TO SUPPLY, INSTALL, TESTING AND COMMISSIONING ON ADDITIONAL ELECTRICAL SYSTEM AT 2 STOREY CLUSTER
PERDANA 2, JOHOR BAHRU
Item No.
Description
FIRST FLOOR
Electrical Wiring & Accessories
Supply, Install, Testing and Commissioning of the
following items:
New lighting points inclusive of conceal conduits,
2x1.5mm sq wires + Earth, switch & accessories
New fan points inclusive of conceal conduits,
2
2x1.5mm sq wires + Earth, switch & accessories
Exhaust fan points inclusive of conceal conduits,
3 2x1.5mm sq wires + Earth, switch & accessories
with outlet trunkings
1 Gang Switch Socket 13A points inclusive of
4 conceal conduits, 2x1.5mm sq wires + Earth, switch
& accessories
2 Gang Switch Socket 13A points inclusive of
5 conceal conduits, 2x1.5mm sq
wires + Earth, switch & accessories
Outlets points using 32A/20A Weatherproof Isolator
6 / Socket Outlet in conceal conduits, 2x4.0mm sq
wires + Earth & accessories
Air Cond points using 20A Socket inclusive of
7 conceal conduits, 2x4mm sq wires + Earth, switch
& accessories
Weatherproof Pillar Light points inclusive of conceal
8 conduits, 2x1.5mm sq wires + Earth, switch &
accessories
9 Modification of Entrance Pillar Light wiring
24 Way PVC Flush New Sub DB for additional wiring
10
& Air Cond First Floor
CCTV points inclusive of conceal conduits, 2x5mm sq
11
wires + Earth
1
Unit
Qty
no
33
no
no
no
no
no
no
no
NA
set
no
Rate
0.00
Total
Remarks
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
NA