Beruflich Dokumente
Kultur Dokumente
Worksheets
Collaboration Partmers
Conductivity
Hydrology
Weir
Side Intake
Bottom Intake
Headrace Canal
Headrace Pipe
Settling Basin
Penstock & Power
Loads on Anchor
Anchor Block Stability
Turbine
Electrical
Machine Foundation
Transmission Line
Loads and Benefits
Costing & Financial Analyses
Utilities
Version: 2010.04
SHPP/GTZ, Nepal
Email
Web
Entec AG, Switzerland
Email
Web
Feedback
Pushpa Chitrakar
pushpa.chitrakar@gmail.com
Help
Online Manual
Drawings
List of Reference
Kathmandu, Nepal
Referances: 6,12,13,15,16
Date
Revision
06-Apr-2016
2006.05
Golmagad SHP
Kankaimai Hydropower P Ltd
EPC Consult
Pushpa Chitrakar
Pushpa Chitrakar
Project
Developer
Consultant
Designed
Checked
Meter
Salt
Given k
Iyoo Noon
Water temp:
1.8 Time intervals
11 deg C
5 sec
1.8000
1580 gm
1795 gm
91
106
24
24
3433
3997
6245
7265
455 l/s
445 l/s
Average Discharge
400 gm
70
25
2062
1560
462 l/s
0 gm
1
0
0
0
0 l/s
454 l/s
Salt
Salt
Salt
Salt
60
Conductivi
ty
50
=400gm, A ef f =1560
=1580gm, A ef f =6245
=1795gm, A ef f =7265
=0gm, A ef f =0
mS
40
30
20
10
0
50
100
150
200
250
300
350
400
450
Time(sec)
Salt =400gm, A eSalt =1580gm,
Date= 2010/10/5, 11de g C, HANNA Ins trum e nts (HI 933000), Iyoo Noon, k =1.8, Ave . Dis charge = 453.89 l/s
500
550
600
Referances:2,2,4, 6,12,13,15,16
Date
Revision
Project:
Developer
Consultant
Designed
Checked
06-Apr-2016
2006.05
INPUT
River name :
Location :
Measured flow for MIP method l/s:
Month and day of flow measurement:
MIP region (1 -7) :
Area of basin below 3000m elevation A3000 km2 :
Chhyota Khola
Barand, Sertung VDC 2, Dhading
80
March
23
3
1.5
80
5%
10%
OUTPUT
MIP monthly average discharge
Month
@ river
To plant
January
#NAME?
#NAME?
February
#NAME?
March
#NAME?
April
#NAME?
May
#NAME?
June
#NAME?
July
#NAME?
August
#NAME?
September
#NAME?
October
#NAME?
November
#NAME?
December
Annual av
Q exceedence (month)
#NAME?
2
20
100
Discharges (l/s)
Qturbine (Qd)
Q diverted Qd+Qlosses
Q losses 5% of Qd
Q release 10% of Qlow
Q min required @ river
#NAME?
#NAME?
As per MGSP
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
12
12
Long Term Average Annual Hydrograph of Chhyota Khola river, Upper Jogmai SHP
12
10
MIP Flows
#NAME?
8
Discharge (l/s)
0
Jan
Feb
Mar
Apr
May
Jun
Months
Jul
Aug
Sep
Oct
Nov
Dec
Referances: 6,12,13,15,16
Date
Revision
06-Apr-2016
2006.05
Upper Jogmai, Ilam
Kankaimai Hydropower P Ltd
EPC Consult
Pushpa Chitrakar
Pushpa Chitrakar
Project
Developer
Consultant
Designed
Checked
4.0
3.5
3.0
2.5
Height ZZ (m)
2.0
1.5
1.0
0.5
0.0
-1.5
-1.0
-0.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
-0.5
XX (m)
-1.0
0.33
20.000
0.5
Weir Geometry
Length L1 (m)
Length L2 (m)
Length L3 (m)
Length L4 (m)
Total length L (m)
Material
0.25
2
1
0.5
3.75
Concrete
Height H1 (m)
Height H2 (m)
Height H3 (m)
Density (kM/m3)
Head above crest during flood, hf (m)
3
1.5
1
22
0.500
OUTPUT
Weight Wi
(kN)
Forces
LA along XX (m)
Moment (kN-m)
Weir
G1
G2
G3
G4
5.500
132.000
16.500
49.500
3.625
2.500
0.833
0.750
19.938
330.000
13.750
37.125
W1
W2
W3
U1
5.000
45.000
5.000
84.375
3.625
-1.000
0.500
-2.083
18.125
-45.000
2.500
-175.781
W1
W2
W3
U1
6.250
61.250
11.250
103.125
3.625
-1.167
0.667
-2.045
22.656
-71.458
7.500
-210.938
S1
S2
1.650
11.250
-0.333
0.500
-0.550
5.625
Normal
205.731
124.125
30.400
Flood
153.648
106.625
40.400
Soil
Summantion forces
Sum of moments M (kN-m)
Sum of vertical forces V (kN)
Sum of horizontal forces H (kN)
1.441
0.434
0.625
Ok
44.621
21.579
Ok
48.177
8.690
Ok
2.042
Ok
1.320
Not Ok
06-Apr-2016
2006.05
Ankhu HEP
Ankhu Hydropower P Ltd
HSEC P Ltd
Neeraj Shrestha
Pushpa Chitrakar
Referances: 6,12,13,15,16
Date
Revision
Project
Developer
Consultant
Designed
Checked
Wall Geometry
Design
Flood Level
Coarse Trashrack
Min 100 thick & 1000 wide
walkway Rcc slab
Orifice (H*B)
Normal
1
river level 3
.
Weir Crest
hbot
h -h
.
h sub
Canal
LS
Fb
River bed
hr
h rf
Trashrack calculations
Input
Output
Trashrack coeffieient kt
Bar thickness t mm
Clear spacing of bars b mm
Approach velocity Vo m/s
Angle of inclination from horizontaldeg
Flow deviation deg
Design Discharge Qd cumec
Height of trashrack bottom from river bed ht
Canal invert level (m)
2.4
15.00
75.00
1.00
75.00
90.00
33.670
1.250
890.65
2.4
roof-sha
River
Velocity coeff of orifice c 0.800
0.800
Velocity through orifice Vo m/s
1.5
Crest length L m
Provided Q flood m3/s
Q flood m3/s (Q20 for MHP with Qd>100)
35.000
976.100
16.334
976.100
0.100
1.600
3.000
Output
Normal Condition
Canal witdth d/s of orifice
1/Slope of canal immediately d/s of orifice
Depth of water in canal hc m
Free board in canal h fb m
Area of orifice A m2
Width of orifice B m
Actual velocity through orifice Vo act m/s
Canal width Wc m
Water level difference dh m
Water depth in the river hr = hc + dh m
Height of weir (hw = hr+0.1) m
Spillway overtopping height h overtop m
Flood
21.000
40492
2.450
3.000
22.447
20.406
1.500
21.000 Spillway
0.179
3.500
3.600
2.600
4.296
#NAME?
7.896
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
06-Apr-2016
2006.05
Sarbari SHP
Kullu, Himanchal Pradesh, India
Referances: 6,7,8,12,13
Date
Revision
Project
Developer
Consultant
Designed
Checked
Pushpa Chitrakar
Pushpa Chitrakar
Critical Depth Considered
Critical Depth Not Considered
##
##
##
##
##
#
#
Weir Geometry
#
#
#
#
#
#
#
#
#
#
#
#
Input
1
River Width (Br) m =
Head/Critical Depth of u/s water (ho)m =
Upstream water velocity (vo) m/s =
River gradient (i) degrees =
Trashrack gradient () deg =
Contraction coeff () =
Output
c/c distance of trash rack bars d mm =
Total head (he) m =
kappa () =
velocity head (h) m =
Correction factor ( c) =
Length of intake (L) m =
Length (L' ) m =
Intake length across the river (b) m =
Area of intake (A=L' *b) m2 =
90
0.340
0.749
0.170
0.146
2.249
1.819
7.975
17.935
2.700
0.000
0.000
1.906
1.864
325.497
7.318
318.178
Side Intake
Spreadsheet
0
0
500
500
800
800
1800
1800
2100
2100
3100
3100
0
1550
Orific =1,1x20,41
0
300
300
1550
1550
300
Top =899,05
300
1800
2650
1550
1800 8695.9694
1550
2100 8695.9694
300
2100
2650
300
1800
2650
0
Canal =890,65
0
3100
300
3500
300
3100
WALL GEOMETRY
10000
9000
8000
7000
WALL (m m )
6000
0
1800
2100
3100
NWL =893,
2750
2750
#NAME?
#NAME?
#NAME?
5000
4000
3000
2000
1000
0
0
1000
Bottom Intake
3000
4000
Weir Geometry
Top =500
0
500
1000
1300
1300
Top =498,68
NWL =500,HFL =501,9Trashrack
Width =1,82
0 3119.3444
0
0 2048.2735
4822
1300 1821.831
1300
0 3119.3444
500
1300 2048.2735
3728 3119.3444
500 3119.3444
1821.831 3419.3444
500 3119.3444
500 2363.5406
1821.831 3719.3444
0 3419.3444
500 2363.5406
0 3919.3444
0 3719.3444
500 2363.5406
2000
BASE ( m m )
0
0
5500
4500
3500
WALL (m m )
2500
1500
500
-500
0
1000
2000
BASE ( m m )
3000
4000
5000
Referances: 6,12,13,15,16
Date
Project
Developer
Consultant
Designed
Checked
06-Apr-2016
2006.05
Sisne Small Hydropower Project
Gautam Buddha Hydropower P Ltd
EPC Consult
Pushpa Chitrakar
Pushpa Chitrakar
Revision
Input
Type and Name
Flow (m3/s)
Intake Canal
Tailrace
0.185
0.02
0.017
0.02
0.02
Sectional Profile
Rectangular
Trapezoidal
Semicircular
Triangular
0.02
Main2
0.017
Main3
0.145
0.145
0.02
0.5
0.5
0.145
0.02
0.5
20
40
150
77
200
30
120
72
0.300
0.525
0.300
0.300
Freeboard FB (m)
0.300
0.250
0.150
0.150
0.500
1.000
0.400
0.400
Channel Drops di m
0.000
0.000
0.000
0.000
0.000
1.000
0.000
1.500
0.000
1.500
0.000
1.500
Output
Side slope d (degrees)
Canal slope S
Total depth H (m)
0.000
63.435
0.000
63.435
0.01299
0.00500
0.03333
0.01389
0.600
0.775
0.450
0.450
20.000
60.000
210.000
330.000
Area A m2
0.150
0.663
0.035
0.060
0.500
1.525
0.400
0.400
1.100
2.174
0.471
0.671
0.136
0.305
0.075
0.089
0.226 high
1.249 high
0.057 low
0.071 low
Chainage L (m)
Present canal
ok
low
ok
ok
1.233
0.219
4.103
2.417
1,72 Ok
2.06 Ok
0,93 Not Ok
1,21 Not Ok
0.260
0.200
5.000
1.667
0.260
19.481
0.460
16.769
5.460
27.500
7.126
13.665
0.1850
0.6022
1,74 Ok
0.1505
0.301
0.150
0.451
0.602
0.0050
0.100
0.100
8.271
0.0967
0.7636
1.11 Not Ok
0.1180
0.236
0.263
0.498
0.528
0.0112
0.449
0.549
14.584
0.0967
0.9949
0,98 Not Ok
0.1244
0.497
0.150
0.647
0.995
0.0145
2.175
2.724
19.834
0.0967
0.4867
1.4 Not Ok
0.1088
0.218
0.150
0.368
0.487
0.0173
2.079
4.803
20.736
Optimum canal
Area Ao m2
Top Width T (m)
Critical Velocity Vc m/s & Remarks
Hydraulic Radius ro (m)
Channel Depth/diameter Do (m)
Freeboard Fbo (m)
Total depth Ho (m)
Channel Width Bo (m)
Canal Slope
Headloss hlo (m)
Total headloss Hlo(m)
Critical dia of sediment d crito (mm)
Project:
Developer
Consultant
Designed
Checked
Date
06-Apr-2016
Revision
2006.05
Jogmai
INPUT
Economic life (years)
15
0.160
1950.00
0.160
7.000
Hydraulics:
Diversion flow Qd (m3/s)
Flow in each pipe Qi (m3/s)
Gross headHg (m)
95.00%
0.8
0.3
0.80.3
Headrace pipe
HDPE
Exit (Yes/No)
Yes
NA
NA
No of pipes
Bending angle 01
1.00
20.00
NA
Burried
0
0
282
260
NA
3.0
Bending angle 02
Bending angle 03
Bending angle 04
Bending angle 05
Bending angle 06
Bending angle 07
Bending angle 08
Bending angle 09
4.00
6.00
20.00
140.000
Bending angle 10
Pipe Material
Welded / Flat rolled if steel
Rolled if steel
Type if steel
Burried or exposed
Type of valve
Non standard ultimate tensile strength (UTS) N/mm2
Estimated pipe diameter d(mm)
Provided pipe diameter d(mm)
Min pipe thickness t (mm)
Provided pipe thickness t (mm)
Pipe Length L (m)
Trashrack
t
6.00
b
20.00
Vo
1.00
60.00
0.00
Q
0.160
H
3.00
Tmax (deg)
T installation
Tmin
40
20
50.00
100.00
150.00
200.00
250.00
hf
0.0213
hb
0.0000
H coeff
0.4174
H
0.0213
S
0.8006
B
0.23
2.40
k
2.40
Expansion Joints
OUTPUT
Trashrack
Min Submergence
1.39
CGL=1.5v^2/2g
0.69
0.80
K bend 05
0.00
K bend 10
0.00
K bend 01
K bend 02
K bend 03
K bend 04
0.16
0.13
0.13
0.16
K bend 06
K bend 07
K bend 08
K bend 09
0.00
0.00
0.00
0.00
K valve
K exit
K others
K Total
0.00
1.00
Hydraulics
Pipe Area A (m2)
Hydraulic Radius R (m)
Velocity V (m/s)
Pipe Roughness ks (mm)
Relative Roughness ks/d
Reynolds Number Re = d V /Vk
Type of Flow
Friction Factor f
Expansion Joints (mm)
0.053
0.07
3.01
0.06
0.00023
687032
Turbulent
0.0153
EJ number
dL theoretical
dL recommended
dL for expansion
dL for contraction
2.37
1950.000
1943.000
OKAY
3.82
1.10
0.02
4.94
70.56% Ok
Date
06-Apr-2016
Revision
Project:
Location:
2006.05
Jogmai
Developer
Consultant
Designed
Checked
Q flood
Manning's number M (m 1/3/s) 1/n=
Design discharge Qdesign (m3/s) =
0.000
50.000
0.421
0.63
0.034
Canal
0.455
0.300
85%
15
0.037
2
8
24.000
0.241
2600
50.00
Pipe
1950.00
1.70
1.00
0.05
1.60
0.30
2.76
1.00
0.455
3.258
2.500
1.000
0.50
0.50
0.30
0.00
10.000
4.000
0.755
1.888
4.010
0.471
1.385
3.750
10.000
1.50
15.12
0.23
0.91
3.03
15763.86
0.33
#NAME?
#NAME?
10.00
0.000
Freeboard m
Spillway overtopping height h overtop m
Spillway length for Qf (flood and non operational)
0.300
0.125
0.000
0.30
1.00
1.00
0.00
0.00
0.00
Spillway
Spillway length for Qd (under operation)
Spillway length for Qd (load rejection & u/s flood bypass)
Spillway length for Qd (d/s obstruction & full hovertop-50)
0.00
6.43
3.18
0.000
1.00
0.262
0.240
0.215
Gate
Opening
Hg
0.000
0.033
0.067
0.100
0.133
0.167
0.200
0.233
0.267
0.300
0.333
0.367
0.400
0.433
0.467
0.500
0.35
0.40
#NAME?
Gate
Buoyance weight of the gate W kgf
Gate Opening B, (m)
Gate Opening H (m)
Submerged area of th gate A m2
Water surface to cg of submerged area h m
Coeff of static friction mu
Lifting force F kgf
H. of water (H1)
1.800
300.00
1.00
0.50
0.50
1.14
0.90
810.84
1.39
1.600
1.400
1.200
Penstock diameter m
Penstock velocity m/s
Submergence depth of penstock pipe m
Height of pipe above the base slab m
Min. pond depth m
Effective thickness of penstock mm
FS for air vent (5 burried, 10 exposed)
Young's modulus of elasticity E N/mm2
Penstock inlet gate (Yes/No)
Air vent diameter mm
0.800
0.600
0.400
0.200
0.000
half of Gr expansion
0.500
Width 2,5m
Flushing cone/spillway O
L =10
Spillway
0.500
Discharge
One basin
Q
0.000
0.128
0.251
0.369
0.484
0.597
0.707
0.816
0.922
1.027
1.129
1.230
1.328
1.423
1.516
1.606
1.000
1.000
Relative
Gate Openinig
Hg/H1
0.000
0.024
0.048
0.072
0.096
0.120
0.144
0.168
0.193
0.217
0.241
0.265
0.289
0.313
0.337
0.361
Slope 1:50
0.300
0.41
3.45
0.91
0.30
1.62
3
10
200000
No
Nominal
Referances:2,4, 5,6,12,13,15,16
SMALL HYDROPOWER PROMOTION PROJECT/GTZ
Project:
Jhankre mini-hydropower
Himal Power Limited
BPC Hydroconsult
Pushpa Chitrakar
Pushpa Chitrakar
Developer
Consultant
Designed
Checked
Date
06-Apr-2016
Revision
2006.05
Location:
INPUT
General:
Project:
Location:
Hydraulics:
Diversion flow Qd (m3/s)
Flow in each pipe Qi (m3/s)
Gross head (from forebay) Hg (m)
Power:
Turbine type (CROSSFLOW/PELTON)
Jogmai I
0.450
0.450
180.00
Number of units
Penstock pipe:
Pipe Material (STEEL/HDPE/PVC)
Welded / Flat rolled if steel
Rolled if steel
Type if steel (UNGRAGED/IS)
Burried or exposed
No of pipes
Bending angle 01(degrees)
Bending angle 02
Bending angle 03
Bending angle 04
Penstock diameter d=>d estd, d act (mm)
Pipe Length L (m)
Trashrack
Valves (Sperical/Gate/Butterfly)
Taper (Yes/No)
0.3
No
Exit (Yes/No)
No
30.00
3
Steel
Welded
Rolled
IS
Exposed
1.00
2.00
11.00
4.00
11.00
475 Pipe thickness t=>t min, t act (mm)
Roughness coefficient (ks)
418
550.000
Clear spacing, b
(mm)
20.00
Approach velocity,
Vo (m/s)
1.00
Tmax (deg)
T installation
Tmin
40
20
10.00
15.00
Bend loss, hb
(m)
0.5
No
0.45
22.00
0.45
Bending angle 06
Bending angle 07
Bending angle 08
Bending angle 09
Bending angle 10
3.0
14.00
0.00
0.00
0.00
0.00
7.0
0.060
Design
discharge, Q
(m3/s)
0.450
Submergence
depth @
trashrack, h (m)
0.70
20.00
25.00
30.00
thickness, t(mm)
6.00
2.40
0.3
Yes
2.40
10
1213.90
16.00%
79.38%
Pelton
1 10%
Trashrack coefficient, kt
Ilam
Expansion Joints
OUTPUT
Trashrack
0.0233
Turbulent loss coefficients
K inlet
0.0000
0.4572
K Total
K bend 01
K bend 02
K bend 03
K bend 04
0.0233
2.79
1.76
0.49
0.50
K bend 05
0.24
K bend 10
0.00
0.18
0.21
0.19
0.21
K bend 06
K bend 07
K bend 08
K bend 09
0.22
0.00
0.00
0.00
K valve
K taper
K exit
K others
0.30
0.00
0.00
0.00
Factor of Safety
Young's modulus of elasticity E N/mm2
Thickness
Diameter (mm)
Net Head (m)
Wave Velocity a (m/s)
Critical time Tc (sec) *2 = Closing time T
Hsurge for 10% closure of one jet
Hsurge for one jet closure of Pelton(m)
Hsurge for instanteneous closure of all unit closure of Pelton (m)
Lengths (max & actual) of the specified pipe (m) & Ok
Power
Turbine efficiency as per MGSP
Available shaft power(kW)
Reqd.'Turbine Capacity (+10%) (kW)
1
4
9
5
4
2.0555
2.06
Hydraulics
Pipe Area A (m2)
Hydraulic Radius R (m)
Velocity V (m/s)
Pipe Roughness ks (mm)
Relative Roughness ks/d
Reynolds Number Re = d V /Vk
Type of Flow
Friction Factor f
Submergence @ Submergence @
trashrack width, penstock, h min penstock, h min
B (m)
(m)
(m)
2
6
13
7
6
560.313
0.177
0.12
2.54
0.060
1.263E-04
1057668
Turbulent
0.0137
200000
1213.90
1033.90
OKAY
5.23
0.67
0.02
5.93
3.29% Ok
410
7.000
208.33
475.000
t effective (mm)
4.30
174.074
4.97
1094.981
Comment on thickness
NA, No gate
1 Ok
3.57
28.33338
283.334
283.334
550.000
Ok
60.75
212.24
183.91
75.00%
576.34
633.97
397.31
461.07
610.00
1.2E-05
5
13
26
14
12
Convex
Date
06-Apr-2016
Revision
2006.05
Project
Developer
Consultant
Designed
Checked
Pushpa Chitrakar
Pushpa Chitrakar
Golmagad SHP
Kankaimai Hydropower P Ltd
EPC Consult
Input
Particulars
Central
Upstream
Pipe dimensions
Diameter (Di)
Thickness
Shaddle Spacing & number
Downstream
0.39
0.006
4.00
0.39
0.006
4.00
Elevations
2.000
53.712
0.0000
27.7832
78.5
9.81
25
0.586
1.172
1.758
3.097
0.000000
0.484908
200
30
20
Heads (m)
Forebay WL
Tot.Transient Length (m)
Tpot Pipe Len (forebay to AB)
Total Surge Head
Static Head
Surge Head
Total (H)
Youngs Modulus of Elasticity (E)
Yes
0.586
1.172
1.758
3.097
22
Yes
Output
Weight of pipe, Wp (kN/m)
Weight of water, Ww (kN/m)
Total weight, W (kN/m))
Velocity, v (m/s)
0.37
818.000
0.5236
835.000
511
56.388
96.360
17.000
10.63
27.633
2.1E+11
12E-06
GENERAL FORCES
1. Perpendicular component of Wt of pipe and water act perpendicular to the pipe CL along the anchor faces
2.
2.344
-2.344
0.25
2.00
F2 (kN) =
3.
Hydrostatic Pressure at Bend due to the vector difference of static pressure & acting towards IP
Pu (kN) = F3u =PI/4*dui^2*Ht*
32.38
32.38
F3 = 2*P*sin((-)/2)
4.
15.549
F4
5.
0.000
F5 (kN)=pi()*Dmean*t*E*a*Dt
Condition
Temp at oC
F5 expansion
F5 contraction
6.
+ Expansion, - Contraction
Tmax
Tinstallation
40
20
0.000
Tmin
4
0.000
0.000
0.000
Axial friction within Expansion joint seal due to the movement against the circumferential pressure
F6=PI()*D*W*H*g*m
0.16
17.000
10.256
11.06
Total (AH)
27.256
13.507
28.992
13.939
F6 (kN)
+ Expansion, - Contraction
7.
0.546
17.93
F6
F6
p
F7
8.
1.996
F7
2.059
P8= mV =Q**Vi
P8 (kN)
1.146
F8
9.
F6
Pipe Movement
1.146
0.540
No
No
3.00
17.00
10.63
F9 (kN)
0.40
0.000
4.00
18.86
10.98
0.40
0.000
10 Axial drag of flowing Water (friction of flowing water) (not considered in MHP)
F10=g*PI()*Dupi^2/4*DH(Exp to block)
F10 (kN)
0.000 No
0.000 No
11 Axial (u/s slope) force due to soil pressure upstream of the block
F11 =s*hs^2/2*cos *ka*B
F11
ka= (cosi-sqrt(cosi^2-cos^2))/(cosi+sqrt(cosi^2-cos^2))
hs = soil depth = hu
F11
0.333
1.8
21.600 Yes
Width, B(m)
@ 1/3 of hs
0.6
16.191
F12
356.202 Yes
Expansion
@ bend
Contraction
Total
@ bend
16.551
38.151
-10.41
11.19
-16.554
339.648
-3.56
352.64
0.000
0.00
Total
F7
Date
Revision
Project
Developer
Consultant
Designed
Checked
06-Apr-2016
2006.05
Golmagad SHP
Mansarawar Hydropower P Ltd
EHS
Pushpa Chitrakar
Pushpa Chitrakar
Input
Anchor
Upstream depth, Hu (m)
Downstream depth, Hd (m)
Width, W (m)
Length, L (m)
anchor (kN/m3)
Output
3.3
2.25
2
3
22
0.5
16.191
356.199
1.405
3.0
2.5
Penstock
Bend at (X), (m)
Bend at (Y), (m)
Diameter, d (m)
Upstream angle, (deg)
Upstream angle, (deg)
2.0
1
2.15
0.458
13
25
1.5
0.5
Length X (m) '
0.0
-0.5
Foundation
Upstream depth hfu (m)
Soil friction , (deg)
soil (kN/m3)
Bearing Capacity, SBC (kN/m2)
1.8
30
20
200
Contraction
H (kN)
V (kN)
1.0
0.0
0.5
1.0
1.5
2.0
2.5
Overturning
3.5
4.0
0.3715
F Pa
Soil force
Acting at (m)
3.0
Fx
23.455
0.6
Fy
22.853
Bearing
5.276
Sliding
Net Forces @
SM @ O
bend
53.180
30.327 d
345.260
-16.215 eccentricity e, Ok
e allowable
563.303 P max
1.632 P min
0.132
0.500
72.681
172.63
42.4057 Ok
Ok
SM @ O
-6.19 d
-41.03 eccentricity e, Ok
473.281 P max
1.477 P min
0.023
55.8664
160.22
50.9469 Ok
Ok
16.66
320.44
Turbine Selection
Small Hydropower Promotion Project (SHPP)/GTZ
06-Apr-2016
2006.05
SMALL HYDROPOWER PROMOTION PROJECTRevision
Project
Upper Jogmai SHP
Kankaimai Hydropower P Ltd
Developer
EPC Consult
Consultant
Designed
Pushpa Chitrakar
Checked
Pushpa Chitrakar
Referances: 6,7,8,12,13
Date
Input
Discharge (l/s)
Gross head (m)
Hydraulic losses
Max turbine output kW
Turbine rpm
Cd
Output
Net head m
No Gearing
Sp speed of runner rpm (no gearing)
Pelton (12-30) => (Ns 17-42)
Turgo (Ns 20-70) => (Ns 28-99)
Crossflow (Ns 20-80)
Fracis (Ns 80-400)
Propeller or Kaplan (Ns 340-1000)
Jet velocity Vj (m/s)
Nozzle diameter, Dn (mm)
Pitch circle diameter, PCD (mm)
**
Turgo
Crossflow
**
**
With Gearing
46 Sp speed of turbine
Pelton (12-30) => (Ns 17-42)
Turgo (Ns 20-70) => (Ns 28-99)
Crossflow (Ns 20-80)
Fracis (Ns 80-400)
Propeller or Kaplan (Ns 340-1000)
32.38
54.85
395.15
1
2
1
2
Pelton
0.46
1500
23
Pelton
**
Crossflow
**
**
06-Apr-2016
2006.05
SMALL HYDROPOWER PROMOTION PROJECT/Revision
Project
Upper Jogmai SHP
Kankaimai Hydropower P Ltd
Developer
EPC Consult
Consultant
Designed
Pushpa Chitrakar
Checked
Pushpa Chitrakar
Referances: 6,7,8,12,13
Date
INPUT
Discharge (m3/s)
Gross head (m)
Overall plant efficiency (%)
Temperature (oC)
Altitude (m)
ELC correction factor
Frequency of the system (Hz)
Capacity of used generator (kW)
Capacitor configuration
Delta
50 No. of poles
0 Rated rotor speed if induction generator N (rpm)
Efficiency of motor at full load
0.8
1.3
1
2
1.25
1.5
4
1450
89%
OUTPUT
Pe Electrical output (active power) (kW)
Generator
Temp.factor
Capacity (kW)
Synchronous rotational speed Ns (rpm)
Cable
Rating (A)
0.96
30.00
1550
24.00
123.16
170.45
142.04
150
Referances: 6,12,13,15,16
Date
Revision
Project
Developer
Consultant
Designed
Checked
06-Apr-2016
2006.05
Upper Jogmai, Ilam
Kankaimai Hydropower P Ltd
EPC Consult
Pushpa Chitrakar
Pushpa Chitrakar
Machine Foundation Plan
1.8
1.6
1.4
Height
1.2ZZ (m )
1.0
0.8
0.6
0.4
0.2
0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4
XX (m )
XX (m )
INPUT
Gross head hg (m)
Surge head hs (m)
Foundation
0.150
Penstock
Foundation on
Soil
Diameter dp (m)
0.300
180
Material
0.5
Centreline above PH floor hp (m)
3.2 Turbine Pit
2.5
Length of opening Lo (m)
1.5
Bredth of opening Bo (m)
Concrete
Height of opening Ho (m)
mild steel
0.300
0.450
0.500
1.000
22
0.500
2.943
3.434
XX (m)
0.625
2.025
YY (m)
1.250
1.250
Weight Wi
(kN)
70.036
LA along YY
33.000
27.225
193.875
3.000
2.575
1.175
282.455
260.477
1.25
1.25
1.25
199.530
260.477
Overturning
Equivalent distance at which SM acts from critical point
d (m)
Eccentricity e, (m)
Allowable eccentricity e all (m)
Comment on overturning moment
LA along XX
1.084
0.516
0.533
Ok
LA along YY
0.766
0.484
0.417
Not Ok
Bearing
Pressure at base
Pmax
Pmin
Comments on bearing
LA along XX
64.038
1.081
Ok
LA along YY
70.379
-5.260
Not Ok
LA along XX
1.860
Ok
LA along YY
1.860
Ok
Sliding
Factor of safety against sliding, FS sl
Comment of sliding
Referances:2,4, 6,12,13,15,16
Date
06-Apr-2016
Revision
2006.05
Cable Summary
Project:
Developer
Consultant
Designed
Checked
Power factor
Voltage systems
0.8
11000
400
230
Type
Squirrel
Length(km)
4.50
Gopher
0.00
Weasel
10.00
Rabbit
3.00
Otter
1.15
Dog
5.30
Total Cost(
606600.00
Node name
Reach
name
Reach
Length
(km)
PH-A-B-C-D
Power at
next node
(kW)
Phase
1,3,11
PHA
0.300
AB
0.500
AC
0.500
AD
0.500
T1
PHT1
0.050
T2
T1 T2
1.500
T2 E
0.300
EJ
0.500
EG
0.500
GH
0.200
EK
0.500
KL
LM
PH-T1
T2
V @ next
node (V)
% voltage
drop
400.00
400.00
28.87
6.30
393.70
1.58
5 Rabbit
2500
227.30
27.50
17.60
209.70
8.82
5 Rabbit
2500
227.30
27.50
17.60
209.70
8.82
5 Rabbit
2500
227.30
27.50
17.60
209.70
8.82
37.89
1.60
398.40
1.38
5.00
10995.00
37.89
8.20
38.68
16.20
400.00
21 Otter
1050
11
400.00
400.00
11000.00
21 Squirrel
31500
11000.00
11000.00
400.00
0.05
400.00
6300
7 Dog
3500
7 Otter
3500
226.21
38.68
18.40
207.81
9.65
3 Dog
600
207.81
18.05
3.00
204.81
10.95
7 Dog
3500
226.21
38.68
16.20
210.01
8.69
0.200
3 Dog
600
210.01
17.86
3.00
207.01
10.00
0.200
2 Dog
400
207.01
12.08
2.00
205.01
10.87
E-H (y)
226.21
E-M (b)
400.00
0.40
21 Dog
E-J ( r )
E
Reach Voltage
drop (V)
4800
11
T2-E
V @ prev
node (V) Current (A)
400.00
16 Dog
T1-T2
T1
Load
Momentu
m (kW-m)
PH
PH
ACSR
type
226.21
2.05
226.21
226.21
391.80
210.01
8.69
226.21
226.21
226.21
Date
Project:
06-Apr-2016
2006.05
Ladagada VDC, Doti
Revision
Location:
Developer
Consultant
Designed
Checked
INPUT
General
Power Output (kW)
Name of the Source
96.1
Gaddi Gad Khola
Beneficiary HH (nos.)
Plant's operating days
471
330
Domestic lighting
Average subscription/household (W/HH)
System loss
10%
time
0
5
load
88
0
440
0
Probable Business Load Expected after 3 years
Operating d/y Tariff (Rs)
Load
Metal Workshop
330
6.00
Photo Studio
320
6.00
Dairy Processing
320
6.00
Cold Store
310
6.00
Load 5
Load 6
4
0
8
9
3
0
3
0
6
0
3
0
0
12
22.5
14
0
16
10
12
25
8
0
5
0
0
16
0
18
0
18
0
17
0
15
0
10
0
0
22
0
22
0
22
0
22
0
22
0
22
0
0
36.00
Annual Income
(Rs)
480,420
85
8
0
0
10
1
8
6
18
91.1
182.2
1037
378578
49.97%
761112
First 3 years
After 3 years
117060
147680
15.38
19.40
42.36
50.40
916,050
1,099,770
Load
Operation Period
(kW)
Hours/day
Days/year
Domestic Lighting
44.483
13.987
Existing/Committed Business Load
Agro-processing
22.5
4
Bakery
9
6
Saw Mill
10
2
Herbs Processing
25
5
Load 5
15
6
Load 6
12
3
Total
Total Annual Income from sales of electricity
Yearly Load
kWh
LF (%)
330
205326
26.98
330
320
300
180
330
330
29700
17280
6000
22500
29700
11880
117060
3.90
2.27
0.79
2.96
3.90
1.56
15.38
178200
103680
30000
123750
0
0
435,630
916,050
13200
3840
25600
18600
0
0
61240
1.73
0.50
3.36
2.44
0.00
0.00
8.05
79200
23040
153600
111600
0
0
183,720
Load Duration Chart for the first three years of operation of Gaddi Gad Khola
0
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
140
Load 6
100
Load 5
Herbs Processing
80
Saw Mill
Bakery
60
Agro-processing
40
Domestic
Installed Capacity
20
0
0
10
11
Tim e (hrs)
12
13
14
15
16
17
18
19
20
21
22
20
0
23
Date
06-Apr-2016
Revision
2006.05
Project
Developer
Consultant
Designed
Checked
Golmagad SHP
Kankaimai Hydropower P Ltd
EPC Consult
Pushpa Chitrakar
Pushpa Chitrakar
INPUT
Project size (kW):
Total Project Cost (Rs.)
Subsidy/kW
Headrace
Canal
91500 Rs/kW x 96,1 =
Interest rate i (%)
Payback period n (yr)
Plant life N (yr)
Discount Rate I (%)
Investment Cost (Rs)
Mechanical components
Electrical component
Civil component
Spare parts & tools
Transport.
96.10
12,734,865
Total subsidy
8793150
Bank loan
1,890,044
3%
7
Other loan
Cash equity
1,200,000
Kind equity
851,671
Others
0
15
4%
8,516,715
999,040 Installation
2,061,717 Commissioning
1,363,497 VAT
57,550 Contingencies
3,178,800 Others
232,500
0
623,611
0
Cost Summary
Project cost (Rs)
Annual Operation, Maintenance and other Costs (Rs)
Annual Income without probable business loads (Rs)
Annual Income with probable business loads (Rs)
Annual installment for Bank loan
Annual installment for other loan
NPV on equity without probable business load (Rs)+ve
NPV equity with probable business load (Rs)+ve
Cost/Kw =>>Ok
Subsidy/HH
O & M (Rs)
Salary
Spares
Maintenance
Office expenses
Miscellaneous
Others
305,004
114000
0
171,000
20,004
12,734,865
305,004
916050
1099770
303364
NA
3,773,038
5,305,869
132,517
18,669
Equity
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
O & M costs
Loan repayment
Income
1,200,000
305,004
305,004
305,004
305,004
305,004
305,004
305,004
305,004
305,004
305,004
305,004
305,004
305,004
305,004
305,004
303,364
303,364
303,364
303,364
303,364
303,364
303,364
0
0
0
0
0
0
0
0
916,050
916,050
916,050
916,050
916,050
916,050
916,050
916,050
916,050
916,050
916,050
916,050
916,050
916,050
916,050
Cash flow
-1,200,000
307,682
307,682
307,682
307,682
307,682
307,682
307,682
611,046
611,046
611,046
611,046
611,046
611,046
611,046
611,046
916,050
916,050
916,050
1,099,770
1,099,770
1,099,770
1,099,770
1,099,770
1,099,770
1,099,770
1,099,770
1,099,770
1,099,770
1,099,770
1,099,770
Cash flow
-1,200,000
307,682
307,682
307,682
491,402
491,402
491,402
491,402
794,766
794,766
794,766
794,766
794,766
794,766
794,766
794,766
Golmagad SHP
Date
06-Apr-2016
Revision
2006.05
1,000
50.0000
300
Freeboard, FB (m)
0.2
0.3
1.000
Z= 0.50
Z= 0.50
Top width, T (m)
Uniform Depth (Y-m)
#NAME?
#NAME?
Canal Wall Geometry
Payment of a loan
Small Hydropower Promotion Project (SHPP)/GTZ
Golmagad SHP
Date
06-Apr-2016
Revision
2006.05
Payback
1
2
2006
Golmagad SHP
Date
06-Apr-2016
Revision
2006.05
Discharge (l/s):
Cumulative efficiency including head loss (n%)
120
80.00%
300.00
282.53
176.58
Golmagad SHP
Date
06-Apr-2016
Revision
2006.05
2,000
500
300
1.5
0.00
0.00
Golmagad SHP
Date
06-Apr-2016
Revision
2006.05
Discharge (m3/s)
Gross head (m)
Pipe roughness ks (mm)
Pipe diameter (mm)
0.500 Flow
63 Velocity, v(m/s)
0.010 Reynold's nr, (R )
500.00 Laminar Flow
2.5464790895
1116876.79362734
5.730265000148E-005
100
9.170E+00
1.50
9.170E+00
Friction factor f
Headloss hl (m)
1.282
Headloss hl (%)
2.03
61.718
0.0118931351
Voltage Drop
Small Hydropower Promotion Project (SHPP)/GTZ
Golmagad SHP
Date
06-Apr-2016
Revision
2006.05
1.000
230
20
6.00
1
1
Current, I (A)
108.70
Impedence, Z (/km)
0.4178
139.17
3.95
90.83
% Voltage drop
39.49
List of References
Small Hydropower Promotion Project (SHPP)/GTZ
1 Mini-Grid Support Programme, Alternative Energy Promotion Centre, Kathmandu, Nepal
(2002), Peltric Standards
2 Mini-Grid Support Programme, Alternative Energy Promotion Centre, Kathmandu, Nepal
(2003), Preliminary Feasibility Studies of Prospective Micro-hydro Projects
3 Mini-Grid Support Programme, Alternative Energy Promotion Centre , Kathmandu,
Nepal(2001), Technical Details and Cost Estimate
4 Mini-Grid Support Programme, Alternative Energy Promotion Centre , Kathmandu,
Nepal(2003), Guidelines for Detailed Feasibility Study of Micro-Hydro Projects
5 European Small Hydropower Association (1998), Layman's Guidebook on How to Develop
a Small Hydro Site
6 BPC Hydroconsult, Intermediate Technology Development Group (ITDG), Kathmandu,
Nepal (2002), Civil Works Guidelines for Micro-Hydropower in Nepal.
7 United Nations Industrial Development Organization (UNIDO), Report on Standardiztion of
Civil Works for Small Hydropower Plants
8 GTZ/Department of Energy Development, Energy Division, Papua New Guinea, Micro
Hydropower Training Modules (1994), Modules 1-7, 10, 13, 14 & 18B.
9 Americal Society of Civil Engineer (ASCE), Sediment Transportation.
10 KB Raina & SK Bhattacharya, New Age International (P) Ltd (1999), Electrical Design
Estimating and Costing.
11 Badri Ram & DN Vishwakarma, Tata McGraw-Hill Publishing Company Limited, New Delhi
(1995), Power System Protection and Switchgear.
12 Adam Harvey et.al. (1993), Micro-Hydro Design Manual, A guide to small-scale water
power schemes, Intermediate Technology Publications, ISBN 1 85339 103 4.
13 Allen R. Inversin (1986), Micro-Hydropower Sourcebook, A Practical Guide to Design and
Implementation in Developing Countries, NRECA International Foundation, 1800
Massachusetts Avenue N. W., Washington, DC 20036.
14 Helmut Lauterjung/Gangolf Schmidt (1989), Planning of Intake Structures, GATE/GTZ,
Vieweg.
15 Methodologies for estimating hydrologic characteristics of ungauged locations in Nepal
(1990), HMG of Nepal, Ministry of Water Resources, Water and Energy Commission
Secretariat, Department of Hydrology and Meteorology.
16 Design Manuals for Irrigation Projects in Nepal (1990), Planning and Design Strengthening
Project (PDSP), His Majesty's Government of Nepal, Ministry of Water Resources,
Department of Irrigation. United Nations Development Programme (NEP/85/013)/World
Bank.
17 Salleri Chialsa Small Hydel Project (1983), Technical Report, DEH/SATA, ITECO.
18 P.N. Khanna (1996), Indian Practical Civil Engineer's Handbook, 15th Edition, Engineer's
Publishers, Post Box 725, New Delhi - 110001.