Sie sind auf Seite 1von 20

POWER TRANSFORMER - STANDARDISATION MANUAL

Chapter - 4
STANDARD MANUFACTURING QUALITY PLAN (MQP)

Working Group Members


Mr. S. K. Negi

- GETCO

Mr. M. M. Goswami

- POWERGRID

Mr. Y. V. Joshi

- GECO

Mr. Krishnan

- Mahindra Intertrade

Mr. Gautam Bhatia

- ENPAY

Mr. Baghel

- ATSA Conductors

Mr. Bharat Tolia

- Bharat Corrub

Mr. R S Thakkar

- GETCO

163

164

POWER TRANSFORMER - STANDARDISATION MANUAL

POWER TRANSFORMER - STANDARDISATION MANUAL

CHAPTER - 4
STANDARD MANUFACTURING QUALITY PLAN (MQP)

It is a contract document between customer and supplier to express commitment for delivery of transformer as per
agreed technical specification and match the type tested design.
Over a period of time as the transmission grid has grown leaps and bounds, with HVDC and 765 kV AC network,
this commitment document is gaining importance, because of rise in transformer failure rate and causing anxiety to
maintain uninterrupted supply for consumer and industry. Customer always wishes that transformer manufactured
and delivered must perform defect free service for its specified design life. It is always a challenge for supplier
(manufacturer) to keep consistency in material used and manufacturing process, which are the main cause for variation
in quality of transformer. While customer practically cannot monitor them and not expected to do so, manufacturers
are on their toes to offer cost competitive and cost effective product. The cost of material plays an important role,
considering the fact that majority of parts and components like bushing, OLTC, tank body, radiators, insulation, copper,
core material etc. are outsourced. The selection of material, its grades / type and design philosophy ultimately decide
the loss capitalization figures of final product. On the manufacturing process front, seamless integration of parts
/ components through mechanical and electrical design is the prerequisite. The change in sub-venders and skilled
manpower time to time at factory also require due diligence to control and maintain the consistency of manufacturing
process. Therefore a balanced view is needed to manufacture and deliver ideal Transformer meeting contract
specification and match type tested design.
It is evident from above background that there is need of mutually agreed manufacturing quality plan (MQP). Apart
from primary objective to have ideal transformer as per customer wish as explained above, the major benefit of MQP
would be timely delivery and any conflict shall be address upfront, so that manufacturing could take place uninterrupted
in a faithful manner. The role of design review is important to provide all necessary inputs for structuring the MQP.
It is proposed in this power transformer standardisation manual to have MQP covering following elements:
1.

Material quality and characteristics.

2.

Stage inspection of material.

3.

Stage inspection and manufacturing process.

4.

Routine and Acceptance tests.

5.

To capture Signature values .

6.

Product dimension and physical condition before dispatch.

It is equally very important that Transformer is manufactured in a dust free clean environment with humidity control.
Any compromise on this aspect will have adverse effect in expected design life of Transformer, however good is the
quality of material used.
Standard Manufacturing Quality Plan (MQP) has been designed in a manner to share the responsibility depending upon
the source of supply, testing, location and criticality of test for the performance of Transformer. Responsibility of subvendor is important for testing of raw material and components (P), but manufacturer has to play a role of verification
(V) as they have to integrate them for actual design of transformer. Similarly, responsibility of manufacturer is crucial
for routine tests (P) but customer has to actively witness (W) these tests to ensure that results are complying the
contract requirements and design review data.

165

Winding Conductor
(PICC)/ (CTC)/ Lead
wires

elongation
%
30 min
32 min

As per design requirement

Max hardness should be RF 65, when measured


in Rockwell F scale

Thickness tensile stregth


(mm)
(Nm/m2)
Up to 2.5
205-265
>2.5-5.6
205-255

As per approved drawing

For annealed conductor


0.01727 ohm/mm2 / m(max) at 20 deg
For half hard conductor
0.01777 ohm-mm2 / m (max)

Bare conductor
Width /thick (mm)
Tolerance (in mm)
Up to 3.15
0.03
3.16 to 6.30
0.05
6.31 to 12.5
0.07
12.51 to 16
0.10
> 16 mm
0.10
Insulated conductor
Covering thick(mm)
Tolerance (%)
0.25 to 0.5
-10
0.51 to 1.25
-7.5
Over 1.25
-5

Acceptable Value

W - Witness Actual testing, verify and accept

IS 7404
IS 13730

6. 0.2% Proof strength of work hardened


conductor

V - Verify and Accept

IS 7404
IS 13730

5. Hardness test

Performance

IS 7404
IS 13730

4.Tesile strength and elongation test

* Category of Responsibility: P - Actual Test

IS 13730

3. Insulation for bunched


conductor
a). No. of conductors.
b). Thickness & width of bare
conductor, Covered width &
thickness
c). Voltage test between strands

IS 1897
IS 13730
IS 7401

Reference /
Standard

IS 13730

One sample
per type per
lot

Sampling
rate

2. Resistivity at 20 deg.C

1. Visual & Dimensional check of Bare


Conductor. Thickness & width of bare
conductor, Covered width & thickness

Raw Material & Components

List of Tests

Item/Components

Sr.
No.

Sub
Vendor

Manufacturer

--

--

--

--

Customer

Category of Reponsibility*

166
POWER TRANSFORMER - STANDARDISATION MANUAL

Kraft Insulating
Paper

Performance

IEC 605543-1
IEC 605543-5
IEC
60554-2,
Methods of
Test

IS 7404
IS 13730

Reference /
Standard

17. Type test report

13. 0.5 to 1.0 m/Pa.s


14. 5 mN m2 /g (min)
15. 6 mN m2 /g (min)
16. 10 %

1. Paper to be smooth, unglazed surface &


free from dust particles
2. 0.8 0.05 gm/ cm3
3. Thick (m) Sub (g/cm3) Tolerence
50
40
10
65
52
05
75
60
05
90
72
05
4. 8 % max
5. 93 NM/gm (min)
6. 34 NM/gm (min)
7. NA
8. NA
9. NA
10. 1 % max
11. 6 to 8
12. 10 mS/m (max)

Thikness (mm)
Over/Upto
Corner Radius(mm)
Up to 1.0
0.50
1.01 to 1.60
0.50
1.61 to 2.24
0.65
2.25 to 3.55
0.80
3.56 to 5.60
1.00

Acceptable Value

W - Witness Actual testing, verify and accept

One sample
per type per
lot

Sampling
rate

V - Verify and Accept

4. Moisture Content
5. Tensile Index MD
6. Tensile Index CD
7. Elongation at Break MD
8. Elongation at Break CD
9. Electric Strength in Air
10. Ash Content
11. PH of Aqueous extract
12. Conductivity of Aqueous
extract
13.Air Permeability
14.Tear Index MD
15.Tear Index CMD
16. Water Absorption (Klemn
Method)
17.Heat Stability
a.) Reduction of Degree of
Polymerization
b.) Reduction of Bursting
Strength
c.) Increase of Conductivity of
Aqueous extract.

1. Visual check & Measurement


of Thickness
2. Density
3. Substance (grammage)

7. Radius of corner of bare conductor

List of Tests

* Category of Responsibility: P - Actual Test

Item/Components

Sr.
No.

Manufacturer

Sub
Vendor

--

Customer

Category of Reponsibility*

POWER TRANSFORMER - STANDARDISATION MANUAL

167

CRGO Laminations

Performance

IS 3024

Losses as per grade of CRGO lamination used

W - Witness Actual testing, verify and accept

One sample
from
offered lot

1. Visually defect free, as per design


requirement
2. Less than 2 micron burr
3. As per IS 649
4. 10 cm2 min average
05 cm2 min individual
5. 4 % max increase in specific measured loss
6. As per table no. 4 of IS 3024

As per approved design

IS 3024
IEC 60404
ASTM 4343

Each Lot

One sample
per lot

Acceptable Value

Reference /
Standard

Sampling
rate

V - Verify and Accept

7. Test for specific Watt loss test

5 Aging test (type test)


6. Test on stacking factor

2. Cutting Burr
3. Bend / Ductility test
4. Surface insulation resistivity check

Check following documents


(a) Invoice of Supplier
(b) Mills Test certificate
(c) Packing List
(d) Bill of Lading
(e) Bill of Entry
Check points:
1. Visual, Dimension & Thickness

List of Tests

* Category of Responsibility: P - Actual Test

Item/Components

Sr.
No.

--

Manufacturer

Sub
Vendor

--

Customer

Category of Reponsibility*

168
POWER TRANSFORMER - STANDARDISATION MANUAL

Pre-compressed
Press Board

Performance

PD--> Perpendicular Direction

One sample
of each size
per lot

Sampling
rate

V - Verify and Accept

IEC 606413-1
IEC
60641-2,
Methods of
Test

Reference /
Standard

(2) Up to 1.6 mm TK -1.0-1.2


>1.6-3 mm TK -1.1-1.25
>3-3.6 mm TK -1.15-1.30
>6-8 mm TK -1.2-1.3
(3) Up to 1.6 -10 %; >1.6-3 mm - 7.5 %
>3-3.6 mm - 5 %; >6-8 mm TK -4 %
(4) Up to 1.6 -45 %; >1.6-3 mm - 50 %
>3-3.6 mm - 50 %; >6-8 mm TK -50 %
(5) Up to 1.6 mm TK -11 min
> 1.6-3 mm TK - 9 min
> 3 - 3.6 mm TK -7 min
> 6-8 mm TK - 7 min
(6) 6 % max
(7) MD - 0.5 % max, CD- 0.7 % max, Thick -5
% max
(8) 6-9 for solid boards
(9) Up to 1.6 - 5 max (mS/m)
> 1.6-3 mm - 6 max, > 3-3.6 mm - 8 max
> 6-8 mm TK - 8-10 max
(10) Up to 1.6 - 12 kV/ mm
> 1.6-3 mm - 11 kV/mm
> 3-3.6 mm - 10 kV / mm
> 6-8 mm TK - 9 kV/mm
(11) Up to 1.6 - 40 kV/ mm
> 1.6-3 mm - 35 kV/mm
> 3-3.6 mm - 30 kV / mm
> 6-8 mm TK - 30 kV/mm
(12) 1 % maximum
MD CD
(13) Up to 1.6 - 3 % 4 %
>1.6-3 mm - 3 % 4 %
>3-3.6 mm - 3 % 4 %
>6-8 mm TK -3 % 4 %

(1) No surface defects

Acceptable Value

W - Witness Actual testing, verify and accept

CD--> Cross Direction

14. Tensile strength MD, CD


15. Ply Bond Resistance
16. Flexural strength MD, CD (Laminated
Boards)

13. Elongation MD, CD

12. Ash Content

11.Electric Strength in Oil

10. Electric Strength in Air

8. pH of aqueous extract
9.conductivity of aqueous extract

6. Mositure Content
7. Shrinkage MD, CD & PD

5. Oil Absorption

4. Reversible part Compressibility

3. Compressibility C

1. Visual & dimensional check, thickness,


width & length/.
2. Apparent Density

List of Tests

* Category of Responsibility: P - Actual Test

***TC --- Test Certificate

Item/Components

Sr.
No.

Sub
Vendor
V

Manufacturer
V

Customer

Category of Reponsibility*

POWER TRANSFORMER - STANDARDISATION MANUAL

169

Permawood

Porcelain Bushings
(Hollow)

Polyster Resin
Impregnated Glass
Fibre Tape

Synthetic Rubber
Bonded Cork sheet
(SRBC)

Performance

IS 4253

IS 15208

1. Free from surface deffect


2. 70 10 IRHD
3. 85 % max
4. NA
5.1550 kpa (min)
6. Should be satifactory when bent though
1800 round the material of diameter three
times the thickness of specimen.
7. 25-35 %
8. 80 % min
9. Change in volume 15 % max for 70 hours at
100 deg c in oil
10. 5-8.5

1. Free from visual defect


2. 12 months
3. 0.25 to 0.35 mm ( 0.07)
4. 20 to 50 mm ( 2)
5. Min 200 N/mm
6. 27 ( 3%)
7. Max 200 C

1. As per approved drawing.


2. As per IS 2099

2. 0.8 to 1.3 gm/cc


3. Max 7%
4. Min 5%
5. Min 60 KV
6. Min for LD - 700 KV /cm2
7. Min for LD - 1400 KV /cm2
8. Min for LD - 450 KV /cm2
9. Thikness (mm)
Tolerance (+/- mm)
10 to 25
1.2
26 to 50
1.4
51 to 150
2.0

1. Shall be free from surface defect

Acceptable Value

W - Witness Actual testing, verify and accept

One sample
per lot

Each lot

As per IS/
IEC

IS 2099

IS 3513
IS 1708
IS 1736
IS 1998

One sample
of each size
per lot

100%

Reference /
Standard

Sampling
rate

V - Verify and Accept

7. Compressibility
8. Recovery
9. Aging in Oil-Finish, Flexibility & change
in volume
10. Ph value

1. Visual check, thickness, length, width


2. Hardness
3. Compression set
4. Side flow under compression
5. Tensile strength
6. Flexibility

1. Visual Check
2. Verification of shelf life
3. Thickness
4. Width
5. Tensile Strength
6. Resin Content
7. Softening point of resin

1. Visual & dimensional check.


2. Power frequency voltage withstand test

1. Visual & dimensional check, thickness,


width & length.
2. Density
3. Moisture content
4. Oil Absorption at 90 C
5. Electric Strength at 90 C
6. Tensile strength
7. Compressive strength test
8. Shear strength age-wise
9. Thickness

List of Tests

* Category of Responsibility: P - Actual Test

Item/Components

Sr.
No.

Sub
Vendor

Manufacturer

--

--

--

--

Customer

Category of Reponsibility*

170
POWER TRANSFORMER - STANDARDISATION MANUAL

Condenser Bushing

Buchholz Relay

Bimetallic Terminal
Connector

Marshalling Box

Remote Tap
Changer Control
Cabinet

10

11

12

13

Performance

1. Dimension & Visual Check


2. 2kV test for Auxillary wiring
3. Paint shade & Thickness
4. Wiring routing check
5. Functional Check
6. Verification of BoQ

1. Dimension & Visual check


2. 2kV test for Auxillary wiring
3. Paint shade & Thickness
4. Wiring routing check
5. Functional Check

1. Dimensional
2. Visual check
3. Tensile strength
4. Resistance

7. Loss of oil & Surge test

IS 3637

100%

100%

100%

1. As per approved drawing


2. 1 min withstand
3. As per approved drawing
4. Firm and aesthetic
5. As per approved drawing
6. As per approved drawing

1. As per approved drawing


2. 1 min withstand
3. As per approved drawing
4. Firm and aesthetic
5. As per approved drawing

1. As per approved drawing


2. Free form defects
3. As per type test report
4. As per type test report

1. As per approved drawing


2. No leakage
3. 2 KV for 1 min. withstand
4. Min 10 M by 500 V DC megger
5. No leakage at 1.75 Kg/cm2 oil pressure for
15 mins
6. GOR - 1: 90 to 165 CC
GOR - 2: 175 to 225 CC
GOR - 3: 200 to 300 CC
7. GOR - 1: 70 to 130 CC
GOR - 2: 75 to 140 CC
GOR - 3: 90 to 160 CC

3. As per IEC - No flash-over/ puncture


4. No leakage
5. No leakage
6. As per approved GTP
7. As per approved drawing

1. Tan Delta - 66 kV - 0.7%


Above 66 kV - 0.4%
2. As per approved GTP

Acceptable Value

W - Witness Actual testing, verify and accept

Approved
drawing
and specification

Approved
drawing
and specification

IS 5561

IS 2099
IEC 60137

100%

100%

Reference /
Standard

Sampling
rate

V - Verify and Accept

6. Gas volume test at 5 ascending towards


conservator

1. Type & make


2. Porosity
3. High voltage
4. Insulation resistance
5. Element test

Routine Test
(1) Measurement of dilectric dissipation
factor and capacitance
(2) Dry power frequency voltage withstand
test
(3) Measurement of partial discharge
(4) Pressure test
(5) Tightness test
(6) Creepage distance
(7) Visual & dimensional check

List of Tests

* Category of Responsibility: P - Actual Test

Item/Components

Sr.
No.

--

--

--

--

W
----W
W
P
V
V
V
V
V
V

Customer

Manufacturer

Sub
Vendor

Category of Reponsibility*

POWER TRANSFORMER - STANDARDISATION MANUAL

171

Air cell (Flexi Air


Separator)

Roller Assembly

Oil & winding


Temperature
Indicator

Pressure Relief
Device

Magnetic Oil Level


Gauge (MOG)

Valves

Transformer Oil

14

15

16

17

18

19

20

Performance

Routine Test as per IS 335

1. Type, make & Visual


2. Leakage test/ Seepage test
100%

100%

As per IEEMA specification (see Chapter 6)

1. As per approved drawing & free from defect


2. No leakage

1. As per approved drawing & free from defect


2. Check pointer position for Max, Min and
center level
3. Withstand for 1 minute
4. No leakage at 4 kg/cm2
5. Operate at Min level indication

1. As per approved drawing & free from defect


2. No leakage
3. Satisfactory operation at pressure release
4. 2 kV withstand for 1 min

W - Witness Actual testing, verify and accept

IS 335
IEC 60296

IS 778

--

IS 2500

100%

100%

--

100%

1. As per approved drawing


2. 1.5% of FSD
3. Withstand for 1 min
4. operation within 2 C of setting

1. Free from surface defect


2. For shaft as per MS EN8, BS 970-1
For roller wheel of cast iron IS 210
For roller wheel of Cast steel IS 1030

IS 8500

One sample
per melt/
heat
treatment
batch

Acceptable Value

1. As per approved deawing


2. No leakage for 24 hours
3. No deformation

Reference /
Standard

IS 3400

100%

Sampling
rate

V - Verify and Accept

1. Type & make


2. Dial Calibration for level
3. 2kV HV test for 1 min between
all terminal & earth
4. Leak test
5. Switch/contact operation test

1. Type & Make


2. Operating air pressure
3. Switch/contact testing
4. HV test

1. Type & make


2. Calibration
3. 2kV HV test for 1 min between
all terminals & earth
3. Switch contact operation test

1. Visual & Dimensions.


2. Mech. Properties & Chemical
composition of raw material used for
shaft & roller forging

1. Make, Visual & Dimensions


2. Pressure test at 0.105 Kg/cm2
3. 10 times inflation and deflation test at
0.105 Kg/cm2

List of Tests

* Category of Responsibility: P - Actual Test

Item/Components

Sr.
No.

Manufacturer

Sub
Vendor

--

--

--

--

--

--

Customer

Category of Reponsibility*

172
POWER TRANSFORMER - STANDARDISATION MANUAL

Tank & Accessories

Radiators

OLTC

21

22

23

Performance

100%

V - Verify and Accept

3. Pressure test on divertor switch oil


compartment
4. Mech. Operation test
5. Sequence test
6. Visual & Dimentional check
7. Operational test on Surge relay

1. Auxiliary circuit insulation test at 2kV for


1min.
2. Function test on OLTC

100%

one per
design

6. Tank 6.1 Presseure test


6.2 Vaccum test

1. DP test on lifting lugs


2. Surface cleaning of header
support and bracing details by
sand/shot blasting
3. Air pressure test on elements
4. Dimensional check after final
welding
5. Air pressure test on radiator
assembly
6. Visual check of paint shade,
paint film thickness & film
adhesion

CBIP
manual
2013

100%

1. Check for a fit up for butt


welds on tank walls, base &
cover
2. DP test on Butt welds after fit
up & load bearing welds
3. Visual & Dimensional check
after final welding
4. Air leakage test on assembled tank with
turrets & on conservator
5. Visual check of paint shade,
paint film thickness & film
adhesion

4. Satisfactory operation for 1 complete cycle


5. Switching time within permissible limit
6. Free from defects
7. Satisfactory working of trip & reset

2. Satisfactory working as per drawing


approved
3. No leakage

1. To Withstand for 1 min

6. As per tech spec, coating thickness more


than 70 micron

5. 2 kg/cm2 for 30 minutes - no leakage

3. As per relevent standards /CBIP


4. As per approved drawing

1. No welding defect
2. Free from surface defect

6.1) Twice the normal head + 30 KN/m2 for 1 hr.


Withstand
6.2) 760 mm of Hg for 1 hr. withstand

5. Paint thickness
Outside: 155 micron
Inside : 30 micron
No peel-off

4. No leakage

3. Free from defect

2. Check for proper welding

1. Check for proper welding

Acceptable Value

W - Witness Actual testing, verify and accept

IEC 60214

IEEMA
standard

CBIP
manual
2013

Reference /
Standard

Sampling
rate

List of Tests

* Category of Responsibility: P - Actual Test

Item/Components

Sr.
No.

Manufacturer

Sub
Vendor

--

Customer

Category of Reponsibility*

POWER TRANSFORMER - STANDARDISATION MANUAL

173

Cooling Fans

Nitrile Rubber
Gasket

Bushing CT

Remote
Temperature
detector

Oil pump

24

25

26

27

28

Performance

2. HV test
3. Oil pressure test
4. Locked rotor test

1. No load test

IS 2705

100%

100%

1. Satisfactory performance & no load losses


within limit
2. 2 kV AC for 1 min withstand
3. 5 Kg/cm2 at 90 C for 30 mins withstand
4. Statisfactory operation of protection

1. 500 V AC for 1 min withstand


2. 1% of FSD
3. 10 M min with 500 V DC megger

3. Rated current withstand for 1 min


4. As per IS 2705
5. 3 kV AC for 1 min withstand

1. As per approved drawing


2. As per IS 2705

1. Within tolerance
2. 70 5 IRHD
3. 12.5 N/mm2 min
4. 20% max
5. 250% min
6. Max change in harness - 10 IRHD
7. Change in weight - 5 to 8.5%
Change in thickness - 4% max
Change in width & length - 0.2% max

1. As per approved drawing


2. As per approved drawing
3. 1.3 kV for 1 min or 1.8 kV for 5 sec
4. 10 M min with 500 V DC megger

Acceptable Value

W - Witness Actual testing, verify and accept

--

--

BS 2751

1 sample/
Lot

100%

IS 2312

Reference /
Standard

100%

Sampling
rate

V - Verify and Accept

1. HV test
2. Calliberation accuracy check
3. IR value

1. Dimensions
2. Verification of terminal
marking & polarity
3. Overvoltage inter-turn test
4. Determination of error
5. HV Test

1.Dimensions
2.Shore Hardness
3.Tensile Strength
4.Compression set test
5. Elongation at break
6. Accelerated aging in air
7. Accelerated aging in oil

1. Type & Make


2. Power consumption, rating test
3. HV test
4. Insulation resistance value

List of Tests

* Category of Responsibility: P - Actual Test

Item/Components

Sr.
No.

Manufacturer

Sub
Vendor

--

--

--

--

Customer

Category of Reponsibility*

174
POWER TRANSFORMER - STANDARDISATION MANUAL

One sample of
each type

One sample of
each type

One sample of
each type

Dimensional check

Check for burr

Edge bow

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Core Diameter

Leg Centre & Leg length

Assembly of limb Insulation


& plates

Rectangularity of Core
Assembly

Check for Overlaps & air gap


at joints

Leaning of Core

Earthing of Core

Limb Clamping & Binding

Insulation test between core


& core clamp / frame

Loss measurement on built


up core assembly.

Visual check for drum lable


and Conductor Size

100%

100%

Total stack height

Winding

100%

Visual check

Core Building

One sample of
each type

Lamination for core

Visual check

In Process Inspection No of turns / disc

Sampling rate

Item/Process

Sr.
No.

As per design drawings

As per specification / GTP

As per specification

Design drawing

Design drawing

Design drawing

Design drawing

Design drawing

Design drawing

As per design drawings

As per design drawings

As per design drawings

--

IS 3024

--

--

--

Reference / Standard

Within limit as per design

Within limit as per GTP

shall withstand 2 kV for 1 min

As per design drawings

Proper connection

No leaning

As per design

As per design

As per design

within specified tolerence of design

within specified tolerence of design

within specified tolerence of design

Free from defect

As per IS 3024

Less than 20n

As per design drawings

Prime CRGO and Free from defect

Acceptable Value

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

Sub Vendor

Manufacturer

Customer

Category of Reponsibility*

POWER TRANSFORMER - STANDARDISATION MANUAL

175

100%

100%

Continuity test

Inter-turn Insulation

100%

100%

100%

100%

100%

100%

100%

100%

Lead & coil indentification &


marking

Brazing / Crimping of Joints

Visual chek for completeness


and cleanliness

Ratio test

Magnetic balance test

Magnetizing current test

Alignment of Spacers/Blocks

HV test

Performance

100%

Visual check for intercoil


insulation

Core Coil Assembly

100%

V - Verify and Accept

Mfgrs standard

--

2 kv for 1 min withstand

Aligned

Tolerance as per standards

Tolerance as per standards

Tolerance as per standards

Complete assembly shall be free from dust/


particles

Shall be smooth and no sharped age

As per design

As per design

As per design

No breaking of continuity

As per design

As per design

As per design

As per approval

As per approval

As per Factory drawing

As per Factory drawing

Acceptable Value

W - Witness Actual testing, verify and accept

As per IS 2026 / IEC 60076

As per IS 2026 / IEC 60076

As per IS 2026 / IEC 60076

--

--

--

--

As per design drawings

--

As per design drawings

As per design drawings

100%

Lead & coil indentification &


marking

As per brazing procedure

Insulation arrangement

100%

Visual inspection of brazed


joints

Customer approval

As per design drawings

--

Brazing procedure and


brazer's qualification

As per approved drawings /


Factory drawing

As per approved drawings /


Factory drawing

Reference / Standard

Visual check for transposition 100%

100%

Dimensional checks
i) Outer diameter
ii) Inner diameter
iii) Unshrunk height
iv) Radial thickness

100%

Sampling rate

* Category of Responsibility: P - Actual Test

Nos of discs

No of turns / disc

Item/Process

Sr.
No.

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

Sub Vendor

Manufacturer

Customer

Category of Reponsibility*

176
POWER TRANSFORMER - STANDARDISATION MANUAL

100%

100%

100%

100%

Check for clearance from


tank walls

Visual checks for crimped


joint

Visual checks for bushing CT


assembly tightness

Ratio test

100%

100%

100%

Dimensions

Pressure test

Vacuum test

100%

Checks for complete


tightness before tanking
a) Tightness of all joints /
screws
b) Application of thread
locking adhesive
c) Padding of top yoke
d) Pressing of active parts
e) Fitting of wall shunts &
packing

Performance

100%

Drying

Ovening, Tanking and Oil filling

100%

Thickness of walls

Tank

100%

Check for cable sizes

* Category of Responsibility: P - Actual Test

100%

OLTC fitting & connections

Connections and checks before tanking

Sampling rate

Item/Process

Sr.
No.

V - Verify and Accept

Manufacturer standard

Manufacturer standard

As per CBIP

As per CBIP

As per design

Low voltage tan delta and PI values shall


be checked periodically and after achieving
the satisfactory values the process will be
declared complete

To withstand, permenat deflection shall not


exceed as per specification

To withstand, permenat deflection shall not


exceed as per specification

As per approved drawings

As per approved drawings

Tolerance as per standards

Assembly tightness

Shall be smooth and no sharped age

As per design

As per design

Manufacturer standard

Acceptable Value

W - Witness Actual testing, verify and accept

As per approved drawings

As per approved drawings

As per IS 2026 / IEC 60076

--

--

As per design drawings

As per design drawings

Manufacturer standard

Reference / Standard

--

--

--

--

--

--

--

--

--

--

--

--

Sub Vendor

Manufacturer

---

Customer

Category of Reponsibility*

POWER TRANSFORMER - STANDARDISATION MANUAL

177

100%

100%

100%

Check for oil qualtity before


impregnation

Oil filling & Air release

Impregnation process

Performance

As per specification

100%

2 kV HV test between
(i) Core & end frame
(ii) Core & yoke bolts
(iii) End frame and yoke bolts

* Category of Responsibility: P - Actual Test

As per design drawings

100%

Tanking of active parts and


check for clearance from
tank walls

V - Verify and Accept

Manufacturer standard

Manufacturer standard

As per specification

Manufacturer standard

100%

Cleanliness of tank before


tanking

Reference / Standard

Sampling rate

Item/Process

Sr.
No.

W - Witness Actual testing, verify and accept

Sufficient impregnation time shall be given


before conducting the electrical test on the
transformer

Manufacturer standard

As per specification

To withstand 2 kV for 1 min

As per design

Shall be clean.

Acceptable Value

--

--

--

--

--

--

Sub Vendor

Manufacturer

---

---

---

Customer

Category of Reponsibility*

178
POWER TRANSFORMER - STANDARDISATION MANUAL

Impedance between each pair of winding /


Impedence Voltage

Excitation losses at 90, 100 and 110 % rated


voltage measured by the average voltmeter
method

Positive phase sequences impedance


measurement on three phase transformers

Regulation at rated load and unity, 0.9, 0.8 lagging


P.F.

Load losses, measured at rated frequency, by


applying a primary voltage sufficient to produce
rated current in the windings with secondary
windings short circuited

Separate source voltage with stand test.

Induced over voltage with stand test

Auxiliary losses (fans. Pumps etc.)

SFRA test

Zero Sequence impedance test

Tests on tap-changer (IEC:214)

Tan delta & capacitance measurement test for


bushings and windings

Tests on transformer oil including DGA on selected


sample as per IS:9434/IEC:567, before and after
temp rise test and at final stage before dispatch.
Corrosive sulphur detection test as per ASTM
D1275 subjecting oil for 150oC for 48 hrs.

10

11

12

13

14

15

16

Acceptable Value

IS:2026 / IEC 60076 As per applicable


/ specification
standard

Reference / Standard

W - Witness Actual testing, verify and accept

100%

Sampling rate

V - Verify and Accept

Polarity and phase relationship (Vector group)

Performance

Turn ratio for all sets of windings on each tap, with


percentage error / Voltage

* Category of Responsibility: P - Actual Test

Resistance of each winding.

Routine Tests

Description of Test

IS:2026 / IEC 60076 / specification

Test

As per applicable standard

Sr. No.

W
W
W

P
P
P

Customer

Manufacturer

Category of Reponsibility*

POWER TRANSFORMER - STANDARDISATION MANUAL

179

HV withstand test on auxiliary equipments and


wiring

Measurement of Insulation Resistance

Measurement of acoustic noise level

Measurement of harmonics of no load current

Measurement of Partial Discharges of transformer

Measurement of no load current with 415 V AC


supply on LV side.

Tests on air cell

ACLD test (For 220 kV class transformer)

Moisture content in active part measurement test

20

21

22

23

24

25

26

27

28

Short circuit withstand capability test (Optional)

Tests on OLTC

Reference / Standard

IEC 60214

IS:2026 / IEC 60076

CBIP manual

IS:2026 / IEC 60076

IS:2026 / IEC 60076

Acceptable Value

As per standards

As per standards

Permanent
deflection within
limit as per length
of plate used.

As per standards

As per standards

0.5 % max

W - Witness Actual testing, verify and accept

One from Lot or as


agreed between
Manufacturer and
Purchaser.

V - Verify and Accept

Vacuum and pressure test on tank

Performance

Lightning Impulse Voltage withstand test with


chopped wave
Switching Impulse Voltage withstand test

* Category of Responsibility: P - Actual Test

Temperature rise test

Type Tests

Magnetic Balance & current test on all winding

19

Tank leak test at 5 psi (35 kN/m2) for 12 hrs with


oil & 1 hr with air.

18

Sampling rate

IS:2026 / IEC 60076 / specification

Description of Test

Test

Sr. No.

As per applicable standard

Customer

Manufacturer

Category of Reponsibility*

180
POWER TRANSFORMER - STANDARDISATION MANUAL

Short Time Current withstand test on offered HV


and LV terminal connectors for 40 kA for 3 Sec for
220 kV & 132 kV Class and 25 kA for 3 sec for 66
kV & below class

Verification of completeness of accessories

Bushings

Conservator tank

Transformer oil

Check Nitrogen / dry air pressure after filling

Mesurement of dew point of nitrogen or dry air


before and after filling in tank before dispatch

Check proper blanking of all openings and leakage, 100%


if any

Provision of Impact recorder / tracking system

Check for soundness of packing

10

11

Performance

Radiators

V - Verify and Accept

Acceptable Value

IS:5561

IS:2026 / IEC 60076

0.15 to 0.2 kg/


cmsq above ATM
Pr

--

--

IS 13947/IEC 60529: -2001

Reference / Standard

W - Witness Actual testing, verify and accept

100%

100%

100%

100%

100%

100%

100%

100%

100%

Pipes and headers

100%

Sampling rate

Packing & Dispatch - Main tank

Measurement of transferred surge in LV due to


Lightning impulse on HV & LV

* Category of Responsibility: P - Actual Test

Degree of protection (IP55) for control cabinets


& RTCC panel, OLTC driving mechanism, terminal
boxes of PRV, MOG, Buchholz Relay, pump motors,
fans etc

Special Tests (Optional)

Description of Test

Manufacturers Standard

Test

Manufacturers Standard
Manufacturers
Standard

Sr. No.

--------

P
P
P
P
P
P
P

--

--

--

--

--

Customer

Manufacturer

Category of Reponsibility*

POWER TRANSFORMER - STANDARDISATION MANUAL

181

182

POWER TRANSFORMER - STANDARDISATION MANUAL

Das könnte Ihnen auch gefallen