Beruflich Dokumente
Kultur Dokumente
Rubble
cement
sand
water
8" thick cemrnt hollow
block
6" thick cemrnt hollow
block
4" hick cemrnt hollow
block
Skilled Labour
Un Skilled Labour
2,500.00
590.00
2,700.00
0.50
Rs.
Rs.
cube
bag
cube
gall.
90.00
no
29.00
no
17.00
no
650.00
450.00
per day
per day
cube
Rs.
11,085.75
sqr.
Rs.
16,466.00
sqr.
Rs.
21,444.00
sqr.
Rs.
26,402.00
sqr.
Rs.
14,018.50
sqr.
Rs.
4,132.20
sqr.
Rs.
6,052.90
sqr.
Rs.
14,248.25
sqr.
Rs.
4,361.95
sqr.
Rs.
6,269.15
sqr.
Rs.
14,460.17
sqr.
Rs.
4,573.87
sqr.
Rs.
6,715.40
Materials
1.35
5.00
0.40
100
cube
bag
cube
gall.
Rubble
Cemrnt
Sand
Watere
at.
at.
at.
at.
3,375.00
2,950.00
1,080.00
50.00
Rs.
7,455.00
Rs.
3,525.00
Rs.
105.75
Rs.
11,085.75
0.00
Rs.
11,085.75
Labour
3.00 day.
3.50 day.
Skilled labour
Un skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
1,950.00
1,575.00
Tools
3%
of labour cost
Materials
2.00
7.50
0.60
150
cube
bag
cube
gall.
Rubble
Cemrnt
Sand
Watere
at.
at.
at.
at.
5,000.00
4,425.00
1,620.00
75.00
Rs.
11,120.00
Rs.
4,950.00
of labour cost
Rs.
148.50
of labour cost
Rs.
Labour
4.50 day.
4.50 day.
Skilled labour
Un skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
2,925.00
2,025.00
Tools
3%
Scaffolding
5%
Rs.
247.50
16,466.00
0.00
Cost for 1' 6" thick wall per sqr. with overheads & profit.
Rs.
16,466.00
Materials
2.70
10.00
0.80
200
cube
bag
cube
gall.
Rubble
Cemrnt
sand
watere
at.
at.
at.
at.
6,750.00
5,900.00
2,160.00
100.00
Rs.
14,910.00
Rs.
6,050.00
of labour cost
Rs.
181.50
of labour cost
Rs.
Labour
5.50 day.
5.50 day.
mason
un skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
3,575.00
2,475.00
Tools
3%
Scaffolding
5%
Rs.
302.50
21,444.00
0.00
Cost for 2' 0 " thick wall per sqr. with overheads & profit
Rs.
21,444.00
Materials
3.5
12.00
1.00
300
cube
bag
cube
gall.
Rubble
Cemrnt
sand
watere
at.
at.
at.
at.
8,750.00
7,080.00
2,700.00
150.00
Rs.
18,680.00
Rs.
7,150.00
of labour cost
Rs.
214.50
of labour cost
Rs.
Labour
6.5 day.
6.5 day.
mason
un skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
4,225.00
2,925.00
Tools
3%
Scaffolding
5%
Rs.
357.50
26,402.00
0.00
Cost for 2' 6" thick wall per sqr. with overheads & profit.
Rs.
26,402.00
D. 05 8" thick hollow block work in cement and sand 1 : 5 in ground floor
( cavities un filled )
1 sqr.
Materials
112
0.85
0.08
100
no
bag
cube.
gal.
block
cement
sand
water
at.
at.
at.
at.
Rs.
90.00 Rs.
Rs.
440.00 Rs.
Rs. 2,700.00 Rs.
Rs.
0.50 Rs.
10,080.00
374.00
216.00
50.00
Rs.
10,720.00
Rs.
504.00
Rs.
2,587.50
of labour cost
Rs.
77.63
of labour cost
Rs.
Labour
2.25 day.
2.50 day.
mason
un skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
1,462.50
1,125.00
Tools
3%
Scaffolding
5%
Rs.
129.38
14,018.50
0.00
Cost for 8 " thick wall per sqr. with overheads & profit.
Rs.
14,018.50
D. 06 4" thick hollow block work in cement and sand 1 : 5 in ground floor
( cavities un filled )
1 sqr.
Materials
112
0.40
0.05
80
no
bag
cube.
gal.
block
cement
sand
water
at.
at.
at.
at.
Rs.
17.00 Rs.
Rs.
440.00 Rs.
Rs. 2,700.00 Rs.
Rs.
0.50 Rs.
1,904.00
176.00
135.00
40.00
Rs.
2,255.00
Rs.
95.20
Rs.
1,650.00
of labour cost
Rs.
49.50
of labour cost
Rs.
Labour
1.50 day.
1.50 day.
mason
un skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
975.00
675.00
Tools
3%
Scaffolding
5%
Rs.
82.50
4,132.20
0.00
Cost for 4 " thick wall per sqr. with overheads & profit.
Rs.
4,132.20
D. 07 6 " thick hollow block work in cement and sand 1 : 5 in ground floor
( cavities un filled )
1 sqr.
Materials
112
0.65
0.07
90
no
bag
cube.
gal.
block
cement
sand
water
at.
at.
at.
at.
Rs.
29.00 Rs.
Rs.
590.00 Rs.
Rs. 2,700.00 Rs.
Rs.
0.50 Rs.
3,248.00
383.50
189.00
45.00
Rs.
3,865.50
Rs.
162.40
Rs.
1,875.00
of labour cost
Rs.
56.25
of labour cost
Rs.
Labour
1.50 day.
2.00 day.
mason
un skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
975.00
900.00
Tools
3%
Scaffolding
5%
Rs.
93.75
6,052.90
0.00
Cost for 6 " thick wall per sqr. with overheads & profit.
Rs.
6,052.90
D. 08 8" thick hollow block work in cement and sand 1 : 5 in first floor
( cavities un filled )
1 sqr.
D. 05
Rs.
14,018.50
Rs.
Rs.
229.75
14,248.25
Rs.
4,132.20
Rs.
229.75
Rs.
4,361.95
Add
Extra labour cost
1/8 day skilled labour
1/3 day skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
Rs.
81.25
148.50
229.75
Rs.
0.00
Cost for 8 " thick wall per sqr. with overheads & profit.
D. 09 4" thick hollow block work in cement and sand 1 : 5 in first floor
( cavities un filled )
1 sqr.
D. 06
Add
Extra labour cost
1/8 day skilled labour
1/3 day skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
Rs.
81.25
148.50
229.75
Rs.
0.00
Cost for 4 " thick wall per sqr. with overheads & profit.
D. 10 6" thick hollow block work in cement and sand 1 : 5 in first floor
( cavities un filled )
1 sqr.
D. 07
Rs.
6,052.90
Rs.
216.25
Rs.
6,269.15
Rs.
14,018.50
Add
Extra labour cost
1/8 day skilled labour
1/3 day skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
Rs.
81.25
135.00
216.25
Rs.
0.00
Cost for 6 " thick wall per sqr. with overheads & profit.
D. 11 8" thick hollow block work in cement and sand 1 : 5 in second floor
( cavities un filled )
1 sqr.
D. 05
Add
Extra labour cost
1/3 day skilled labour
1/2day skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
Rs.
Rs.
Cost for 8 " thick wall per sqr. with overheads & profit.
216.67
225.00
441.67 Rs.
0.00
Rs.
441.67
Rs.
14,460.17
D. 12 4" thick hollow block work in cement and sand 1 : 5 in second floor
( cavities un filled )
1 sqr.
D. 06
Rs.
4,132.20
Rs.
441.67
Rs.
4,573.87
Rs.
6,052.90
Rs.
662.50
Rs.
6,715.40
Add
Extra labour cost
1/3 day skilled labour
1/2 day skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
216.67
225.00
441.67
Rs.
0.00
Cost for 4 " thick wall per sqr. with overheads & profit.
D. 13 6" thick hollow block work in cement and sand 1 : 5 in second floor
( cavities un filled )
1 sqr.
D. 07
Add
Extra labour cost
1/2day skilled labour
3/4 day skilled labour
at. Rs.
at. Rs.
650.00 Rs.
450.00 Rs.
Rs.
325.00
337.50
662.50
Rs.
0.00
Cost for 6 " thick wall per sqr. with overheads & profit.