Sie sind auf Seite 1von 6

CONSTRUCTION OF MEDITERANNEAN TOWN HOUSES ALMA-1 (58

AT CANYON VIEWS DHA PHASE-II EXTENSION ISLAMABAD

General Check List MEP Department


TIJAARAT DEVELOPERS
Location:
Sr. No.

OK

Pipe line assessories

Position, Install & size

Pipe lines position installation & size

Water test low/high pressure

Materials Quantities

Pipe sleeves in wall or in slab

Wooden boxes for slab holes

Embedded parts for HVAC

Size/material of earthing conductor

10

Earthing conductor welding work

11

Colour coding of earthing conductor

12

Resistance of earth points (<01 ohm)

13

Conduit dia, thickness and material

14

Placement of conduit

15

Conduit joints are tight and strong

16

Check open ends of conduits are


closed

Not OK

17
18
19
20

Surveyor___________
(Tijaarat Developers)

Site Supervisor______________
(Tijaarat Developers)

Site Engineer_______________
(Tijaarat Developers)

DITERANNEAN TOWN HOUSES ALMA-1 (58 -UNITS)


WS DHA PHASE-II EXTENSION ISLAMABAD

ral Check List MEP Department

___

No.
Date:
Comments

Site Engineer________________
(Tijaarat Developers)

CHECK LIST FOR MEP WORKS


1

PPR lines in walls Bath (FF) Hot & Cold

PPR lines in walls Bath (GF) Hot & Cold

PPR lines in Kitchen Hot & Cold

PPR lines Vertical to O.H.W.T

PPR Hanging Lines Horizontal

PPR Line Horizontal Under G.F

UPVC lines Bath WC (FF)

UPVC lines in Bath WC (GF)

10

UPVC lines Bath Basin (FF)

11

UPVC lines in Bath Basin (GF)

12

UPVC lines in Kitchen (Sink)

13

UPVC lines Vertical Vent

14

UPVC Line Vertical RWD

15

UPVC Line Vertical AC Drain

16

UPVC Line Vertical Balconi RWD

17

UPVC Line Vertical Outside Gerrage RWD

18

UPVC Hanging WC pipes

19

UPVC Hanging Basin pipes

20

All Floor Drains GF

21

All Floor Drains FF

22

AC Drain Connected to 3" dia Basin line

23

Pipe line assessories

24

Position, Install & size

25

Pipe lines position installation & size

26

Water test low/high pressure

27

Materials Quantities

28

Pipe sleeves in wall or in slab

29

Wooden boxes for slab holes

30

Embedded parts for HVAC

31

Size/material of earthing conductor

32

Earthing conductor welding work

33

Colour coding of earthing conductor

34

Resistance of earth points (<01 ohm)

35

Conduit dia, thickness and material

36

Placement of conduit

37

Conduit joints are tight and strong


Check open ends of conduits are
closed

38

Gerrage Area Services


1

Manholes

Gully Traps

Hand Hole for Electrical

UPVC Pipes Connected to M.H

UPVC pipe from M.H in Gerrage to outside

PPR Pipe From gerrage to outside to connect main line

2 No Rain Water Drains connected to RWD infront of gerrage

Telephone Line Sleeve

Data Cable Sleeve

10

Earthing Sleeve

11

Main Electrical cable sleeve

12

ECK LIST FOR MEP WORKS