Beruflich Dokumente
Kultur Dokumente
656.844
65
1
3211.679
Max. current dissipated by one Earthing Pipe = Current Density x Surface area of electrode
Number of earthing pipe required = Fault Current / Max.current dissipated by one earthing
503.87597 mm
standard strip size available to cater the current will be =
50
3
0.065
-m
m
m
KA
sec.
I = 7.571000/(xt) A/m2
Pipe = 2 x 3.14 x r x L
0.6123
m
1966.5111
33.045247 NOS.
2x50x10 mm
Amps
bangalore
45
2.45
2.45
P=AoXNgX10
=
Ao=
P=
mean
0.5
0.5
1.1
1.9
2.8
3.7
4.7
6.9
9.2
1366.24
5055.088 x10
A=
B=
B=
D=
E=
=
rger than 10
1.2
0.4
0.3
0.4
0.3
0.01728
87.35192 x10
r=/A(/A)
Resistivity of the soil () =
Area of plate earthing =
time withstand capacity T=
resistance of plate earthing R =
fault current of the system Isc =
current density at the surface of earth electrode I =
I=
max. current dissipated by one earthing plate
50
-M
enter the value from here
0.72
600x600 =
0.72
m2
1
sec.
1200x1200=
2.88
145.0227
50
7.57x1000/(xt)
1070.56
= current desityx surface area of electrode
770.80296
2.23567903
20
7.25
50x10
20
0.183
EARTHING IS OK
0.183
0.173
mm
415
System voltage =
450
load in KW=
0.8
value of old p.f=
0.95
desired value of p.f=
3
No. of phase =
tan=
0.64
tan=
0.32
total load in KVAR=KW( tan-tan)
146.67
total load in KVAR=
Leading KVAR supplied by each Phase=
Kvar
48.89
408.11
Amp.
500
Amp.
306.08
Thermal relay setting between 1.3 and 1.5of Capacitor Charging current.
265
306
Thermal relay setting =
Magnetic relay setting between 5 and 10 of Capacitor Charging current.
1020
2041
Magnetic relay setting =
OVERALL RESULTS
146.67
27.12
500
306.08
Size of the Circuit Breaker =
265
Thermal relay setting =
1020
Magnetic relay setting =
Cables size for Capacitor Connection =
Maximum Discharge resistance =
total load in KVAR=
Capacitance of Capacitor =
hence the size of fuse =
291.80
Kvar
F
Amp.
306
2041
291.80
2068.40
2068.40
Calculations:
Collection Area: (Ac)
Probable No of Strikes to Building / Structure :(P)
Overall Multiplying Factor : (M)
Overall Risk Factor Calculated: (xc)
Results:
Calculated Overall Risk Factor Calculated > Maximum Acceptable Overall Risk Factor
Lightning Protection is Required.
Formulas
Ac=(L x W) + 2 (L x H) + 2(W x H) + 3.14 H2
Ab=( L x W )
P=2(L+W)
s=1+(Ab-100)/300
t=P/30
Meter
Meter
Meter
30.00
1.9
Factories / workshop/ Laboratories
Reinforced concrete with Metal Roof
Factories / Workshop
Structure located in a area of the same height
Flat country at any level
0.000001
Days/Year
km2/Year
12469.585
0.0236922115
0.09000
0.002132299
Meter2
No's/Year
5000
300
Yes
Meter2
Meter
>
1
0.3
1
0.3
>
Results:
No's
No's
10
No's