SIEMENS

TASK:

RISK ASSESSMENT
Enhancement Project Kadanwari.

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown of Task
1)
2)
3)

Excavation, backfilling
Lifting Operation
Scaffolding

4)

Fabrication

5)
6)

NDT
Grit blasting

7)

8)
9)
10)
11)
12)
13)

Sleeving
Hydro static Test
Piping/ installation of pre- fabricated spools
Under ground Piping

Touchup Painting.
House keeping

Holiday

S/N
O
1

Activity

HAZARDS

Effects

Sev Pro
erit babi Risk
y
lity

Additional Controls

RESID
UAL
RISK

Final
Assessmen
t

Excavation / Backfilling.

Manual Excavation

Dehydration, dust,
hit / cut, slip,
existing
People
underground
injury.
cables/ instrument
tubes & piping

Backfilling and
compacting with
diesel driven plate
compactor

Dust, slip, oil


leakage of oil,
failure of
equipment

Hit,
People
injury,
equipmen
t damage

PTW,PPE, first aid box,


Inspection of location, Deploy
MCI the skilled persons and proper
supervision , use the shawal,
spade and ganti

Acceptable

PPE, First aid box, Inspection of


site equipment, PTW,
MCI barrication, use the dust mask,
do not carry out job in heavy
wind.

Acceptable

1 OF 22

S/N
Activity
O
2 Lifting Operation

Scaffolding

Effects

Loading/ Off loading


of pipes, Spools/
Personnel
Hit/Slip/fall,
Assemblies,
Injury/equ
unbalance, failures
Equipment and other
ipment
of mechanism.
material at assigned/
damage.
job location

Placement of
Equipment at
locations

HAZARDS

Erection of
Scaffolding

Removal of
Scaffolding

Personnel
Hit/Slip/fall,
Injury/equ
unbalance, failures
ipment
of mechanism.
damage.

Disturbance on
access, hit, fall,
throw

Disturbance on
access, hit, fall,
throw

Persons
injury,
property
damage

Persons
injury,
property
damage

Sev Pro
erit babi Risk
y
lity

Additional Controls

RESID
UAL
RISK

Final
Assessmen
t

IRR
M

Review of RA, PTW, PPE, Safety


Talk, Inspection of location,
ground and equipment,
employment of certified crane,
operator, & lifting
gears,barricade the working
area, first aid box, close
supervision.

Acceptable

PTW, PPE, Safety Talk,


Inspection of location, ground
IRR and equipment, employment of
M
certified crane, operator, &
lifting gears,barricade the
working area, close supervision.

Acceptable

Inspection of material & site,


PTW, PPE, barrication, clear
IRR
access, deploy the competent
M
scaffolders,
use the harness
for work at height.

Acceptable

Inspection of material & site,


PTW, PPE, barrication, clear
access,avoid to thrown the
IRR
material from height,use the
M
bucket, deploy the competent
scaffolders,
use the harness
for work at height.

Acceptable

2 OF 22

S/N
O
4

Activity

HAZARDS

Effects

Fabricationk and Fitting

Welding

Persons
Spark, Fire,
injury,
Explosion,
property
equipment failuar.
damage

Grinding and use of


Power brush

Persons
Spark, Fire,
injury,
Explosion,
property
equipment failure.
damage

Sev Pro
erit babi Risk
y
lity

Cutting, use of
cutting torch set.

Persons
Spark, Fire,
injury,
Explosion,
property
equipment failures.
damage

Additional Controls

PTW,PPE, safety talk,


inspection of site and
equipment, deploy qualified
welders, proper welding hood,
monitor the condition
IRR continuously, arrangement of
M water and nimkol, ensure the
availability of fire extinguisher,
fire proof trepollian/ blanket,
arrangement of water /sand
buck, barrication, no unconcerned persons.
PTW,PPE, safety talk,
inspection of site and
IRR equipment, deploy competent
M persons, use the face shield,
arrangement of water and
nimkol at site,

RESID
UAL
RISK

Final
Assessmen
t

Acceptable

Acceptable

PTW,PPE, stack the cylinders on


proper trolley, installed the flash
back arrestor on cylinder,
proper tightening of leads and
IRR valves, inspection of
M equipment, deploy trained
persons, availability of fire
extinguisher, fire proof
trepollian/ blanket, arrangement
of water & sand filled bucket

3 OF 22

S/N
O

b
c

Activity

Cold Cutting,
Wherever required

HAZARDS

Effects

Persons
Cut, Slip, Hit/ Fall/ injury,
Fire, spark
property
damage

Sev Pro
erit babi Risk
y
lity

Additional Controls

PTW/PPE, as per job location


check the gas, inspection of
equipments, prior to start of
cold cutting work, use of proper
IRR
cold cutter, bonding clamp &
M
other hand tools, barricade the
working area/deploy skilled
manpower, use of Mud plug for
plug/blind the cutted pipe.

IRR
M

RESID
UAL
RISK

Final
Assessmen
t

Acceptable

NDT
DPT- Dry
Fumes, smell,
Penitration Test
MPI- Magnetic
Particle
Megna flux
Inspection
UT- Ultrasonic Test

RT- Radiographic
Test.

Blasting

Radiation, stored
energy

Chronic
effects on
health of
people

Cleaner, developer, penitrator

IRR
M
IRR
M
IRR
M

Area will be
Barricaded/Evacuate the
radiation area

Use
of
Dozy
met
er/fil
m
batc
h/us
e of
confi
ned
cont
aine
r for
hand
ling
of
sour
se.

4 OF 22

S/N
O

Activity

HAZARDS

Dust, Rupture of
Grit blasting / Sand
hose, loosing of
blasting
fittings, hit, fall

Effects

Persons
injury,
property
damage

Sev Pro
erit babi Risk
y
lity

Additional Controls

RESID
UAL
RISK

Inspection of equipment,
site,deploy trained manpower,
first aid box should be available
at site.use the proper hood with
fresh air/ life line,close
supervision, PTW, PPE, removek
the pieces of stones from grit/
sand, barrication of location.

Final
Assessmen
t

Acceptable

5 OF 22

S/N
O
7

Activity

HAZARDS

Effects

Holiday Testing

Sev Pro
erit babi Risk
y
lity

Persons
injury,
Holiday Testing for
Electric shock, Mis- effect
detect the pin holes
handling, hit /fall.
on
in welded spools.
equipmen
t
8

RESID
UAL
RISK

Final
Assessmen
t

PPE, PTA, certificate, deploy


competent person, continue
monitoring activity, earthing on
spools.

Acceptable

PTW,PPE, use the burner with


gas cylender, installed & proper
tightening of valve on gas
cylender, inspection of
equipment, deploy trained
persons, availablity of fire
extinguisher, fire proof
trepollan/ blenket, arrangement
of water & sand filled bucket

Acceptable

PTW, PPE, Prior to start of this


job to be arrange the tool box
IRR talk, ensure the proper
M handling to work, avoid to fall of
tools, proper tightening, use the
hand gloves..

Acceptable

Sleeving

Fixing / applying of
Heat Sleeves

Additional Controls

Spark, Fire,
Explosion

Persons
injury,
property
damage

Hydrostatic Test.

Installation of Fitting Sliping of fitting,


and flanges.
tools, hit

Persons
injury

6 OF 22

S/N
O

Activity

Filling of Water

Pressurization on
psi

De-pressurize & /
flushing

HAZARDS

Effects

sleepry soil/
Effect on
ground, produce of health
mud
and eyes

Loosing/ Leakage of
fittings, rupture/
brust of hose, entry
of un authorized
persons, lake of
communication,
failure of
equipment like
compressure, PSV,
guages, valves, hit.

Persons
injury,
equipmen
t damage,
effect on
environm
ent.

Persons
Rupture/ brust of
injury,
hose, entry of un
equipmen
authorized persons, t damage,
lake of
effect on
communication,
environm
ent.

Sev Pro
erit babi Risk
y
lity

Additional Controls

RESID
UAL
RISK

Final
Assessmen
t

PTW, PPE, ensure the proper


IRR handling to work, avoid to
M spread the huge quantiity of
water at job location.

Acceptable

PTW,PPE, Use the corrective psv


and other accessories, First aid
MCI box,prior to start of activity
inspection of site & equipment,
proper monitoring, barrication.

Acceptable

PTW,PPE, proper monitoring,


barrication, open the drain
IRR
valve slowly, drain of water at
M
safe place or as per instruction
of HSE OMV

Acceptable

7 OF 22

S/N
O
10

Activity

HAZARDS

Effects

Sev Pro
erit babi Risk
y
lity

Additional Controls

RESID
UAL
RISK

Piping/ Installation of pre-fabricated Spools


Stringing/ Stacking
of pipes/ spools

Hit, slip, fall of tools Injury

Piping/ Installation of Cut, Slip, Hit/ Fall/


pre-fabricated
failure of
Spools
equipment, tools

Persons
injury,
equipmen
t damage,

Final
Assessmen
t

Prior to start of work visual


MCI inspection of job location,
proper supervision, PPE, PTW.

Acceptable

PPE,PTW, skilled workers,


arrangement of corrective tools,
MCI continue watch the activity, if
work at height to be use the
harness

Acceptable

MCI

Acceptable

Proper supervision, Store at out


of residential area barricade the
area, No Smoking should be
IRR
mark on signboard , use the
M
rubber gloves, LEP/goggle and
mask, proper arramgement for
protection of soil/ ground..

11 Under ground piping


Welded spools lying
in trenches.

12

Dust, slip, coleps of Minor


trench
injury

PTW,PPE deploy cometent


workers and proper supervision

Painting

Placement of
Painting material

Chronic
effects on
health,
Fumes, Spread, fire
environm
ent
damage.

8 OF 22

S/N
O

Activity

Mixing of paint with


thinner

Touch up Painting

HAZARDS

Effects

Chronic
effects on
Fumes, contact with health,
skin,eyes, fire
environm
ent
damage.

Chronic
effects on
Fumes, contact with health,
skin,eyes, fire
environm
ent
damage.

Sev Pro
erit babi Risk
y
lity

Additional Controls

RESID
UAL
RISK

Final
Assessmen
t

PPE,PTW, close supervision,


avoid to direct contact with
hands, eyes, No smoking, use
MCI
the rubber gloves, LEP/goggle
and mask, proper arramgement
for protection of soil/ ground..

Acceptable

Use the proper brush, if job at


height fasten of harness,
PPE,PTW, close supervision,
avoid to direct contact with
MCI hands,eyes, use the rubber
gloves, LEP/goggle and mask,
no smoking during this job,
proper arramgement for
protection of soil/ ground

Acceptable

MCI

Acceptable

13 House keeping / Restoration of site


House keeping /
Restoration of site

Dust / Garbage

Suffocatio
n

PPE, Inspection of site, PTW,


use the dust mask

9 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

2
3
4
5

Activity

10) Piping/ Installation of Spools


HAZARDS

Excavation / Backfilling.
Dehydration, dust,
hit / cut, slip,
existing
Manual Excavation underground
cables/
instrument tubes &
piping
Back filling and
Dust, slip, oil
compacting with
leakage of oil,
diesel driven plate failure of
compactor
equipment
Attendees
Muhammad Saifullah Khan
Construction
Superintendent
OMV
Basharat Ahmed
Butt
HSE Advisor
Projects OMV
Syed
Khalid Anwer
Site Manager
SIEMENS
Musharaf
Hussain
Construction. Manager, Civil SIEMENS
Abdul Wahab Manager HSE SIEMENS

Effects

People
injury.
Hit,
People
injury,
equipmen
t damage

Sev- Proberity ability

Risk

Additional Controls

Final
RESIDUAL Assessmen
RISK
t

MCI

PTW,PPE, first aid box,


Inspection of location, Deploy
the skilled persons and proper
supervision , use the shawal,
spade and ganti

Acceptabl
e

MCI

PPE, First aid box, Inspection of


site equipment, PTW,
barrication, use the dust mask,
do not carry out job in heavy
wind.

Acceptabl
e

6 Ghulam Khan
CivilAhmed
Surveyor.
7 Riaz
Supervisor
8.Civil
Shaukat
Raza
9. HSE
RanaSupervisor
Tanweer
Site Supervisor for inside of plant.

MCI - Manage for Continuous


Improvemen
(LOW)
IRRM
- Incorporate Risk Reduction
Measures
(MEDIUM)
I - Intolerable
(High)

10 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

Activity

10) Piping/ Installation of Spools


HAZARDS

Effects

Sev- Proberity ability

Risk

Lifting Operation

Loading/ Off loading


of pipes, Spools/
Personnel
Assemblies,
Hit/Slip/fall,
Injury/equ
Equipment and
unbalance, failures
ipment
other material at
of mechanism.
damage.
assigned/ job
location

IRRM

Placement of
Equipment at
locations

Personnel
Hit/Slip/fall,
Injury/equ
unbalance, failures
ipment
of mechanism.
damage.

IRRM

Scaffolding

2
3
4
5

Erection of
Scaffolding

Disturbance on
access, hit, fall,
throw

Attendees
Muhammad Saifullah Khan
Construction
Superintendent
OMV
Basharat Ahmed
Butt
HSE Advisor
Projects OMV
Syed
Khalid Anwer
Site Manager
SIEMENS
Musharaf
Hussain
Construction. Manager, Civil SIEMENS

Persons
injury,
property
damage

IRRM

6 Ghulam Khan
CivilAhmed
Surveyor.
7 Riaz
Supervisor
8.Civil
Shaukat
Raza
9. HSE
RanaSupervisor
Tanweer
Site Supervisor for inside of plant.

Additional Controls

Review of RA, PTW, PPE, Safety


Talk, Inspection of location,
ground and equipment,
employment of certified crane,
operator, & lifting
gears,barricade the working
area, first aid box, close
supervision.
PTW, PPE, Safety Talk,
Inspection of location, ground
and equipment, employment of
certified crane, operator, &
lifting gears,barricade the
working area, close supervision.

Inspection of material & site,


PTW, PPE, barrication, clear
access, deploy the competent
scaffolders,
use the harness
for work at height.

Final
RESIDUAL Assessmen
RISK
t

Acceptabl
e

Acceptabl
e

Acceptabl
e

MCI - Manage for Continuous


Improvemen
(LOW)
IRRM
- Incorporate Risk Reduction
Measures
(MEDIUM)
I - Intolerable
(High)

11 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

Activity

10) Piping/ Installation of Spools


HAZARDS

Effects

Sev- Proberity ability

Risk

Additional Controls

Final
RESIDUAL Assessmen
RISK
t

Abdul Wahab Manager HSE SIEMENS

12 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

10) Piping/ Installation of Spools

Activity

HAZARDS

Disturbance on
access, hit, fall,
throw

Removal of
Scaffolding

Fabrication and Fitting

Welding

Effects

Persons
injury,
property
damage

Persons
Spark, Fire,
injury,
Explosion,
property
equipment failure.
damage

Sev- Proberity ability

Risk

Additional Controls

Final
RESIDUAL Assessmen
RISK
t

IRRM

Inspection of material & site,


PTW, PPE, barrication, clear
access,avoid to thrown the
material from height,use the
bucket, deploy the competent
scaffolders,
use the harness
for work at height.

Acceptabl
e

IRRM

PTW,PPE, safety talk,


inspection of site and
equipment, deploy qualified
welders, proper welding hood,
monitor the condition
continuously, arrangement of
water and nimkol, ensure the
availability of fire extinguisher,
fire proof trepollian/ blanket,
arrangement of water /sand
bucket, barrication, no unconcerned persons entry.

Acceptabl
e

13 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

Activity

Grinding and use of


Power brush

Cutting, use of
cutting torch set.

Cold Cutting,
Wherever required

10) Piping/ Installation of Spools


HAZARDS

Effects

Persons
Spark, Fire,
injury,
Explosion,
property
equipment failure.
damage

Persons
Spark, Fire,
injury,
Explosion,
property
equipment failures.
damage

Persons
Cut, Slip, Hit/ Fall/ injury,
Fire, spark
property
damage

Sev- Proberity ability

Risk

Additional Controls

Final
RESIDUAL Assessmen
RISK
t

IRRM

PTW,PPE, safety talk,


inspection of site and
equipment, deploy competent
persons, use the face shield,
arrangement of water and
nimkol at site,

Acceptabl
e

IRRM

PTW,PPE, stack the cylinders on


proper trolley, installed the flash
back arrestor on cylinder,
proper tightening of leads and
valves, inspection of
equipment, deploy trained
persons, availability of fire
extinguisher, fire proof
trepollian/ blanket, ar

Acceptabl
e

IRRM

PTW/PPE, as per job location


check the gas, inspection of
equipments, prior to start of
cold cutting work, use of proper
cold cutter, bonding clamp &
other hand tools, barricade the
working area/deploy skilled
manpower, use of Mud plug for
plug/blind the

Acceptabl
e

14 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

Activity

10) Piping/ Installation of Spools


HAZARDS

Effects

Sev- Proberity ability

Final
RESIDUAL Assessmen
RISK
t

Risk

Additional Controls

MCI

PTW, Use the specific material


like Cleaner, developer,
penitrator, use the dust mask
and goggles,if work at height to
be use the harness.

Acceptabl
e.

MCI

PTW, Use the specific material ,


use the dust mask and goggles,
if work at height to be use
the harness.

Acceptabl
e

MCI

PTW, Use the electreonic, use


the dust mask and goggles,
if work at height to be
use the harness.

Acceptabl
e

IRRM

Strict monitoring, deploy


authorize Radiographic team,
use the convinent equipment
like Dosimeter,survey
meter,flim badge, situate sign
board, deploy safety watch
man, area will be
barricaded/evacuate the
radiation area

Acceptabl
e

Non Detective Test (NDT)


DPT- Dry
Penitration Test

Effects on
Spray of chemical,
health
fumes, smell,
and eyes

MPI- Magnetic
Particle Inspection

Electric shock, Chronic


mis-handling, effects on
health
fall.

UT- Ultrasonic Test

RT- Radiographic
Test.

Blasting

use the electronic


effects on
equiopment,
hands
batteru falure

Chronic
Radiation, stored
effects on
energy, moment of
health of
peoples,unpeople &
authorize entries.
wild.

15 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

Activity

Grit blasting / Sand


blasting

10) Piping/ Installation of Spools


HAZARDS

Dust, Rupture of
hose, loosing of
fittings, hit, fall

Effects

Persons
injury,
property
damage

Holiday Testing

Persons
injury,
Holiday Testing for
Electric shock, Mis- effect
detect the pin holes
handling, hit /fall. on
in welded spools.
equipmen
t
Sleeving

Fixing / applying of
Heat Sleeves

Spark, Fire,
Explosion

Persons
injury,
property
damage

Sev- Proberity ability

Final
RESIDUAL Assessmen
RISK
t

Risk

Additional Controls

IRRM

Inspection of equipment,
site,deploy trained manpower,
first aid box should be available
at site.use the proper hood with
fresh air/ life line,close
supervision, PTW, PPE, removek
the pieces of stones from grit/
sand, barrication of location.

Acceptabl
e

IRRM

PPE, PTA, certificate, deploy


competent person, continue
monitoring activity, earthing on
spools.

Acceptabl
e

IRRM

PTW,PPE, use the burner with


gas cylender, installed & proper
tightening of valve on gas
cylender, inspection of
equipment, deploy trained
persons, availablity of fire
extinguisher, fire proof
trepollan/ blenket, arrangement
of water & sand filled buc

Acceptabl
e

16 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

Activity

10) Piping/ Installation of Spools


HAZARDS

Installation of Fitting Sliping of fitting,


and flanges.
tools, hit

Filling of Water

10

Sev- Proberity ability

Risk

Additional Controls

Final
RESIDUAL Assessmen
RISK
t

Hydrostatic Test.

Effects

Pressurization on
psi ?

sleepry soil/
ground,
Loosing/produce
Leakageof
mud
of fittings, rupture/
brust of hose,
entry of un
authorized
persons, lake of
communication,
failure of
equipment
like of
Rupture/ brust
compressure,
hose, entry of PSV,
un
guages,
valves,
hit.
authorized

Persons
injury

Effect on
health
and eyes
Persons
injury,
equipmen
t damage,
effect on
environm
Persons
ent.
injury,

equipmen
De-pressurize & /
t damage,
flushing
persons, lake of
effect on
communication,
environm
Piping/ Installation of pre-fabricated ent.
Spools

MCI

MCI

MCI

IRRM

PTW, PPE, Prior to start of this


job to be arrange the tool box
talk, ensure the proper
handling to work, avoid to fall of
tools, proper tightening, use the
hand gloves..
PTW, PPE, ensure the proper
handling to work, avoid to
spread the huge quantiity of
water at job location.

Acceptabl
e

Acceptabl
e

PTW,PPE, Use the corrective psv


and other accessories, First aid
box,prior to start of activity
inspection of site & equipment,
proper monitoring, barrication.

Acceptabl
e

PTW,PPE, proper monitoring,


barrication, open the drain
valve slowly, drain of water at
safe place or as per instruction
of HSE OMV

Acceptabl
e

17 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

10) Piping/ Installation of Spools

Activity

HAZARDS

Stringing & Stacking Hit, slip, fall of


of pipes/ spools
tools

Piping/ Installation
of pre-fabricated
Spools

Cut, Slip, Hit/ Fall/


failure of
equipment, tools

Effects

Injury

Persons
injury,
equipmen
t damage,

Sev- Proberity ability

Risk

Additional Controls

Final
RESIDUAL Assessmen
RISK
t

IRRM

Prior to start of work visual


inspection of job location,
proper supervision, use of
certified crane, operator, lifting
gears, PPE, PTW.

Acceptabl
e

IRRM

PPE,PTW, skilled workers,


arrangement of corrective tools,
continue watch the activity, if
work at height to be use the
harness, use of certified crane,
operator, lifting gears

Acceptabl
e

IRRM

PTW,PPE deploy competent


workers and proper supervision,
use of certified crane, operator,
lifting gears

Acceptabl
e

11 Under ground piping


Welded spools lying Dust, slip, coleps of Minor
in trenches.
trench
injury

12

Painting

18 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

Activity

10) Piping/ Installation of Spools


HAZARDS

Effects

Sev- Proberity ability

Risk

Smell, Fumes,
Spread, fire

Chronic
effects on
health,
environm
ent
damage.

IRRM

Fumes, smell,
Mixing of paint with
contact with
thinner
skin,eyes, fire

Chronic
effects on
health,
environm
ent
damage.

MCI

Handling &
Placement of
Painting material

Touch up Painting

Chronic
effects on
Fumes, contact
health,
with skin,eyes, fire environm
ent
damage.

MCI

Additional Controls

Final
RESIDUAL Assessmen
RISK
t

Proper supervision, Store at out


of residential/ working area,
barricade the area, No Smoking
should be mark on sign board ,
L
use the rubber gloves,
LEP/goggle and mask, proper
arramgement for protection of
soil/ ground.
PPE,PTW, close supervision,
avoid to direct contact with
hands, eyes, No smoking, use
L
the rubber gloves, LEP/goggle
and mask, proper arramgement
for protection of soil/ ground..
Use the proper brush, if job at
height fasten of harness,
PPE,PTW, close supervision,
avoid to direct contact with
hands,eyes, use the rubber
gloves, LEP/goggle and mask,
no smoking during this job,
proper arramgement for
protection of soil/ ground

Acceptabl
e

Acceptabl
e

Acceptabl
e

13 House keeping / Restoration of site

19 OF 22

SIEMENS

RISK ASSESSMENT
HSE

Enhancement Project OMV Pakistan, Kadanwari.

TASK:

MECHANICAL WORK INSIDE OF PLANT AREA.


Breakdown

of

Task

1) Excavation/ Back filling


2) Lifting Operation

6) Blasting
7) Holiday

11) Under ground piping


12) Painting

3) Scaffolding

8) Sleeving
9) Hydrostatic Test

13) House Keeping

4) Fabrication & Fitting.


5) NDT
S/NO

Activity

House keeping /
Restoration of site

10) Piping/ Installation of Spools


HAZARDS

Effects

Dust / Garbage

Suffocatio
n

Sev- Proberity ability

Risk

MCI

Additional Controls

PPE, Inspection of site, PTW,


use the dust mask

Final
RESIDUAL Assessmen
RISK
t

Acceptabl
e

20 OF 22

SIEMENS
HSE

RISK ASSESSMENT
Enhancement Project OMV Pakistan, Kadanwari.

TASK: Fabrication and Fitting


Breakdown
2004

of

1) Inspection of job Location


2) Checking of Material
3) Inspection of Equipment/
T&P
4) Measurement & Marking

S/N
O

Activity

Inspection of Job
Location

Task

7) Cutting

HAZARDS

Effects

Person
injury,
effects on
equipment
Broked wooden
Person
plankes, loose of joints,
injury,
holes in pipes due to
effects on
rust.
equipment
Un-even, soft ground,
hurdles, block access

Checking of Material

Inspection of
Equipment and Tools.

Inproper equipments &


tools

Measurement &
Marking

inproper tools

Welding

Date: July 08,

5) Welding
6) Grinding

Location: SIEMENS WORK SHOP IN DRILLING YARD

Person
injury,
effects on
equipment
Person
injury

Persons
Spark, Fire, Explosion, injury,
property
equipment failuar.
damage

Sev- ProbRisk
erity ability
2

Additional Controls

MCI

Compection & leveling of ground and


removal of hurdles, to be clear the
access

Acceptable

MCI

Segrecation of scaffolding
material,use only proper material,
avoid from spread of material, proper
stacking

Acceptable

Acceptable

Acceptable

MCI

Segrecation of equipment and tools


material,use only proper e, avoid
from spread of material, proper
stacking

MCI

Use the measuring tape,angle,chalk,

21 of 22

Final
RESIDUAL Assessmen
RISK
t

PTW,PPE, safety talk, inspection of


site and equipment, deploy qualified
welders, proper welding hood,
monitor the condition continuously,
IRRM arrangement of water and nimkol,
ensure the availability of fire
extinguisher, fire proof trepollian/
blanket, arrangement of water /sand
bucket, barrication.

Acceptable

SIEMENS
HSE

RISK ASSESSMENT
Enhancement Project OMV Pakistan, Kadanwari.

TASK: Fabrication and Fitting


Breakdown
2004

of

1) Inspection of job Location


2) Checking of Material
3) Inspection of Equipment/
T&P
4) Measurement & Marking

Location: SIEMENS WORK SHOP IN DRILLING YARD

Task

Date: July 08,

5) Welding
6) Grinding
7) Cutting

Persons
Spark, Fire, Explosion, injury,
property
equipment failure.
damage

Persons
injury,
property
damage

PTW,PPE, safety talk, inspection of


site and equipment, deploy
IRRM competent persons, use the face
shield, arrangement of water and
nimkol at site,
PTW,PPE, stack the cylinders on
proper trolley, installed the flash back
arrestor on cylinder, proper
tightening of leads and valves,
IRRM
inspection of equipment, deploy
trained persons, availability of fire
extinguisher, fire proof terpolean/
blanket.

Grinding and use of


Power brush

Cutting, use of cutting


torch set.

Attendees
Muhammad Saifullah Khan Const: Suptt: OMV

.Shaikh M. Afzal- Site Supervisor.

MCI - Manage for Continuous Improvemen (Low)

Basharat A.But HSE Advisor Projects OMV

Iqbal - Fabricator.

IRRM - Incorporate Risk Reduction Measures

Syed Khalid Anwer Site Manager Siemens

.Zulfiqar- Fabricator

I - Intolerable

Fakhir Sohail- CM

Allah Yar- Welder

Shahid Mansoor Piping Engineer

Allah Ditta- Welder

Abdul Wahab Manager HSE

Tahir Iqbal- Welder

Mian Nisar- I/c Mechanical Works

S.M. Qamar- QA/QC Inspector

Gh. Sabbir-Mech Supptt:

Spark, Fire, Explosion,


equipment failures.

22 of 22

(High)

Acceptable

Acceptable

(MEDIUM)