1.0 SCOPE
This procedure applies to during the process test of high pressure gas cylinder
for Service Gas Supply System.
2.0 PURPOSE
This procedure is to estabilish the methods and requirments for manufacturing
of high pressure gas cylinder's to be used in Qurayyah IPP Project Service
Gas System
3.0 RESPONSIBILITY
3.1 The NK QM inspection personnel is responsible for witness or review the
manufactuing process test and preparing the test reports if required.
3.2 The NK QM Manager is responsible for reviewing & approval for the test reports
4.0 PROCEDURE
4.1. Material Control
4.1.1 The NK and Independent Inspector will verify that the CMTRS(Certified
Material Test Report) issued for the raw material are proper and
that the chemical contents specified are as required.
A.
B.
C.
NK TECH CO.,LTD.
QIPP-MPN025-G00-3003
REV. A
4 of 14
B.
4.1.5 All accepted rew materials are held until further processing is
performed.
4.2
4.3.1 Each tube and circular blank is cleaned by shot blasting and / or
chemical means to remove scale, etc., if necessary, before
further process.
4.3.2 Each circular blank and cup is lubricated by Zinc Phosphating and
Soaping treatment prior to the drawing operations by CUP press &
DDI (Deep Drawing Ironing) press.
NK TECH CO.,LTD.
QIPP-MPN025-G00-3003
REV. A
5 of 14
4.4
Spin Forming
4.4.1 One end is preheated to the required temperature.
A.
B.
4.4.4 The spinning operator will watch for and determine if folding has
occurred duriug the spinning process.
4.4.5 The formed tube is removed from the automatic controlled machine and
pressedd to
t the
th required
i d bottom
b tt
shape
h
b a hydraulic
by
h d
li press andd then
th
cooled.
l d
4.4.6 Shotting and Inspection
upon cooling, the inside area of formed tube shall be
cleaned by shotting.
4.4.7 After shotting, the formed tube will be inspected by
the NK and Independent Inspector.
A.
B.
NK TECH CO.,LTD.
QIPP-MPN025-G00-3003
REV. A
6 of 14
B.
4.1
Heat Treating
B.
NK TECH CO.,LTD.
QIPP-MPN025-G00-3003
REV. A
7 of 14
B.
C.
D.
NK TECH CO.,LTD.
QIPP-MPN025-G00-3003
REV. A
8 of 14
TEST
B.
C.
D.
E.
(2)
(3)
corresponding strain.
Cross-head speed of the testing machine shall not exceed
1/8 inch per minute during yield strength determination.
F.
G.
H.
NK TECH CO.,LTD.
QIPP-MPN025-G00-3003
REV. A
9 of 14
B.
C.
D.
E.
F.
After completion of flattening test, the QC section or Subcontractor shall record the results on the physical Test Report.
A chemical analysis will be performed on one of the test specimens by the QC section or Subcontractor.
B.
C.
NK TECH CO.,LTD.
QIPP-MPN025-G00-3003
REV. A
10 of 14
Machining
4.7.1
4.7.2
When the taper threads are used, the length of thread will be no
less than as specified for American Standard of National GAS
Threads.
4.7.3
When the straight threads are used, the threads will have at least
6 engaged threads and gaskets is required to prevent leakage.
4.7.4
4.7.5
4.8
4.9
Hydrostatic Test
This test will be performed in accordance with Hydrostatic Test Procedure
QIPP-MPN025-G00-3004
4.10
Leakage Test
This test will be performed in accordance with Hydrostatic Test Prodcedure
QIPP-MPN025-G00-3004
NK TECH CO.,LTD.
QIPP-MPN025-G00-3003
REV. A
11 of 14
Cleaning
4.12.1
4.12.2
4.13
4.13.1
A.
B.
C.
D.
4.13.2
4.14
Surface Treatment
4.14.1
4.15
4.15.1
NK TECH CO.,LTD.
INSPECTION PROCEDURE
FOR N2 FILLING SYSTEM
QIPP-MPN025-G00-3003
REV. A
12 of 14
. CYLINDER RACK
1.0 SCOPE
This procedure specifies the procedure for shop inspection and tests for the
following gas cylinder rack pack.
2.0 INSPECTION PROCEDURE
2.1 Material Inspection
2.1.1 Material in the drawing and material test certificate of the manufacture's
issue to check whether the chemical composition and mechanical property
are within the approved drawing(QIPP-MPN025-M00-0003)
2.1.2 The surface of material shall be checked with naked eye for any defect
(dent, crack, corrosions) to see whether its appearance and standard mark
to meet the standard.
2 2 Dimension & Visual Inspection
2.2
2.2.1 After installation overall visual and outline shall be checked according
to the specified approved GA drawing(QIPP-MPN025-M00-0001).
2.2.2 Dimension inspection shall include the following,
- Dimension of mounting pad including the size and location of each anchor
bolt hole.
- Clearance and dimension for maintenance or assembly.
- Outline dimension for connection or installation including the size,
type and location of accessories.
2.3 Paint Inspection
2.3.1 Paint Inspection report submitted by sub-vendor shall be checked to see
whether to meet the painting and coating specification and procedure
(QIPP-MPN025-G00-3007) required.
NK TECH CO.,LTD.
INSPECTION PROCEDURE
FOR N2 FILLING SYSTEM
QIPP-MPN025-G00-3003
REV. A
13 of 14
NK TECH CO.,LTD.
INSPECTION PROCEDURE
FOR N2 FILLING SYSTEM
QIPP-MPN025-G00-3003
REV. A
14 of 14
NK TECH CO.,LTD.