Project: Tottus Huancayo - Sala de Ventas 1
Drawing no.:
Date: 25/01/2016
Design
Remote area number:
Remote area location:
Occupancy classification:
Density:
Area of application:
Coverage per sprinkler:
Type of sprinklers calculated:
No. of sprinklers calculated:
In rack demand:
Hose streams:
Total water required (including hose streams):
Total water required at base of system riser:
Type of system:
Volume of dry or preaction system:
Notes
System has been automatically peaked by the "Simple Hydraulic Calculator" computer program.
25/01/2016
Page 2
175
Water Source:
A) 150 psi Static
B) 700 gpm at 141.2 psi
(A)
150
(C)
(D)
125
P
S
I
Source at BOR:
(B) C) 149.15 psi Static
D) 429.4 gpm at 136.85 psi
E) 700 gpm at 118.77 psi
(E)
Demand at BOR:
F) 429.4 gpm at 63.68 psi
100
75
(F)
50
25
0
0100
200
300
400
500
GPM
600
report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com
700
25/01/2016
Page 3
Supply Analysis
Node at
Static
Pressure
[psi]
Residual
Pressure
[psi]
Flow
[gpm]
Available
Pressure
[psi]
Total
Demand
[gpm]
Required
Pressure
[psi]
UG-1
150.0
140.0
750.0
139.26
779.42
66.09
Node Analysis
Node Tag
Elev
[M]
Type
M1-1
23.830
ref
25.147
M1-2
23.830
ref
24.404
M1-3
23.830
ref
23.778
M1-4
23.830
ref
23.247
M1-5
23.830
ref
22.790
M1-6
23.830
ref
22.393
M1-7
23.830
ref
22.045
M1-8
23.830
ref
21.737
M1-9
23.830
ref
21.462
M1-10
23.830
ref
21.218
M1-11
23.830
ref
21.130
M2-1
23.830
ref
21.912
M2-2
23.830
ref
21.901
M2-3
23.830
ref
21.866
M2-4
23.830
ref
21.802
M2-5
23.830
ref
21.704
M2-6
23.830
ref
21.575
M2-7
23.830
ref
21.413
M2-8
23.830
ref
21.222
M2-9
23.830
ref
21.002
M2-10
23.830
ref
20.754
Register for complete node information.
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com
25/01/2016
Page 4
Pipe Information
negative pipe flow (Q) indicates flow is from node 2 towards node 1
Node 1
Pipe
Node 2
Elev
[M]
M1-1
23.830
M1-2
23.830
M1-2
23.830
M1-3
23.830
M1-3
23.830
M1-4
23.830
M1-4
23.830
M1-5
23.830
M1-5
23.830
M1-6
23.830
M1-6
23.830
M1-7
23.830
M1-7
23.830
M1-8
23.830
M1-8
23.830
M1-9
23.830
M1-9
23.830
M1-10
23.830
M1-10
M1-10
M1-11
23.830
M2-1
23.830
M2-2
23.830
M2-2
23.830
M2-3
23.830
M2-3
23.830
M2-4
23.830
M2-4
23.830
M2-5
23.830
M1-1
M1-2
M1-3
M1-4
M1-5
M1-6
M1-7
M1-8
M1-9
23.830
M2-1
M2-2
M2-3
M2-4
K-factor
Discharge
& Flow
[gpm]
Nom
i.d.
[in]
Fittings
num & length
[M]
L [M]
F [M]
T [M]
material
C factor
psi/M
total (Pt)
elev (Pe)
frict (Pf)
q=
0.000
4
Q= 389.722 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.149
Pt= 25.147
Pe= 0.000
Pf= 0.743
q=
0.000
4
Q= 355.165 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.125
Pt= 24.404
Pe= 0.000
Pf= 0.626
q=
0.000
4
Q= 325.289 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.106
Pt= 23.778
Pe= 0.000
Pf= 0.532
q=
0.000
4
Q= 299.611 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.091
Pt= 23.247
Pe= 0.000
Pf= 0.457
q=
0.000
4
Q= 277.612 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.079
Pt= 22.790
Pe= 0.000
Pf= 0.397
q=
0.000
4
Q= 258.723 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.07
Pt= 22.393
Pe= 0.000
Pf= 0.348
q=
0.000
4
Q= 242.302 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.062
Pt= 22.045
Pe= 0.000
Pf= 0.308
q=
0.000
4
Q= 227.605 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.055
Pt= 21.737
Pe= 0.000
Pf= 0.275
q=
0.000
4
Q= 213.775 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.049
Pt= 21.462
Pe= 0.000
Pf= 0.245
q=
0.000
4
Q= 122.951 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.018
Pt= 21.218
Pe= 0.000
Pf= 0.088
q=
Q=
q=
0.000
4
39.697 4.026
0.000
5.000
0.000
5.000
S40
C=120
0.002
Pt= 21.912
Pe= 0.000
Pf= 0.011
q=
Q=
q=
0.000
4
74.255 4.026
0.000
5.000
0.000
5.000
S40
C=120
0.007
Pt= 21.901
Pe= 0.000
Pf= 0.035
q=
0.000
4
Q= 104.130 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.013
Pt= 21.866
Pe= 0.000
Pf= 0.065
q=
0.000
4
Q= 129.809 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.019
Pt= 21.802
Pe= 0.000
Pf= 0.097
report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com
25/01/2016
Page 5
Pipe Information, cont.
Node 1
Pipe
Node 2
Elev
[M]
M2-5
23.830
M2-6
23.830
M2-6
23.830
M2-7
23.830
M2-7
23.830
M2-8
23.830
M2-8
23.830
M2-9
23.830
M2-9
23.830
M2-10
23.830
M2-10
M2-10
M2-11
23.830
M2-5
M2-6
M2-7
M2-8
M2-9
23.830
K-factor
Discharge
& Flow
[gpm]
Nom
i.d.
[in]
Fittings
num & length
[M]
L [M]
F [M]
T [M]
material
C factor
psi/M
total (Pt)
elev (Pe)
frict (Pf)
q=
0.000
4
Q= 151.808 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.026
Pt= 21.704
Pe= 0.000
Pf= 0.130
q=
0.000
4
Q= 170.697 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.032
Pt= 21.575
Pe= 0.000
Pf= 0.161
q=
0.000
4
Q= 187.118 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.038
Pt= 21.413
Pe= 0.000
Pf= 0.191
q=
0.000
4
Q= 201.815 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.044
Pt= 21.222
Pe= 0.000
Pf= 0.220
q=
0.000
4
Q= 215.645 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.05
Pt= 21.002
Pe= 0.000
Pf= 0.249
q=
0.000
4
Q= 119.290 4.026
q=
0.000
5.000
0.000
5.000
S40
C=120
0.017
Pt= 20.754
Pe= 0.000
Pf= 0.083
Material Codes
Pipe Material
S40 - Schedule 40 Steel
A
E
G
T
Fittings
Alarm Valve
Standard 90 degree elbow
Gate Valve
Tee - Flow turn 90 degrees
report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com
25/01/2016
Page 6
Flow Diagram ( 1 of 2 )
M1-11 L11-1
122.95
L11-2
122.95
L11-3
122.95
L11-4
122.95
*81.21
L11-5
122.95
*80.00
L11-6
41.74
*81.03
L11-7
38.26
L11-8
119.29
L11-9
119.29
119.
122.95
M1-10 L10-1
90.82
L10-2
90.82
L10-3
90.82
L10-4
90.82
L10-5
90.82
*93.59
L10-6
90.82
*93.59
L10-7
2.76
L10-8
96.36
L10-9
96.36
213.77
M1-9
L9-1
13.83
L9-2
13.83
L9-3
13.83
L9-4
13.83
L9-5
13.83
L9-6
13.83
L9-7
13.83
L9-8
13.83
L9-9
13.83
227.60
M1-8
L8-1
14.70
L8-2
14.70
L8-3
14.70
L8-4
14.70
L8-5
14.70
L8-6
14.70
L8-7
14.70
L8-8
14.70
L8-9
14.70
242.30
M1-7
L7-1
16.42
L7-2
16.42
L7-3
16.42
L7-4
16.42
L7-5
16.42
L7-6
16.42
L7-7
16.42
L7-8
16.42
L7-9
16.42
258.72
M1-6
L6-1
18.89
L6-2
18.89
L6-3
18.89
L6-4
18.89
L6-5
18.89
L6-6
18.89
L6-7
18.89
L6-8
18.89
L6-9
18.89
277.61
M1-5
L5-1
22.00
L5-2
22.00
L5-3
22.00
L5-4
22.00
L5-5
22.00
L5-6
22.00
L5-7
22.00
L5-8
22.00
L5-9
22.00
299.61
M1-4
L4-1
25.68
L4-2
25.68
L4-3
25.68
L4-4
25.68
L4-5
25.68
L4-6
25.68
L4-7
25.68
L4-8
25.68
L4-9
25.68
325.29
M1-3
L3-1
29.88
L3-2
29.88
L3-3
29.88
L3-4
29.88
L3-5
29.88
L3-6
29.88
L3-7
29.88
L3-8
29.88
L3-9
29.88
355.16
M1-2
L2-1
34.56
L2-2
34.56
L2-3
34.56
L2-4
34.56
L2-5
34.56
L2-6
34.56
L2-7
34.56
L2-8
34.56
L2-9
34.56
389.72
M1-1
L1-1
L1-2
L1-3
L1-4
L1-5
L1-6
report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com
L1-7
L1-8
L1-9
25/01/2016
Page 7
Flow Diagram ( 2 of 2 )
L11-4
2.95
*81.21
L11-5
122.95
*80.00
L11-6
41.74
*81.03
L11-7
38.26
L11-8
119.29
L11-9
119.29
L11-10
119.29
L11-11
119.29
M2-11
119.29
119.29
L10-4
L10-5
90.82
*93.59
L10-6
90.82
*93.59
L10-7
2.76
L10-8
96.36
L10-9
96.36
L10-10
96.36
L10-11
96.36
M2-10
96.36
215.64
L9-4
L9-5
13.83
L9-6
13.83
L9-7
13.83
L9-8
13.83
L9-9
13.83
L9-10
13.83
L9-11
13.83
M2-9
13.83
201.81
L8-4
L8-5
14.70
L8-6
14.70
L8-7
14.70
L8-8
14.70
L8-9
14.70
L8-10
14.70
L8-11
14.70
M2-8
14.70
187.12
L7-4
L7-5
16.42
L7-6
16.42
L7-7
16.42
L7-8
16.42
L7-9
16.42
L7-10
16.42
L7-11
16.42
M2-7
16.42
170.70
L6-4
L6-5
18.89
L6-6
18.89
L6-7
18.89
L6-8
18.89
L6-9
18.89
L6-10
18.89
L6-11
18.89
M2-6
18.89
151.81
L5-4
L5-5
22.00
L5-6
22.00
L5-7
22.00
L5-8
22.00
L5-9
22.00
L5-10
22.00
L5-11
22.00
M2-5
22.00
129.81
L4-4
L4-5
25.68
L4-6
25.68
L4-7
25.68
L4-8
25.68
L4-9
25.68
L4-10
25.68
L4-11
25.68
M2-4
25.68
104.13
L3-4
L3-5
29.88
L3-6
29.88
L3-7
29.88
L3-8
29.88
L3-9
29.88
L3-10
29.88
L3-11
29.88
M2-3
29.88
74.25
L2-4
L2-5
34.56
L2-6
34.56
L2-7
34.56
L2-8
34.56
L2-9
34.56
L2-10
34.56
L2-11
34.56
M2-2
34.56
39.70
L1-4
L1-5
L1-6
L1-7
L1-8
L1-9
L1-10
L1-11
M2-1
report created by the "Simple Hydraulic Calculator" version 2.3.4 from www.igneusinc.com