Beruflich Dokumente
Kultur Dokumente
WECC Power
System
Stabilizer
Design and
Performance
Criteria 1
WECC Power
System
Stabilizer
Tuning
Guidelines
WECC
Policy
Statement
on PSS
found here
Criteria for
Determining
Excitation
System
Suitability
for PSS in
WSCC
System
found here
No
Yes- all
found here
found here
WECC Test
Guidelines
for
Synchronous
Unit Dynamic
Testing and
Model
Validation
found here
Reissued:
here
Is there overlap
with other
documents
Consider
linking or
combining
with Tuning
Guidelines
Reformatted
Criteria.
Tuning
Guidelines
Small amount
of overlap with
definitions and
descriptions
with Suitability
Is there overlap
with NERC
standards
No
No
No
Yes In
service
Requirement
and
exceptions
No
No
Yes
addressed
when the
WECC-0074
Criterion was
drafted.
Does the
document define a
requirement for
reliability
No
Yes PSS
Minimum
performance
requirement
No
Yes- Defines
application
PSS, and
Operation.
No-but
defines the
benchmark
for
application of
PSS.
No
Yes migrated
to WECC-0074.
No
No
Number of
Units with
PSS on-line.
Is the document a
fill in the blank
standard
No
No
No
No
WECC
Generating
Facility Data,
Testing and
Model
Validation
Requirements
found here.
Does the
document
describe action
that makes the
procedure
consistent in
WECC for
Technical
procedures or
consistent
business practices
No
Yes,
Verification
Reporting
No
No
No
No
Yes
Does the
document
describe a goal for
consistency in
WECC
No
Yes
No
No
No
Yes
Does the
document
describe a step by
Step procedure or
explanation of a
technical issue
Yes
No
Yes
No
Yes
Yes
No
Does the
document provide
training material
Yes
No
Yes
No
No
Yes
Some value
Does the
document improve
awareness of
technical issues
Yes
No
No
No
Yes
No
Yes
Is the document
only for WECC
organization or
WECC staff
No
No
No
No
No
No
No
Is the document
up to date
Should be
updated for
digital
controllers.
Consideration
for updating.
Should be
updated for the
latest IEEE
Model
No
No
No
No
Is the document
needed?
Yes
Hold
Yes
Hold
No Should
consider a
means of
preserving
the
information.
Yes, for
training
purposes
No, but
historical
narrative could
be retained.
Recommended
Classification
WECC
Report
Minimum
Performance
Requirements
should
migrate to a
Standard.
Verification
Reporting
should
migrate to a
RBP.
The type of
PSS should
migrate to a
Guideline.
WECC
Guideline
WECC
Regional
Standard
WECC
Report
WECC
Guideline
Retire. Its
content has
been
addressed in
WECC-0074,
Steady State
and Dynamic
Data Criterion.