
Rochester City Council (for land sale);
City Bureau of Planning and Zoning (for site plan review and approval); and
State Environmental Quality Review.
Developers Name;
Developers Street Address;
City, State & Zip;
Mailing Address if different from Street Address;
Contact Person Name, Title;
Telephone Number;
Email Address;
Fax Number;
Federal Taxpayer I.D. Number; and
This proposal is for (check all that apply): Site 1 ___; Site 2 ___; Site 3 ___; Site 4____; Site 5____.
Site plan including how the proposed building will be oriented on the Sites, and showing building
elements, landscaping, parking and access (vehicular and pedestrian);
Description of land use types, styles and number of bedrooms/square footage proposed for each
land use type; and
Infrastructure requirements.
Note: Detailed perspectives, renderings, 3D modeling and electronic presentations are not
required; however, they may enhance understanding of the proposal.
Digital presentation material on CD may be submitted to supplement the proposal hard copies.
Number of buildings to be developed on each Site, specifically the types of use for each building
and number of residential units, commercial units, or whatever is proposed;
Square footage by proposed uses, number and, if applicable, size of housing units broken down by
floor;
Describe your understanding of the 2014 Center City Master Plan Update, the ILE vision, and the
recommended design concepts for the Sites and the district as a whole, and state how your design
plays to these guidelines;
Key development components with an explanation of relevance for each component;
How the project responds to the environmental conditions and findings of the Site; and
Any unique and/or highlighted features and how these features will be beneficial.
G. Marketing plan
Please include a marketing plan that includes, at a minimum, the following items:
1.
2.
3.
4.
C. Financing Plan:
1. Economic feasibility/financial soundness of project budget/Proforma, with Sources and Uses;
2. Ability to secure project funding/financing (i.e. commitment of funds already in place);
3. Level of Developer cash equity in the project; and
4. Impact on the tax base.
Please note: Preference will be given to proposals showing:
- The highest economic benefit to the public; and
- The lowest or no public subsidy necessary to complete the project.
D. Experience:
1. Developer must demonstrate proof of having completed projects similar in scope and size;
2. Developer must demonstrate ability to complete proposed project; and
3. Experience working with public/private partnership.
E. Project Schedule:
The Developers ability to complete the projects in a timely manner.
Upon initial review of the submitted proposals, the evaluation team may choose to establish a short-list for
subsequent interviews, may require the submission of more detailed information related to the financial
condition of the development company (company financial statements, personal financial statements, global
real estate report, etc.). Any additional financial information provided will be confidential and not subject to
the Freedom of Information Law. All RFP respondents will be notified if and when a short-list is established.
The City reserves the right to accept or reject any and all submissions.
Rights Reserved
A. Only submissions that comply with all the objectives, provisions and requirements of this Request for
Proposals (RFP) will be considered for review by the City of Rochester (City).
B. The City reserves the right to independently investigate or request clarification of the contents of any
proposal, including requesting that any prospective purchaser provide additional information, or make a
presentation before the final selection is made.
C. All materials submitted in response to this RFP become the property of the City, without obligation of the
City to return such materials.
D. All determinations of completeness of any submission and compliance with the objectives, provisions and
requirements of this RFP, and the eligibility or qualification of any developer, shall be at the sole and
absolute discretion of the City.
E. Subsequent to the submission of the proposals, the City, in its sole and absolute discretion, may enter into
parallel negotiations with two or more developers, may designate two or more developers for short list
consideration, may request best and final offers and/or may conduct competitive proceedings with respect to
the potential disposition of the property described in this RFP. This is not a competitive process; the City
will assess proposals and select developers in its sole and absolute discretion.
F. The City of Rochester may waive any of the provisions, requirements, terms and conditions of this RFP.
G. The City reserves the right to cancel or reissue the RFP at its sole discretion and that the City shall have no
liability for any costs incurred in preparing a proposal.
H. The City reserves the right to issue an addendum should it become necessary to revise any section of this
RFP, provide additional information necessary to adequately interpret provisions and requirements of this
RFP, or respond to written inquiries concerning the RFP.
I. The City reserves the right at its sole discretion to accept or reject any and all proposals received as a result
of this RFP, to waive minor irregularities, to withdraw from the sale of the property, to elect not to proceed
with the process set forth in this RFP, and to conduct discussions with all responsible respondents, in any
manner necessary, to serve the best interest of the City of Rochester.
J. The City has no obligation to discuss its reasons for selecting, accepting or rejecting any proposals with any
proposers or representatives of said proposers.
K. The City shall not be liable for any costs or expenses (including but not limited to the foregoing costs and
expenses of legal counsel) incurred by any proposer in responding to this Request.
L. All costs and expenses incurred by each proposer in connection with this RFP will be borne by the proposer,
including without limiting the foregoing, all costs and expenses in connection with: surveys, reports, plans,
designs, schematics, studies, research and any other due diligence work; preparation of each proposal;
advice and representation of legal counsel responding to this RFP.
M. The City reserves the right to withdraw from, or lease any or all of the properties for which the City has
made a public request for Proposals at any time prior to approval by Rochester City Council.
N. Proposals shall be accepted from principals only. No brokerage fees, finders fees, commissions or other
compensation will be payable by the City in connection with selection of a developer.
O. Should it become necessary to review any part of this RFP, provide additional information necessary to
adequately interpret provisions and requirements of this RFP, or respond to written inquiries concerning this
RFP, the City reserves the right to issue Addenda to the RFP and post it to the City website
(http://www.cityofrochester.gov) it is the responsibility of all interested parties to regularly check the City
website for any Addenda. The City reserves the right to extend the Submission Deadline by a reasonable
time.
P. The City of Rochester has the right in its sole and absolute discretion to reject any and all proposals, to
accept any proposal and to elect not to proceed with the process set forth in this Request for Proposals.
Transmittal letter with all 10 items listed in section 6A of RFP (No exceptions)
B.
Summary to include Narrative summarizing overall proposal; Vision; and Justification for highest
and best use
C-1
C-2
C-3
C-4
D-1
D-2
Project Costs and Funding Standardized Sources & Uses Form for construction & permanent
phases
D-3
Project Costs and Funding Expected terms for all sources for financing
D-4
D-5
D-6
Project Costs and Funding Statement about requiring COMIDA/City tax abatements
D-7
The following items, E-1 to I, below need only be provided once for the entire proposal:
E-1 Development Team Listing and organization chart showing development team members
E-2
E-3
F-1
Developer Experience List current projects & commitments for next 24 months
F-2
G.
Marketing Plan
H.
I.
Yes
N/A
USES OF FUNDS
PROJECT:
USE
ESTIMATED COST
Property Acquisition
Professional Fees (Arch., Legal, Eng., etc)
Site Work/Mobilization/Staging
Construction Costs
FF&E/Finishes
Financing Fees/Carrying Costs/Closing Closing Costs
Contingency
Other:
Other:
Other:
TOTAL
Additional Comments:
NOTES
SOURCE
AMOUNT
NOTES
SOURCE
AMOUNT
NOTES
ROCHESTER CITY:
INNER LOOP ART.
(NORTH STREET TO GEORGE STREET) F.A.C. 63-23
THE PEOPLE OF
THE STATE OF NEW YORK
UNDER PRESENT JURISDICTION OF
THE STATE OF NEW YORK
DEPARTMENT OF TRANSPORTATION
PARCEL SUMMARY:
Type: CONVEYANCE
Portion of 2013 Tax Map
Ref. No. 106.81-2-NO I.D.
City of Rochester
County of Monroe
State of New York
IAN
RID
ME
UE
TR
Point of Beginning:
Parcel No: 502
N:
OF
E
TH
16"
PINE
M-469
P-479
WOA
16"
PINE
TE
GRANI
STA U 54+38.46
1962
85.60
STA U 54+38.81
1961
1961
M-424
P-431
WOA
HAAGS ST
ON ST
N UNI
ONE WAY
PAVERS
CNCv
2"
1
MAPLE
Uv
54+00
GRANI
TE
STOP
ON ST
N UNI
CHARLOTTE ST
PARKI
NG FOR UNI
ON PLACE ONLY
CONCRETE
PAVERS
WALL
CONCRETE
SURVEY BASELINE
ELEC
CONCRETE
ELEC
1
#1
CS 9+50
cvPROP.vIMP.
1961
RCS
TE
GRANI
W/ DH
CONCRETE
1961
M-423
P-430
WOA
#12
CHARLOTTE STREET
(R.
O.
W. 50 )
2012 SURV
EY BASELI
NE
1961
M-422
P-429
WOA
EXIST. HWY.
BDY.
GRANITE
USN 16+00
M-421
P-428
WOA
ASPHALT
90
1
Y-
M-420
P-427
WOA
Uv
53+00
cv
PROP.
v
IMP.
USN 17+50
GRANI
TE
ASPHALT
USN 16+50
TE
GRANI
18"
PINE
HAAGS ALLEY
(R.
O.
W. 15 )
EXIST. HWY. BDY.
CP 220 (
STA Uv
52+
40.
97)
N 1
,
1
51
,
927.
1
40
2012
E 1
,
41
1
,
805.
077
USN 18+00
Y2M
NYS
EXIT
RAMP
GRANI
TE
CS 10+50
C
NG TRAFFI
MERGI
940T/4362/3D01
ONE WAY
CS 11+00
GRASS
R=8.00
L=12.53
TO 490
<-
STA U 52+91.49
14"
PINE
1961
USN 17+00
STA U 52+99.49
1962
M-419
P-426
WOA
NG
NO STOPPI
ME
ANYTI
85.61
M-470
P-480
WOA
STREET
LI
NK FEN
CE
GRASS
P.T.
NYS
CHARL
OTTE
6 CHAI
N
GRASS
1961
M-417
P-423
WOA
B.SEWER
6 TUNNEL COM
STA U 54+23.81
M-416
P-422
WOA
TE
GRANI
P.O.C.
0/M
1
B1
L
DE RAI
GUI
H
W
Y
.
85.60
P.C.
TE
GRANI
CONC
BOXBEAM
L
DE RAI
GUI
CS 11+50
VEMENT
EDGE OF PA
TE
NI
GRA
1961
DY.
.B
HWY
M-419
P-470
W/A
ST.
EXI
2 STORY
WOOD FRAME
#89
CS 12+00
SR5M
2
1
B1
50
16+
PS
PARCELS 502&503
93.57
AY
BOL
ONE W
C SYM
AFFI
NG TR
MERGI
.
IMP
GHTS
I
v
P.
TWO L
PRO
cv
NO LEFT
TURN SYMBOL
STOP
P.O.B.
1961
cvPROP.vIMP.
CS 12+50
GRANITE
. M3-C
746 SQ. FT
22,
P502
522 ACRE
0.
CS 13+00
VEMENT
EDGE OF PA
MERGE
SYMBOL
E
NK FENC
LI
NYS
GRASS
+00
PS 17
GRANITE
INNER LOOP
SOUTHBOUND
N
6 CHAI
TE
GRANI
TE
GRANI
+50
PS 17
NCE
NK FE
LI
14"
LOCUST
TO BE
PROPERTY
D
QUITCLAIME
MP
EXIT RA
N
I
6 CHA
IMP.
v
.
PROP
cv
+00
PS 18
TE
CONCRE
2
MAPLE
BDY. 0"
STA U 52+90.74
ONE WAY
1961
1961
14"
LOCUST
WBEAM
M-418
P-424
WOA
P.L.P. &
INNER LOOP
ND
NORTHBOU
M-415
P-421
WOA
TE
GRANI
GRASS
TE
GRANI
NK FENCE
N LI
6 CHAI
TE
GRANI
M-418
P-425
W/A
246.41
CHARLOTTE STREET
(R.
O.
W. 50 )
CONCRETE CONCRETE
EXIST. HWY.
BDY.
90
1961
CONCRETE
0.
28
AY
ONE W
+50
PS 18
EET
N STR
PITKI
NG
RKI
NO PA
MES
W/ TI
TTE
CHARLO
00
1
ST 1
EXIST.
HAAGS AL
L
EY
15.00
STA U 54+23.46
TE
GRANI
GRAVEL
GATE POSTS
15.20
268.25
.
Y. BDY
. HW
EXIST
CE
NK FEN
LI
AY
ONE W
N ST
TKI
PI
ALLEY
HAAGS
STOP
N
4 CHAI
TE
CONCRE
GATE
POST
6"
SUMAC
16"
PINE
16"
PINE
ASPHALT
1961
2"
1
BASSWOOD
1961
1961
NG FOR
PARKI
ON PLACE ONLY
UNI
M-414
P-420
WOA
16"
PINE
ASPHALT
M-413
P-419
WOA
NCE
NK FE
LI
1961
M-412
P-418
WOA
USN 18+50
M-411
P-417
WOA
1961
HAAGS ALLEY
(R.
O.
W. 15 )
6"
CHERRY
CP 10 (STA Uv56+06.12)
N 1,152,265.417
N
I
6 CHA
TE
GRANI
TE
GRANI
+00
PS 19
ONE
WAY
EXIST. HWY.
BDY.
M-410
P-416
WOA
270.71
ELEC
WITH RISERS
E 1,411,942.550
08B
1
TE
CONCRE
PROPERTY TO BE
QUITCLAIMED
5
n3
78
E:
RGE NO#
RTC 6
DE
ITU
NG
LO
AT
ST
WE
H
RT
NO
E:
20
40
20
1" = 40
PREPARED BY
ANTHONY CRETELLE
CHECKED BY
SEAN BALDWIN
FINAL CHECK BY
60
80