Beruflich Dokumente
Kultur Dokumente
Proposal
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 1 of 47
Training Proposal
Contents
1 Training Solution ..................................................................................................................... 3
1.1 Training Projects........................................................................................................................................ 4
Data Service Quality Improvement Training .............................................................................................. 5
RAN Refined Quality Improvement solution ............................................................................................. 6
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 2 of 47
Training Proposal
1 Training Solution
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 3 of 47
Training Proposal
Business Aspects
Training Path
Traffic Operation Management
MBB Development Trend
Overview
ILT
1D
ILT
ILT
3D
ILT
1.5D
5D
SQM Analysis
Engineer(service )
ILT
3.5D
Data Service
ILT
Voice and
SMS Service
SQM Monitoring
Engineer(service )
ILT
NPM Monitoring
(CS,PS,IP)
3.5D
3.5D
ILT
system Enigneer
ILT
3D
1.5D
ILT
ILT
4D
1D
ILT
ILT
4D
ILT
4D
8.5D
ILT
1D
ILT
CS Probe(SPM) Training
PS Probe Training
ILT
1D
6.5D
ILT
4D
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 4 of 47
Training Proposal
Level
Centralized
Training
(Workdays)
Engineering
Practice
(Days)
Number
of
Trainees
IV
6 to 12
persons
IV
6 to 12
persons
IV
6 to 12
persons
IV
0.5
6 to 12
persons
IV
6 to 12
persons
IV
6 to 12
persons
IV
6 to 12
persons
Courseware
1 Traffic Management
MBB Traffic Management
III
6 to 12
persons
IV
0.5
6 to 12
persons
IV
0.5
6 to 12
persons
IV
6 to 12
persons
IV
1.5
6 to 12
persons
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 5 of 47
Training Proposal
Project
Level
Centralized
Training
(Workdays)
Engineering
Practice
(Days)
Number
of
Trainees
Courseware
IV
0.5
IV
6 to 12
persons
6 to 12
persons
IV
0.5
6 to 12
persons
IV
0.5
6 to 12
persons
IV
6 to 12
persons
IV
1.5
6 to 12
persons
3Monitoring Position
Mobile Service Quality &User Experience Monitoring Topic(With SEQ Anlyst Platform)
SEQ Analyst Platform
III
0.5
6 to 12
persons
III
6 to 12
persons
III
6 to 12
persons
III
0.5
6 to 12
persons
III
6 to 12
persons
III
6 to 12
persons
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 6 of 47
Training Proposal
Project
Level
Centralized
Training
(Workdays)
Engineering
Practice
(Days)
Number
of
Trainees
CS Performance Monitoring
Training( M2000)
III
6 to 12
persons
PS Performance Monitoring
Training( M2000)
III
6 to 12
persons
Courseware
2.5
6 to 12
persons
6 to 12
persons
4.5
6 to 12
persons
6 to 12
persons
6 to 12
persons
6 to 12
persons
PS Probe Training
0.5
6 to 12
persons
CS Probe(SPM) Training
0.5
6 to 12
persons
6 to 12
persons
4System Administrator
Smartcare Platform and Probe Training
NOTE
Level I indicates primary training projects. Level II indicates intermediate training projects. Level III indicates advanced
training projects. Level IV indicates expert training projects.
COMMERCIAL IN CONFIDENCE
Page 7 of 47
Training Proposal
Training Path
Telecom Development Trend
and MBB Challenges
WR30
Lecture
0.5 days
Lecture
0.5 days
Intended Trainees
Management personnel, marketing personnel, market analysis personnel, and traffic management personnel
Objectives
After the completion of this training project, you will be able to:
Content
Telecom Development Trend and MBB Challenges
Describe the definition of traffic management and comparison between traffic and data volume.
Describe the strategy and policy and traffic management.
Describe the development policies of smart pipe.
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 8 of 47
Training Proposal
Training Duration
1 workday
Number of Trainees
6 to 12 persons
1 day
Intended Trainees
Objectives
After the completion of this training project, you will be able to:
Know MBB traffic operation solution and key technology and fuction
Content
Traffic Management Description
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 9 of 47
Training Proposal
Describe the definition of traffic management and comparison between traffic and data
volume.
Describe the strategy and policy and traffic management.
Describe the development policies of smart pipe.
Describe how to transform traffic management.
Describe Huawei MBB traffic management solutions.
Describe new business models of data volume marketing in the MBB era.
Introduce the traffic management and O&M related solutions.
MBB Traffic Operation key technology Overview
Traffic Operation key technology theory ,protocol , scenarios application and
deployment.-PCC,SA,Smartcare, SmartPCC and ISOP
Training Duration
1days
Number of Trainees
6 to 12 persons
2 day
Intended Trainees
Objectives
After the completion of this training project, you will be able to:
Understand MBB Traffic management network supporting key technologyProtocol
technical frameworkapplication scenarios and 3GPP trends of SA, PCC,E2E Qos service
Know the deployment of differential service.
Know Huawei Solution application.
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 10 of 47
Training Proposal
Content
MBB Traffic Operation Key technology
MBB Traffic Operation key technologyService Awareness(SA)(Protocal, technology
Training Duration
2days
Number of Trainees
6 to 12 persons
0.5
day
Intended Trainees
Objectives
After the completion of this training project, you will be able to:
Know industry data analysis trend , driven power and solution
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 11 of 47
Training Proposal
Training Duration
0.5days
Number of Trainees
6 to 12 persons
1 day
Intended Trainees
Data service market analysts and other analysts that need to learn about data services
Objectives
After the completion of this training project, you will be able to:
Have the basic analysis ways in dimensions such as service, subscriber, terminal, and area.
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 12 of 47
Training Proposal
Content
PS Data Service Analysis
Trend analysis:
Analyze traffic trend of each cell and find busy cells.
Analyze subscribers with no traffic consumption, and identify opportunities for increasing service values.
PS Data Service Analysis on the Subscriber Dimension
Project requirements:
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 13 of 47
Training Proposal
Analysis methods:
Describe the main analysis methods, analysis elements, and conclusions.
Training Duration
1 workday
Number of Trainees
6 to 12 persons
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 14 of 47
Training Proposal
WR34
0.5 day
0.5day
WR34
0.5 days
0.5 day
0.5 day
0.5 day
0.5 day
Intended Trainees
PS and Core Network Engineer
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 15 of 47
Training Proposal
Objectives
After the completion of this training project, you will be able to:
Use the GGSN and UGW to experience services, identifying specific traffic.
Use GGSN and UGW to manage bandwidths, restricting the bandwidths for specific traffic.
Implement content-based charging for traffic based on the service experience of the GGSN and UGW.
Understand QoS requirements of various services and common service guarantee methods.
Complete QoS related data configuration on each NE together with related policies.
Complete the analysis, configuration, and verification of traffic-based typical FUP application policies.
Content
PCC principle
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 16 of 47
Training Proposal
Introduce the differences between PCC static rules and PCC dynamic rules and the application scenarios.
Analyze original user requirements.
Plan the services of predefined rules.
Complete the configuration of predefined rules using instances.
Training Duration
4 workdays
Number of Trainees
6 to 12 persons
Lecture
0.5 days
2014-01-13
Lecture
0.5 days
COMMERCIAL IN CONFIDENCE
Page 17 of 47
Training Proposal
Intended Trainees
Marketing personnel, market analysis personnel, traffic management personnel, and policy deployment personnel
Having completed section Mobile Data Service Deployment PCC Service Policy Design and Differentiated
Deployment.
Objectives
After the completion of this training project, you will be able to:
Content
Gx Interface Signaling Analysis
Training Duration
1 workday
Number of Trainees
6 to 12 persons
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 18 of 47
Training Proposal
Training Path
MBB Mobile data QoE
improvement overview
WR90
0.5 days
0.25 days
Intended Trainees
MBB technical personnel and network assessment and optimization personnel
Objectives
After the completion of this training project, you will be able to:
tLearn about the scenarios of visible O&M and service experience of the MBB.
Content
EY14 MBB Data Quality of Experience (QoE) Improvement Topic
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 19 of 47
Training Proposal
Training Duration
1 workday
Number of Trainees
6 to 12 persons
WR90
0.5 days
WR91
0.5 days
1 day
2014-01-13
1.5 days
COMMERCIAL IN CONFIDENCE
Page 20 of 47
Training Proposal
Intended Trainees
RAN data service analysis and optimization engineers
Objectives
After the completion of this training project, you will be able to:
Learn about the system architecture for MBB E2E data QoS improvement.
Describe the service scenarios of the SEQ Analyst platform, including KQI description and SEQ Analyst
application management.
Be familiar with the basic KQI models of typical services of the KPI system and learn about the difference and
relationship between KPI and KQI.
Understand the RAN service associated URAN, coverage problem, air interface interference, and data analysis
methods.
Content
MBB E2E Mobile Data QoS and Solutions to Data Service QoE Improvement
Understand the visible, assessable, and manageable QoS system architecture for MBB E2E mobile data.
Describe the MBB O&M, including visible and smart O&M, VIP service improvement, and QoE
improvement.
Describe the basic KQI models of typical services (for example, WAP and Web) of the KPI system and
introduce the difference and relationship between KPI and KQI.
TCP packet analysis and demarcation.
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 21 of 47
Training Proposal
Training Duration
3.5 workdays
Number of Trainees
6 to 12 persons
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 22 of 47
Training Proposal
Lecture
WR93
WR94
Target Audience
Data Service Optimization engineers
Prerequisites
Objectives
On completion of this program, the participants will be able to:
Training Content
Duration
3.5 working day
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 23 of 47
Training Proposal
0 d
0 5d
Target Audience
Core network operation and maintenance engineers, optimization engineers
Prerequisites
At least two years experience of operation and maintenance of GSM NSS/UMTS CS or other
telecommunication equipments
A basic knowledge of core network optimization
Objectives
On completion of this program, the participants will be able to:
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 24 of 47
Training Proposal
Training Content
Voice and SMS Evaluation and Optimization Training
Successful MO flow
Successful MT flow
2014-01-13
Page 25 of 47
Training Proposal
SMMO flow
SMMT flow
Duration
3working days
Class Size
Min 6, Max 12
1 5d
Target Audience
Mobile broadband technical engineers and network assessment and optimization engineers
Prerequisites
Objectives
On completion of this program, the participants will be able to:
Training Content
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 26 of 47
Training Proposal
Duration
1.5 working day
Class Size
5
Intended Trainees
Optimization and O&M engineers of RAN data, PS, and CS
Objectives
After the completion of this training project, you will be able to:
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 27 of 47
Training Proposal
Learn about KQI definitions of typical services and related concepts and standard protocols of CEM.
Content
Training Duration
3 workdays
Number of Trainees
6 to 12 persons
PS NPM/SQM Scenario
Application
Lecture and hands-on exercise
Intended Trainees
Optimization and O&M engineers of RAN data, PS, and CS
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 28 of 47
Training Proposal
Objectives
After the completion of this training project, you will be able to:
Learn about KQI definitions of typical services and related concepts and standard protocols of CEM.
Content
Training Duration
1 workdays
Number of Trainees
6 to 12 persons
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 29 of 47
Training Proposal
OWB92
1d
Target Audience
Field Maintenance Engineers, First line Maintenance Engineers, Routine Maintenance Engineers
Prerequisites
Objectives
On completion of this program, the participants will be able to:
Training Content
OWB92 PS Product Survey Training
PS Product Basic
OWB92 PS Performance Monitoring Training
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 30 of 47
Training Proposal
Duration
2 working day
Class Size
Min 6, Max 12
Prerequisites
M2000 Operator Training
Lecture, Hands-on exercise
2d
2d
Alarm Monitoring
Lecture, Hands-on exercise
0 5d
Performance Monitoring
Lecture, Hands-on exercise
0 5d
Target Audience
CS Field Technician, First Line Operation and Maintenance Technician and Engineer
Prerequisites
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 31 of 47
Training Proposal
Objectives
Product Description
CS Product Basic
CS product hardware and structure
M2000 Operator Training
M2000 client alarm management
M2000 client performance management
Alarm Monitoring
MSOFTX3000 Alarm monitoring and handling
UMG8900 Alarm monitoring and handling
HLR9820 Alarm monitoring and handling
Performance Monitoring
MSOFTX3000 performance monitoring and management
UMG8900 performance monitoring and management
HLR9820 performance monitoring and management
Duration
Min 6max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 32 of 47
Training Proposal
Prerequisites
Product Basic
1.5d
Lecture
U2000 Introduction
Lecture,Hands-on exercise
0.5d
Transmission Field Technician, First Line Operation and Maintenance Technician and Engineer
Prerequisites
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 33 of 47
Training Proposal
Training Content
Product Basic
System structure of SDH/RTN/SYNLOCK equipment
Hardware structure of SDH/RTN/SYNLOCK equipment
Main features of SDH/RTN/SYNLOCK equipment
U2000 Introduction
iManager U2000 System Introduction
Telecommunications Management Network Concept
Network Management Layer of U2000
U2000 System Architecture
Interfaces of U2000
Managed Equipment of U2000
Hardware and Software Requirement
The User Interface of U2000
Processes of U2000
NMS Maintenance Suite: MSuite
License Introduction
Directory Structure of U2000
KPI Performance Monitoring and Analysis
Alarm Severity and Category
Alarm Status
Alarm Viewing and Operations
Alarm Template
Alarm Setting Operations
Alarm Dumping
Performance Events Type
Performance Monitoring Setting
Performance Viewing Operations
Performance Data Dumping
Duration
Min 6max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 34 of 47
Training Proposal
Prerequisites
Transmission Network Capacity
Assessment
Lecture, Hands-on exercise
3d
3d
Target Audience
Transmission Field Technician, First Line, and Second Line Operation and Maintenance Technician and
Engineer
Prerequisites
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 35 of 47
Training Proposal
Overview
Network Overview
Network Statistic
SDH Network clock, ECC and DCN support ability assessment key point
2014-01-13
Trail optimization
COMMERCIAL IN CONFIDENCE
Page 36 of 47
Training Proposal
Given assessment
Duration
Min 6max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 37 of 47
Training Proposal
Prerequisites
Product Description
Lecture
2.5d
0.5d
0.5d
1d
Target Audience
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 38 of 47
Training Proposal
Product Description
S Switch Product Description
NE40E-X Series Product Description
CX600-X Series Product Description
ME60-X Series Product Description
ATN Series Product Description
Eudemon1000E/8000E Series Product Description
U2000 System Introduction
The architecture and main features of U2000
The directory structure of U2000
The main functions of U2000
How to discover devices on U2000
How to configure Telnet/Stelnet on U2000
How to synchronize the device and U2000
Performance KPI Introduction
IP network KPI definition
KPI monitoring
Performance Monitoring and Analysis
The performance counter categories and the difference between them
The performance object categories
Query the performance result by the setting conditions
Export the performance result file
Define the performance query template
Check the performance task status
User Resources Monitoring
Duration
Min 6, max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 39 of 47
Training Proposal
Prerequisites
IP Network Capacity Monitoring
0.5d
Lecture
0.5d
Target Audience
1 working day
Class Size
Min 6, max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 40 of 47
Training Proposal
Prerequisites
Alarm Monitoring
0.5d
Lecture
0.5d
Target Audience
Alarm Monitoring
The alarm categories and levels
The alarm processing ability supported by the U2000 server
Browse the current alarms
Query the specified alarms by conditions set manually
Redefine the alarm level in U2000 and NE
Modify the alarm name in U2000 and NE
Set the shield condition in U2000 and NE
Performance Alarm Troubleshooting
Preventive Maintenance Tools Introduction
Troubleshooting process introduction
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 41 of 47
Training Proposal
1 working days
Class Size
Min 6, max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 42 of 47
Training Proposal
Training Path
1d
Target Audience
Prerequisites
None
Objectives
Describe SEQ Analyst Network position, system structure, feature, function and interface protocol
Describe hardware structure and function of different parts of SEQ Analyst
Describe software structure and function of different software sub-system of SEQ Analyst
Describe System Dimensioning & Network Design of Connection ,Interfaces design and Data
Configuration
Perform System Operation & Maintenance
Perform System Support & Troubleshooting
Describe and Perform the function of NPM, CEM and SQM of SEQ analyst
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 43 of 47
Training Proposal
Training Content
System Overview
SEQ Analyst Network position, system structure, feature, function and interface protocol
Hardware structure and function of different parts of SEQ Analyst
Software structure and function of different software sub-system of SEQ Analyst
Duration
3 working days
Class Size
Min 6, max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 44 of 47
Training Proposal
Training Path
PS Probe Training
1d
Target Audience
Prerequisites
None
Objectives
Duration
1 working days
Class Size
Min 6, max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 45 of 47
Training Proposal
Training Path
CS Probe Training
1d
Target Audience
Prerequisites
None
Objectives
Duration
Class Size
Min 6, max 12
Training Path
2d
Target Audience
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 46 of 47
Training Proposal
Prerequisites
None
Objectives
Describe the networking and function of SEQ Analyst and IMS probe
Describe the hardware and software structure of SEQ Analyst and IMS probe
Describe the application scenario of SEQ Analyst and IMS probe
Describe the interface and protocol of SEQ Analyst and IMS probe
Perform O&M of SEQ Analyst and SEQ Analyst and IMS probe
Perform Real-time trace &History Records Query
Perform IMS network performance analysis
Perform IMS NPM/SQM real-time Monitoring
Training Content
Duration
2 working days
Class Size
Min 6, max 12
2014-01-13
COMMERCIAL IN CONFIDENCE
Page 47 of 47