LIST OF PENDING WORKS FOR BOIL

s.no
A
1
2
2
3
4
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

26
27
28
29
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
D

1
2
3
4
5
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
F
1
2
3
4
5
6
7
8
G
1
2
3
4

5
6
7
8
9
10
11
12
13
14
15
16

LIST OF PENDING WORKS FOR BOILER


description
PRESSURE PARTS
Cold setting of balance pr.part supports-04 nos for Eco feed line
Guid corraction is pending in link pipes at some locations.
soot blower piping balance work with supports
SH & RH spray piping boiler area termination with skid as per modification
SH & RH spray piping hydro test and control valves fixing work
Trim piping i.e Drain and vent lines supporting(50% completed)

Back pass tapping point completion. ( 06 Nos. Missing at Site )


frist pass tapping point with flage completion work. and 01 Nos. Missing at Site
pending at EL 8 mtr Front middle wall.
Platform for BED lance front & rear side is pending.
Expansion tramps erection at drum,burner,backpass elevation
Backpass penthouse completion with insulation
SV escape piping for MS,CRH,HRH,DRUM with SV body drain & vent
Aux.steam piping completion with supports
ID to Chimney outside welding completion and supports welding
Eco Enclosure built up beam total 08 Nos. welding completion
Eco enclosure 32 nos beam ISMB 200 between hoppers erection,welding pending
Eco to APH inside expansion locking erection,welding completion
Eco Enclosure duct outside welding & supports completion ( 50 % Completed)
Hot SA to AH bus ducting balance supports ( 61 Nos. ) erection,welding completion
Hot SA bus to pentleg supports(52 nos) erection,welding completion
Hot SA distribution to burner supports(24 nos) erection,welding completion
Hot SA distribution to nozzle (front & rear)supports-33 nos erection,welding completion
Eco to APH outside welding completion and supports welding
APH to ESP outside welding completion and supports welding ( 04 Supports bal for
EDTA/SB )

HFO & Bed Lance Readiness ( connection ,Hydro ,Air Test to be done )
Readiness of aux.steam system with tracing and trap station
Service Air and Cold PA to Bed Lance Connection
Air Heater Water Wash Line

STRUCTURE
Balance work of 36 group platform at different elevation in front pass.

Monorail for material handling in Boiler Area ( 35-301)


Air Preheater Support frame ( 35-310)
Horizontal bracing at different elevation ( 35-353,354,355)
Upper landing platform ( 35-383 )
Critical Piping structure supports ( 35-446 )
Floor grill , stairs and handrail post etc of landing platform ( 35-810,811,850 )
Balance work of 36 group platform at different elevation in Back pass since long
time.
Interconnection platform between boiler and elevator ( 38-210)
Beams & bracings of Interconnection platforms ( 38-510 )
Elevator Cladding Structure ( 38-610)
Elvator Cladding Sheeting ( 38-611 )
Elevator Mchine Room Guide structre (38-710)
Beam bracing of PA System , ID system ( 39-150,160)
PA SA Duct Supports ( 39-200 )
ID system floors , Platforms for Fans ( 39-300,301 )
PA/SA Fan Monorails ( 39-303 )
ID Fan Monorails ( 39-323)
NON PRESSURE PARTS
FBHE 3&4 crap cutting pending for insulation clearance scine long back.
FBHE 1,2,3&4 drain pipe extention work as per drawing pending
Modification work pending in ALL 04 FBHE as per drawing.
back pass bottam & top biltup beam support pending
back pass bottam 08 no bearing plates support pending
Purge and Seal Air System ( 43 group )balance.
Ash cooler blower piping & support pending.
ash cooler 04 nos taping pending in drain pipe.
Perging air line connction is balance in all spice valves & lime stone hopper etc.
Chain Feeder Work ( Bunker area to Boiler ) 47 group slow progress.
chain feeder supporting str work pending as per drawing.
Parmanent supporting work is pending in blower lines like FBHE,SEAL POT, PEARGING
AIR, ASH COOLER ETC.
Outside finishing of duct support ( Cyclone , FGD , Seal Pot ) 49
Lime Stone Bunker door work ( 66-302 )
Hoist Erection ( 99-100 )& commissing work.
INSULATION

insulation pending in link pipes.


insulation pending in fbhe & blower piping.
insulation pending in ducting area
insulation pending in back pass.
poor progreess in pent leg & other area in insulation work
ESP
Rigde cover welding
7th & 8th Field Gauging pending
Deflection plate Erection & Welding
Platform with hand railing and stairs
Emmiting Rapping System
Vertical Rapping System
Collecting Rapping system
Collecting motor erection and alignment
Washing line system ( Pass A & Pass B )
Shield plate Welding
Vertical motor erection and alignment
Oil Pan along with oil Drain piping
Hopper Corner Tube inside & Outside Erection & Welding
GD screen system
Insulation Hopper
L P PIPING(CW,DMCW,IA,SA)
02 joint fit up item no.03 is balance (vide drg no-1-80-468-18398.) in supply line of CW.
04 nos man hole door cover plate NB600 alongwith nut bolt & gasket erection is balance
in supply and return line of CW.
04 nos drain line with butterfly valve NB150 alongwith nut bolt & gasket erection is
balance in supply and return line of CW.
02 nos Air release butterfly valve NB150 alongwith nut bolt & gasket erection is balance
in return line of CW.
7 nos joint (OD1829X16) welding balance in supply and return line of CW..
28 qty 4''-ss flange alongwith nut,bolt & gasket are balance for instrument tapping in
supply and return line of CW.
PU coating of site weld joints are balance.
4'' SS line form ball strainer to ball seperator skid are fully balance.
DMCW SYSTEM
8'' supply & 8'' return line with valve tag nos DMCW-19,20,143 & 144 alongwith
supports and instruments tapping is balance for exciter cooler.
supply and return Interconnecting line and C&I tapping with valve tag DMCW-26 & TCV
is balance for hydrozen cooler.
40NB supply & return line with valve tag DMCW-21,22,23,&24 and C&I tappings are
balance for both CEPs.
40NB supply & return line with valve tag DMCW-29,30,31,&32 and C&I tappings are
balance for SWAS chiller & primary rack at PRDS floor.

Erection of 40NB SS line with valve tag DMCW-126 & 127 and its hanger supports (15
nos) is balance from EL-34.00 to 0.00 mtr for NAOH dosing in DMCW return header.
1/2" makeup water line for vaccume pump.
PENDING WORK OF DMCW NEAR BFP-B
02 joins balance in supply & return line of Booster pump jacket.
PENDING WORK OF DMCW NEAR BFP-A
Erection of 65NB BFV tag DMCW-64 &65 alongwith nut,bolts & gasket is balance for BFP
jacket.
Erection of 40NB BFV tag DMCW-51 &52 is balance for Booster pump jacket.
Erection of 65NB BFV tag DMCW-58 & 59 alongwith nut,bolts & gasket is balance for BFP
Motor cooler.
40NB supply & return line erection and its tapping points for C&I is balance for Booster
pump jacket.
65NB supply & return line erection and its tapping points for C&I is balance for BFP
Motor cooler.
Nut & bolts (partially) balance in valve tag DMCW-37,38,39,40,43,44,45,46 and DMCW33&49 in supply & return line of working oil/lube oil cooler and main isolation valve
respectively.
30 joints balance in supply & return line of above incomplete line.

BOILER UNIT-2
from

to

AS ON 26.03.16
gang/responsibility

remarks