1. Introduction.
The T13 Zone mainly covers the Heerassagala Road, Bodiyangana
Mawatha, Mada bowala road, part of Dangolla, Udelke Road, Part of
Sirimavo Bandaranayake mawatha (Old Peradeniya road) from Gatambe
junction upto Heerassagala road, angampitya road and William Gopallawa
MW. Within the zone T13 Kandy court complex, Royal Mall, Okeray
Regency hotel and Kandian art are the major water consumers in the zone.
Northern boundary of the zone is Primrose Ridge (Ending points of by road
of Old Peradeniya road) and Zone T12, eastern boundary is Zone T09 and
Upper side of Heerassagala road, Southern boundary is deiyange ela and
the western boundary is Gatmbe junction and Angampitiya Road. This
zone T13 has elevations ranging from 602 MSL at the branch sewer
starting point of Heerassagala road to 469 MSL at angampitiya road.
Hotels such as okaray regency are willing to pump their waste water from
the basement floors much below the road surface level of the road Devani
Rajasinghe mawatha, and this attitude is good sign for the betterment of
the project.
2. Surveying comparison
We compare the details of the tender proposal drawings and topographic
surveying of the detail design at following locations.
- Major junction levels
- New roads
The Annex 01 attached shows the caparison of survey data at 8 locations.
3. Walk through surveying & Pipe routes selection
As per the Tender Proposal report and the contract the Zone T 13 include
10.9 km of branch sewers 1.78km of trunk sewer, several mandatory
trenchless location and service connections.
Walk though survey was carried out to investigate the preliminary design
drawing details with the actual site conditions to physically identify the
pipe routes and locations at site. The followings were reviewed in detailed
during the walk through survey.
Space and access for construction
Depth of excavation any obstacles
Possible alternative way for pipe lines
No mandatory trenchless locations but identified new additional
trenchless locations.
Pipe flow direction
Location and Position of culverts,
Steep slope areas, deep excavations and steps etc.
The location of culverts and their details are studied and observations are
shown in the Annex 02. The proposed pipe route which included trunk
sewers, branch sewers, services lines and location required easement are
shown in the Annex 03. Contour map of with the pipe network is in the
annex 04.
4. Comparison with tender proposal
Length of pipe lines:
The length of branch sewer line and trunk sewer line between PDD and
details design survey outcome are as follows.
Item
Tender
Proposal(Km)
10.92
1.78
Detail design
Topography
surveying
13.2km
150m
207