Sie sind auf Seite 1von 429

Sl No.

Items
Sand (Screened & Washed)
Sand (Filling)
Moorum
K.B. Bricks (25cm x 12cm x 8cm)
C.B. Brick Khoa
H.G.Metal & Chips (CB)
R.R.H.G.stone

Existing Rate of
Royalty
19.60 x
19.60
19.60
98.00
19.60
70.56
70.56

Revised Royalty
40 %
40 %
40 %
40 %
40 %
40 %
40 %

Revised Royalty
7.84
7.84
7.84
39.2
7.84
28.224
28.224

Round
27.44
27.44
27.44
137.20
27.44
98.78
98.78

27.40
27.40
27.40
137.20
27.40
98.80
98.80

Lead W.E.F.
Royalty

LEAD STATEMENT FOR SAMBALPUR TOWN


01.08.2013
Nov-13

1
1st
Next
Rest

5 km
45 km
270 km

@ Rs.
@ Rs.

9.20 /
6.50 /

km
km

PUR TOWN

156.40
414.00
1755.00
2325.40

156.4
270

LEAD STATEMENT FOR SAMBALPUR TOWN


Lead W.E.F.
10/11/2014
Royalty
Nov-13
1

Sand (Screened & Washed)


River Zeera - 42

1st
Rest

5 km
37 km

@ Rs.

5 Km
15 Km

@ Rs

5 Km
16 Km

@ Rs.

Royalty
2

Sand (Filling)
Dhobi jore-30 Km

1st
Rest
Royalty

Moorum
Kilasama-21Km

1st
Rest
Royalty

Cement (43 Grade)


Local MarketSAIL Steel
Local-5 Km

K.B. Bricks (25cm x 12cm x 8cm)


Padiabahal-20 Km

1st

5 Km

1st
Next
Rest

5 Km
0 Km
0 Km

@ Rs.
@ Rs.

1st
Rest

5 Km
15 Km

@ Rs.

5 Km
15 Km

@ Rs.

Roaylty

C.B. Brick Khoa


Padiabahal-20 Km

1st
Rest
Royalty

H.G.Metal & Chips (CB)


Mundher(Jamdali)-21Km

1st

5 Km

Rest

16 Km

@ Rs.

5 km
28 km

@ Rs.
@ Rs.

5 Km

@ Rs.

5 Km
Upto 50Km

@ Rs.
@ Rs.

Royalty
9

R.R.H.G.stone(Jujumura-33 Km
1st
Rest
Royalty

10

Wood(Local Market)

1st

11

Interlocking Paver Block(coloured)

1st
Rest

Certified that the leads provided above are shortest and true to the best of my knowledge.

BALPUR TOWN
10/11/2014
Nov-13

9.20 /

9.20 /

9.20 /

km

km

Km

156.40
340.40
496.80
27.40
524.20

524.20 /cum

156.40
138.00
294.40
27.40
321.80

321.80 /cum

156.40
147.20
303.60
27.40
331.00

331.00 /cum

169.00 MT
16.90

Qntl

7.50 /
6.40 /

41.40 /

km
km

Km

169.00
0.00
0.00
169.00
1010.80
621.00
1631.80
137.20
1769.00
884.50

9.20 /

Km

156.40
138.00
294.40
27.40
321.80
156.40

156.4

16.90 /Qntl

169.00 /MT

1769.00 /2000
nos
884.50 /1000
nos

321.80 /cum

696

9.20 /

9.20 /

169.00 /
1010.80 /
1035.00 /
For 10 sqm
knowledge.

Km

km

1.25
180.00sqm
180.00sqm

147.20
303.60
98.80
402.40
156.40
257.60
414.00
98.80
512.80

402.40 /cum

512.80 /cum
135.20 Qntl
5.62
5.75
11.37
113.70

Materials Cost as per Scheduled of Rate


SL No
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Materials

Unit

Rates

SL No

3
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
Qntl
MT
1000
cum
cum
MT
Sqm

5
1
2
3
4

Sand (Filling)
Sand(Mortar)
Metal(40mm)
Chip(12mm)
Chip(6mm)
Chip(4.7mm)
Chip(20mm)
Chip(10mm)
Chip(6.7mm)
Chip(13.20mm)
Cement
Brick
R.R.Stone
Brick Khoa
Rod
Wall Tile (20cmx30cm/20cm x 20mm Special
Plain size
Floor Tile (30cm x 30cm or 40cm
floor tile size(30cm x 30cm or 40cm
size(Kajaria Crema)
Marble Chip
White Cement
Marble Power
Marble Tiles of minimum 16 mm thick, dunguri
Variety.

48.00
55.00
780.00
1168.00
811.00
742.00
1139.00
1215.00
811.00
1145.00
658.00
6580.00
4300.00
231.00
350.00
51880.00
387.00

Sqm
Sqm

429.00
0.00

Qntl
Qntl
Qntl

550.00
1750.00
320.00

b)

Up to 0.10 Sqm.
Above 0.10 sqm to 0.40
Above 0.40 sqm to 1.00
Vetrified tile Above 0.10 Sqm. to 0.40 Sqm. 1

Sqm
Sqm
Sqm
Sqm

495.00
605.00
682.00
665.00

c)
23
a)
b)

Above 0.4 Sqm. to 1.00 Sqm.


Granite Tiles
Up to 0.10 Sqm. (10mm thick)
Above 0.10 Sqm & up to 0.4 sqm (10mm. thick)

Sqm

726.00

c)
24
a)
b)

Above 0.40 sqm. (20mm thick)


Kodappa Tiles of 10 mm thick
Above 0.1 Sqm & Up to 0.40 Sqm.
Above 0.40 Sqm.

18
19
20
21
22

a)

1067.00
1210.00
1900.00
Sqm
Sqm

275.00
330.00

25

Vitrified floor tiles of premium grade having


thickness 8 mm to 10mm confirming to IS
13756 of following sizes

a)

Vitrified Tile 600mmx 600mm Plain (Ivory)

Sqm

605.00

b)

Vitrified Tile 600mmx 600mm Coloured /Printed


series(Homogeneous)

Sqm

660.00

c)

Vetrified industrial Floor tile of premium grade


having thickness 8mm to 10mm confirming to
4457 of size 300x300mm

Sqm

550.00

26
27
28

Non Sal woods scanting


Planks
120mm dia Bullah
120mm dia non-sal Bullah
Carriage of wood
Non sal Bullah 80mm dia
Binding wire
Plastic Emulsion Paint
Enamel Paint
Alminium Paint
Weather Coats(ISI)
Distemper
Adhesive (I.S.I.)
Cement Paint
Red Oxide Powder
French Polish
Wood Shine Paint
Wood Primer
Plaster of parish
Coal tar
Tar Paper
Putty(Wood)
Putty(Iron)
G.C.I. Sheet
0.30mm Thick
0.40mm Thick
A.C. Sheet
A.C. Ridge
6mm thick Plain A.C. Sheet
Wall cement Primer
Oil Bound
Water Bound
White Cement
Distemper
Chequre tile

cum
cum
mtr
mtr
cum
mtr
Kg
litr
litr
litr
kG
Kg
Kg
Kg
Kg
litr
litr
litr
Kg
Kg
sqm
Kg
Kg

21287.00
21287.00
104.00
78.00
135.20
50.00
73.00
227.00
176.00
150.00
175.00
66.00
200.00
43.00
118.00
150.00
145.00
133.00
11.00
40.00
16.00
26.00
90.00

Sqm
Sqm
Sqm
pair
Sqm

260.00
266.00
182.00
171.00
210.00

litr
litr

108.00
140.00

sqm

198.00

29
30

26
28

Interlocking Paver Block(Coloured)


Chequred tile

sqm
sqm

610.00
217.00

ROYALTY OF MATERIALS
SL No

Materials

Unit

Rates

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

2
Sand (Filling)
Sand (Mortar)
Chips
Metal
Brick
Stone
Brick Khoa
Cement
Rod Rourkela
Wood

3
cum
cum
cum
cum
1000
cum
cum
Qntl
MT
Qntl

4
321.80
524.20
402.40
402.40
884.50
512.80
321.80
16.90
169.00
135.20

te
Type of Labour

Rates

6
High Skilled
Skilled
Semi-Skilled
Unskilled

7
260.00
240.00
220.00
200.00

52600

SAND FILLING
SL
No.
3

Description of items

Qnty

Unit

Rate

Supplying all materials, labour, T&P and filling in


foundation and plinth with sand well watered and
rammed including conveyance of all materials to
work site, payment of royalty , taxes ,contractor
profit & labour cess etc all complete as per
specification and direction of Engineer-in-charge.

Data for Per Cum


a)

a)
i)

Materials
Sand for filling

100 cum cum

Labour charges
Man Mulia (Unskilled)

12.36 nos

O.H.C. @
Add Contractor Profit@

C)

Cost of 100 cum


Cost for 1 cum =
Lead & Royalty of Sand
Total (A+B+C)

7.50 %
7.50 %
8362.80 /

Each

48.00

200.00

7272.00
7272.00
100 cum

Add 1 % Labour Cess

Amount
in Rs.

4800.00
4800.00

2472.00
2472.00

211.40

Say

Remarks

4800.00

2472.00
7272.00
545.40
545.40
8362.80
83.63
211.40
295.03
2.95
297.98
298.00

SAND FILLING
SL
No.
3

Description of items

Qnty

Unit

Rate

Supplying all materials, labour, T&P and filling in


foundation and plinth with sand well watered and
rammed including conveyance of all materials to
work site, payment of royalty , taxes ,contractor
profit & labour cess etc all complete as per
specification and direction of Engineer-in-charge.

Data for Per Cum


a)

a)
i)

Materials
Sand for filling

100 cum cum

Labour charges
Man Mulia (Unskilled)

12.36 nos

O.H.C. @
Add Contractor Profit@

C)

Cost of 100 cum


Cost for 1 cum =
Lead & Royalty of Sand
Total (A+B+C)

7.50 %
7.50 %
8362.80 /

Each

48.00

200.00

7272.00
7272.00
100 cum

Add 1 % Labour Cess

Amount
in Rs.

4800.00
4800.00

2472.00
2472.00

211.40

Say

Remarks

4800.00

2472.00
7272.00
545.40
545.40
8362.80
83.63
211.40
295.03
2.95
297.98
298.00

SAND FILLING
SL
No.
3

Description of items

Qnty

Unit

Rate

Supplying all materials, labour, T&P and filling in


foundation and plinth with sand well watered and
rammed including conveyance of all materials to
work site, payment of royalty , taxes ,contractor
profit & labour cess etc all complete as per
specification and direction of Engineer-in-charge.

Data for Per Cum


a)

a)
i)

Materials
Sand for filling

100 cum cum

Labour charges
Man Mulia (Unskilled)

12.36 nos

O.H.C. @
Add Contractor Profit@

C)

Cost of 100 cum


Cost for 1 cum =
Lead & Royalty of Sand
Total (A+B+C)

7.50 %
7.50 %
8362.80 /

Each

48.00

200.00

7272.00
7272.00
100 cum

Add 1 % Labour Cess

Amount
in Rs.

4800.00
4800.00

2472.00
2472.00

321.80

Say

Remarks

4800.00

2472.00
7272.00
545.40
545.40
8362.80
83.63
321.80
405.43
4.05
409.48
409.50

SL
No.

Description of items

2
Supplying all materials, labour and T & P etc.
and cutting R.C.C. road for taking the pipeline
through as per specification and direction of
the Engineer-in-charge.

Road cutting
Qnty

Unit

Ref:-Dismantling and removing R.C.C.


columns beams slab staircase landing

a)

b)
c)

Data for 1 Cum


Labour
Semi-skilled Mulia
Man Mulia(U/S)

1.50 nos
1.50 nos
Overhead Charges @
Add Contractor Profit@
Data for 1 Cum
Add Labour Cess

7.5 %
7.5 %
1%

on
on

Each
Each

Rate

Amount in
Rs.

Remarks

330.00
300.00
630.00
47.25
47.25
724.50
7.25
731.75

731.70

220.00
200.00
630.00
630.00

DISMANTLING WORK ITEMS


SL
No.

Description of items

Qnty

a)

Supplying all labour T&P and Dismantling brick or


stone masonry in clay under 3m. height including
stacking the useful materials for reuse and removing
the debris within 50m. Lead

Data for 1 cum


(Data for 2.83 cum)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

a)

1.25 nos
3.50 nos
Overhead Charges @
Add Contractor Profit.@
Data for 2.83 cum
For 1 cum
Add Labour Cess

7.5 %
7.5 %
1092.50

Each
Each

on
on
/

2.83

1%

Supplying all labour, T&P and Dismantling brick or


stone masonry in clay above 3m. height including
stacking the useful materials for reuse and removing
the debris within 50m. Lead

Data for 1 cum


(Data for 2.83 cum)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

Unit

1.50 nos
3.50 nos
Overhead Charges @
Add Contractor Profit.@
Data for 2.83 cum
For 1 cum
Add Labour Cess

Supplying all labour, T&P and Dismantling brick or


stone masonry in lime or cement mortar under
3m.height including stacking the useful materials for
reuse and removing the debris within 50m. Lead &
labour cess

Data for 1 cum

7.5 %
7.5 %
1150.00

1%

Each
Each

on
on
/

2.83

a)

(Data for 2.83 cum)


Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

a)

Overhead Charges @
Add Contractor Profit.@
Data for 2.83 cum
For 1 cum
Add Labour Cess

a)

b)
c)

7.5 %
7.5 %
1955.00

Each
Each

on
on
/

2.83

1%

Supplying all labour, T&P and Dismantling


brick or stone masonry in lime or cement
mortar above 3m.height including stacking the
useful materials for reuse and removing the
debris within 50m. Lead

Data for 1 cum


(Data for 2.83 cum)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

4.00 nos
4.50 nos

4.50 nos
4.50 nos
Overhead Charges @
Add contractor profit.@
Data for 2.83 cum
For 1 cum
Add Labour Cess

7.5 %
7.5 %
2070.00

Each
Each

on
on
/

2.83

1%

Supplying all labour, T&P and Removing


thatched roof including tying of useful thatches
to small bundles and stacking them carefully
for reuse and removing the debris within 50m.
Lead
Data for 1 Sqm
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

0.50 nos
1.75 nos
Overhead Charges @
Add Contractor Profit @
Data for 9.30 Sqm
For 1 Sqm

7.5 %
7.5 %
517.50

Each
Each

on
on
/

9.30

Add Labour Cess

a)

Supplyin g all labour, T&P and Dismantling roof


timbers of thatched roof including stacking the
useful materials for reuse and removing the
debris within 50m.Lead
Data for 1 Sqm
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

a)

0.30 nos
0.25 nos
Overhead Charges @
Add Contractor Profit @
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

7.5 %
7.5 %
126.50

Each
Each

on
on
/

9.30

1%

Supplying all labour, T&P and Dismantling and


removing lime concrete flooring 7.5 cm to 10 cm
thick including stacking the useful materials
for reuse and removing the debris within 50m
lead
Data for 1 Sqm
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

1%

0.75 nos
2.00 nos
Overhead Charges @
Add Contractor profit
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

Supplying all labour, T&P and Dismantling and


removing 2.5 cm.thick artificial stone flooring including
stacking the useful materials for reuse and removing
the debris within 50m lead

Data for 1 Sqm

7.5 %
7.5 %
632.50

1%

Each
Each

on
on
/

9.30

a)

b)
c)

(Data for 9.30 Sqm)


Labour
Man Mulia(U/S)
Women Mulia(U/S)

0.75 nos
1.25 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

2 First Floor
Rate Same as G.F.
Add Extra labour for First Floor
O.H.C

For 9.30
For Per sqm
Add Labour cess

2 First Floor
Rate Same as G.F.
Add Extra labour for First Floor
O.H.C

For 9.30
For Per sqm
Add Labour cess

a)
b)
c)

Supplying all labour, T&P and Removing old


lime or cement plaster from walls including
raking out joints 12 mm deep and removing the
debris within 50m lead,contractor profit &
labour cess etc all complete as per the direction
Data
for 1 Sqm
of Engineer-in-charge.
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm

7.5 %
7.5 %
460.00

Each
Each

on
on
/

9.30

1%

5%
x
15 % on
23.00

400.00
20.00
9.3

1%

5%
x
15 % on
23.00

400.00
20.00
9.3

1%

1.00 nos

7.5 %
7.5 %
230.00

Each

on
on
/

9.30

Add Labour Cess

First Floor
Rate Same as G.F.
Add Extra Labour for first floor
Add OHC

For 9.30 Sqm


For Per sqm
Add Labour cess

First Floor
Rate Same as G.F.
Add Extra Labour for first floor
Add OHC

For 9.30 Sqm


For Per sqm
Add Labour cess

a)

5%
15 %
11.50

x
on
/

200.00
10.00
9.3

1%

5%
15 %
11.50

x
on
/

200.00
10.00
9.3

1%

Supplying all labour, T&P and Dismantling flag


stone flooring including stacking the useful
stones for reuse and removing the debris within
50m lead
Data for 1 Sqm
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

10

1%

0.50 nos
1.00 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

Supplying all labour, T&P and Dismantling


terraced roof (Madras or Orissa) including
stacking the useful materials for reuse and
removing the debris within 50m lead

Data for 1 Sqm

7.5 %
7.5 %
345.00

1%

Each
Each

on
on
/

9.30

a)

(Data for 9.30 Sqm)


Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

11

a)

Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

a)

b)
c)

7.5 %
7.5 %
1460.50

Each
Each

on
on
/

9.30

1%

Supplying all labour, T&P and Dismantling


G.C.I. or A.C. sheet roofing after carefully
removing the bolts and nuts including stacking
of the materials for reuse and removing the
debris within 50m lead
Data for 1 Sqm
(Data for 9.30 Sqm)
Labour
Fitter (2nd Class)
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

12

2.35 nos
4.00 nos

0.25 nos
0.5 nos
1 nos
Overhead Charges @
Add Contractor Profit @
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

7.5 %
7.5 %
414.00

Each
Each
Each

on
on
/

9.30

1%

Supplying all labour, T&P and Dismantling


wrought and framed timber in roof frame work
of floors after careful removal of nail, bolts etc.
and stacking of the materials for reuse and
removing the debris within 50m lead

Per 1 cum
(Data for 0.0283 cum)
Labour
Carpenter (2nd Class)
Man Mulia(U/S)

0.03 nos
0.04 nos
Overhead Charges @
Add Contractor Profit @
Data for 0.0283 cum

7.5 %
7.5 %

on
on

Each
Each

For 1 cum
Add Labour Cess
13

a)

b)
c)

14

a)

b)
c)

17.48

0.0283

1%

Supplying all labour, T&P and Dismantling and


removing doors, windows and ventilators
including removal of frame, hinges, fastening
and stacking the same for reuse and removing
the debris within 50m lead including contractor
profit & labour cess etc all complete as per the
direction of Engineer-in-charge.
per 1 sqm
Consider a door of (1.22 M2.13 M=2.60sqm)
Labour
Carpenter (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Overhead Charges @
Add Contractor Profit@
Data for 2.60 Sqm
For 1 Sqm
Add Labour Cess

0.5 nos
0.6 nos
1 nos
7.5 %
7.5 %
506.00

Each
Each
Each

on
on
/

2.60

1%

Supplying all labour, T&P and Dismantling and


removing 2.5 cm thick grading concrete from
roof slab cleaning the surface lowering and
removing the debris within 50m lead

Data for 1 Sqm


(Data for 9.30 Sqm)
Labour
Man Mulia
Women Mulia(U/S)
Woman Mulia for lifting the debries
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

0.75 nos
1.25 nos
0.25 nos
7.5 %
7.5 %
517.50

1%

Each
Each
Each

on
on
/

9.30

15

a)

Supplying all labour, T&P and Removing old


grading plaster from roof slab, cleaning the
surface, lowering and removing the debris
within 50m lead
Data for 1 Sqm
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

16

a)

Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

a)

b)
c)

7.5 %
7.5 %
356.50

Each
Each

on
on
/

9.30

1%

Supplying all labour, T&P and Removing old


tarfelt from roof slab,cleaning the surface,
lowering and removing the debris within 50m
lead
Data for 1 Sqm
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)

b)
c)

17

1.40 nos
0.15 nos

1.75 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

7.5 %
7.5 %
402.50

Each

on
on
/

9.30

1%

Supplying all labour, T&P and Dismantling and


removing cement concrete including stacking
the useful materials for reuse and removing the
debris within 50m lead

Data for 1 Cum


Labour
Man Mulia(U/S)
Women Mulia(U/S)

1.50 nos
0.10 nos
Overhead Charges @
Add Contractor Profit@
Data for 1 Cum

7.5 %
7.5 %

on
on

Each
Each

Add Labour Cess

18

a)

Supplying all labour, T&P


removing R.C.C. columns
landing lintels including
materials for reuse and
within 50m lead

19

a)
b)
c)

and Dismantling and


beams slab staircase
stacking the useful
removing the debris

Data for 1 Cum


Labour
Semi-skilled Mulia
Man Mulia(U/S)

b)
c)

1%

1.50 nos
1.50 nos
Overhead Charges @
Add Contractor Profit@
Data for 1 Cum
Add Labour Cess

7.5 %
7.5 %

Each
Each

on
on

1%

Supplying all labour, T&P and Dismantling and


removing R.C.C. Chajja, Shelves, fins and
parapet including stacking the useful materials
for reuse and removing the debris within 50m
lead
Data for 1 Sqm
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)

3.50 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

7.5 %
7.5 %
805.00

1%

Each

on
on
/

9.30

20

a)

Supplying all labour, T&P and Dismantling and


removing marble chips flooring including
stacking the useful materials for reuse and
removing the debris within 50m lead including
contractor profit & labour cess etc all complete
Data
1 direction
Sqm
as
perfor
the
of Engineer-in-charge.
(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

21

a)
b)
c)

Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

0.85 nos
1.40 nos

7.5 %
7.5 %
517.50

Each
Each

on
on
/

9.30

1%

Supplying all labour, T&P and Dismantling and


removing marbel chips dados & skirting from walls
including rackingout joints 12mm.Deep stacking
the useful materials for reuse and removing the
debris within 50m lead

Data for 1 Sqm


(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)

1.10 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

7.5 %
7.5 %
253.00

1%

Each

on
on
/

9.30

22

a)

Supplying all labour, T&P and dismantling and


removing old tiled flooring including removing the
base coarse and stacking the useful materials for
reuse and removing the debris within 50m lead &
contractor profit & labour cess etc all complete as
per the direction of Engineer-in-charge.

Data for 1 Sqm


(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)
Women Mulia(U/S)

b)
c)

23

a)
b)
c)

24

1.00 nos
1.50 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

7.5 %
7.5 %
575.00

Each
Each

on
on
/

9.30

1%

Supplying all labour, T&P and dismantling and


removing old tiled cladding from walls including
racking out joints 12mm deep stacking the useful
materials for reuse and removing the debris within
50m lead & contractor profit & labour cess etc all
complete as per the direction of Engineer-incharge.

Data for 1 Sqm


(Data for 9.30 Sqm)
Labour
Man Mulia(U/S)

1.30 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess

7.5 %
7.5 %
299.00

1%

Supplying all labour, T&P and scraping old


paint with scrapers, sand papering and washing
with soap water or soda including scaffolding
charges upto 5M height
Add Labour Cess

1%

Each

on
on
/

9.30

25

Supplying all labour, T&P and scraping old


paint with scrapers, sand papering and
washing with soap water or soda including
scaffolding charges above 5M high and upto 8M
height
Add Labour Cess

25

Supplying all labour, T&P and scraping old


paint with scrapers, sand papering and
washing with soap water or soda including
scaffolding charges above 5M high and upto 8M
height
Add Labour Cess

01)

1%

1%

Note :
For dismantling work in 1st floor or any additional floor add 5% extra labour over &
above the rate of next lower floor for lowering the dismantled materials.
10% excess on the above rate will be allowed for the works being executed inside jail
Premises.

MS
Rate

Amount in
Rs.

Remarks

4.00

5.00

6.00

200.00
200.00

250.00
700.00
950.00
71.25
71.25
1092.50
386.04
3.86
389.90

389.90

300.00
700.00
1000.00
75.00
75.00
1150.00
406.36
4.06
410.42

410.40

950.00
950.00

200.00
200.00
1000.00
1000.00

200.00
200.00
1700.00
1700.00

200.00
200.00
1800.00
1800.00

200.00
200.00
450.00
450.00

800.00
900.00
1700.00
127.50
127.50
1955.00
690.81
6.91
697.72

697.70

900.00
900.00
1800.00
135.00
135.00
2070.00
731.45
7.31
738.76

738.80

100.00
350.00
450.00
33.75
33.75
517.50
55.65

0.56
56.20

200.00
200.00
110.00
110.00

200.00
200.00
550.00
550.00

60.00
50.00
110.00
8.25
8.25
126.50
13.60
0.14
13.74

13.70

150.00
400.00
550.00
41.25
41.25
632.50
68.01
0.68
68.69

68.70

200.00
200.00
400.00
400.00

Say

150.00
250.00
400.00
30.00
30.00
460.00
49.46
0.49
49.96
GF

49.96
50.00

49.46
20.00
3.00
23.00

2.47
51.94
0.52
52.45

52.50

51.94
20.00
3.00
23.00

2.47
54.41
0.54
54.95

200.00
200.00
200.00

200.00
200.00
15.00
15.00
230.00
24.73

55.00

Say

0.25
24.98

24.98
25.00

24.73
10.00
1.50
11.50

1.24
25.97
0.26
26.23

26.20

25.97
10.00
1.50
11.50

200.00
200.00
300.00
300.00

1.24
27.20
0.27
27.48

27.50

100.00
200.00
300.00
22.50
22.50
345.00
37.10
0.37
37.47

37.50

200.00
200.00
1270.00
1270.00

240.00
200.00
200.00
360.00
360.00

240.00
200.00
15.20
15.20

470.00
800.00
1270.00
95.25
95.25
1460.50
157.04
1.57
158.61

158.60

60.00
100.00
200.00
360.00
27.00
27.00
414.00
44.52
0.45
44.96

45.00

7.20
8.00
15.20
1.14
1.14
17.48

240.00
200.00
200.00
440.00
440.00

200.00
200.00
200.00
450.00
450.00

617.67
6.18
623.84

623.80

120.00
120.00
200.00
440.00
33.00
33.00
506.00
194.62
1.95
196.56

196.56

150.00
250.00
50.00
450.00
33.75
33.75
517.50
55.65
0.56
56.20

56.20

200.00
200.00
310.00
310.00

200.00
350.00
350.00

200.00
200.00
320.00
320.00

280.00
30.00
310.00
23.25
23.25
356.50
38.33
0.38
38.72

38.70

350.00
350.00
26.25
26.25
402.50
43.28
0.43
43.71

43.70

300.00
20.00
320.00
24.00
24.00
368.00

Say

220.00
200.00
630.00
630.00

200.00
700.00
700.00

3.68
371.68
371.70

330.00
300.00
630.00
47.25
47.25
724.50
7.25
731.75

731.70

700.00
700.00
52.50
52.50
805.00
86.56
0.87
87.42

87.40

200.00
200.00
450.00
450.00

200.00
220.00
220.00

170.00
280.00
450.00
33.75
33.75
517.50
55.65
0.56
56.20

56.20

220.00
220.00
16.50
16.50
253.00
27.20
0.27
27.48

27.50

200.00
200.00
500.00
500.00

200.00
260.00
260.00

200.00
300.00
500.00
37.50
37.50
575.00
61.83
0.62
62.45

62.40

260.00
260.00
19.50
19.50
299.00
32.15
0.32
32.47

32.50

3.50
0.04
3.54 /Sqm

64.9214

34.125

4.80
0.05
4.85 /Sqm

20.40
0.20
20.60 /100Sqm

over &

d inside jail

Concrete portion
SL
Description of items
No.
1
2
1
Supplying all materials, labour, T&P and providing
cement concrete(1:4:8) with 40cm size crusher broken
black hard granite metal including watering , curing,
conveyance of all materials to work site, payment of
royalty taxes,contractor profit & labour cess etc all
complete as per specification and direction of
Engineer-in-charge.
a)

Materials
Metal
Sand
Cement

b)

Materials

0.96 cum
0.48 cum
1.72 qntl

Mason 2nd class


Man Mulia (Un-skilled)
Women Mulia(Un-skilled)

0.18 nos
1.80 nos
1.40 nos

Man Mulia for mixing stone, sand and cement and


getting Water

0.70 nos

Add O.H.C.@
Add Contractor Profit@
c)

Qnty

Lead & Royalty


Metal
Sand
Cement

7.5 %
7.5 %

0.96 cum
0.48 cum
1.72 qntl

Add Labour Cess

1%

on(a+b)
on(a+b)

Supplying all materials, labour, T&P and providing


cement concrete( 1:3:6) with 40cm size crusher
broken black hard granite metal including watering
, curing, conveyance of all materials to work site,
payment of royalty taxes ,contractor profit & labour
cess etc all complete as per specification and
direction of Engineer-in-charge.

a)

Materials
Metal
Sand
Cement

b)

Materials

c)

0.96 cum
0.48 cum
2.29 qntl

Mason 2nd class


Man Mulia (Un-skilled)
Women Mulia(Un-skilled)

0.18 nos
1.80 nos
1.40 nos

Man Mulia for mixing stone, sand and cement and


getting Water

0.70 nos

Lead & Royalty


Metal
Sand
Cement

O.H.C. @
Add Contractor Profit@

0.96 cum
0.48 cum
2.29 qntl

Add Labour Cess

First Floor

7.5 %
7.5 %

1%

on(a+b)
on(a+b)

Rate same as G.F.


Add Extra labour for first floor i.e.
O.H.C+C.P.

15 %
15 %
Add labour cess

Supplying all materials, labour, T&P and providing


cement concrete( 1:5:10 ) with 40cm size crusher
broken black hard granite metal including watering
, curing, conveyance of all materials to work site,
payment of royalty taxes, etc all complete as per
specification and direction of Engineer-in-charge.

a)

Materials
Metal
Sand
Cement-0.96 cum

b)

Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)

0.96 cum
0.48 cum
1.38 qntl

0.18 nos
1.8 nos
1.4 nos

x
x

823.20
123.48
1%

Man Mulia for mixing stone, sand and cement and


getting Water
O.H.C. @
Add Contractor Profit@
c)

Lead & Royalty


Metal
Sand
Cement

0.7 nos

7.5 %
7.5 %

0.96 cum
0.48 cum
1.38 qntl

Add Labour Cess

1%

on(a+b+c)
on(a+b+c)

Supplying all labour, T&P, and materials and


making cement concrete (1:3:6) with 12mm size
crusher broken hard granite chips including all
cost of conveyance ,royalty,sundries,watering for
curing ,supervision charge etc.all complete as per
the direction of Engineer-in-charge.

a)

Materials
Crusher broken Chips 12mm size
Sand
Cement

b)

0.90 cum
0.45 cum
2.15 Qntl

Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)

0.18 nos
1.80 nos
1.40 nos

Man Mulia for mixing stone, sand and cement and


getting Water
Mason 2nd class

1.40 nos

O.H.C. @
Add Conyractor Profit
c)

0.50 nos

7.5 %
7.5 %

on(a+b+c)
on(a+b+c)

Lead & Royalty


Crusher broken Chips 12mm size(Royalty only)

Sand
Cement

Add Labour Cess

First Floor
Rate same as G.F.
Add Extra labour for first floor i.e.
O.H.C

1%

15 %
15 %
Add labour cess

2nd Floor
Rate same as F.F.
Add Extra labour for 2nd floor i.e.

0.90 cum
0.45 cum
2.15 Qntl

x
X

15 %

1083.20
162.48
1%

1083.20

O.H.C

15 %
Add labour cess

162.48
1%

Supplying all labour,T&P,Materials and making 2.5


cm Damp proof course with cement concrete (1:2:4)
using 12mm size crusher broken chips. including
cost of conveyance& royalty ,sundries & watering
for curing & supervision charges etc, all complete
as per the direction of Engineer-in-charge.

Data for per sqm


a)

b)

Materials
Crusher broken granite chips 12mm size

0.023 cum

Sand (Screened and washed)-

0.012 cum

Cement-

0.0754 qntl

labour
Man Mulia
Mason spl.
Man Mulia for mixing chips, sand and cement

O.H.C. @
Add Contractor Profit@

0.330 nos
0.103 nos
0.030 nos

7.5 %
7.5 %

Add Lead & Royalty


Crusher broken granite chips 12mm size (Royalty
only)
Sand (Screened and washed)-

0.023 cum

Cement-

0.0754 qntl

Add Labour Cess

0.012 cum

1%

on(a+b+c)
on(a+b+c)

Supplying all labour, T&P, and materials and


making cement concrete (1:1:3) with 12mm size
crusher broken hard granite chips including all
cost of conveyance ,royalty,sundries, watering for
curing ,supervision charge etc.all complete as per
the direction of Engineer-in-charge.

a)

Materials
Crusher broken Chips 12mm size
Sand
Cement

b)

0.90 cum
0.45 cum
4.29 qntl

Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)

0.18 nos
1.80 nos
1.40 nos

Man Mulia for mixing stone, sand and cement and


getting Water
Mason 2nd class

1.40 nos

O.H.C. @
Add Contractor profit @
c)

0.50 nos

7.5 %
7.5 %

Lead & Royalty


Crusher broken Chips 12mm size(Royalty only)

Sand
Cement

Add Labour Cess

First Floor
Rate same as G.F.

0.90 cum
0.45 cum
4.29 qntl

1%

on(a+b)
on(a+b)

Add Extra labour for first floor i.e.


O.H.C & C.P.

15 %
15 %
Add labour cess

2nd Floor
Rate same as F.F.
Add Extra labour for first floor i.e.
O.H.C & C.P.

3RD Floor
Rate same as 2nd Floor
Add Extra labour for 3rd floor i.e.
O.H.C & C.P.

Supplying all labour, T&P, and materials and


providing cement concrete (1:2:4) with 12mm size
crusher broken hard granite chips including all
cost of conveyance ,royalty,sundries,watering for
curing ,supervision charge ,contractor profit &
labour cess etc.all complete as per the direction of
Engineer-in-charge.

a)

Materials
Crusher broken Chips 12mm size
Sand
Cement -0.225 cum

b)

Materials

1083.20
162.48
1%

x
X

1083.20
162.48
1%

0.18 nos
1.8 nos
1.4 nos

Man Mulia for mixing stone, sand and cement and


getting Water
Mason 2nd class

O.H.C. @
Contractor profit @
Lead & Royalty

x
X

0.90 cum
0.45 cum
3.23 qntl

Mason 2nd class


Man Mulia (Un-skilled)
Women Mulia(Un-skilled)

c)

1083.20
162.48
1%

15 %
15 %
Add labour cess

D)

15 %
15 %
Add labour cess

x
X

1.4 nos
0.5 nos

7.50
% on (a+b)
7.50 %
on(a+b)

0.90 cum
0.45 cum
3.23 qntl

Crusher broken Chips 12mm size(Royalty)

Sand
Cement

Add Labour Cess

First Floor
Rate same as G.F.
Add Extra labour for first floor i.e.
O.H.C

1%

15 %
15 %
Add labour cess

2nd Floor
Rate same as F.F.
Add Extra labour for 2nd floor i.e.
O.H.C

15 %
15 %
Add labour cess

x
X
1%

x
X

1083.20
162.48
1%

Supplying all materials,labour, T&P and making


2.5cm thick grading concrete (1:2:2) on roof slab
with 6mm size crusher broken
granite chips.
including cost of conveyance, sundries, watering for
curing, racking out joints, rounding of corners
,scaffolding etc, all complete as per the direction of
engineer-in-charge.

Materials

1083.20
162.48

DATA FOR PER SQM

4.7mm size Crusher broken hard granite chips

0.0169

cum

Sand (Screened & Washed)


Cement 0.0085 cum or 0.1208 qntl

0.0169
0.1208

cum
Qntl

Labour Charges
Mason ( Spl)
Man Mulia (U/S)
Man Mulia for mixing chips ,sand and cement

O.H.C. @
Add Contractor Profit @
Add Lead & Royalty
4.7mm size Crusher broken hard granite chips
(Royalty only)
Sand (Screened & Washed)
Cement 0.0085 cum or 0.1208 qntl

Add Labour Cess

0.10 nos
0.33 nos
0.03 nos

7.50 %
7.50 %
0.0169
0.0169
0.1208

1%

on(a+b+c)
on(a+b+c)

a)

Supplying all labour, materials, T&P and making


4cm thick grading concrete (1:2:4 ) on roof slab
with 12mm & down grade size black hard granite
chip. including Cost of conveyance, sundries,
watering for curing, racking out joints, rounding of
corners ,scaffolding etc, all complete as per the
direction of engineer-in-charge.

Materials

DATA FOR PER SQM


0.018 cum
0.018 cum
0.018 cum
0.1287 qntl

12mm thick hard granite chips


4.7mm thick hard granite chips
Sand (Screened & Washed)
Cement

b)

Labour Charges
Mason ( Spl)
Man Mulia (U/S)

0.165 nos
0.528 nos

Man Mulia for mixing chips ,sand and cement

O.H.C. @
Add Lead & Royalty

Add Contractor Profit @

12mm thick hard granite chips(Royalty only)


4.7mm thick hard granite chips(Royalty only)

Sand (Screened & Washed)


Cement

Add Labour Cess

0.48 nos

7.50 %
7.5 %
0.018 cum
0.018 cum
0.018 cum
0.1287 qntl

1%

on(a+b+c)
on(a+b+c)

10

Supplying all materials,Labour ,T&P for spreading


metal to proper camber and consolidation with
H.R.R. including watering and turf edging ihcluding
cost and conveyance of metal and filler materials
etc all complete as per specification and direction of
Engineer-in-charge.

Unit = Cum
a)

b)

Taking output = 2.83 cum


Labour
Man Mulia for removing from stacks
spreading metal to proper camber turf
edging and rolling.

3 nos

Women Mullia for conveying metal from


stacks and watering and turfing.

2 nos

c)

d)
e)

O.H.C.
Add contractor profit@
Cost of
Cost of 1 cum
Cost of Materials
40mm size C.B. Metal
Lead & Royalty
40mm size C.B. Metal

7.5 %
on
1000.00
7.5 %
on
1000.00
2.83 cum
2.83
1150.00 /

1 cum
1 cum

Unit

Rate
4.00

Amount in
Rs.
5.00

Cum
Cum
Qntl

780.00
55.00
658.00

Each
Each
Each

240.00
200.00
200.00

43.20
360.00
280.00

Each

200.00

140.00
823.20

6.00

748.80
26.40
1131.76

1906.96

2730.16
2730.16

Cum
Cum
Qntl

Remarks

402.40
524.20
16.90

386.30
251.62
29.07
666.99

Say

1906.96

823.20
2730.16
204.76
204.76

666.99
3806.67
38.07
3844.74
3844.70

cum
cum
Qntl

780.00
55.00
658.00

748.80
26.40
1506.82
2282.02

Each
Each
Each

240.00
200.00
200.00

43.20
360.00
280.00

Each

200.00

140.00
823.20

3105.22
3105.22
cum
cum
Qntl

402.40
524.20
16.90

386.30
251.62
38.70
676.62

Say

2282.02

823.20
3105.22
232.89
232.89

676.62
4247.62
42.48
4290.10
4290.10

4247.62
123.48
18.52
4389.63
43.90
4433.52

823.20
123.48

Say

4433.50

cum
cum
Qntl

780.00
55.00
658.00

748.80
26.40
908.04
1683.24

Each
Each
Each

240.00
200.00
200.00

43.20
360.00
280.00

1683.24

Each

200.00

140.00
823.20

2506.44
2506.44

cum
cum
Qntl

402.40
524.20
16.90

386.30
251.62
23.32
661.24

Say

823.20
2506.44
187.98
187.98

661.24
3543.65
35.44
3579.08
3579.10

Cum
Cum
Qntl

55.00
658.00

1051.20
24.75
1414.70
2490.65

Each
Each
Each

240.00
200.00
200.00

43.20
360.00
280.00

Each

200.00

280.00

Each

240.00

120.00
1083.20

1168.00

3573.85
3573.85

Cum
Cum
Qntl

402.40
524.20
16.90

362.16
235.89
36.34
634.39

Say

1083.20
162.48

Say

1083.20

4744.31
162.48
24.37
4931.16
49.31
4980.48
4980.50

4931.16
162.48

2490.65

1083.20
3573.85
268.04
268.04

634.39
4744.31
47.44
4791.76
4791.80

162.48

24.37
5118.02
51.18
5169.20

Say

5169.20

Cum

1168.00

26.86

Cum

55.00

0.66

Qntl

658.00

49.61
77.14

Each
Each
Each

200.00
260.00
200.00

66.00
26.78
6.00
98.78

175.92
175.92
Cum

402.40

9.26

Cum

524.20

6.29

Qntl

16.90

1.27
16.82

77.14

98.78
175.92
13.19
13.19

16.82
219.12
2.19

221.32
221.30

Say

Cum
Cum
Qntl

55.00
658.00

1051.20
24.75
2822.82
3898.77

Each
Each
Each

240.00
200.00
200.00

43.20
360.00
280.00

Each

200.00

280.00

Each

240.00

120.00
1083.20

1168.00

4981.97
4981.97

Cum
Cum
Qntl

402.40
524.20
16.90

362.16
235.89
72.50
670.55

Say

6399.82

3898.77

1083.20
4981.97
373.65
373.65

670.55
6399.82
64.00
6463.81
6463.80

1083.20
162.48

162.48
24.37
6586.67
65.87
6652.54

Say

6652.50

6586.67
162.48
24.37
6773.52
67.74
6841.26

1083.20
162.48

Say

6841.30

6773.52
162.48
24.37
6960.37
69.60
7029.98

1083.20
162.48

Say

7030.00

cum
cum
Qntl

1168.00

55.00
658.00

1051.20
24.75
2125.34
3201.29

Each
Each
Each

240.00
200.00
200.00

43.20
360.00
280.00

Each

200.00

280.00

Each

240.00

120.00
1083.20

4284.49
4284.49

3201.29

1083.20
4284.49
321.34
321.34

cum
cum
Qntl

402.40
524.20
16.90

362.16
235.89
54.59
652.64

Say

652.64
5579.80
55.80
5635.60
5635.60

5579.80
162.48
24.37
5766.65
57.67
5824.32

1083.20
162.48

Say

5824.30

5766.65
162.48
24.37
5953.50
59.54
6013.04

1083.20
162.48

Say

6013.00

cum

742.00

12.54

cum
Qntl

55.00
658.00

0.93
79.49
92.96

92.96

Each
Each
Each

260.00
200.00
200.00

26.00
66.00
6.00
98.00

190.96
190.96
cum

402.40

6.80

cum
Qntl

524.20
16.90

8.86
2.04
17.70

Say

98.00
190.96
14.32
14.32

17.70
237.30
2.37
239.67
239.70

cum
cum
cum
Qntl

1168.00

742.00
55.00
658.00

21.02
13.36
0.99
84.68
120.05

Each
Each

260.00
200.00

42.90
105.60

Each

200.00

96.00
244.50

364.55
364.55
cum
cum
cum
Qntl

402.40
402.40
524.20
16.90

7.24
7.24
9.44
2.18
26.10

Say

120.05

244.50
364.55
27.34
27.34

26.10
445.33
4.45
449.79
449.80

336130.18

9.2%

Each

200.00

600.00

Each

200.00

400.00
1000.00
75.00
75.00
1150.00

1000.00
1000.00
406.36

406.36

780.00

780.00

402.40

402.40
1182.40

1182.40
1588.76

1.8
1.4
1.4
4.6

367054.15656

R.C.C. WORK PORTION

SL
Description of items
No.
1
2
1
Supplying all labour, materials ,T&P and
providing Cement concrete (1:1:3)
with crusher broken hard granite chips on
12mm size RCC works including cost of
conveyance & royalty ,sundries , watering
,curing &lifting &laying concrete at a
height of 5mtr. Maximum complete etc
all
complete(Excluding
cost
of
reinforcement & centering & shuttering)

a)

b)

Materials
Crusher broken Chips 12mm size
Sand
Cement

Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)
Man Mulia for mixing stone, sand and
cement and getting Water
Mason 2

nd

class

O.H.C. @
Add contractor profit@
c)

Qnty

Unit

0.90 cum
0.45 cum
4.29 qntl

Cum
Cum
Qntl

0.18 nos
1.80 nos
1.40 nos

Each
Each
Each

1.40 nos

Each

0.50 nos

Each

7.5 %
7.5 %

4981
498

on(a+b+c)
on(a+b+c)

Lead & Royalty


Crusher broken Chips 12mm size(Royalty

Sand
Cement

Add Labour Cess

First Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.

0.90 cum
0.45 cum
4.29 qntl

Cum
Cum
Qntl

1%

15 %
15 %

x
x

1083.20
162.48

Add Labour cess

2nd Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.

15 %
15 %

Add Labour cess

3rd Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.

Supplying all labour, T&P, and materials


and providing cement concrete (1:2:4)
with 12mm size crusher broken hard
granite chips including all cost of
conveyance ,royalty,sundries, watering
for curing ,supervision charge etc.all
complete as per the direction
of
Engineer-in-charge.

a)

Materials
Crusher broken Chips 12mm size
Sand
Cement -0.225 cum
Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)
Man Mulia for mixing stone, sand and
cement and getting Water
Mason 2nd class

x
x

1083.20
162.48

x
x

1083.20
162.48

1%

15 %
15 %

Add Labour cess

b)

1%

1%

0.90 cum
0.45 cum
3.23 qntl

cum
cum
Qntl

0.18 nos
1.8 nos
1.4 nos

Each
Each
Each

1.4 nos

Each

0.5 nos

Each

O.H.C. @
Add contractor profit@
c)

Lead & Royalty


Crusher broken Chips 12mm size
Sand
Cement

Add Labour Cess

First Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.& C.P.

7.5 %
7.5 %

2nd Floor
Rate Same as first floor
Add Extra labour for 2nd floor
Add O.H.C.& C.P.

3RD Floor
Rate Same as 2rd floor
Add Extra labour for 3rd floor
Add O.H.C.& C.P.

x
x

1083.20
162.48

x
x

1083.20
162.48

x
x

1083.20
162.48

1%

1%

15 %
15 %

Add Labour cess

cum
cum
Qntl

1%

15 %
15 %

Add Labour cess

on(a+b+c)

0.90 cum
0.45 cum
3.23 qntl

15 %
15 %

Add Labour cess

4284
4284

on(a+b+c)

1%

Supplying all labour, T&P , materials and


R.C.C. Work of M-15 Grade with 20mm
and down grade black Crusher broken
granite stone chips including hoisting and
laying and including cost of conveyance,
royalties of materials etc all complete as
per direction of Engineer-in-charge.

(Data for 1 cum)

(a)

(B)

c)

Materials
20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement

0.54 cum
0.36 cum
0.45 cum
2.80 qntl

Cum
Cum
Cum
Qntl

Labour
Mate
Mason 2nd class
Man Mulia (U/S)

0.06 nos
0.10 nos
1.33 nos

Each
Each
Each

0.40 hrs
0.40 hrs

Hr
Hr

Mechinary
Concrete mixer( Cap.0.40/0.28 cum)

Generator-33KVA

Add OHC @
Add contractor profit@
D)

Lead & Royalty


20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement

Add Labour Cess

7.5 %
7.50 %

0.54 cum
0.36 cum
0.45 cum
2.80 Qntl

1%

on (a+b+c)
on (a+b+c)

Cum
Cum
Cum
Qntl

Supplying all labour, T&P , materials and


R.C.C. Work of M-20 Grade with 20mm
and down grade black Crusher broken
granite stone chips including hoisting and
laying and including cost of conveyance,
royalties of materials etc all complete as
per direction of Engineer-in-charge.

(Data for 15 cum)

(a)

Materials
20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement

8.10 cum
5.40 cum
6.75 cum
5.21 M.T.

Cum
Cum
Cum
MT

(B)

c)

Labour
Mate
Mason 2nd class
Man Mulia (U/S)

0.86 nos
1.5 nos
20 nos

Mechinary
Concrete mixer( Cap.0.40/0.28 cum)
Generator-33KVA

6 hrs
6 hrs

Add OHC @
Add contractor profit@
D)

Each
Each
Each

Lead & Royalty


20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement

7.5 %
7.50 %

Hr
Hr

on (a+b+c)
on (a+b+c)

8.10 cum
5.40 cum
6.75 cum
5.21 M.T.

Cum
Cum
Cum
MT

Cost for 15 cum


For 1 cum
Add Labour Cess

First Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.& C.P.
For
For
Add Labour cess

Supplying all labour, T&P , materials and


R.C.C. Work of M-25 Grade with 20mm
and down grade black Crusher broken
granite stone chips including hoisting and
laying and including cost of conveyance,
royalties of materials etc all complete as
per direction of Engineer-in-charge.

(Data for 15 cum)

(a)

Materials

75966.06
1%

15 %
x
15 %
x
15 cum
1 cum
1%

15

4549.20

682.38

20mm size Chips


10mm size Chips
Coarse sand ( screened& washed)
Cement
(B)

c)

8.10 cum
5.40 cum
6.75 cum
6.05 M.T.

Labour
Mate
Mason 2nd class
Man Mulia (U/S)

0.86 nos
1.50 nos
20.00 nos

Each
Each
Each

Mechinary
6 hrs
6 hrs

Concrete mixer( Cap.0.40/0.28 cum)

Generator-33KVA

Add OHC @
Add contractor profit@
D)

Cum
Cum
Cum
MT

Lead & Royalty


20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement

7.5 %
7.50 %

Hr
Hr

on (a+b+c)
on (a+b+c)

8.10 cum
5.40 cum
6.75 cum
6.05 M.T.

Cum
Cum
Cum
MT

Cost for 15 cum


For 1 cum
Add Labour Cess
First Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.& C.P.
For
For
Add Labour cess

2nd Floor
Rate Same as 1st floor
Add Extra labour for First floor
Add O.H.C.& C.P.
For
For
Add Labour cess

3rd Floor
Rate Same as 2nd floor

82464.30
1%

15 %
x
15 %
x
15 cum
1 cum

15

4549.20

682.38

1%

15 %
x
15 %
x
15 cum
1 cum
1%

4549.20

682.38

Add Extra labour for First floor


Add O.H.C.& C.P.
For
For
Add Labour cess

15 %
x
15 %
x
15 cum
1 cum

4549.20

682.38

1%

Supplying all labour, T&P , materials and


R.C.C. Work of
M-30 Grade with
20mm and down grade black Crusher
broken
granite stone chips including
hoisting and laying and including cost of
conveyance, royalties of materials etc all
complete as per direction of Engineer-incharge.

(Data for 15 cum)

(a)

(B)

Materials
20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement
Labour
Mate
Mason 2nd class
Man Mulia (U/S)

8.10 cum
5.40 cum
6.75 cum
6.10 M.T.

0.86 nos
1.50 nos
20.00 nos

Cum
Cum
Cum
MT

Each
Each
Each

c)

Mechinary
Concrete mixer( Cap.0.40/0.28 cum)

Generator-33KVA

Add OHC @
Add contractor profit@
D)

Lead & Royalty


20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement

6 hrs
6 hrs

7.5 %
7.50 %

Hr
Hr

on (a+b+c)
on (a+b+c)

8.10 cum
5.40 cum
6.75 cum
6.10 M.T.

Cum
Cum
Cum
MT

Cost for 15 cum


For 1 cum
Add Labour Cess

82851.10
1%

15

Supplying all labour, T&P , materials and


R.C.C. Work of
M-35 Grade with
20mm and down grade black Crusher
broken
granite stone chips including
hoisting and laying and including cost of
conveyance, royalties of materials etc all
complete as per direction of Engineer-incharge.

(Data for 15 cum)

(a)

Materials
20mm size Chips
10mm size Chips

8.10 cum
5.40 cum

Cum
Cum

Coarse sand ( screened& washed)


Cement
(B)

c)

Labour
Mate
Mason 2nd class
Man Mulia (U/S)

Cum
MT

0.86 nos
1.50 nos
20.00 nos

Each
Each
Each

Mechinary
Concrete mixer( Cap.0.40/0.28 cum)

Generator-33KVA

Add OHC @
Add contractor profit@
D)

6.75 cum
6.33 M.T.

Lead & Royalty


20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement

6 hrs
6 hrs

7.5 %
7.50 %

Hr
Hr

on (a+b+c)
on (a+b+c)

8.10 cum
5.40 cum
6.75 cum
6.33 M.T.

Cum
Cum
Cum
MT

Cost for 15 cum


For 1 cum
Add Labour Cess

84630.38
1%

15

Supplying all labour, T&P , materials and


R.C.C. Work of
M-40 Grade with
20mm and down grade black Crusher
broken
granite stone chips including
hoisting and laying and including cost of
conveyance, royalties of materials etc all
complete as per direction of Engineer-incharge.

Using concrete mixer.


Unit = 1 cum
Taking output = 15 cum

(a)

(B)

c)

Materials
Cement
Coarse sand ( screened& washed)
20 mm Aggregate
10 mm Aggregate
Admixture @ 0.4 per cent of cement

6.45 MT
6.75 cum
8.10 cum
5.40 cum
25.80 kg

MT
cum
Cum
Cum
kg

Labour
Mate
Mason 2nd class
Man Mulia (U/S)

0.96 nos
2.00 nos
22.00 nos

Each
Each
Each

Mechinary
Concrete mixer( Cap.0.40/0.28 cum)

Generator-33KVA

Add OHC @
Add contractor profit@
D)

Lead & Royalty


Cement
Coarse sand ( screened& washed)
20 mm Aggregate
10 mm Aggregate

6 hrs
6 hrs

7.5 %
7.50 %

Hr
Hr

on (a+b+c)
on (a+b+c)

6.45 cum
6.75 cum
8.10 cum
5.40 M.T.

MT
Cum
Cum
Cum

Cost for 15 cum


For 1 cum
Add Labour Cess

87368.80
1%

15

Rate in Rs.
4

Amount in
Rs.
5

1168.00
55.00
658.00

1051.20
24.75
2822.82
3898.77

240.00
200.00
200.00

43.20
360.00
280.00

200.00

280.00

240.00

120.00
1083.20

4981.97
4981.97
402.40
524.20
16.90

362.16
235.89
72.50
670.55

3898.77

1083.20
4981.97
373.65
373.65

G.F.

670.55
6399.82
64.00
6463.81

Say

6463.80
6399.82

162.48
24.37
186.85

Remarks

186.85

6586.67
65.87
6652.54
6652.50 /cum

Say

6586.67
162.48
24.37
186.85

Say

186.85
6773.52
67.74
6841.26
6841.30 /cum

6773.52
162.48
24.37
186.85

Say

1168.00
55.00
658.00

186.85
6960.37
69.60
7029.98
7030.00 /cum

1051.20
24.75
2125.34
3201.29

240.00
200.00
200.00

43.20
360.00
280.00

200.00

280.00

240.00

120.00
1083.20

3201.29

1083.20

4284.49
321.34
321.34

4284.49
4284.49
402.40
524.20
16.90

362.16
235.89
54.59
652.64

652.64
5579.80
55.80
5635.60

Say

5635.60

5635.60
162.48
24.37
186.85

Say

186.85
5822.45
58.22
5880.68
5880.70 /cum

5822.45
162.48
24.37
186.85

Say

186.85
6009.30
60.09
6069.40
6069.40 /cum

6009.30
162.48
24.37
186.85

Say

186.85
6196.16
61.96
6258.12
6258.10 /cum

1139.00
1215.00
55.00
658.00

220.00
240.00
200.00

177.00
240.00

615.06
437.40
24.75
1842.40
2919.61

2919.61

13.20
24.00
266.00
303.20

303.20

70.80
96.00
166.80

3389.61
3389.61

402.40
402.40
524.20
16.90

217.30
144.86
235.89
47.32
645.37

For 1 cum
Say

166.80
3389.61
254.22
254.22

645.37
4543.42
45.43
4588.86
4588.90

1139.00
1215.00
55.00
6580.00

9225.90
6561.00
371.25
34281.80
50439.95

50439.95

220.00
240.00
200.00

177.00
240.00

189.20
360.00
4000.00
4549.20
1062.00
1440.00
2502.00

57491.15
57491.15

402.40
402.40
524.20
169.00

3259.44
2172.96
3538.35
880.49
9851.24

4549.20

2502.00
57491.15
4311.84
4311.84

9851.24
75966.06

5064.40
50.64
5115.05
5115.00

Say

5064.40
682.38
102.36
784.74
52.32

Say

52.32
5116.72
51.17
5167.89
5167.90 /cum

1139.00
1215.00
55.00
6580.00

220.00
240.00
200.00

177.00
240.00

9225.90
6561.00
371.25
39809.00
55967.15

55967.15

189.20
360.00
4000.00
4549.20

4549.20

1062.00
1440.00
2502.00

63018.35
63018.35

402.40
402.40
524.20
169.00

3259.44
2172.96
3538.35
1022.45
9993.20
5497.62
54.98
5552.60

2502.00
63018.35
4726.38
4726.38

9993.20
82464.30

5552.60

5497.62
682.38
102.36
784.74
52.32

Say

52.32
5549.94
55.50
5605.44
5605.40 /cum
5549.94

682.38
102.36
784.74
52.32

Say

52.32
5602.25
56.02
5658.27
5658.30 /cum

5602.25

682.38
102.36
784.74
52.32

Say

1139.00
1215.00
55.00
6580.00

220.00
240.00
200.00

52.32
5654.57
56.55
5711.11
5711.10 /cum

9225.90
6561.00
371.25
40138.00
56296.15
189.20
360.00
4000.00

56296.15

4549.20
177.00
240.00

1062.00
1440.00
2502.00

63347.35
63347.35

402.40
402.40
524.20
169.00

3259.44
2172.96
3538.35
1030.90
10001.65
5523.41
55.23
5578.64

1139.00
1215.00

9225.90
6561.00

4549.20

2502.00
63347.35
4751.05
4751.05

10001.65
82851.10

55.00
6580.00

220.00
240.00
200.00

177.00
240.00

371.25
41651.40
57809.55

57809.55

189.20
360.00
4000.00
4549.20

4549.20

1062.00
1440.00
2502.00

64860.75
64860.75

402.40
402.40
524.20
169.00

3259.44
2172.96
3538.35
1069.77
10040.52
5642.03
56.42
5698.45

2502.00
64860.75
4864.56
4864.56

10040.52
84630.38

5698.40

6580.00
55.00
1139.00
1215.00
40.00

220.00
240.00
200.00

177.00
240.00

42441.00
371.25
9225.90
6561.00
1032.00
59631.15

59631.15

211.20
480.00
4400.00
5091.20

5091.20

1062.00
1440.00
2502.00

67224.35
67224.35

169.00
524.20
402.40
402.40

1090.05
3538.35
3259.44
2172.96
10060.80
5824.59
58.25
5882.83

2502.00
67224.35
5041.83
5041.83

10060.80
87368.80

5882.80

FLOORING ITEMS
SL
No.

Description of items

Qnty

2
Supplying all materials, labour, T&P and
fixing Ceramic floor tiles using tile 30cm
x 30cm or 40cm x 40cm in floor treads or
steps and landing on 25mm thick bed of
cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including
rubbing and polishing ,contractor profit &
labour cess all complete as per direction of
Engineer-in-Charge.

a)

(Data for 10 sqm)


For 1 Sqm
Materials
Cement- 0.13 cum or
Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting

10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Sqm
Qntl
cum
Qntl
Qntl

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

floor tile size(30cm x 30cm or 40cm size

b)

Unit

Add O.H.C@
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement

7.5 %
7.5 %

on
on

(a+b)
(a+b)

0.13 cum
2.737 qntl

For 10 sqm
For 1 sqm
Add Labour Cess

First Floor
Rate Same as First Floor
Add Extra labour for first floor

9661.35

Cum
Qntl

/
1%

2203.60 x
10 %
x
For 10 Sqm
For 1 Sqm

121.20

10

10

%
110.18

Add Labour cess

a)

Supplying all labour,T&P, Materials and


fixing
ceramic
glazed
tiles
in
dados,skirtting and risers of steps on
12mm thick bed of cement plaster (1:3)
jointed with cement slurry mixed pigment
to match the shades of the tiles including
rubbing and polishing etc. Complete after
providing a base plaster of 12mm thick in
cement mortar (1:4) using tiles of size
20cmx20cm or 20cmx30cm including cost
of tiles ,conveyance, taxes ,contractor
profit & labour cess etc all complete as per
the
specification and the direction of
engineer-in-charge.(tiles
of
approved
shades to be used)

(Data for 10 sqm)


Materials
Under Layer
10 sqm

Sqm

Sand ( Screened and washed)


CementCement for slurry

0.15 cum
0.715 qntl
0.66 qntl

cum
Qntl
Qntl

Labour Charges
Mason (spl)
Mulia
Semi-skilled Mulia or rubbering

3.25 nos
3.25 nos
7.60 nos

Each
Each
Each

Creami tiles 300 x 450mm Triedant Wood Brown


(Make Assian) Page No.73

b)

1%

Add O.H.C @
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement

7.5 %
7.5 %

on
on

0.15 cum
1.375 qntl
For 10 Sqm
For 1 Sqm
Wax polishing

22581.16

Add Labour cess

1%

(a+b)
(a+b)
cum
Qntl

10

a)

(Data for 10 sqm)


Materials
Under Layer
Ceramic Tiles-248 x 375 Onice squeexe
Dekar,Grinder Dekor Kidece Dcor,Textrure
squre Dcor ( Make Assian)

b)

10 sqm

Sqm

Sand ( Screened and washed)


CementCement for slurry

0.15 cum
0.715 qntl
0.66 qntl

cum
Qntl
Qntl

Labour Charges
Mason (spl)
Mulia
Semi-skilled Mulia or rubbering

3.25 nos
3.25 nos
7.60 nos

Each
Each
Each

Add O.H.C @
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement

7.5 %
7.5 %

on
on

0.15 cum
1.375 qntl
For 10 Sqm
For 1 Sqm
Wax polishing

24692.86

Add Labour cess

1%

(a+b)
(a+b)
cum
Qntl

10

a)

Supplying,fitting,fixing vitrified tile in floors


of size 600mm x 605mm of approved make
conforming to IS:13755 laid on 20mm thick
cement mortar(1:4) (cement :4 course sand)
and filling joint with
white cement of
approved quality including cost of all
materials,taxes,conveyance labour,T&P etc
required for the work ,contractor profit &
labour cess all complete as per direction of
Engineer-In-charge( For New work only)

(Data for 10 sqm)


Materials
Vetriti fied.Tiles. 605X605 Valanvcia,
Maharaja, wood land, Arosia, Eros,
ivora (make Assian) page No.130
Sand
Cement
Cement for slurry
White cement

b)

10 Sqm

Sqm

0.21 cum
0.744 Qntl
0.33 Qntl
0.076 Qntl

cum
Qntl
Qntl
Qntl

2.16 Nos
2.16 Nos

Each
Each

Labour charges
Mason Special
Mulia

Add O.H.C.@
Add Contractor profit@
c)

7.5%
7.5%

Lead & Royalty


0.21 cum
0.744 qntl
0.33 qntl
0.076 qntl

Sand
Cement
Cement for slurry
White cement

Rate for
Rate for
Add Labour cess @

10 Sqm
1 Sqm
1%

cum
qntl
qntl
qntl

0.00
0.00
0.00
0.00

13

a)

Supplying all materials, labour, T&P and


fixing Vetrified tiles in floor threads or steps
and landing and dados on 25mmthick bed of
cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including
rubbing and polishing including cost of
Vetrified tiles ,taxes of all materials , royalty
taxes, etc all complete as per specification
and direction of Engineer-in-charge.

(Data for 10 sqm)


For 1 Sqm
Materials
Vetrified tiles 605x605 Valanvcia Maharaja wood land
,Arosia,Eros,Ivora (Make Assian) Page-130.

b)

10 sqm

Sqm

Cement- 0.13 cum or


Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting

1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Qntl
cum
Qntl
Qntl

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

Add O.H.C@
Add contractor profit@
Lead & Royalty
Sand ( Screened and washed)
Cement

on
on

0.13 cum
2.737 qntl

For 10 sqm
For 1 sqm
Add Labour Cess
For First Floor
Rate Same as Ground floor
Add extra labour for first floor
Add O.H.C

7.5 %
7.5 %

31626.44

5%
15 %
For 10 sqm
For 1 sqm 126.71 /

Add Labour cess

(a+b)
(a+b)

Cum
Qntl

/
1%

10

x
x

2203.60
110.18
10

1%

a)

Supplying all materials, labour, T&P and


fixing Ceramic floor tiles using tile 30cm
x 30cm or 40cm x 40cm in floor treads or
steps and landing on 25mm thick bed of
cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including
rubbing and polishing ,contractor profit &
labour cess all complete as per direction of
Engineer-in-Charge.

(Data for 10 sqm)


For 1 Sqm
Materials
Cement- 0.13 cum or
Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting

10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Sqm
Qntl
cum
Qntl
Qntl

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

Chequred tile

b)

Add O.H.C@
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
For 10 sqm
For 1 sqm
Add Labour Cess

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

#REF!

/
1%

(a+b)
(a+b)

Cum
Qntl

10

Rate in Rs.

Amount in
Rs.

Remarks

4.00

429.00
658.00
55.00
658.00
658.00

4290.00
1221.91
7.15
289.52
289.52
6098.10

260.00
220.00
200.00

561.60
1210.00
432.00
2203.60

8301.70
8301.70

180
0.013
2.737
0.2737
6098.10

2203.60
8301.70
622.63
622.63
9546.95

524.20
16.90

68.15
46.26
114.40

114.40
9661.35

966.14
9.66
975.80
975.80

Say

966.14
=
=

110.18
11.02
121.20
12.12

12.12
978.25

9.78
988.04
988.00

Say

1546.72

15467.21

55.00
658.00
658.00

8.25
470.47
434.28
16380.21

260.00
200.00
220.00

845.00
650.00
1672.00
3167.00

19547.21
19547.21
524.20
16.90

2258.12
8.50
2266.62
22.67
2289.28 Say

78.63
23.24
101.87

1.375
0.1375
16380.21
0.015
0.1375

3167.00
19547.21
1466.04
1466.04

101.87
22581.16

2289.30

1730.35

17303.48

55.00
658.00
658.00

8.25
470.47
434.28
18216.48

260.00
200.00
220.00

845.00
650.00
1672.00
3167.00

21383.48
21383.48
524.20
16.90

2469.29
8.50
2477.79
24.78
2502.56 Say

78.63
23.24
101.87

1.375
0.1375
18216.48
0.015
0.1375

3167.00
21383.48
1603.76
1603.76

101.87
24692.86

2502.60

2339.01

23390.08

55.00
658.00
658.00
1925.00

11.55
489.55
217.14
146.30
24254.62

260.00
200.00

561.60
432.00
993.60

24254.62

993.60
25248.22

25248.22
25248.22

1893.62
1893.62
29035.46

0.00
10.00
1.00
Say

0.00
29035.46
2903.55
2903.50

Say

29035.46
2903.55
29.04
2932.58
2932.60

0.00
0.00
0.00
0.00
0.00
For Sqm
For Sqm

2339.01

23390.08

658.00
55.00
658.00
658.00

1221.91
7.15
289.52
289.52

260.00
220.00
200.00

25198.18

25198.18

561.60
1210.00
432.00
2203.60

2203.60
27401.78

2055.13
2055.13

27401.78
27401.78

524.20
16.90

68.15
46.26
114.40

114.40
31626.44

3162.64
31.63
3194.27
3194.30

Say
3162.64
110.18
16.53
126.71

Say

12.67
3175.32
31.75
3207.07
3207.10

198.00
#REF!

1980.00

180
0.013
2.737
0.2737

#REF!
#REF!
1980.00
#REF!

1980.00

#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

Say

#REF!
#REF!
#REF!
#REF!

FLOORING ITEMS
SL
No.

Description of items

Qnty

2
Supplying all labour,T&P, Materials and
making 2.5 cm artificial stone flooring with
cement concrete (1:2:4) including punning
using 12mm size crusher broken granites
chips. including cost of conveyance &
royalty ,sundries & watering for curing &
supervision charges ,contractor profit &
labour cess etc, all complete as per the
direction of Engineer-in-charge.

a)

b)

Materials

Unit

(Data for per sqm)

Crusher broken granites chips 12mm size

0.023 cum

Cum

Sand (Screened and washed)


Cement- ( 0.006 cum) or

0.012 cum
0.0858 qntl

Cum
Qntl

0.03 nos
0.13 nos
0.22 nos
0.11 nos

Each
Each
Each
Each

Labour charges
Man Mulia for mixing chips cement and Sand
in small quantity and watering
Mason (Spl)
Women Mulia
Man Mulia

O.H.C @
Add contractor profit @

7.5 %
7.5 %

on (a+b)
on (a+b)

Lead & Royalty


Crusher broken granites chips 12mm
size(Royalty only)
Sand (Screened and washed)
Cement- ( 0.006 cum) or

0.023 cum

Cum

0.012 cum
0.0858 qntl

Cum
Qntl

Add Labour Cess

First Floor
Rate Same as G.F.
Add Extra for First Floor

1%

105.80

Add OHC& C.P.@7.50% EACH

15%

Add Labour cess

B)

2ND Floor
Rate Same as F.F.
Add Extra for 2nd Floor
Add OHC& C.P.@7.50% EACH

1%

5%
15% %

x
x

Add Labour cess

Cc)

3rd Floor
Rate Same as 2nd.F.
Add Extra for 3rd Floor
Add OHC& C.P.@7.50% EACH

a)

5%
15% %

x
x

105.80
5.29

1%

Supplying all labour,T&P, Materials and


making 2.5 cm artificial stone flooring with
cement concrete (1:3:6) including punning
using 12mm size crusher broken granites
chips. including cost of conveyance &
royalty ,sundries & watering for curing &
supervision charges etc, all complete as per
the direction of Engineer-in-charge.

Materials

(Data for per sqm)

Crusher broken granites chips 12mm size


Sand (Screened and washed)
Cement- ( 0.006 cum) or
b)

105.80
5.29

1%

Add Labour cess

5.29

0.023 cum

Cum

0.012 cum
0.0548 qntl

Cum
Qntl

Labour charges
Man Mulia for mixing chips cement and Sand
in small quantity and watering
Mason (Spl)
Women Mulia
Man Mulia

0.03 nos
0.13 nos
0.22 nos
0.11 nos

Each
Each
Each
Each

O.H.C @
Add Contractor profit@

7.5 %
7.5 %

on(a+b)
on(a+b)

Lead & Royalty


Crusher broken granites chips 12mm size
Sand (Screened and washed)
Cement- ( 0.006 cum) or

0.023 cum

Cum

0.012 cum
0.0548 qntl

Cum
Qntl

Add Labour Cess

First Floor
Rate Same as G.F.
Add Extra for First Floor
Add OHC& C.P.@7.50% EACH

1%

5%
15%

x
x

Add Labour cess

2nd Floor
Rate Same as F.F.
Add Extra for First Floor
Add OHC& C.P.@7.50% EACH

1%

5%
15%

Add Labour cess

a)

105.80
5.29

x
x

105.80
5.29

1%

Supplying all labour,T&P, Materials and


making Filling Brick Khoa inside Soak pit
or soak gallery including cost of conveyance
& royalty ,supervision charges etc, all
complete as per the direction of Engineerin-charge.

(Data for per cum)

Materials
K.B. Brick Khoa

1 cum

cum

Labour Charges
As per actual observation
Man Mulia (U/S)

2 nos

Each

O.H.C @
Add Contractor profit @
Lead & Royalty
K.B. Brick Khoa

7.5
7.5

a)

b)

on
on

1 cum

Add Labour Cess

%
%

(a+b)
(a+b)

cum

1%

Supplying all labour,T&P, Materials and


10cm thick dry brick khoa well watered &
rammed to receive A.S.flooring including
cost of conveyance & royalty ,supervision
charges etc, all complete as per the
direction of Engineer-in-charge.

Per 1 sqm.
Materials
K.B.brick khoa 4cm size

0.14 cum

cum

Labour
Mason 2nd class
Man mulia for ramming
women mulia for watering

0.05 nos
0.16 nos
0.22 nos

Each
Each
Each

Add OHC @
Add Contractor Profit@
K.B. Brick Khoa

7.5 %
7.5 %
1 cum

on
on

(a+b)
(a+b)
cum

24

a)

Supplying all materials, labour, T&P and


fixing Ceramic floor tiles using tile 30cm x
30cm or 40cm x 40cm in floor treads or
steps and landing on 25mm thick bed of
cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including
rubbing and polishing ,contractor profit &
labour cess all complete as per direction of
Engineer-in-Charge.

(Data for 10 sqm)


For 1 Sqm
Materials
floor tile size(30cm x 30cm or 40cm size

Cement- 0.13 cum or


Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting
b)

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Sqm
Qntl
cum
Qntl
Qntl

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

Add O.H.C@
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

For 10 sqm
For 1 sqm
Add Labour Cess

9661.35

/
1%

(a+b)
(a+b)

Cum
Qntl

10

First floor
Rate Same as G.F.
Add Extra Labour for F.F.
Add O.H.C. &C.P.@7.50% EACH
For
For
Add labour cess

b)

2203.60

110.18

10 Sqm
1 Sqm
1% on

2nd floor
Rate Same as F.F.
Add Extra Labour for F.F.
Add O.H.C. &C.P.@7.50% EACH
For
For
Add labour cess

C)

5% X
15% X

5% X
15% X

2203.60

110.18

10 Sqm
1 Sqm
1% on

3RD floor
Rate Same as F.F.
Add Extra Labour for 2.F.
Add O.H.C. &C.P.@7.50% EACH
For
For
Add labour cess

5% X
15% X
10 Sqm
1 Sqm
1% on

2203.60

110.18

a)

Supplying all labour,T&P, Materials and


fixing Ceramic floor tiles using tile 30cm x
30cm or 40cm x 40cm in floor treads or
steps and landing on 25mm thick bed of
cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including cost
of Floor tile of Kajaria Crema) ,rubbing and
polishing complete as per direction of
Engineer-in-Charge.

(Data for 10 sqm)


For 1 Sqm
Materials
floor tile size(30cm x 30cm or 40cm size(Kajaria
Crema)

Cement- 0.13 cum or


Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting
b)

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

Add O.H.C@
add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
For 10 sqm
For 1 sqm
Add Labour Cess

10 sqm

Sqm

1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Qntl
cum
Qntl
Qntl

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

4727.85

/
1%

(a+b)
(a+b)

Cum
Qntl

10

25

a)

Supplying all labour,T&P, Materials and


fixing
ceramic
glazed
tiles
in
dados,skirtting and risers of steps on
12mm thick bed of cement plaster (1:3)
jointed with cement slurry mixed pigment
to match the shades of the tiles including
rubbing and polishing etc. Complete after
providing a base plaster of 12mm thick in
cement mortar (1:4) using tiles of size
20cmx20cm or 20cmx30cm including cost
of tiles ,conveyance, taxes ,contractor profit
& labour cess etc all complete as per the
specification and the direction of engineerin-charge.(tiles of approved shades to be
used)

(Data for 10 sqm)


Materials

Under Layer
Add cost of Wall tile 300mm x 200mm size

Sand ( Screened and washed)


CementCement for slurry

b)

Labour Charges
Mason (spl)
Mulia
Semi-skilled Mulia or rubbering

Add O.H.C @
Add Contractor Profit@

Lead & Royalty


Sand ( Screened and washed)
Cement

First Floor
Rate same as G.F.
Add Extra labour for F.F.
Add O.H.C.&C.P.@7.50 Each
For
For
Add labour cess

b)

2nd Floor
Rate same as F.F.
Add Extra labour for F.F.
Add O.H.C.&C.P.@7.50 Each
For
For
Add labour cess

C)

3RD Floor
Rate same as 2nd.F.

Sqm
cum
Qntl
Qntl

3.25 nos
3.25 nos
7.60 nos

Each
Each
Each

7.5 %
7.5 %

on
on

0.15 cum
1.375 qntl
For 10 Sqm
For 1 Sqm
Wax polishing

A)

10 sqm
0.15 cum
0.715 qntl
0.66 qntl

9244.37

(a+b)
(a+b)
cum
Qntl

5%
X
15%
x
10 sqm
1 sqm

10

3167.00

158.35

1%

5%
X
15%
x
10 sqm
1 sqm
1%

3167.00

158.35

Add Extra labour for 3rd.F.


Add O.H.C.&C.P.@7.50 Each
For
For
Add labour cess

5%
X
15%
x
10 sqm
1 sqm
1%

3167.00

158.35

a)

b)

35mm thick marble chips flooring of dark,


light of medium shade rubbed and polished
to granolithic finish under layer 5mm thick
C.C(1:2:4) with 12m size black hard
granitechips and top layer 10mm thick with
marble chips of 4 to 7 mm nominal size laid
in cement marble powder mix 3:1 (3 cement
:1 marblepowder by weight) in prop.4:7 (4
cement marble powder mix :7 marble chips
by volume.)

Per 1 sqm
Details of cost for 10sqm
Materials
Bottom layer
12mm size chips
sand (Screened & washed)
Cement
Top Layer Marble chips 4 mm. to 7mm size
White Cement
Marble powder

Labour.
Mason special Bottom layer
Manson, special(toplayer)
Mulia (Bottom layer)
Mulia (top layer)
Semi-skilled mulia or rubbing (top layer)

c)

Add O.H.C. @)
Add lead & Royalty
12mm size chips
sand (Screened & washed)
Cement

0.23 cum
0.12 cum
0.754 qntl
1.4 qntl
0.578 qntl
0.1927 qntl

cum
cum
Qntl
Qntl
Qntl
Qntl

1.3 nos
1 nos
3.3 nos
1.35 nos
10.8 nos

Each
Each
Each
Each
Each

10 %

on

0.23 cum
0.12 cum
0.754 qntl
For 10 sqm
For 1 sqm
Add wax polishing
Add Labour Cess

7338.59 /

1%

(a+b)

cum
cum
Qntl

10

a)

18mm thick marble chips skirting to dados


with dark light or medium shade rubbed
and polished to granolithic finish with
under layer 12mm. Thick cement plaster
(1:3) and top layer 6mm thick with marble
chips of 4to 7mm nominal size said in
cement marble powder mix 3:1 (3cement :1
marble powder by weight) in prop 4:7 (4
cement marble powder. Mix : 7 marble
chips in volume)

Per 1 sqm
Details of cost for 10sqm
Materials
Bottom layer
Cement
sand (Screened & washed)
Top Layer Marble chips 4 mm. to 7mm size

White Cement
Marble powder

b)

Labour.
Mason special Bottom layer
Manson, special(toplayer)
Mulia (Bottom layer
Mulia (top layer)
Semi-skilled mulia or rubbing (top layer)

c)

Add O.H.C. @
Add lead & Royalty
sand (Screened & washed)
Cement

0.715 cum
0.150 cum
0.872 qntl
0.405 qntl
0.135 qntl

cum
cum
Qntl
Qntl
Qntl

1.10 nos
1.00 nos
1.2 nos
1.35 nos
10.8 nos

Each
Each
Each
Each
Each

10 %

on

(a+b)

0.150 cum
0.715 qntl
Cost for 10 sqm
Cost for 1 sqm
Add Wax polishing
Add Labour Cess

5747.21 /

1%

cum
Qntl

10

10

a)

Supplying , fitting, fixing marble tiles stone


in floor on 25cm thick Bed of cement
mortar(1:1) joined with neat white cement
slung mixed with pigment to match the shade
of tiles including rubbing & polishing
complete wih cost and conveyance of all
materials to site.

(Data for 10 sqm)


For 1 Sqm
Materials
Marble tile size between (0.10 sqm to 0.40 sqm)

Cement- 0.13 cum or


Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting
b)

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

Add O.H.C@
Add contractor Profit@

Lead & Royalty


Sand ( Screened and washed)
Cement

For 10 sqm
For 1 sqm
Add Labour Cess

10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Sqm
Qntl
cum
Qntl
Qntl

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

12375.35

/
1%

(a+b)
(a+b)
Cum
Qntl

10

11

a)

Supplying all labour,T&P, Materials and fixing


of granite in floor and dados on 25mm thick
bed of cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including
rubbing and polishing complete as per
direction of Engineer-in-Charge.(including
cost of Granite tile
Above 0.40 sqm.
(20mm thick)

(Data for 10 sqm)


For 1 Sqm
Materials
Granite tile sAbove 0.40 sqm. (20mm thick)

Cement- 0.13 cum or


Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting
b)

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Sqm
Qntl
cum
Qntl
Qntl

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

Add O.H.C@
Add contractor profit@

Lead & Royalty


Sand ( Screened and washed)
Cement

For 10 sqm
For 1 sqm
Add Labour Cess

12

a)

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

26577.85

/
1%

(a+b)
(a+b)
Cum
Qntl

10

Supplying all labour,T&P, Materials and fixing


of granite in floor and dados on 25mm thick
bed of cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including
rubbing and polishing complete as per
direction of Engineer-in-Charge. (including
cost Granite tile Above 0.10 Sqm & up to
0.4 sqm (10mm. thick)

(Data for 10 sqm)


For 1 Sqm
Materials
Granite tile Above 0.10 Sqm & up to 0.4 sqm (10mm. thick)

Cement- 0.13 cum or

10 sqm
1.857 Qntl

Sqm
Qntl

b)

Sand ( Screened and washed)


Cement for slurry 4.45kg/sqm
Cement for grutting

0.13 cum
0.44 Qntl
0.44 Qntl

cum
Qntl
Qntl

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

Add O.H.C@
Add contractor profit@

Lead & Royalty


Sand ( Screened and washed)
Cement

For 10 sqm
For 1 sqm
Add Labour Cess

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

18642.85

/
1%

(a+b)
(a+b)
Cum
Qntl

10

13

a)

Supplying all materials, labour, T&P and


fixing Vetrified tiles in floor threads or steps
and landing and dados on 25mmthick bed of
cement mortar (1:1) jointed with neat cement
slurry mixed with pigment to matching
shades of the tiles including rubbing and
polishing including cost of
Vetrified tiles
,taxes of all materials , royalty taxes, etc all
complete as per specification and direction of
Engineer-in-charge.(Ties to be used of Size
60cm x 60cm)

(Data for 10 sqm)


For 1 Sqm
Materials
10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Vitrified Tile 600mmx 600mm Plain (Ivory)

Cement- 0.13 cum or


Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting
b)

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

Sqm
Qntl
cum
Qntl
Qntl

2.16 nos
5.50 nos
2.16 nos

Add O.H.C@
Add contractor profit@
Lead & Royalty
Sand ( Screened and washed)
Cement

Each
Each
Each

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

For 10 sqm
For 1 sqm
Add Labour Cess
For First Floor
Rate Same as Ground floor
Add extra labour for first floor
Add O.H.C

11685.35

5%
15 %
For 10 sqm
For 1 sqm
126.71 /

Add Labour cess

(a+b)
(a+b)

Cum
Qntl

/
1%

10

x
x

2203.60

110.18
10

1%

13

a)

Supplying all materials, labour, T&P and


fixing Vetrified tiles in floor threads or steps
and landing and dados on 25mmthick bed of
cement mortar (1:1) jointed with neat cement
slurry mixed with pigment to matching
shades of the tiles including rubbing and
polishing including cost of
Vetrified tiles
,taxes of all materials , royalty taxes, etc all
complete as per specification and direction of
Engineer-in-charge.(Ties to be used of Size
60cm x 60cm)

(Data for 10 sqm)


For 1 Sqm
Materials
Vitrified
Tile
600mmx
series(Homogeneous)

600mm

Coloured

/Printed

Cement- 0.13 cum or


Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting
b)

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

Add O.H.C@
Add contractor profit@

Lead & Royalty


Sand ( Screened and washed)
Cement

For 10 sqm
For 1 sqm
Add Labour Cess

10 sqm

Sqm

1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Qntl
cum
Qntl
Qntl

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

7.5
7.5

%
%

on
on

0.13 cum
2.737 qntl

12317.85

/
1%

(a+b)
(a+b)
Cum
Qntl

10

Labour Charges only 1 Sqm

For First Floor


Rate Same as Ground floor
Add extra labour for first floor
Add O.H.C

5%
10 %
For 10 sqm
For 1 sqm
121.20 /

Add Labour cess

13

a)

b)

x
x

2203.60
110.18
10

1%

Supplying all materials, labour, T&P and


fixing Vetrified tiles in floor threads or steps
and landing and dados on 25mmthick bed of
cement mortar (1:1) jointed with neat cement
slurry mixed with pigment to matching
shades of the tiles including rubbing and
polishing excluding cost of
Vetrified tiles
,taxes of all materials , royalty taxes, etc all
complete as per specification and direction of
Engineer-in-charge.(Ties to be used of Size
60cm x 60cm)

(Data for 10 sqm)


For 1 Sqm
Materials
Cement- 0.13 cum or
Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

Add O.H.C@
Add contractor profit@

1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Qntl
cum
Qntl
Qntl

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

7.5 %
7.5 %

on
on

(a+b)
(a+b)

Lead & Royalty


Sand ( Screened and washed)
Cement
For 10 sqm
For 1 sqm
Add Labour Cess

14

a)

0.13 cum
2.737 qntl

4727.85

/
1%

Cum
Qntl

10

Supplying all materials, labour, T&P and


fixing Kadappa stone in kitchen slab on
25mmthick bed of cement mortar (1:1)
jointed with neat cement slurry mixed with
pigment to matching shades of the tiles
including rubbing and polishing including
cost of
Kadappa stone ,taxes of all
materials , royalty taxes, etc all complete as
per specification and direction of Engineerin-charge.

(Data for 10 sqm)


For 1 Sqm
Materials
Kodappa Tiles of 10 mm thick Above 0.40 Sqm.

Cement- 0.13 cum or


Sand ( Screened and washed)
Cement for slurry 4.45kg/sqm
Cement for grutting

10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl

Sqm
Qntl
cum
Qntl
Qntl

b)

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

Add O.H.C@
Add contractor profit@

Lead & Royalty


Sand ( Screened and washed)
Cement

For 10 sqm
For 1 sqm
Add Labour Cess

a)

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

8902.35

/
1%

(a+b)
(a+b)
Cum
Qntl

10

Supplying all materials, labour, T&P and


fixing Chequred tile in floor using tile 30cm
x 30cm or 40cm x 40cm in floor treads or
steps and landing on 25mm thick bed of
cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including
rubbing and polishing ,contractor profit &
labour cess all complete as per direction of
Engineer-in-Charge.

(Data for 10 sqm)


For 1 Sqm
Materials
Chequred tile

Cement- 0.13 cum or


Sand ( Screened and washed)

10 sqm
1.857 Qntl
0.13 cum

Sqm
Qntl
cum

b)

Cement for slurry 4.45kg/sqm


Cement for grutting

0.44 Qntl
0.44 Qntl

Qntl
Qntl

Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia

2.16 nos
5.50 nos
2.16 nos

Each
Each
Each

Add O.H.C@
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
For 10 sqm
For 1 sqm
Add Labour Cess

7.5 %
7.5 %

on
on

0.13 cum
2.737 qntl

8393.33

/
1%

(a+b)
(a+b)

Cum
Qntl

10

Rate in Rs.

Amount in
Rs.

Remarks

4.00

1168.00

26.86

55.00
658.00

0.66
56.46
83.98

200.00
260.00
200.00
200.00

6.00
33.80
44.00
22.00
105.80
189.78
189.78

402.40

9.26

524.20
16.90

6.29
1.45
17.00

Say

5.29

235.24

83.98

105.80
189.78
14.23
14.23

17.00
235.24
2.35
237.60
237.60

0.79
6.08

5.29
0.79
6.08

5.29
0.79
6.08

6.08
241.33
2.41
243.74

243.70

241.33

6.08
247.41
2.47
249.88

249.90

247.41

6.08
253.49
2.53
256.03

1168.00

26.86

55.00
658.00

0.66
36.06
63.58

200.00
260.00
200.00
200.00

6.00
33.80
44.00
22.00

256.00

63.58

105.80
169.38
169.38
402.40

9.26

524.20
16.90

6.29
0.93
16.47

Say

5.29
0.79
6.08

5.29
0.79
6.08

105.80
169.38
12.70
12.70

16.47
211.26
2.11
213.37
213.40

211.26

6.08
217.34
2.17
219.52

219.50

217.34

6.08
223.43
2.23
225.66

225.70

350.00

350.00
350.00

350.00

200.00

400.00
400.00

400.00

750.00
56.25
56.25

750.00
750.00

321.80

321.80
321.80

Say

350.00

49.00
49.00

240.00
200.00
200.00

12.00
32.00
44.00
88.00

137.00
137.00
321.80

321.80
321.80
Say

321.80
1184.30
11.84
1196.14
1196.10

49.00

88.00
137.00
10.28
10.28
321.80
479.35
479.40

429.00
658.00
55.00
658.00
658.00

4290.00
1221.91
7.15
289.52
289.52
6098.10

260.00
220.00
200.00

561.60
1210.00
432.00
2203.60

180
0.013
2.737
0.2737
6098.10

2203.60
8301.70

8301.70
8301.70

622.63
622.63
9546.95

524.20
16.90

68.15
46.26
114.40

114.40
9661.35

966.14
9.66
975.80
975.80

Say
9661.35
110.18
16.53
126.71

978.81
Say

126.71
9788.06
978.81
9.79
988.59
988.60

9788.06
110.18
16.53
126.71

991.48
Say

126.71
9914.77
991.48
9.91
1001.39
1001.40

9914.77
110.18
16.53
126.71

1004.15
Say

126.71
10041.47
1004.15
10.04
1014.19
1014.20

0.00

0.00

658.00
55.00
658.00
658.00

1221.91
7.15
289.52
289.52
1808.10

260.00
220.00
200.00

561.60
1210.00
432.00
2203.60

4011.70
4011.70

524.20
16.90

68.15
46.26
114.40

1808.10

2203.60
4011.70
300.88
300.88

114.40
4727.85

472.79
4.73
477.51

387.00
55.00
658.00
658.00

260.00
200.00
220.00

3870.00
8.25
470.47
434.28
4783.00

845.00
650.00
1672.00
3167.00

7950.00
7950.00
524.20
16.90

78.63
23.24
101.87

924.44
8.50
932.94
9.33
942.27 Say

951.15
Say

18.21
951.15
9.51
960.66
960.70

951.15
158.35
23.75
182.10
18.21
969.36
Say

4783.00
0.015
0.1375

3167.00
7950.00
596.25
596.25

101.87
9244.37

942.30

932.94
158.35
23.75
182.10
18.21

1.375
0.1375

18.21
969.36
9.69
979.05
979.10

969.36

158.35
23.75
182.10
18.21
987.57
Say

18.21
987.57
9.88
997.44
997.40

1168.00
55.00
658.00
550.00
1750.00
320.00

268.64
6.60
496.13
770.00
1011.50
61.66
2614.54

260.00
260.00
200.00
200.00
220.00

338.00
260.00
660.00
270.00
2376.00
3904.00

6518.54

402.40
524.20
16.90

733.86
8.50
742.36
7.42
749.78

92.55
62.90
12.74
168.20

2614.54

3904.00
6518.54
651.85

168.20
7338.59

658.00
55.00
550.00
1750.00
320.00

470.47
8.25
479.60
708.75
43.20
1710.27

260.00
260.00
200.00
200.00
220.00

286.00
260.00
240.00
270.00
2376.00
3432.00

5142.27

524.20
16.90

574.72
8.50
583.22
5.83

78.63
12.08
90.71

1710.27

3432.00
5142.27
514.23

90.71
5747.21

589.05

665.00
658.00
55.00
658.00
658.00

6650.00
1221.91
7.15
289.52
289.52
8458.10

260.00
220.00
200.00

561.60
1210.00
432.00
2203.60

10661.70
10661.70
524.20
16.90

68.15
46.26
114.40

8458.10

2203.60
10661.70
799.63
799.63

114.40
12375.35

1237.54
12.38
1249.91

1900.00
658.00
55.00
658.00
658.00

260.00
220.00
200.00

19000.00

1221.91
7.15
289.52
289.52
20808.10

20808.10

561.60
1210.00
432.00
2203.60

2203.60

23011.70
1725.88
1725.88

23011.70
23011.70

524.20
16.90

68.15
46.26
114.40

114.40
26577.85

2657.79
26.58
2684.36
2684.40

Say

1210.00

12100.00

658.00

1221.91

55.00
658.00
658.00

260.00
220.00
200.00

7.15
289.52
289.52
13908.10

13908.10

561.60
1210.00
432.00
2203.60

2203.60
16111.70

1208.38
1208.38

16111.70
16111.70

524.20
16.90

68.15
46.26
114.40

114.40
18642.85

1864.29
18.64
1882.93

605.00
658.00
55.00
658.00
658.00

260.00
220.00
200.00

6050.00

1221.91
7.15
289.52
289.52
7858.10

7858.10

561.60
1210.00
432.00
2203.60

2203.60
10061.70

754.63
754.63

10061.70
10061.70

524.20
16.90

68.15
46.26
114.40

114.40
11685.35

1168.54
11.69
1180.22
1168.54
110.18
16.53
126.71

Say

12.67
1181.21
11.81
1193.02
1193.00

660.00

6600.00

658.00
55.00
658.00
658.00

1221.91
7.15
289.52
289.52

260.00
220.00
200.00

8408.10

8408.10

561.60
1210.00
432.00
2203.60

2203.60
10611.70

795.88
795.88

10611.70
10611.70

524.20
16.90

68.15
46.26
114.40

114.40
12317.85

1231.79
12.32
1244.10

110.18
11.02
121.20

1231.79

12.12
1243.90
12.44
1256.34
1256.30

Say

658.00
55.00
658.00
658.00

260.00
220.00
200.00

1221.91
7.15
289.52
289.52
1808.10

1808.10

561.60
1210.00
432.00
2203.60

2203.60
4011.70

4011.70
4011.70

300.88
300.88

524.20
16.90

68.15
46.26
114.40

14105.92
114.40
4727.85

472.79
4.73
477.51

363.00

3630.00

658.00
55.00
658.00
658.00

1221.91
7.15
289.52
289.52

260.00
220.00
200.00

5438.10

5438.10

561.60
1210.00
432.00
2203.60

2203.60
7641.70

573.13
573.13

7641.70
7641.70

524.20
16.90

68.15
46.26
114.40

114.40
8902.35

890.24
8.90
899.14
899.10

Say

198.00
658.00
55.00

1980.00
1221.91
7.15

180
0.013
2.737

658.00
658.00

289.52
289.52
3788.10

260.00
220.00
200.00

561.60
1210.00
432.00
2203.60

5991.70
5991.70

0.2737
3788.10

2203.60
5991.70
449.38
449.38
6890.45

524.20
524.20

68.15
1434.74
1502.88

1502.88
8393.33

Say

839.33
8.39
847.73
847.70

Brick Masonry work

SL
No.
1

a)

Description of items

Qnty

2
Supplying all materials, labour, T&P and
Providing Brick work with K.B. Bricks
25cm x 12cm x 8cm size having
crushing strength not Less than
75kg/cm with dimensional tolerance
8 percent in Cement mortar in Cement
Mortar (1:3) foundation & Plinth
including cost of conveyance & royalty
,sundries & watering for curing &
supervision charges etc, all complete as
per the direction of Engineer-in-charge .

(Data for per cum)


Labour Cost
Mason (Spl)
Mason (2nd class)
Man mulia(U/S)
Women Mulia (U/S)
Preparing mortar and getting water

b)

Unit

0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos

Each
Each
Each
Each
Each

Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent

350 nos

1000 nos

Sharp sand (screened and washed)

0.28 cum

cum

Cement-0.093 cum or

1.33 qntl

Qntl

Add O.H.C. @
Add contractor Profit@
Lead & Royalty
K.B. Brick
Sharp sand (screened and washed)
Cement-0.093 cu or

Add Labour Cess

7.50 %
7.50 %

on
on

350 nos
0.28 cum
1.33 Qntl

(a+b)
(a+b)

1000

1%

Cost of foundation & Plinth


2

For Superstructure
Rate same as Foundation & Pilnth
For superstructre
Add Labour Cess

1%

4308.95
33.00
4341.95
43.42
4385.37

a)

First Floor
Rate Same as G.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH

15% on
15% on

Add Labour cess

b)

2nd Floor
Rate Same as F.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH

1%

15% on
15% on

Add Labour cess

C)

935.00
140.25

3RD Floor
Rate Same as 2nd
Add Extra labour 3rd floor
Add O.H.C&C.P.@7.50%EACH

935.00
140.25

1%

15% on
15% on

Add Labour cess

935.00
140.25

1%

a)

Supplying all materials, labour, T&P and


Providing Brick work with K.B. Bricks 25cm x
12cm x 8cm size having crushing strength not
Less than 75kg/cm with dimensional
tolerance 8 percent in Cement mortar in
Cement Mortar (1:4) foundation & Plinth
including cost of conveyance & royalty
,sundries & watering for curing & supervision
charges etc, all complete as per the direction of
Engineer-in-charge .

(Data for per cum)


Labour Cost
Mason (Spl)
Mason (2nd class)
Man mulia(U/S)
Women Mulia (U/S)
Preparing mortar and getting water

b)

0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos

Each
Each
Each
Each
Each

Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent

350 nos

1000 nos

Sharp sand (screened and washed)

0.28 cum

cum

Cement-0.07 cum

1.00 qntl

Qntl

Add O.H.C. @
Add Contractor profit@

Lead & Royalty


K.B. Brick
Sharp sand (screened and washed)
Cement-0.07 cum

Add Labour Cess


Cost of foundation & Plinth

7.50 %
7.50 %

on
on

350 nos
0.28 cum
1.00 Qntl

(a+b)
(a+b)
1000
cum
Qntl

1%

For Superstructure
Rate same as Foundation & Pilnth
For superstructre
Add Labour Cess

a)

First Floor
Rate Same as G.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH

1%

15% on
15% on

Add Labour cess

b)

2nd Floor
Rate Same as F.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH

935.00
140.25

1%

15% on
15% on

Add Labour cess

C)

3RD Floor
Rate Same as 2nd
Add Extra labour 3rd floor
Add O.H.C&C.P.@7.50%EACH

935.00
140.25

1%

15% on
15% on

Add Labour cess

4053.66
33.00
4086.66
40.87
4127.53

935.00
140.25

1%

a)

Supplying all materials, labour, T&P and


Providing Brick work with K.B. Bricks
25cm x 12cm x 8cm size having crushing
strength not Less than 75kg/cm with
dimensional tolerance 8 percent in
Cement mortar in Cement Mortar (1:5)
foundation & Plinth including cost of
conveyance & royalty ,sundries & watering
for curing & supervision charges etc, all
complete as per the direction of Engineerin-charge .

(Data for per cum)


Labour Cost
Mason (Spl)
Mason (2nd class)
Man mulia(U/S)
Women Mulia (U/S)
Preparing mortar and getting water

b)

0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos

Each
Each
Each
Each
Each

Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent

350 nos

1000 nos

Sharp sand (screened and washed)

0.28 cum

cum

Cement-0.055 cum

0.80 qntl

Qntl

Add O.H.C. @
Add contractor profit@

Lead & Royalty


K.B. Brick
Sharp sand (screened and washed)

7.50 %
7.50 %
350 nos
0.28 cum

on
on

(a+b)
(a+b)
1000
cum

0.80 Qntl

Cement-0.055 cum

Add Labour Cess

Qntl

1%

Cost of foundation & Plinth


2

For Superstructure
Rate same as Foundation & Pilnth
For superstructre
Add Labour Cess

a)

First Floor
Rate Same as G.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH

1%

15% on
15% on

Add Labour cess

b)

2nd Floor
Rate Same as F.F.
Add Extra labour 2nd floor
Add O.H.C&C.P.@7.50%EACH

935.00
140.25

1%

15% on
15% on

Add Labour cess

c)

3rd Floor
Rate Same as 2nd F.
Add Extra labour 3rd floor
Add O.H.C&C.P.@7.50%EACH

935.00
140.25

1%

15% on
15% on

Add Labour cess

3898.94
33.00
3931.94
39.32
3971.26

935.00
140.25

1%

19

a)

Supplying all materials, labour, T&P and


Providing Brick work with K.B. Bricks
25cm x 12cm x 8cm size having crushing
strength not Less than 75kg/cm with
dimensional tolerance 8 percent in
Cement mortar in Cement Mortar (1:6 )
foundation & Plinth including cost of
conveyance & royalty ,sundries & watering
for curing & supervision charges & labour
cess etc, all complete as per the direction
of Engineer-in-charge .

(Data for per cum)


Labour Cost
Mason (Spl)
Mason (2nd class)
Man mulia(U/S)
Women Mulia (U/S)
Preparing mortar and getting water

0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos

Each
Each
Each
Each
Each

b)

Materials
K.B. Bricks 25cm x 12cm x 8cm size having
crushing strength not Less than 75kg/cm
with dimensional tolerance 8 percent

Sharp sand (screened and washed)


Cement-0.047 cum

Add O.H.C. @
Add Contractor Profit@

Lead & Royalty


K.B. Brick
Sharp sand (screened and washed)

350 nos

1000 nos

0.28 cum

cum

0.672 qntl

Qntl

7.50 %
7.50 %

on
on

350 nos
0.28 cum

1000
cum
Qntl

0.672 Qntl

Cement-0.047 cum

Add Labour Cess

(a+b)
(a+b)

1%

Cost of foundation & Plinth


2

For Superstructure
Rate same as Foundation & Pilnth
For superstructre

3799.92
33.00
3832.92

Add Labour Cess

a)

First Floor
Rate Same as G.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH

1%

15% on
15% on

Add Labour cess

b)

2nd Floor
Rate Same as F.F.
Add Extra labour 2nd floor
Add O.H.C&C.P.@7.50%EACH

935.00
140.25

1%

15% on
15% on

Add Labour cess

c)

3rd Floor
Rate Same as 2nd F.
Add Extra labour 3rd floor
Add O.H.C&C.P.@7.50%EACH

935.00
140.25

1%

15% on
15% on

Add Labour cess

38.33
3871.25

935.00
140.25

1%

a)

Supplying all materials, labour, T&P and


Providing Brick work with K.B. Bricks
25cm x 12cm x 8cm size having
crushing strength not Less than
75kg/cm with dimensional tolerance
8 percent in Cement mortar in Cement
Mortar (1:8) foundation & Plinth
including cost of conveyance & royalty
,sundries & watering for curing &
supervision charges etc, all complete as
per the direction of Engineer-in-charge .

(Data for per cum)


Labour Cost
Mason (Spl)
Mason (2nd class)
Man mulia(U/S)
Women Mulia (U/S)
Preparing mortar and getting water

b)

Materials

0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos

Each
Each
Each
Each
Each

K.B. Bricks 25cm x 12cm x 8cm size


having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent
Sharp sand (screened and washed)
Cement-0.035 cum

Add O.H.C. @
Add Contractor Profit@

Lead & Royalty


K.B. Brick
Sharp sand (screened and washed)

350 nos

1000 nos

0.28 cum

cum

0.501 qntl

Qntl

7.50 %
7.50 %

on
on

350 nos
0.28 cum

1000
cum
Qntl

0.501 Qntl

Cement-0.035 cum

Add Labour Cess

(a+b)
(a+b)

1%

Cost of foundation & Plinth


2

For Superstructure
Rate same as Foundation & Pilnth
For superstructre
Add Labour Cess

1%

3667.63
33.00
3700.63
37.01
3737.64

a)

b)

Supplying all labour,T&P, Materials and


making brick work with kiln burnt brick
size 25cmx12cmx8cm having strength
75 kg/cm2 Laid Dry in foundation &
plinth including cost of conveyance &
royalty ,sundries & watering for curing &
supervision charges etc, all complete as
per the direction of Engineer-in-charge.

(Data for per cum)


Labour Cost
Mason (Spl)
Mason (2nd class)
Man mulia(U/S)
Women Mulia (U/S)

0.35 nos
1.05 nos
1.41 nos
1.41 nos

Each
Each
Each
Each

350 nos

1000

Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent

O.H.C. @
Add Contractor Profit@
Lead & Royalty
K.B. Brick

7.5 %
7.5 %

350 nos

Add 1% Labour Cess

on
on

(a+b)
(a+b)

1000

Supplying all materials, labour,T&P and


providing Brick edge flooring over one
brick flat set in cement mortar(1:8)
including cost of conveyance & royalty
,sundries & watering for curing &
supervision charges etc, all complete as
per the direction of Engineer-in-charge.

Data for per sqm


(a)

Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent
Sand (Screened & Washed)
Cement-0.0071 cum

(b)

0.06 cum
0.1015 qntl

Labour Charges
Take 0.19 times of labour of item No.1 of
brick masonry =
Man Mulia for mixing sand and cement

Add 10% O.H.C.


Add contractor profit@
c)

1000

80 nos

0.19

935.00
Each

0.07 nos

7.5 %
7.5 %

on
on

(a+b)
(a+b)

Lead & Royalty


K.B. Bricks 25cm x 12cm x 8cm size having
crushing strength not Less than 75kg/cm with
dimensional tolerance 8 percent

Sand (Screened & Washed0


Cement-0.0071 cum

80 nos

0.06 cum
0.1015 qntl

1000

cum
Qntl

Add Labour Cess

Rate in Rs.
4.00

Amount in
Rs.
5.00

260.00
240.00
200.00
200.00

91.00
252.00
282.00
282.00

200.00

28.00
935.00

4300.00

1505.00

55.00

15.40

658.00

875.14
2395.54

3330.54
3330.54

884.50
524.20
16.90

309.58
146.78
22.48
478.83

Remarks
6.00

935.00

2395.54
3330.54
249.79
249.79

478.83
4308.95
43.09

4352.04
4352.00

Say

Say

4385.40

4341.95
140.25
21.04
161.29

Say

161.29
4503.24
45.03
4548.27
4548.30

4503.24
140.25
21.04
161.29

Say

161.29
4664.52
46.65
4711.17
4711.20

4664.52
140.25
21.04
161.29

Say

161.29
4825.81
48.26
4874.07
4874.10

260.00
240.00
200.00
200.00

91.00
252.00
282.00
282.00

200.00

28.00
935.00

4300.00

1505.00

55.00

15.40

658.00

658.00
2178.40

3113.40
3113.40
884.50
524.20
16.90

309.58
146.78
16.90
473.25

Say

935.00

2178.40
3113.40
233.51
233.51

473.25
4053.66
40.54
4094.20
4094.20

Say

4127.50 /cum

4086.66
140.25
21.04
161.29

Say

161.29
4247.95
42.48
4290.43
4290.40

4247.95
140.25
21.04
161.29

Say

161.29
4409.24
44.09
4453.33
4453.30

4409.24
140.25
21.04
161.29

Say

161.29
4570.52
45.71
4616.23
4616.20

260.00
240.00
200.00
200.00

91.00
252.00
282.00
282.00

200.00

28.00
935.00

4300.00

1505.00

55.00
658.00

15.40
526.40
2046.80

2981.80
2981.80
884.50
524.20

309.58
146.78

935.00

2046.80
2981.80
223.64
223.64

16.90

13.52
469.87

Say

3971.30 /cum

Say

3931.94
140.25
21.04
161.29

Say

161.29
4093.23
40.93
4134.16
4134.20
4093.23

140.25
21.04
161.29

Say

161.29
4254.52
42.55
4297.06
4297.10
4254.52

140.25
21.04
161.29

Say

469.87
3898.94
38.99
3937.93
3937.90

161.29
4415.80
44.16
4459.96
4460.00

260.00
240.00
200.00
200.00

91.00
252.00
282.00
282.00

200.00

28.00
935.00

935.00

4300.00

1505.00

55.00
658.00

15.40
442.18
1962.58

2897.58
2897.58
884.50
524.20
16.90

309.58
146.78
11.36
467.71

Say

1962.58
2897.58
217.32
217.32

467.71
3799.92
38.00
3837.92
3837.90

3871.20 /cum

Say

3832.92
140.25
21.04
161.29

Say

161.29
3994.21
39.94
4034.15
4034.10
3994.21

140.25
21.04
161.29

Say

161.29
4155.50
41.55
4197.05
4197.10
4155.50

140.25
21.04
161.29

161.29
4316.78
43.17

14105.923

11803.314
25909.31
15957.27

4359.95
4360.00

Say

260.00
240.00
200.00
200.00

91.00
252.00
282.00
282.00

200.00

28.00
935.00

935.00

4300.00

1505.00

55.00
658.00

15.40
329.66
1850.06

1850.06
2785.06
208.88
208.88

2785.06
2785.06
884.50
524.20
16.90

309.58
146.78
8.47
464.82

Say

Say

464.82
3667.63
36.68
3704.31
3704.30

3737.60 /cum

260.00
240.00
200.00
200.00

91.00
252.00
282.00
282.00
907.00

4300.00

907.00

1505.00

1505.00
2412.00
2412.00

884.50

309.58
309.58

1%
Say

1505.00
2412.00
180.90
180.90

309.58
3083.38
30.83
3114.21
3114.20

4300.00

344.00

55.00
658.00

3.30
66.79
414.09

414.09

177.65
200.00

14.00
191.65

605.74
605.74

884.50

70.76

524.20
16.90

31.45
1.72
103.93

191.65
605.74
45.43
45.43

103.93
800.52

1%

8.01
808.53

Masonry Stone Work


SL
No.

Description of items

Qnty

2
Supplying all labour, materials, T&P and
Random Rubble stone masonry in

Unit

Cement Mortar (1:5) in foundation and


plinth
including Cost of conveyance,
sundries, watering for curing, racking out
joints, rounding of corners ,scaffolding
etc, all complete as per the direction of
engineer-in-charge.

(a)

Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.068 cum

1.00 cum

Cum

0.34 cum
0.9724 qntl

Cum
Qntl

b)

Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar

0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos

Each
Each
Each
Each
Each

c)

Lead only on stone product(Stone)


R.R. Stone

1.00 cum

cum

Lead & Royalty

O.H.C. Charges @
Add contractor profit@

Rough Granite stone quarried including


bond stones ONLY
Sand (Screened &Washed)
Cement-0.068 cum

7.5 %
7.5 %

on
on

(a+b+C)
(a+b+C)

1.00 cum

cum

0.34 cum
0.9724 qntl

cum
Qntl

Add Labour Cess

(a)

Supplying all materials,labour, T&P and


Random Rubble stone masonry in
Cement Mortar (1:6) in foundation and
plinth
including Cost of conveyance,
sundries, watering for curing, racking out
joints, rounding of corners ,scaffolding
etc, all complete as per the direction of
engineer-in-charge.

Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.057 cum

b)

Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar

Lead & Royalty

O.H.C. Charges @
Add Contractor Profit@

Rough Granite stone quarried including


bond stones
Sand (Screened &Washed)
Cement-0.068 cum

1 cum

cum

0.34 cum
0.8151 qntl

cum
Qntl

0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos

7.5 %
7.5 %

Each
Each
Each
Each
Each

on
on

(a+b+c)
(a+b+c)

1 cum

cum

0.34 cum
0.8151 qntl

cum
Qntl

Add Labour Cess

(a)

Supplying all labour, materials, T&P and


Random Rubble stone masonry in
Cement Mortar (1:8) in foundation and
plinth
including Cost of conveyance,
sundries, watering for curing, racking out
joints, rounding of corners ,scaffolding
etc, all complete as per the direction of
engineer-in-charge.

Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.0425 cum

b)

Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar

O.H.C. Charges @
Lead & Royalty

1 cum

cum

0.34 cum
0.6078 Qntl

cum
Qntl

0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos

Each
Each
Each
Each
Each

10 %

on

(a+b)

Rough Granite stone quarried including


bond stones
Sand (Screened &Washed)
Cement-0.068 cum

cum

0.34
0.6078

cum
Qntl

Add Labour Cess

Supplying all labour, materials, T&P and


Random Rubble stone masonry in
Cement Mortar (1:4) in foundation and
plinth
including Cost of conveyance,
sundries, watering for curing, racking out
joints, rounding of corners ,scaffolding
etc, all complete as per the direction of
engineer-in-charge.

.
(a)

Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.085 cum

b)

Labour Charges
Mason (Special)
Mason 2nd class

1 cum

cum

0.34 cum
1.2156 qntl

cum
Qntl

0.35 nos
1.41 nos

Each
Each

Man Mulia
Women mulia
Man Mulia for mixing mortar

O.H.C. Charges @

1.41 nos
1.41 nos
0.35 nos

Each
Each
Each

10 %

on

(a+b)

Lead & Royalty


Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.068 cum

1 cum

cum

0.34 cum
1.2156 qntl

cum
Qntl

Add Labour Cess

Rate in Rs.

Amount in
Rs.

Remarks

4.00

5.00

6.00

231.00

231.00

55.00
658.00

18.70
639.84
889.54

889.54

260.00
240.00
200.00
200.00
200.00

91.00
338.40
282.00
282.00
70.00
1063.40

1063.40

414.00

414.00

2366.94
2366.94
98.80

98.80

524.20
16.90

178.23
16.43
293.46

%
Say

414.00
2366.94
177.52
177.52

293.46
3015.44
30.15
3045.60
3045.60

#REF!

231.00

231.00

55.00
658.00

18.70
536.34
786.04

260.00
240.00
200.00
200.00
200.00

91.00
338.40
282.00
282.00
70.00
1063.40

1849.44
1849.44

338.00

338.00

524.20
16.90

178.23
13.78
530.00

786.04

1063.40
1849.44
138.71
138.71

49200
530.00
2656.85
26.57
2683.42

Say

2683.40

231.00

231.00

55.00
658.00

18.70
399.93
649.63

260.00
240.00
200.00
200.00
200.00

91.00
338.40
282.00
282.00
70.00
1063.40

1713.03

649.63

1063.40
1713.03
171.30

338.00

338.00

524.20
16.90

178.23
10.27
526.50

231.00

231.00

55.00
658.00

18.70
799.86
1049.56

260.00
240.00

91.00
338.40

526.50
2410.84
24.11
2434.94

1049.56

200.00
200.00
200.00

282.00
282.00
70.00
1063.40

2112.96

338.00

338.00

524.20
16.90

178.23
20.54
536.77

1063.40
2112.96
211.30

536.77
2861.03
28.61
2889.64

2324.26

Masonry Stone Work


SL
No.

Description of items

Qnty

2
Supplying all labour, materials, T&P and
Random Rubble stone masonry in

Unit

Cement Mortar (1:5) in foundation and


plinth
including Cost of conveyance,
sundries, watering for curing, racking out
joints, rounding of corners ,scaffolding
etc, all complete as per the direction of
engineer-in-charge.

(a)

Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.068 cum

1.00 cum

Cum

0.34 cum
0.9724 qntl

Cum
Qntl

b)

Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar

0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos

Each
Each
Each
Each
Each

c)

Lead only on stone product(Stone)


R.R. Stone

1.00 cum

cum

Lead & Royalty

O.H.C. Charges @
Add contractor profit@

Rough Granite stone quarried including


bond stones ONLY
Sand (Screened &Washed)
Cement-0.068 cum

7.5 %
7.5 %

on
on

(a+b+C)
(a+b+C)

1.00 cum

cum

0.34 cum
0.9724 qntl

cum
Qntl

Add Labour Cess

(a)

Supplying all labour, materials, T&P and


Random Rubble stone masonry in
Cement Mortar (1:6) in foundation and
plinth
including Cost of conveyance,
sundries, watering for curing, racking out
joints, rounding of corners ,scaffolding
etc, all complete as per the direction of
engineer-in-charge.

Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.057 cum

1 cum

cum

0.34 cum
0.8151 qntl

cum
Qntl

b)

Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar

0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos

Each
Each
Each
Each
Each

c)

Lead only on stone product(Stone)


R.R. Stone

1.00 cum

cum

Lead & Royalty

O.H.C. Charges @
Add Contractor Profit@

Rough Granite stone quarried including


bond stones
Sand (Screened &Washed)
Cement-0.068 cum

7.5 %
7.5 %

on
on

(a+b+c)
(a+b+c)

1 cum

cum

0.34 cum
0.8151 qntl

cum
Qntl

Add Labour Cess

(a)

Supplying all labour, materials, T&P and


Random Rubble stone masonry in
Cement Mortar (1:8) in foundation and
plinth
including Cost of conveyance,
sundries, watering for curing, racking out
joints, rounding of corners ,scaffolding
etc, all complete as per the direction of
engineer-in-charge.

Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.0425 cum

b)

Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar

O.H.C. Charges @

1 cum

cum

0.34 cum
0.6078 Qntl

cum
Qntl

0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos

Each
Each
Each
Each
Each

10 %

on

(a+b)

Lead & Royalty


Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.068 cum

cum

0.34
0.6078

cum
Qntl

Add Labour Cess

Supplying all labour, materials, T&P and


Random Rubble stone masonry in
Cement Mortar (1:4) in foundation and
plinth
including Cost of conveyance,
sundries, watering for curing, racking out
joints, rounding of corners ,scaffolding
etc, all complete as per the direction of
engineer-in-charge.

.
(a)

Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.085 cum

b)

Labour Charges

1 cum

cum

0.34 cum
1.2156 qntl

cum
Qntl

Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar

0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos

O.H.C. Charges @

Each
Each
Each
Each
Each

10 %

on

(a+b)

Lead & Royalty


Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.068 cum

1 cum

cum

0.34 cum
1.2156 qntl

cum
Qntl

Add Labour Cess

(a)

Supplying all labour, materials, T&P and


Random Rubble stone masonry in dry
packing in approans and revetment
including Cost of conveyance, sundries,
watering for curing, racking out joints,
rounding of corners ,scaffolding etc, all
complete as per the direction of engineerin-charge.

Per cum
Materials
Rough Granite stone quarried including
bond stones

1 cum

cum

b)

Labour Charges
Mason (Special)
Stone packer
Man Mulia
Women mulia

0.17 nos
0.35 nos
0.52 nos
0.52 nos

Each
Each
Each
Each

c)

Lead only on stone product(Stone)


R.R. Stone

1.00 cum

cum

O.H.C. Charges @

7.5 %

on

(a+b+c)

Lead & Royalty

Add Contractor Profit@

Rough Granite stone quarried including


bond stones

7.5 %
1 cum

Add Labour Cess

on

(a+b+c)
cum

Rate in Rs.

Amount in
Rs.

Remarks

4.00

5.00

6.00

231.00

231.00

55.00
658.00

18.70
639.84
889.54

889.54

260.00
240.00
200.00
200.00
200.00

91.00
338.40
282.00
282.00
70.00
1063.40

1063.40

414.00

414.00

2366.94
2366.94
98.80

98.80

524.20
16.90

178.23
16.43
293.46

%
Say

414.00
2366.94
177.52
177.52

293.46
3015.44
30.15
3045.60
3045.60

#REF!

231.00

231.00

55.00
658.00

18.70
536.34
786.04

260.00
240.00
200.00
200.00
200.00

91.00
338.40
282.00
282.00
70.00
1063.40

414.00

414.00

138.71
138.71

786.04

1063.40
1849.44
414.00
138.71
138.71
2540.85

98.80

98.80

524.20
16.90

178.23
13.78
290.80

49200
290.80
2831.65

28.32
2859.97
2859.96

Say

231.00

231.00

55.00
658.00

18.70
399.93
649.63

260.00
240.00
200.00
200.00
200.00

91.00
338.40
282.00
282.00
70.00
1063.40

1713.03

649.63

1063.40
1713.03
171.30

98.80

98.80

524.20
16.90

178.23
10.27
287.30

231.00

231.00

55.00
658.00

18.70
799.86
1049.56

287.30
2171.64
21.72
2193.35

1049.56

260.00
240.00
200.00
200.00
200.00

91.00
338.40
282.00
282.00
70.00
1063.40

2112.96

98.80

98.80

524.20
16.90

178.23
20.54
297.57

231.00

231.00

231.00

260.00
240.00
200.00
200.00

44.20
84.00
104.00
104.00
336.20

512.78

512.78

42.54

1063.40
2112.96
211.30

297.57
2621.83
26.22
2648.05

231.00

336.20
567.20
512.78
42.54

2324.26

42.54

42.54
1165.06

0.00

0.00
0.00

%
Say

0.00
1165.06
11.65
1176.71
1176.71

Centering & Shuttering for R.C.C. Work


SL No.

1
11

(i)

a)

b)

Description of items

Qnty

Unit

Supplying all materials, labour, T&P and


providing rigid and Smooth centering and
shuttering for R.C.C. works including False
work and dismantling them after casting
including Conveyance of all materials to Work
site, payment of royalty taxes,
etc all
complete as per specification and direction of
Engineer-in-charge.

R.C.C. floor and roof slabs, landings,balconies, projecting sun shades an


chajjas upt 4.3m height
Details for 9 sqm.
Materials
Non Sal woods scanting
0.112 cum
cum
Planks
0.34 cum
cum
120mm dia Bullah
56.00 mtr
mtr
Carriage of wood
1.142 cum
cum
Considering for 10 times use
Use once
15600.12
/
10
Labour
Carpenter 2nd
S.S.Mulia

2.75 nos
2.75 nos

Add O.H.C @
7.5 %
Add Contractor profit@
7.5 %
for 9.00 sqm
For 1 sqm
3248.76
Add Labour Cess

Each
Each

on
on

(a+b)
(a+b)

9
1

%
Say

(ii)
a)

b)

R.C.C. stairs excluding landing but including railing


details for 5 Sqm
Materials
Non sal wood 38mm thick planks
0.228 cum
Non sal wood scantling
0.039 cum
120mm dia non sal bullah
6.50 mtr
Carriage of wood
0.35 cum
Considering 10times use of the materials
for use once
6237.95
/
Labour
Carpenter 2nd
2.75 nos
S.S.Mulia
2.75 nos

Add O.H.C @

7.5 %

on

cum
cum
mtr
cum
10
Each
Each

(a+b)

Add Contractor Profit@


7.5 %
for 5.00 sqm
For 1 sqm
2172.11
Add Labour Cess
iii)
a)

a)

b)

a)

5
1

cum
mtr
cum

6358.03

Labour
Carpenter 2nd
S.S.Mulia

10

0.50 nos
0.50 nos

Each
Each

7.5 %
7.5 %
995.67

on (a+b)
on (a+b)
/
1%

10

R.C.C. beams, column, grider and bressmer, etc


Data for 4.2 sqm
Materials
38mm non sal planks
120mm dia Sal bullah
80mm dua Sal bullahCarriage of wood
Considering for 10 times use
Use once
Labour
Carpenter 2nd
S.S.Mulia

Add O.H.C@
Add Contractor Profit@
For 4.2 Sqm
For 1 sqm
Add Labour Cess
v)

Details for 10 Sqm


Materials
25mm non sal planks
0.267 cum
Non sal Bullah 80mm dia
12.60 mtr
Carriage of wood
0.3284 cum
Considering 10times use of the materials

Add O.H.C @
Add Contractor profit@
For 10 Sqm
For 1 sqm
Add Labour Cess
iv)

(a+b)

R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc

Use once
b)

on

R.C.C. Lintels
Data for 7.8 sqm
For 1 Sqm
Materials
38mm Non sal planks

0.218 cum
15.2 mtr
8.00 mtr
0.456 cum
7115.02

cum
mtr
mtr
mtr
/

10

2.75 nos
2.75 nos

7.5 %
7.5 %
2272.98

0.413 cum

Each
Each

on (a+b)
on (a+b)
/
1%

4.2

cum

120mm dia non sal bullah


Carriage of wood
Considering for 10 times use

21 mtr
0.689 cum
Use once

a)

Labour
Carpenter 2nd
S.S.Mulia

mtr
cum

10522.68

10

1.25 nos
1.25 nos

Add O.H.C@
Add Contractor Profit@
For 7.8 Sqm
For 1 sqm
Add Labour Cess

Each
Each

7.5 %
7.5 %
1871.36

on (a+b)
on (a+b)
/
1%

vi)

R.C.C. walls and fins including attached pillasters

a)

Data for 23.90 sqm


For 1 Sqm
Materials
38mm thick Non- sal wood Plank

Non sal wood canting


120mm dia non -sal bullah
Carriage of wood
Considering for 10 times use
Use once
Labour
Carpenter 2nd
S.S.Mulia 2.75 nos.

Add O.H.C @
Add Contractor Profit @
For 23.90 Sqm
For 1 sqm
Add Labour Cess

7.8

0.954 cum
0.269 cum
100.80 mtr
2.461 cum

cum
cum
mtr
cum

34229.13

13.5 nos
13.5 nos

7.5 %
7.5 %
11077.85

10.00

Each
Each

on (a+b)
on (a+b)
/
1%

23.9

. Work
Rate in Rs.

Amount in
Rs.

Remarks

4.00

5.00

6.00

un shades and

21287.00
21287.00

104.00
135.20

2384.14
7237.58
5824.00
154.40
15600.12

1560.01

240.00
220.00

660.00
605.00
1265.00

2825.01
2825.01

1560.01

1265.00
2825.01
211.88
211.88
3248.76

360.97
3.61
364.58
329.10 /Sqm

21287.00
21287.00
78.00
135.20

240.00
220.00

1888.79

4853.44
830.19
507.00
47.32
6237.95
623.79
660.00
605.00
1265.00

623.79

1265.00
1888.79
141.66

1888.79

141.66
2172.11

434.42
4.34
438.77 Say

438.80

recast slabs etc

21287.00

50.00
135.20

5683.63
630.00
44.40
6358.03
635.80

240.00
220.00

120.00
110.00
230.00

865.80
865.80
99.57
1.00
100.56 Say

21287.00

104.00
104.00
135.20

240.00
220.00

230.00
865.80
64.94
64.94
995.67

100.60

4640.57
1580.80
832.00
61.65
7115.02
711.50
660.00
605.00
1265.00

1976.50
1976.50
541.18
5.41
546.60 Say

21287.00

635.80

711.50

1265.00
1976.50
148.24
148.24
2272.98

546.60

8791.53

78.00
135.20

1638.00
93.15
10522.68
1052.27

240.00
220.00

300.00
275.00
575.00

1627.27
1627.27
239.92
2.40
242.32 Say

575.00
1627.27
122.05
122.05
1871.36

242.30

21287.00

20307.80

21287.00

5726.20
7862.40
332.73

78.00
135.20

1052.27

34229.13

3422.91

240.00
220.00

9632.91
9632.91
463.51
4.64
468.14 Say

3240.00
2970.00
6210.00

3422.91

6210.00
9632.91
722.47
722.47
11077.85

468.10

Centering & Shuttering for R.C.C. Work


SL
No.

Description of items

Qnty

Unit

Supplying all materials, labour, T&P and


providing rigid and Smooth centering
and shuttering for R.C.C. works including
False work and dismantling them after
casting including Conveyance of all
materials to Work site, payment of royalty
taxes,
etc all complete as per
specification and direction of Engineer-incharge.

(i)

R.C.C. floor and roof slabs, landings,balconies, projecting sun shades an


chajjas upt 4.3m height
Details for 9 sqm.
Materials
Non Sal woods scanting
0.112 cum
cum
Planks
0.34 cum
cum
120mm dia Bullah
56.00 mtr
mtr
Carriage of wood
1.142 cum
cum
Considering for 10 times use
Use once
15600.12
/
10

a)

b)

Labour
Carpenter 2nd
S.S.Mulia

2.75 nos
2.75 nos

Add O.H.C @
7.5 %
Add Contractor profit@
7.5 %
for 9.00 sqm
For 1 sqm
3248.76
Add Labour Cess

Each
Each

on
on

(a+b)
(a+b)

9
1

%
Say

(ii)
a)

R.C.C. stairs excluding landing but including railing


details for 5 Sqm
Materials
Non sal wood 38mm thick planks
0.228 cum

cum

Non sal wood scantling

0.039 cum

cum

6.50 mtr
0.35 cum

mtr
cum

120mm dia non sal bullah


Carriage of wood
Considering 10times use of the
materials
for use once

6237.95

10

b)

Labour
Carpenter 2nd
S.S.Mulia

2.75 nos
2.75 nos

Each
Each

Add O.H.C @
7.5 %
Add Contractor Profit@
7.5 %
for 5.00 sqm
For 1 sqm
2172.11
Add Labour Cess

iii)

a)

b)

a)

b)

(a+b)
(a+b)

5
1

R.C.C. foundation , plinth band and footings bases of columns mass concre
precast slabs etc
Details for 10 Sqm
Materials
25mm non sal planks
Non sal Bullah 80mm dia
Carriage of wood
Considering 10times use of the
materials
Use once
Labour
Carpenter 2nd
S.S.Mulia

0.267 cum
12.60 mtr
0.3284 cum

cum
mtr
cum

6358.03

10

0.50 nos
0.50 nos

Add O.H.C @
Add Contractor profit@
For 10 Sqm
For 1 sqm
Add Labour Cess
iv)

on
on

Each
Each

7.5 %
7.5 %
995.67

on (a+b)
on (a+b)
/
1%

10

R.C.C. beams, column, grider and bressmer, etc


Data for 4.2 sqm
Materials
38mm non sal planks
120mm dia Sal bullah
80mm dua Sal bullahCarriage of wood
Considering for 10 times use
Use once
Labour
Carpenter 2nd
S.S.Mulia

Add O.H.C@
Add Contractor Profit@

0.218 cum
15.2 mtr
8.00 mtr
0.456 cum
7115.02

cum
mtr
mtr
mtr
/

10

2.75 nos
2.75 nos

7.5 %
7.5 %

Each
Each

on (a+b)
on (a+b)

For 4.2 Sqm


For 1 sqm
Add Labour Cess

v)

a)

R.C.C. Lintels
Data for 7.8 sqm
For 1 Sqm
Materials
38mm Non sal planks
120mm dia non sal bullah
Carriage of wood
Considering for 10 times use

/
1%

4.2

0.413 cum
21 mtr
0.689 cum
Use once

a)

2272.98

Labour
Carpenter 2nd
S.S.Mulia

cum
mtr
cum

10522.68

10

1.25 nos
1.25 nos

Add O.H.C@
Add Contractor Profit@
For 7.8 Sqm
For 1 sqm
Add Labour Cess

Each
Each

7.5 %
7.5 %
1871.36

on (a+b)
on (a+b)
/
1%

vi)

R.C.C. walls and fins including attached pillasters

a)

Data for 23.90 sqm


For 1 Sqm
Materials
38mm thick Non- sal wood Plank

Non sal wood canting


120mm dia non -sal bullah
Carriage of wood
Considering for 10 times use
Use once
Labour
Carpenter 2nd
S.S.Mulia 2.75 nos.

Add O.H.C @
Add Contractor Profit @
For 23.90 Sqm
For 1 sqm
Add Labour Cess

7.8

0.954 cum
0.269 cum
100.80 mtr
2.461 cum

cum
cum
mtr
cum

34229.13

13.5 nos
13.5 nos

7.5 %
7.5 %
11077.85

10.00

Each
Each

on (a+b)
on (a+b)
/
1%

23.9

. Work
Rate in Rs.

Amount in
Rs.

Remarks

4.00

5.00

6.00

un shades and

21287.00
21287.00

104.00
135.20

2384.14
7237.58
5824.00
154.40
15600.12

1560.01

240.00
220.00

660.00
605.00
1265.00

2825.01
2825.01

1560.01

1265.00
2825.01
211.88
211.88
3248.76

360.97
3.61
364.58
/Sqm

21287.00

4853.44

21287.00

830.19

78.00
135.20

507.00
47.32
6237.95
623.79

623.79

240.00
220.00

660.00
605.00
1265.00

1888.79
1888.79
434.42
4.34
438.77 Say

1265.00
1888.79
141.66
141.66
2172.11

438.80

mass concrete

21287.00

50.00
135.20

5683.63
630.00
44.40
6358.03
635.80

240.00
220.00

120.00
110.00
230.00

865.80
865.80
99.57
1.00
100.56 Say

21287.00

104.00
104.00
135.20

240.00
220.00

1976.50
1976.50

635.80

230.00
865.80
64.94
64.94
995.67

100.60

4640.57
1580.80
832.00
61.65
7115.02
711.50
660.00
605.00
1265.00

711.50

1265.00
1976.50
148.24
148.24

2272.98
541.18
5.41
546.60 Say

21287.00

78.00
135.20

546.60

8791.53
1638.00
93.15
10522.68
1052.27

240.00
220.00

300.00
275.00
575.00

1627.27
1627.27
239.92
2.40
242.32 Say

575.00
1627.27
122.05
122.05
1871.36

242.30

21287.00

20307.80

21287.00

5726.20
7862.40
332.73

78.00
135.20

1052.27

34229.13

3422.91

240.00
220.00

9632.91
9632.91
463.51
4.64
468.14 Say

3240.00
2970.00
6210.00

3422.91

6210.00
9632.91
722.47
722.47
11077.85

468.10

Centering & Shuttering for R.C.C. Work


SL
No.

Description of items

Qnty

Unit

Supplying all materials, labour, T&P and


providing rigid and Smooth centering
and shuttering for R.C.C. works including
False work and dismantling them after
casting including Conveyance of all
materials to Work site, payment of royalty
taxes,
etc all complete as per
specification and direction of Engineer-incharge.

(i)

R.C.C. floor and roof slabs, landings,balconies, projecting sun shades an


chajjas upt 4.3m height
Details for 9 sqm.
Materials
Non Sal woods scanting
0.112 cum
cum
Planks
0.34 cum
cum
120mm dia Bullah
56.00 mtr
mtr
Carriage of wood
1.142 cum
cum
Considering for 10 times use
Use once
15600.12
/
10

a)

b)

Labour
Carpenter 2nd
S.S.Mulia

2.75 nos
2.75 nos

Add O.H.C @
7.5 %
Add Contractor profit@
7.5 %
for 9.00 sqm
For 1 sqm
3248.76
Add Labour Cess

Each
Each

on
on

(a+b)
(a+b)

9
1

%
Say

For First Floor


Rate same as G.F.
Add extra labour for F.F.
O.H.C & Contractor profit

1265.00 x
253.00 X

For 9.00 Sqm


For 1 sqm
Add Labour Cess

b)

For 2nd Floor


Rate same as F.F.

290.95

20%
15%
/

9
1%

253.00
37.95
290.95
32.33

Add extra labour for F.F.


O.H.C & Contractor profit

1265.00 x
506.00 X

For 9.00 Sqm


For 1 sqm

581.90

40%
15%
/

Add Labour Cess

b)

For 3rd Floor


Rate same as F.F.
Add extra labour for F.F.
O.H.C & Contractor profit

872.85

For 4th Floor


Rate same as 3rd.F.
Add extra labour for F.F.
O.H.C & Contractor profit

1163.80

80%
15%
/

Add Labour Cess

(ii)
a)

1%

R.C.C. stairs excluding landing but including railing

details for 5 Sqm


Materials
Non sal wood 38mm thick planks
Non sal wood scantling
120mm dia non sal bullah
Carriage of wood
Considering 10times use of the
materials
for use once

b)

1%

1265.00 x
1012.00 X

For 9.00 Sqm


For 1 sqm

1012.00
151.80
1163.80
129.31

60%
15%

Add Labour Cess


b)

759.00
113.85
872.85
96.98

1%

1265.00 x
759.00 X

For 9.00 Sqm


For 1 sqm

506.00
75.90
581.90
64.66

Labour
Carpenter 2nd
S.S.Mulia

0.228 cum
0.039 cum

cum
cum

6.50 mtr
0.35 cum

mtr
cum

6237.95

10

2.75 nos
2.75 nos

Add O.H.C @
7.5 %
Add Contractor Profit@
7.5 %
for 5.00 sqm
For 1 sqm
2172.11
Add Labour Cess
For First Floor

Each
Each

on
on

(a+b)
(a+b)

5
1

Rate same as G.F.


Add extra to the rates for F.F.
OHC &Contractor profit

1265.00 x
253.00 x
For
5.00 SQM
For
1.00 sqm

20%
15%

Add Labour Cess


For 2nd Floor
Rate same as F.F.
Add extra to the rates for F.F.
OHC &Contractor profit

1%

1265.00 x
253.00 x
For
5.00 SQM
For
1.00 sqm

20%
15%

Add Labour Cess


iii)

a)

b)

253.00
37.95
290.95
58.19

1%

R.C.C. foundation , plinth band and footings bases of columns mass concre
precast slabs etc
Details for 10 Sqm
Materials
25mm non sal planks
Non sal Bullah 80mm dia
Carriage of wood
Considering 10times use of the
materials
Use once
Labour
Carpenter 2nd
S.S.Mulia

0.267 cum
12.60 mtr
0.3284 cum

cum
mtr
cum

6358.03

10

0.50 nos
0.50 nos

Add O.H.C @
Add Contractor profit@
For 10 Sqm
For 1 sqm
Add Labour Cess
iv)

253.00
37.95
290.95
58.19

Each
Each

7.5 %
7.5 %
995.67

on (a+b)
on (a+b)
/
1%

10

R.C.C. beams, column, grider and bressmer, etc


Data for 4.2 sqm

a)

b)

Materials
38mm non sal planks
120mm dia Sal bullah
80mm dua Sal bullahCarriage of wood
Considering for 10 times use
Use once
Labour
Carpenter 2nd
S.S.Mulia

0.218 cum
15.2 mtr
8.00 mtr
0.456 cum
7115.02
2.75 nos
2.75 nos

cum
mtr
mtr
mtr
/

10
Each
Each

Add O.H.C@
Add Contractor Profit@
For 4.2 Sqm
For 1 sqm
Add Labour Cess

7.5 %
7.5 %
2272.98

on (a+b)
on (a+b)
/
1%

4.2

For First Floor


Rate same as G.F.
1265.00 X
20%
253.00
X
15%
Add O.H.C. & contractor profit
For
4.2 Sqm
For
1 Sqm

add 20 percent extra to the rates for F.F.

Add Labour Cess

253.00
37.95
290.95
69.27

1%

For 2nd Floor


Rate same as F.F.

1265.00 X
40%
506.00 X
15%
Add O.H.C. & contractor profit
For
4.2 Sqm
For
1 Sqm

add 20 percent extra to the rates for F.F.

Add Labour Cess

506.00
75.90
581.90
138.55

1%

For 3rd Floor


Rate same as 2.F.
add 20 percent extra to the rates for F.F.
Add O.H.C. & contractor profit

For
For
Add Labour Cess

506.00 X
60%
303.60 X
15%
4.2 Sqm
1 Sqm

303.60
45.54
349.14
83.13

1%

For 4th Floor


Rate same as 2.F.
add 20 percent extra to the rates for F.F.
Add O.H.C. & contractor profit

For
For
Add Labour Cess

v)
a)

R.C.C. Lintels
Data for 7.8 sqm
For 1 Sqm
Materials

303.60 X
80%
242.88 X
15%
4.2 Sqm
1 Sqm
1%

242.88
36.43
279.31
66.50

38mm Non sal planks


120mm dia non sal bullah
Carriage of wood
Considering for 10 times use

0.413 cum
21 mtr
0.689 cum
Use once

a)

cum
mtr
cum

10522.68

10

Labour
Carpenter 2nd
S.S.Mulia

1.25 nos
1.25 nos

Add O.H.C@
Add Contractor Profit@
For 7.8 Sqm
For 1 sqm
Add Labour Cess
For First Floor
Rate same as G.F.
add extra labour for F.F.
OHC & Contractor profit
For
For 1 sqm

Each
Each

7.5 %
7.5 %
1871.36

on (a+b)
on (a+b)
/
1%

575.00 X
20%
115.00 x
15%
7.8 Sqm
132.25
/
7.8

Add Labour Cess

For 2nd Floor


Rate same as G.F.
add extra labour for F.F.
OHC & Contractor profit
For 7.8 Sqm
For

1%

575.00 X
115.00 x
7.8 Sqm
1 Sqm

R.C.C. walls and fins including attached pillasters

a)

Data for 23.90 sqm


For 1 Sqm
Materials

Labour
Carpenter 2nd
S.S.Mulia 2.75 nos.

0.954 cum
0.269 cum
100.80 mtr
2.461 cum
34229.13

cum
cum
mtr
cum
/

13.5 nos
13.5 nos

Add O.H.C @

115.00
17.25
132.25
16.96

1%

vi)

Non sal wood canting


120mm dia non -sal bullah
Carriage of wood
Considering for 10 times use
Use once

115.00
17.25
132.25
16.96
256.87

20 %
15 %

Add Labour Cess

38mm thick Non- sal wood Plank

7.8

7.5 %

10.00

Each
Each

on (a+b)

Add Contractor Profit @


For 23.90 Sqm
For 1 sqm
Add Labour Cess

For First Floor


Rate same as G.F.
Add Extra labour for F.F.

7.5 %
11077.85

6210.00 X

1242.00
For
23.90 sqm
For
1 sqm
Add Labour Cess

For 2nd Floor


Rate same as G.F.
Add Extra labour for F.F.

/
1%

23.9

20%
15%

1242.00
186.30
1428.30
59.76

1%

6210.00 X

1242.00
For
23.90 sqm
For
1 sqm
Add Labour Cess

on (a+b)

20%
15%

1%

1242.00
186.30
1428.30
59.76

. Work
Rate in Rs.

Amount in
Rs.

Remarks

4.00

5.00

6.00

un shades and

21287.00
21287.00

104.00
135.20

2384.14
7237.58
5824.00
154.40
15600.12

1560.01

240.00
220.00

660.00
605.00
1265.00

2825.01
2825.01
360.97
3.61
364.58
/Sqm
360.97

32.33
393.30
3.93
397.23
Say
393.30

1560.01

1265.00
2825.01
211.88
211.88
3248.76

64.66
457.96
4.58
462.54

457.96

96.98
554.94
5.55
560.49
554.94

129.31
684.25
6.84
691.09
691.10

Say

21287.00
21287.00

4853.44
830.19

78.00
135.20

507.00
47.32
6237.95
623.79

240.00
220.00

1888.79
1888.79
434.42
4.34
438.77 Say

660.00
605.00
1265.00

623.79

1265.00
1888.79
141.66
141.66
2172.11

438.80

434.42

58.19
492.61
4.93
497.54

497.50

492.61

58.19
550.80
5.51
556.31

556.30

mass concrete

21287.00

50.00
135.20

5683.63
630.00
44.40
6358.03
635.80

240.00
220.00

120.00
110.00
230.00

865.80
865.80
99.57
1.00
100.56 Say

21287.00
104.00
104.00
135.20

240.00
220.00

635.80

230.00
865.80
64.94
64.94
995.67

100.60

4640.57
1580.80
832.00
61.65
7115.02
711.50
660.00
605.00

711.50

1265.00
1976.50
1976.50

1265.00
1976.50
148.24
148.24
2272.98

541.18
5.41
546.60 Say

546.60

541.18

610.46

69.27
610.46
6.10
616.56 /sqm
610.46

749.01
Say

138.55
749.01
7.49
756.50 /sqm
756.50 /sqm

749.01

832.13
Say

83.13
832.13
8.32
840.46 /sqm
840.50 /sqm

832.13

898.64
Say

66.50
898.64
8.99
907.62 /sqm
907.60 /sqm

21287.00
78.00
135.20

240.00
220.00

8791.53
1638.00
93.15
10522.68
1052.27

300.00
275.00
575.00

1627.27
1627.27
239.92
2.40
242.32 Say

1052.27

575.00
1627.27
122.05
122.05
1871.36

242.30
239.92

16.96
256.87
2.57
259.44
259.40

Say

256.87

273.83

Say

16.96
273.83
2.74
276.57

276.60

21287.00

20307.80

21287.00

5726.20
7862.40
332.73

78.00
135.20

34229.13

3422.91

240.00
220.00

9632.91

3240.00
2970.00
6210.00

3422.91

6210.00
9632.91
722.47

9632.91

722.47
11077.85

463.51
4.64
468.14 Say

468.10

463.51

523.27
Say

59.76
523.27
5.23
528.50
528.50 /sqm

523.27

583.03
Say

59.76
583.03
5.83
588.86
588.90 /sqm

Centering & Shuttering for R.C.C. Work


SL
No.
1
11

(i)

a)

b)

Description of items

Qnty

Unit

Supplying all materials, labour, T&P and


providing rigid and Smooth centering
and shuttering for R.C.C. works including
False work and dismantling them after
casting including Conveyance of all
materials to Work site, payment of royalty
taxes,
etc all complete as per
specification and direction of Engineer-incharge.

R.C.C. floor and roof slabs, landings,balconies, projecting sun shades an


chajjas upt 4.3m height
Details for 9 sqm.
Materials
Non Sal woods scanting
0.112 cum
cum
Planks
0.34 cum
cum
120mm dia Bullah
56.00 mtr
mtr
Carriage of wood
1.142 cum
cum
Considering for 10 times use
Use once
15600.12
/
10
Labour
Carpenter 2nd
S.S.Mulia

2.75 nos
2.75 nos

Add O.H.C @
7.5 %
Add Contractor profit@
7.5 %
for 9.00 sqm
For 1 sqm
3248.76
Add Labour Cess

Each
Each

on
on

(a+b)
(a+b)

9
1

%
Say

For First Floor


Rate same as G.F.
Add extra labour for F.F.
O.H.C & Contractor profit

1265.00 x
253.00 X

For 9.00 Sqm


For 1 sqm
Add Labour Cess

b)

For 2nd Floor


Rate same as F.F.

290.95

20%
15%
/

9
1%

253.00
37.95
290.95
32.33

Add extra labour for F.F.


O.H.C & Contractor profit

1265.00 x
253.00 X

For 9.00 Sqm


For 1 sqm

290.95

20%
15%
/

Add Labour Cess

(ii)
a)

b)

1%

R.C.C. stairs excluding landing but including railing


details for 5 Sqm
Materials
Non sal wood 38mm thick planks
0.228 cum
Non sal wood scantling
0.039 cum
120mm dia non sal bullah
6.50 mtr
Carriage of wood
0.35 cum
Considering 10times use of the materials
for use once
6237.95
/
Labour
Carpenter 2nd
2.75 nos
S.S.Mulia
2.75 nos

Add O.H.C @
7.5 %
Add Contractor Profit@
7.5 %
for 5.00 sqm
For 1 sqm
2172.11
Add Labour Cess
For First Floor
Rate same as G.F.
Add extra to the rates for F.F.
OHC &Contractor profit

1265.00 x
253.00 x
For
5.00 SQM
For
1.00 sqm

Add Labour Cess


For 2nd Floor
Rate same as F.F.
Add extra to the rates for F.F.
OHC &Contractor profit

a)

cum
cum
mtr
cum
10
Each
Each

on
on

(a+b)
(a+b)

5
1

20%
15%

253.00
37.95
290.95
58.19

1%

1265.00 x
253.00 x
For
5.00 SQM
For
1.00 sqm

Add Labour Cess


iii)

253.00
37.95
290.95
32.33

20%
15%

253.00
37.95
290.95
58.19

1%

R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc

Details for 10 Sqm


Materials
25mm non sal planks

0.267 cum

cum

Non sal Bullah 80mm dia


12.60 mtr
Carriage of wood
0.3284 cum
Considering 10times use of the materials
Use once
b)

6358.03

Labour
Carpenter 2nd
S.S.Mulia

a)

b)

10

0.50 nos
0.50 nos

Add O.H.C @
Add Contractor profit@
For 10 Sqm
For 1 sqm
Add Labour Cess
iv)

mtr
cum

Each
Each

7.5 %
7.5 %

on (a+b)
on (a+b)

995.67

/
1%

10

R.C.C. beams, column, grider and bressmer, etc


Data for 4.2 sqm
Materials
38mm non sal planks
120mm dia Sal bullah
80mm dua Sal bullahCarriage of wood
Considering for 10 times use
Use once
Labour
Carpenter 2nd
S.S.Mulia

Add O.H.C@
Add Contractor Profit@
For 4.2 Sqm
For 1 sqm
Add Labour Cess

0.218 cum
15.2 mtr
8.00 mtr
0.456 cum

cum
mtr
mtr
mtr

7115.02

10

2.75 nos
2.75 nos

Each
Each

7.5 %
7.5 %
2272.98

on (a+b)
on (a+b)
/
1%

4.2

For First Floor


Rate same as G.F.
1265.00 X
20%
253.00 X
15%
Add O.H.C. & contractor profit
For
4.2 Sqm
For
1 Sqm

add 20 percent extra to the rates for F.F.

Add Labour Cess

253.00
37.95
290.95
69.27

1%

For 2nd Floor


Rate same as F.F.
1265.00 X
253.00 X
Add O.H.C. & contractor profit

Add 20 percent extra to the rates for F.F.

20%
15%

253.00
37.95

v)

a)

For
For

4.2 Sqm
1 Sqm

Add Labour Cess

1%

R.C.C. Lintels
Data for 7.8 sqm
For 1 Sqm
Materials
38mm Non sal planks
120mm dia non sal bullah
Carriage of wood
Considering for 10 times use

0.413 cum
21 mtr
0.689 cum
Use once

a)

290.95
69.27

Labour
Carpenter 2nd
S.S.Mulia

cum
mtr
cum

10522.68

1.25 nos
1.25 nos

Add O.H.C@
Add Contractor Profit@
For 7.8 Sqm
For 1 sqm
Add Labour Cess

For First Floor


Rate same as G.F.
add extra labour for F.F.
OHC & Contractor profit

Each
Each

7.5 %
7.5 %
1871.36

on (a+b)
on (a+b)
/
1%

575.00 X
115.00 x

For
For 1 sqm

For 2nd Floor


Rate same as G.F.
add extra labour for F.F.
OHC & Contractor profit

115.00 x

7.8

20 %
15 %

7.8 Sqm
1 Sqm

Add Labour Cess

R.C.C. walls and fins including attached pillasters


Data for 23.90 sqm

20%
15%

1%

575.00 X

For 7.8 Sqm


For

7.8

7.8 Sqm
132.25
/

Add Labour Cess

vi)

10

1%

115.00
17.25
132.25
16.96
256.87

115.00
17.25
132.25
16.96

a)

For 1 Sqm
Materials
0.954 cum
0.269 cum
100.80 mtr
2.461 cum

38mm thick Non- sal wood Plank

Non sal wood canting


120mm dia non -sal bullah
Carriage of wood
Considering for 10 times use
Use once

cum
cum
mtr
cum

34229.13

Labour
Carpenter 2nd
S.S.Mulia 2.75 nos.

13.5 nos
13.5 nos

Add O.H.C @
Add Contractor Profit @
For 23.90 Sqm
For 1 sqm
Add Labour Cess

7.5 %
7.5 %
11077.85

For First Floor


Rate same as G.F.
Add Extra labour for F.F.

6210.00 X
1242.00
For
23.90 sqm
For
1 sqm

Add Labour Cess

For 2nd Floor


Rate same as G.F.
Add Extra labour for F.F.

Each
Each

on (a+b)
on (a+b)
/
1%

23.9

20%
15%

1242.00
186.30
1428.30
59.76

1%

6210.00 X

1242.00
For
23.90 sqm
For
1 sqm
Add Labour Cess

10.00

20%
15%

1%

1242.00
186.30
1428.30
59.76

. Work
Rate in Rs.

Amount in
Rs.

Remarks

4.00

5.00

6.00

un shades and

21287.00
21287.00

104.00
135.20

2384.14
7237.58
5824.00
154.40
15600.12

1560.01

240.00
220.00

660.00
605.00
1265.00

2825.01
2825.01
360.97
3.61
364.58
364.60 /Sqm
360.97

Say

32.33
393.30
3.93
397.23
397.20
393.30

1560.01

1265.00
2825.01
211.88
211.88
3248.76

32.33
425.63
4.26
429.89

21287.00
21287.00
78.00
135.20

240.00
220.00

4853.44
830.19
507.00
47.32
6237.95
623.79
660.00
605.00
1265.00

1888.79
1888.79
434.42
4.34
438.77 Say

623.79

1265.00
1888.79
141.66
141.66
2172.11

438.80
434.42

58.19
492.61
4.93
497.54

497.50

492.61

58.19
550.80
5.51
556.31
recast slabs etc

21287.00

5683.63

556.30

50.00
135.20

630.00
44.40
6358.03
635.80

240.00
220.00

635.80

120.00
110.00
230.00

230.00
865.80
64.94
64.94
995.67

865.80
865.80
99.57
1.00
100.56 Say

21287.00

104.00
104.00
135.20

240.00
220.00

100.60

4640.57
1580.80
832.00
61.65
7115.02
711.50
660.00
605.00
1265.00

1976.50
1976.50
541.18
5.41
546.60 Say

711.50

1265.00
1976.50
148.24
148.24
2272.98

546.60

541.18

610.46

69.27
610.46
6.10
616.56 /sqm
610.46

69.27
679.73
6.80
686.53 /sqm
686.50 /sqm

679.73
Say

21287.00

78.00
135.20

8791.53
1638.00
93.15
10522.68
1052.27

240.00
220.00

300.00
275.00
575.00

1627.27
1627.27
239.92
2.40
242.32 Say

16.96
256.87
2.57
259.44
259.40
256.87

273.83
Say

575.00
1627.27
122.05
122.05
1871.36

242.30

239.92

Say

1052.27

16.96
273.83
2.74
276.57
276.60

21287.00

20307.80

21287.00

5726.20
7862.40
332.73

78.00
135.20

34229.13

3422.91

240.00
220.00

3240.00
2970.00
6210.00

9632.91
9632.91

3422.91

6210.00
9632.91
722.47
722.47
11077.85

463.51
4.64
468.14 Say

468.10

463.51

523.27
Say

59.76
523.27
5.23
528.50
528.50 /sqm

523.27

583.03
Say

59.76
583.03
5.83
588.86
588.90 /sqm

R.C.C. Work with Centering & Shuttering


SL
No.
1

Description of items

Qnty

2
Supplying all labour, materials ,T&P and
providing Cement concrete (1:1:3)
with crusher broken hard granite chips
on 12mm size RCC works including cost
of
conveyance&
royalty
,sundries,
watering ,curing &lifting &laying concrete
at a height of 5mtr. Maximum complete
etc all complete(Excluding cost of

Unit

reinforcement But including cost of


centering & shuttering)

a)
(i)
(ii)

Column Base
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

b)
(i)
(ii)

Lintel
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

c)
(i)
(ii)

Plinth Band
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

d)
(i)
(ii)

Column Superstructure /Beam


Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

1 cum
1.5 Sqm

Cum
sqm

1%

1 cum

Cum

14 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

e)
(i)
(ii)

Roof slab
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

f)
(i)
(ii)

Stair Case

1 cum

Cum

10 Sqm

sqm

1%

Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering

1 cum

Cum

9 Sqm

sqm

Add Labour Cess

1%

g)
(i)

Chajja(0.065 cum)

(ii)

Cost of Centering & Shuttering

Cost of C.C.(1:1 : 3 )

Add Labour Cess

g)
(i)

Parapet /Fins/Wall(0.075 cum)

(ii)

Cost of Centering & Shuttering

Cost of C.C.(1:1 : 3 )

Add Labour Cess

1 cum
for
0.065
1.10 Sqm

Cum
cum
sqm

1%

1 cum
for
0.075
2.00 Sqm

1%

Cum
cum
sqm

Supplying all labour, materials ,T&P and


providing Cement concrete (1:2:4) with
crusher broken hard granite chips on
12mm size RCC works including cost of
conveyance&
royalty
,sundries,
watering ,curing &lifting &laying concrete
at a height of 5mtr. Maximum complete
etc all complete(Excluding cost of
reinforcement But including cost of
centering & shuttering)

a)
(i)
(ii)

Column Base
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

b)
(i)
(ii)

Lintel
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

c)
(i)
(ii)

Plinth Band
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering

1 cum
1.5 Sqm

Cum
sqm

1%

1 cum

Cum

14 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

Add Labour Cess

d)
(i)
(ii)

1%

Column Superstructure /Beam


Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

e)
(i)
(ii)

(ii)

Cum

10 Sqm

sqm

1%

Roof slab
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

f)
(i)

1 cum

1 cum

Cum

10 Sqm

sqm

1%

Stair Case
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering

1 cum

Cum

9 Sqm

sqm

Add Labour Cess

1%

g)
(i)

Chajja(0.065 cum)

(ii)

Cost of Centering & Shuttering

Cost of C.C.(1:2 : 4 )

1 cum
for
0.065
1.10 Sqm

Add Labour Cess

g)
(i)

Parapet /Fins/Wall(0.075 cum)

(ii)

Cost of Centering & Shuttering

Cost of C.C.(1:2 : 4 )

Add Labour Cess

Cum
cum
sqm

1%

for

1 cum
0.075

2.00 Sqm

1%

Cum
cum
sqm

huttering
Rate in Rs. Amount in Rs.
4

5570.64

5570.64

99.57

149.35
5719.99

Say
5570.64

5570.64

239.92

3358.85
8929.49

Say
5570.64

5570.64

99.57

995.67
6566.31

Say
5570.64

5570.64

541.18

5411.85
10982.49

Say

Remarks
6

5719.99
57.20
5777.19
5777.20

8929.49
89.29
9018.78
9018.80

6566.31
65.66
6631.97
6632.00
5579.80
10982.49
109.82
11092.31
11092.30

541.18
6120.99
61.20985495
6182.20

5570.64

5570.64

5579.80

360.97

3609.74
9180.37

3609.74
9189.54
91.89538362
9281.43

Say

5570.64

5570.64

434.42

3909.81
9480.44

Say
5570.64

5570.64

360.97

6108.79
11679.42

Say
5570.64

5570.64

463.51

12360.22
17930.86

Say

9180.37
91.80
9272.18
9272.20

9480.44
94.80
9575.25
9575.20

11679.42
116.79
11796.22
11796.20
5579.80
12360.22
17930.86
179.31
18110.17
18110.20

17940.02
179.4002337
18119.42

5579.80

5579.80

99.57

149.35
5729.15

Say
5579.80

5579.80

239.92

3358.85
8938.65

Say
5579.80

5579.80

99.57

995.67
6575.47

5729.15
57.29
5786.44
5786.40

8938.65
89.39
9028.04
9028.00

6575.47

65.75
6641.23

5579.80

5579.80

27.34

541.18

5411.85
10991.65

Err:509
Err:509
Err:509
Err:509

Say

10991.65
109.92
11101.57
11101.60

5579.80

5579.80

27.34

360.97

3609.74
9189.54

3609.74
3637.08
36.37079457
3673.45

Say

5579.80

5579.80

21287.00

191583.00
197162.80

9189.54
91.90
9281.43
9281.40

197162.80
1971.63
199134.43

5579.80

5579.80

0.00

0.00
5579.80

5579.80

5579.80

27.34
12360.22

463.51

12360.22
17940.02

12387.56
123.8756446
12511.44

Say

5579.80
55.80
5635.60

17940.02
179.40
18119.42
18119.40

R.C.C. Work with Centering & Shuttering


SL
No.
1

Description of items

Qnty

2
Supplying all labour, materials ,T&P and
providing Cement concrete (1:1:3)
with crusher broken hard granite chips
on 12mm size RCC works including cost
of
conveyance&
royalty
,sundries,
watering ,curing &lifting &laying concrete
at a height of 5mtr. Maximum complete
etc all complete(Excluding cost of

Unit

reinforcement But including cost of


centering & shuttering)

a)
(i)
(ii)

Column Base
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

b)
(i)
(ii)

Lintel
G.F.
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

(i)
(ii)

F.F.
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

(i)
(ii)

2nd Floor
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

1 cum
1.5 Sqm

Cum
sqm

1%

1 cum

Cum

14 Sqm

sqm

1%

1 cum

Cum

14 Sqm

sqm

1%

1 cum

Cum

14 Sqm

sqm

1%

c)
(i)
(ii)

Plinth Band
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

d)
(i)
(ii)

Column Superstructure /Beam


Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

(i)
(ii)

F.F.
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

(i)
(ii)

2nd floor
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

e)
(i)
(ii)

Roof slab
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

(i)
(ii)

Roof slab(F.F.)
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

Roof slab(2ND FLOOR)

1 cum

Cum

10 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

(i)
(ii)

Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

f)
(i)
(ii)

f)
(i)
(ii)

f)
(i)
(ii)

Stair Case

sqm

1%

Cum

9 Sqm

sqm

Add Labour Cess

1%

Stair Case(F.F.)
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering

1 cum

Cum

9 Sqm

sqm

Add Labour Cess

1%

Stair Case(2nd floor)


Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering

1 cum

Cum

9 Sqm

sqm

Add Labour Cess

1%

(ii)

Cost of Centering & Shuttering

Cost of C.C.(1:1 : 3 )

Add Labour Cess

Chajja(0.065 cum) F.F.


Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

g)
(i)

10 Sqm

1 cum

Chajja(0.065 cum)

(ii)

Cum

Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering

g)
(i)

(i)

1 cum

Parapet /Fins/Wall(0.075 cum)


Cost of C.C.(1:1 : 3 )

1 cum
for
0.065
1.10 Sqm

Cum
cum
sqm

1%

1 cum
for
0.065
1.10 Sqm

Cum
cum
sqm

1%

1 cum

Cum

for
(ii)

Cost of Centering & Shuttering

2.00 Sqm

Add Labour Cess

(i)
(ii)

Parapet /Fins/Wall(0.075 cum)


Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

(i)
(ii)

Parapet /Fins/Wall(0.075 cum)


Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess

0.075

cum
sqm

1%

F.F.
for

1 cum
0.075

2.00 Sqm

Cum
cum
sqm

1%

2nd Floor
1 cum
for
0.075
2.00 Sqm

1%

Cum
cum
sqm

Supplying all labour, materials ,T&P and


providing Cement concrete (1:2:4) with
crusher broken hard granite chips on
12mm size RCC works including cost of
conveyance&
royalty
,sundries,
watering ,curing &lifting &laying concrete
at a height of 5mtr. Maximum complete
etc all complete(Excluding cost of
reinforcement But including cost of
centering & shuttering)

a)
(i)
(ii)

Column Base
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

b)
(i)
(ii)

Lintel
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

c)
(i)
(ii)

Plinth Band
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

d)
(i)
(ii)

Column Superstructure /Beam


Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

e)
(i)
(ii)

Roof slab
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess

1 cum
1.5 Sqm

Cum
sqm

1%

1 cum

Cum

14 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

1 cum

Cum

10 Sqm

sqm

1%

f)
(i)
(ii)

Stair Case
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering

1 cum

Cum

9 Sqm

sqm

Add Labour Cess

1%

g)
(i)

Chajja(0.065 cum)

(ii)

Cost of Centering & Shuttering

Cost of C.C.(1:2 : 4 )

Add Labour Cess

g)
(i)

Parapet /Fins/Wall(0.075 cum)

(ii)

Cost of Centering & Shuttering

Cost of C.C.(1:2 : 4 )

Add Labour Cess

for

1 cum
0.065

1.10 Sqm

Cum
cum
sqm

1%

1 cum
for
0.075
2.00 Sqm

1%

Cum
cum
sqm

Shuttering
Rate in Rs. Amount in Rs.
4

6399.82

6399.82

99.57

149.35
6549.17

Say

6399.82

6399.82

239.92

3358.85
9758.67

Say
6586.67

6586.67

256.87

3596.22
10182.89

Say

6773.52

6773.52

273.83

3833.59
10607.11

Remarks
6

6549.17
65.49
6614.66
6614.70

9758.67
97.59
9856.25
9856.30

10182.89
101.83
10284.72
10284.70

10607.11
106.07

10713.18

Say

10713.20

6399.82

6399.82

99.57

995.67
7395.49

Say

7395.49
73.95
7469.44
7469.40

6399.82

6399.82

5579.80

541.18

5411.85
11811.67

541.18
6120.99
61.20985495
6182.20

Say

11811.67
118.12
11929.78
11929.80

6586.67

6586.67

0.00

610.46

6104.59
12691.26

0.00
0.00
0
0.00

Say

12691.26
126.91
12818.17
12818.20

6773.52

6773.52

0.00

679.73

6797.33
13570.85

0.00
0.00
0
0.00

Say

13570.85
135.71
13706.56
13706.60

6399.82

6399.82

5579.80

360.97

3609.74
10009.55

3609.74
9189.54
91.89538362
9281.43

Say

10009.55
100.10
10109.65
10109.60

6586.67

6586.67

0.00

393.30

3933.02
10519.68

3933.02
3933.02
39.3301564
3972.35

Say

10519.68
105.20
10624.88
10624.90

6773.52

6773.52

0.00

425.63

4256.29
11029.81

4256.29
4256.29
42.56293418
4298.86

Say

6399.82

6399.82

434.42

3909.81
10309.62

6586.67

6586.67

492.61

4433.52
11020.18

6773.52

6773.52

550.80

4957.23
11730.75

6399.82

6399.82

360.97

6108.79
12508.60
G.F.

10309.62
103.10
10412.72

11020.18
110.20
11130.39

11730.75
117.31
11848.05

12508.60
125.09
12633.69

6586.67

6586.67

393.30

6655.87
13242.54
G.F.

6399.82

11029.81
110.30
11140.11
11140.10

13242.54
132.43
13374.97

6399.82

379.93215
397.859
777.79115 13162.62

5579.80

12360.22
463.51

12360.22
18760.04

Say

18760.04
187.60
18947.64
18947.60

17940.02
179.4002337
18119.42

6586.67

6586.67

0.00
13953.86

523.27

13953.86
20540.53

13953.86
139.5386303
14093.40

Say

20540.53
205.41
20745.94
20745.90

6773.52

6773.52

0.00
15547.50

583.03

15547.50
22321.02

15547.50
155.475032
15702.98

Say

22321.02
223.21
22544.23
22544.20

5579.80

5579.80

99.57

149.35
5729.15

Say
5579.80

5579.80

239.92

3358.85
8938.65

Say

5729.15
57.29
5786.44
5786.40

8938.65
89.39
9028.04
9028.00

5579.80

5579.80

99.57

995.67
6575.47

5579.80

5579.80

27.34

541.18

5411.85
10991.65

Err:509
Err:509
Err:509
Err:509

Say

6575.47
65.75
6641.23

10991.65
109.92
11101.57
11101.60

5579.80

5579.80

27.34

360.97

3609.74
9189.54

3609.74
3637.08
36.37079457
3673.45

Say

9189.54
91.90
9281.43
9281.40

5579.80

5579.80

21287.00

191583.00
197162.80

5579.80

5579.80

360.97

6108.79
11688.59

197162.80
1971.63
199134.43

11688.59

116.89
11805.47

5579.80

5579.80

27.34
12360.22

463.51

12360.22
17940.02

12387.56
123.8756446
12511.44

Say

17940.02
179.40
18119.42
18119.40

Plastering work
SL No.

Description of items

Qnty

2
Providing fitting, fixing of Al. door with anodized Al.
door section of 9202 as vertical member, 9201 as
top,9200 as bottom and middle member with frame
section as 9221 with tapered clip No.4660 and the
frame to be complete by means of jointing angle
No.1855 including all cost of labour,T&P ,hire
charges of drilling machine,labour charge & labour
cess etc complete (excluding cost of laminated
board)

a)

Data for 3'-0" x 6'-8" = 23.31 Sft or


Materials
Vertical Section No.9202
Middle and bottom AI Section No.9200
Top Al.section No.9201
Tapper clip Al.Section No.4660
Al. Ang. Sec. No 1855
Al. Frame Section No.9221

27.13 sqm
4.06 mtr
2.14 mtr
2.13 mtr
16.65 mtr
0.42 mtr
6.2 mtr
Wastage

5%

Say
4" Anodised Al. Hinges.
U rubber beading
Door Stopper
Handle
6 Level mortice lock
Hire charges of drilling machine
Aluminium Screws adaessive
B)

Labour Charges
Carpenter (1st Class)
Fitter(2nd Class)
Helper to Carpenter
Mulia

@
@
@
@
@
@

0.92
4 nos
18.29 mtr
1 Day
2 nos
1 nos
1.5 Days

1.202 /
1.970 /
1.298 /
0.169 /
0.518 /
1.975 /
on
28.49
Sqm

0.42 nos
1.68 nos
2.3 nos
3 nos

O.H.C
Add contractor Profit

@ 7.50 % on(a+b)
@ 7.50 % on(a+b)
Total cost of (a+b+c)
Rate per Sqm
11234.60 /
27.13
Add Labour cess
@
1%

27.14

Unit

Rate in Rs.
4

kg/mtr
kg/mtr
kg/mtr
kg/mtr
kg/mtr
kg/mtr

4.88
4.22
2.76
2.81
0.22
12.25
27.14
1.36
28.49
226.00
577.00
39.00
15.00
25.00
62.50
400.00
100.00

27.14
Kg
Sqm
each
mtr
Day
each
each
Day
L.S.

Each
Each
Each
Each

260.00
240.00
220.00
200.00

9769.22
9769.22
Sqm

Say

Amount in
Rs.
5

Remarks
6

6439.63
530.84
156.00
274.35
25.00
125.00
400.00
150.00
50.00
8150.82
109.20
403.20
506.00
600.00
1618.40

8150.82

1618.40
9769.22
732.69
732.69
11234.60

414.10
4.14
418.24
418.20 /sqm

Plastering work
SL No.

Description of items

Qnty

2
Supplying all labour,T&P, materials and making
12mm thick cement plaster in cement

mortar(1:3) for brick work including Cost of


conveyance, sundries, watering for curing,
racking out joints, rounding of corners
,scaffolding
etc, all complete as per the
direction of engineer-in-charge.

a)

b)

Per 1 sqm
Materials
Sand (Screened & washed)
Cement

0.015 cum
0.0715 Qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)

0.14 nos
0.05 nos
0.05 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor profit @
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.02 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0715 Qntl

Add Labour Cess

For First Floor


Rate Same as G.F.
Add Extra labour for F.F.
Add O.H.C.&C.P.@7.50% EACH

57.60
2.88

Add Labour cess


For 2nd Floor

1% on

Rate Same as F.F.


Add Extra labour for F.F.
Add O.H.C.&C.P.@7.50% EACH

57.60
2.88

Add Labour cess

a)

b)

1% on

Supplying all labour,T&P, materials and making


12mm thick cement plaster in cement
mortar(1:4) for brick work including Cost of
conveyance, sundries, watering for curing,
racking out joints, rounding of corners
,scaffolding,contractor profit & labour cess etc,
all complete as per the direction of engineer-incharge.
Per 1 sqm
Materials
Sand (Screened & washed)
Cement

0.015 cum
0.0543 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)

0.14 nos
0.05 nos
0.05 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor Profit @
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.02 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0543 qntl

Add Labour Cess


First floor
Rate same as G.F.
Extra labour for work in F.F
Add O.H.C.

57.60
X
2.88 x

Add Labour cess

5
10

1%

2nd floor
Rate same as f.F.
Extra labour for work in F.F
Add O.H.C.

57.60
X
2.88 x

Add Labour cess

3rd floor
Rate same as 2nd floor
Extra labour for work in 3rd floor
Add O.H.C.

1%

57.60
X
2.88 x

Add Labour cess

a)

b)

5
10

1%

Supplying all labour,T&P, materials and making


12mm thick cement plaster in cement
mortar(1:4) with cement punning for skirting.
for brick work including cost of conveyance,
sundries, watering for curing, racking out
joints,
rounding
of
corners
,scaffolding,contractor profit & labour cess etc,
all complete as per the direction of engineer-incharge.
Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.0045 cum or

0.015 cum
0.0644 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering

5
10

0.15 nos
0.04 nos
0.05 nos
0.02 nos

O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0644 qntl

Add Labour Cess

First floor
Rate same as G.F.
Extra labour for work in F.F
Add O.H.C.

58.00
X
2.90 x

Add Labour cess

2nd floor
Rate same as F.F.
Extra labour for work in F.F
Add O.H.C.

Supplying all labour,T&P, materials and


making12mm thick cement plaster (1:4) over
brick work including cement punning and
bitumen painting over top of wall including
Cost of conveyance, sundries, watering for
curing, racking out joints, rounding of
corners ,scaffolding etc, all complete as per the
direction of engineer-in-charge.

Per 1 sqm

1%

58.00
X
2.90 x

Add Labour cess

5
15

5
15

1%

a)

Materials
Sand (Screened & washed)
Cement 0.0045 cum or

b)

Labour charges

0.015 cum
0.0644 qntl

Mason (2nd class)


Man Mulia(U/S)
Women Mulia(U/S)

0.15 nos
0.04 nos
0.05 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.02 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0543 qntl

Add for bitumen painting one coat


Add Labour Cess

1 Sqm
1

16

a)

b)

Supplying all materials, labour,T&P,


and
making 12mm thick cement plaster in
cement mortar(1:6) for brick work including
Cost of conveyance, sundries, watering for
curing, racking out joints, rounding of
corners ,scaffolding ,contractor profit & labour
cess etc, all complete as per the direction of
engineer-in-charge.
Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.0025 cum or

0.015 cum
0.0358 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)

0.14 nos
0.05 nos
0.05 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.02 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0358 qntl

Add Labour Cess

For First Floor


Rate same as G.F.
Extra labour for work in F.F
Add O.H.C.& C.P.@7.50% Each

57.60
X
2.88 x

Add Labour cess

For 2nd Floor


Rate same as F.F.
Extra labour for work in F.F
Add O.H.C.& C.P.@7.50% Each

5
15

1%

57.60
X
2.88 x

5
15

Add Labour cess

18

a)

b)

1%

Supplying all materials,labour,T&P,


and
providing 16mm thick cement plaster in cement
mortar(1:6) for brick or stone masonry work
including Cost of conveyance, sundries,
watering for curing, racking out joints,
rounding of corners ,scaffolding ,contractor
profit & labour cess etc, all complete as per the
direction of engineer-in-charge.

Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.003 cum or

0.018 cum
0.043 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)

0.16 nos
0.11 nos
0.11 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

7.5 %
7.5 %

on(a+b)
on(a+b)

0.018 cum
0.043 qntl

Add Labour Cess

First Floor

0.02 nos

Rate Same as G.F.


Add Extra labour for first floor
Add OHC

86.40 x
15 %

5
on

Add Labour cess

2ND Floor
Rate Same as F.F.
Add Extra labour for 2nd floor
Add OHC & C.P.@7.50% EACH

86.40 x
15 %

Add Labour cess

a)

b)

5
on

Supplying all materials, labour, T&P and


providing Cement punning including watering ,
curing conveyance of all Materials , taxes ,
royalty ,contractor profit & labour cess etc all
complete as per direction of
Engineer incharge
(Data for per sqm)
Materials
Cement

0.0114 qntl

Labour Charges
Mason (spl)
Women Mulia(U/S)

0.027 nos
0.027 nos

O.H.C. @
Add contractor profit@
Lead & Royalty
Cement

7.50 %
7.50 %

on(a+b)
on(a+b)

0.0114 qntl
Add Labour cess @

Supplying all labour,T&P, materials and


making 16mm thick cement plaster in cement
mortar(1:8) for brick or stone masonry work
including Cost of conveyance, sundries,
watering for curing, racking out joints,
rounding of corners ,scaffolding
etc, all
complete as per the direction of engineer-inPer
1 sqm
charge.(including
1% labour cess)
Materials
Sand (Screened & washed)
Cement
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add contractor Profit@

Add Lead & Royalty


Sand (Screened & washed)
Cement

0.018 cum
0.0329 Qntl

0.16 nos
0.11 nos
0.11 nos
0.02 nos

7.50 %
7.5 %

0.018 cum
0.0329 Qntl

Add Labour Cess

1%

Supplying all
materials, labour, T&P and
providing 20mm thick cement plaster (1:4) for
stone work
including watering , curing
conveyance of all materials to work site,
payment of royalty, taxes etc all complete as per
specification and direction of Engineer-incharge (including 1% labour cess).
Per 1 sqm
Materials
Sand (Screened & washed)
Cement

Labour charges
Mason (2nd class)
Man Mulia(U/S)

on(a+b)
on(a+b)

0.021 cum
0.0744 Qntl

0.16 nos
0.11 nos

Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

Add Labour Cess

Supplying all
materials, labour, T&P and
providing 20mm thick cement plaster (1:6) for
stone work
including watering , curing
conveyance of all materials to work site,
payment of royalty, taxes etc all complete as per
specification and direction of Engineer-incharge (including 1% labour cess).

Per 1 sqm
Materials

0.11 nos
0.02 nos

7.5 %
7.5 %

on
on

0.021 cum
0.0744 Qntl

Sand (Screened & washed)


Cement 0.004 cum

0.021 cum
0.057 Qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add contractor profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

Add Labour Cess

0.16 nos
0.11 nos
0.11 nos
0.02 nos

7.5 %
7.5 %

on
on

0.021 cum
0.057 Qntl

17

a)

b)

Supplying all materials, labour, T&P and


providing 6 mm thick cement plaster (1:4) to
RCC surfaces finished smooth including closed
deep chiping and slury treatment including
watering , curing conveyance of all Materials ,
taxes , royalty etc all complete as per direction
of Engineer in-charge

Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.003 cum or

0.0075 cum
0.0372 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
Labour for closed deep chipping & cleaning

O.H.C. @
Add contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.16 nos
0.11 nos
0.11 nos
0.02 nos
0.05 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.0075 cum
0.0372 qntl

Add Labour Cess

First Floor
Rate Same as G.F.
Add Extra labour for first floor
Add OHC

96.40 x
15 %

Add Labour cess

5
on

Unit

Rate in Rs. Amount in


Rs.
4
5

cum
Qntl

55.00
658.00

0.83
47.05
47.87

Each
Each
Each

240.00
200.00
200.00

33.60
10.00
10.00

Each

200.00

4.00
57.60

n(a+b)
n(a+b)

105.47
105.47

cum
Qntl

524.20
16.90

7.86
1.21
9.07

%
Say

5%
15%

133.68

2.88
0.43
3.31

Remarks
6

47.87

57.60
105.47
7.91
7.91

9.07
130.36
1.30
131.67
131.70

130.36

3.31
133.68
1.34
135.01

135.00

130.36
23.10
153.47
1.534662
155.00

48

524.20

5%
15%

133.68

2.88
0.43
3.31

136.99

3.31
136.99
1.37
138.36

138.40

36.55

cum
Qntl

55.00
658.00

0.83
35.73
36.55

Each
Each
Each

240.00
200.00
200.00

33.60
10.00
10.00

Each

200.00

4.00
57.60

n(a+b)
n(a+b)
cum
Qntl

94.15
94.15
524.20
16.90

7.86
0.92
8.78

%
Say
%
%

2.88
0.29
3.17

117.06

3.17
120.23
1.20

57.60
94.15
7.06
7.06

8.78
117.06
1.17
118.23
118.20

Say

%
%

121.40

120.23

2.88
0.29
3.17

Say

%
%

121.43

3.17
123.39
1.23
124.63

124.60

123.39

2.88
0.29
3.17

Say

3.17
126.56
1.27
127.83

cum
Qntl

55.00
658.00

0.83
42.38
43.20

Each
Each
Each

240.00
200.00
200.00

36.00
8.00
10.00

Each

200.00

4.00
58.00

127.80

43.20

58.00

n(a+b)
n(a+b)

cum
Qntl

101.20
7.59
7.59

101.20
101.20

524.20
16.90

7.86
1.09
8.95

%
Say

%
%

125.33

2.90
0.44
3.34

Say

%
%

8.95
125.33
1.25
126.58
126.60

3.34
128.67
1.29
129.95

130.00

128.67

2.90
0.44
3.34

Say

3.34
132.00
1.32
133.32

133.30

148.43
1.484336
149.92

cum
Qntl

55.00
658.00

0.83
42.38
43.20

Each
Each
Each

240.00
200.00
200.00

36.00
8.00
10.00

Each

200.00

4.00
58.00

n(a+b)
n(a+b)

cum
Qntl

101.20
101.20

524.20
16.90

7.86
0.92
8.78

%
Say

43.20

58.00
101.20
7.59
7.59

8.78
125.16
6.60
131.76
1.32
133.08
133.10

cum
Qntl

55.00
658.00

0.83
23.56
24.38

Each
Each
Each

240.00
200.00
200.00

33.60
10.00
10.00

Each

200.00

4.00
57.60

n(a+b)
n(a+b)

cum
Qntl

81.98
81.98

524.20
16.90

7.86
0.61
8.47

%
Say

%
%

2.88
0.43
3.31

2.88
0.43

57.60
81.98
6.15
6.15

8.47
102.75
1.03
103.77
103.80

102.75

Say

%
%

24.38

3.31
106.06
1.06
107.12

106.06

107.10

3.31

Say

3.31
109.37
1.09
110.46

cum
Qntl

55.00
658.00

0.99
28.29
29.28

Each
Each
Each

240.00
200.00
200.00

38.40
22.00
22.00

Each

200.00

4.00
86.40

n(a+b)
n(a+b)

cum
Qntl

115.68
115.68

524.20
16.90

9.44
0.73
10.16

%
Say

110.50

29.28

86.40
115.68
8.68
8.68

10.16
143.20
1.43
144.63
144.60

143.20

4.32
0.65
4.97

4.32

4.97
148.17
1.48
149.65
149.60 / sqm

%
Say

148.17

4.32
0.65
4.97

4.32

4.97
153.13
1.53
154.67
154.70 / sqm

%
Say

Qntl

658.00

7.50
7.50

Each
Each

260.00
200.00

7.02
5.40
12.42

n(a+b)
n(a+b)

Qntl

19.92
19.92

16.90

0.19

%
Say

7.50

12.42
19.92
1.49
1.49
22.91
0.19
23.10
0.23
23.33
23.30

20.11

0.15276
19.41
19.56276
0.195628
19.75839

Cum
Qntl

44.00
640.00

0.79
21.06
21.85

Each
Each
Each
Each

190.00
150.00
150.00
150.00

30.40
16.50
16.50
3.00
66.40

n(a+b)
n(a+b)

88.25
88.25

cum
Qntl

524.20
13.40

3.50
0.44
3.95

cum
Qntl

44.00
640.00

0.92
47.62
48.54

Each
Each

240.00
200.00

38.40
22.00

21.85

66.40
88.25
8.82
8.82

3.95
109.84
1.01
110.85

48.54

Each
Each

200.00
200.00

22.00
4.00
86.40

(a+b)
(a+b)

cum
Qntl

134.94
134.94

524.20
13.40

11.01
1.00
12.01

%
Say

86.40
134.94
10.12
10.12

12.01
167.19
1.67
168.86
168.90

cum
Qntl

55.00
658.00

1.16
37.51
38.66

Each
Each
Each
Each

240.00
200.00
200.00
200.00

38.40
22.00
22.00
4.00
86.40

(a+b)
(a+b)

125.06
125.06

cum
Qntl

524.20
16.90

11.01
0.96
11.97

%
Say

38.66

86.40
125.06
9.38
9.38

11.97
155.79
1.56
157.35
157.30

cum
Qntl

55.00
658.00

0.41
24.48
24.89

Each
Each
Each
Each
Each

240.00
200.00
200.00
200.00
200.00

38.40
22.00
22.00
4.00
10.00
96.40

n(a+b)
n(a+b)

24.89

96.40
121.29
9.10
9.10

121.29
121.29

cum
Qntl

183.80
16.90

1.38
0.63
2.01

%
Say

%
4.82

4.82
0.72
5.54

Sqm
141.49

5.54
147.03
1.47
148.50

2.01
141.49
1.41
142.91
142.90

572.20

Plastering work
SL No.

Description of items

Qnty

2
Supplying all labour,T&P, materials and making
12mm thick cement plaster in cement

mortar(1:3) for brick work including Cost of


conveyance, sundries, watering for curing,
racking out joints, rounding of corners
,scaffolding
etc, all complete as per the
direction of engineer-in-charge.

a)

b)

Per 1 sqm
Materials
Sand (Screened & washed)
Cement

0.015 cum
0.0715 Qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)

0.14 nos
0.05 nos
0.05 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor profit @
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.02 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0715 Qntl

Add Labour Cess

For First Floor


Rate Same as G.F.
Add Extra labour for F.F.
Add O.H.C.&C.P.@7.50% EACH

57.60
2.88

Add Labour cess


For 2nd Floor

1% on

Rate Same as F.F.


Add Extra labour for F.F.
Add O.H.C.&C.P.@7.50% EACH

57.60
2.88

Add Labour cess

a)

b)

1% on

Supplying all labour,T&P, materials and making


12mm thick cement plaster in cement
mortar(1:4) for brick work including Cost of
conveyance, sundries, watering for curing,
racking out joints, rounding of corners
,scaffolding,contractor profit & labour cess etc,
all complete as per the direction of engineer-incharge.
Per 1 sqm
Materials
Sand (Screened & washed)
Cement

0.015 cum
0.0543 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)

0.14 nos
0.05 nos
0.05 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor Profit @
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.02 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0543 qntl

Add Labour Cess


First floor
Rate same as G.F.
Extra labour for work in F.F
Add O.H.C.

57.60
X
2.88 x

Add Labour cess

5
10

1%

2nd floor
Rate same as f.F.
Extra labour for work in F.F
Add O.H.C.

57.60
X
2.88 x

Add Labour cess

3rd floor
Rate same as 2nd floor
Extra labour for work in 3rd floor
Add O.H.C.

1%

57.60
X
2.88 x

Add Labour cess

a)

b)

5
10

1%

Supplying all labour,T&P, materials and making


12mm thick cement plaster in cement
mortar(1:4) with cement punning for skirting.
for brick work including cost of conveyance,
sundries, watering for curing, racking out
joints,
rounding
of
corners
,scaffolding,contractor profit & labour cess etc,
all complete as per the direction of engineer-incharge.
Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.0045 cum or

0.015 cum
0.0644 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering

5
10

0.15 nos
0.04 nos
0.05 nos
0.02 nos

O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0644 qntl

Add Labour Cess

First floor
Rate same as G.F.
Extra labour for work in F.F
Add O.H.C.

58.00
X
2.90 x

Add Labour cess

2nd floor
Rate same as F.F.
Extra labour for work in F.F
Add O.H.C.

Supplying all labour,T&P, materials and


making12mm thick cement plaster (1:4) over
brick work including cement punning and
bitumen painting over top of wall including
Cost of conveyance, sundries, watering for
curing, racking out joints, rounding of
corners ,scaffolding etc, all complete as per the
direction of engineer-in-charge.

Per 1 sqm

1%

58.00
X
2.90 x

Add Labour cess

5
15

5
15

1%

a)

Materials
Sand (Screened & washed)
Cement 0.0045 cum or

b)

Labour charges

0.015 cum
0.0644 qntl

Mason (2nd class)


Man Mulia(U/S)
Women Mulia(U/S)

0.15 nos
0.04 nos
0.05 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.02 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0543 qntl

Add for bitumen painting one coat


Add Labour Cess

1 Sqm
1

16

a)

b)

Supplying all materials, labour,T&P,


and
making 12mm thick cement plaster in
cement mortar(1:6) for brick work including
Cost of conveyance, sundries, watering for
curing, racking out joints, rounding of
corners ,scaffolding ,contractor profit & labour
cess etc, all complete as per the direction of
engineer-in-charge.
Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.0025 cum or

0.015 cum
0.0358 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)

0.14 nos
0.05 nos
0.05 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.02 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.015 cum
0.0358 qntl

Add Labour Cess

For First Floor


Rate same as G.F.
Extra labour for work in F.F
Add O.H.C.& C.P.@7.50% Each

57.60
X
2.88 x

Add Labour cess

For 2nd Floor


Rate same as F.F.
Extra labour for work in F.F
Add O.H.C.& C.P.@7.50% Each

5
15

1%

57.60
X
2.88 x

5
15

Add Labour cess

18

a)

b)

1%

Supplying all materials,labour,T&P,


and
providing 16mm thick cement plaster in cement
mortar(1:6) for brick or stone masonry work
including Cost of conveyance, sundries,
watering for curing, racking out joints,
rounding of corners ,scaffolding ,contractor
profit & labour cess etc, all complete as per the
direction of engineer-in-charge.

Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.003 cum or

0.018 cum
0.043 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)

0.16 nos
0.11 nos
0.11 nos

Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

7.5 %
7.5 %

on(a+b)
on(a+b)

0.018 cum
0.043 qntl

Add Labour Cess

First Floor

0.02 nos

Rate Same as G.F.


Add Extra labour for first floor
Add OHC

86.40 x
15 %

5
on

Add Labour cess

2ND Floor
Rate Same as F.F.
Add Extra labour for 2nd floor
Add OHC & C.P.@7.50% EACH

86.40 x
15 %

Add Labour cess

a)

b)

5
on

Supplying all materials, labour, T&P and


providing Cement punning including watering ,
curing conveyance of all Materials , taxes ,
royalty ,contractor profit & labour cess etc all
complete as per direction of
Engineer incharge
(Data for per sqm)
Materials
Cement

0.0114 qntl

Labour Charges
Mason (spl)
Women Mulia(U/S)

0.027 nos
0.027 nos

O.H.C. @
Add contractor profit@
Lead & Royalty
Cement

7.50 %
7.50 %

on(a+b)
on(a+b)

0.0114 qntl
Add Labour cess @

Supplying all labour,T&P, materials and


making 16mm thick cement plaster in cement
mortar(1:8) for brick or stone masonry work
including Cost of conveyance, sundries,
watering for curing, racking out joints,
rounding of corners ,scaffolding
etc, all
complete as per the direction of engineer-inPer
1 sqm
charge.(including
1% labour cess)
Materials
Sand (Screened & washed)
Cement
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add contractor Profit@

Add Lead & Royalty


Sand (Screened & washed)
Cement

0.018 cum
0.0329 Qntl

0.16 nos
0.11 nos
0.11 nos
0.02 nos

7.50 %
7.5 %

0.018 cum
0.0329 Qntl

Add Labour Cess

1%

Supplying all
materials, labour, T&P and
providing 20mm thick cement plaster (1:4) for
stone work
including watering , curing
conveyance of all materials to work site,
payment of royalty, taxes etc all complete as per
specification and direction of Engineer-incharge (including 1% labour cess).
Per 1 sqm
Materials
Sand (Screened & washed)
Cement

Labour charges
Mason (2nd class)
Man Mulia(U/S)

on(a+b)
on(a+b)

0.021 cum
0.0744 Qntl

0.16 nos
0.11 nos

Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add Contractor profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

Add Labour Cess

Supplying all
materials, labour, T&P and
providing 20mm thick cement plaster (1:6) for
stone work
including watering , curing
conveyance of all materials to work site,
payment of royalty, taxes etc all complete as per
specification and direction of Engineer-incharge (including 1% labour cess).

Per 1 sqm
Materials

0.11 nos
0.02 nos

7.5 %
7.5 %

on
on

0.021 cum
0.0744 Qntl

Sand (Screened & washed)


Cement 0.004 cum

0.021 cum
0.057 Qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering

O.H.C. @
Add contractor profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

Add Labour Cess

0.16 nos
0.11 nos
0.11 nos
0.02 nos

7.5 %
7.5 %

on
on

0.021 cum
0.057 Qntl

17

a)

b)

Supplying all materials, labour, T&P and


providing 6 mm thick cement plaster (1:4) to
RCC surfaces finished smooth including closed
deep chiping and slury treatment including
watering , curing conveyance of all Materials ,
taxes , royalty etc all complete as per direction
of Engineer in-charge

Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.003 cum or

0.0075 cum
0.0372 qntl

Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
Labour for closed deep chipping & cleaning

O.H.C. @
Add contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement

0.16 nos
0.11 nos
0.11 nos
0.02 nos
0.05 nos

7.5 %
7.5 %

on(a+b)
on(a+b)

0.0075 cum
0.0372 qntl

Add Labour Cess

First Floor
Rate Same as G.F.
Add Extra labour for first floor
Add OHC

96.40 x
15 %

Add Labour cess

5
on

Unit

Rate in Rs. Amount in


Rs.
4
5

cum
Qntl

55.00
658.00

0.83
47.05
47.87

Each
Each
Each

240.00
200.00
200.00

33.60
10.00
10.00

Each

200.00

4.00
57.60

n(a+b)
n(a+b)

105.47
105.47

cum
Qntl

524.20
16.90

7.86
1.21
9.07

%
Say

5%
15%

133.68

2.88
0.43
3.31

Remarks
6

47.87

57.60
105.47
7.91
7.91

9.07
130.36
1.30
131.67
131.70

130.36

3.31
133.68
1.34
135.01

135.00

130.36
23.10
153.47
1.534662
155.00

48

524.20

5%
15%

133.68

2.88
0.43
3.31

136.99

3.31
136.99
1.37
138.36

138.40

36.55

cum
Qntl

55.00
658.00

0.83
35.73
36.55

Each
Each
Each

240.00
200.00
200.00

33.60
10.00
10.00

Each

200.00

4.00
57.60

n(a+b)
n(a+b)
cum
Qntl

94.15
94.15
524.20
16.90

7.86
0.92
8.78

%
Say
%
%

2.88
0.29
3.17

117.06

3.17
120.23
1.20

57.60
94.15
7.06
7.06

8.78
117.06
1.17
118.23
118.20

Say

%
%

121.40

120.23

2.88
0.29
3.17

Say

%
%

121.43

3.17
123.39
1.23
124.63

124.60

123.39

2.88
0.29
3.17

Say

3.17
126.56
1.27
127.83

cum
Qntl

55.00
658.00

0.83
42.38
43.20

Each
Each
Each

240.00
200.00
200.00

36.00
8.00
10.00

Each

200.00

4.00
58.00

127.80

43.20

58.00

n(a+b)
n(a+b)

cum
Qntl

101.20
7.59
7.59

101.20
101.20

524.20
16.90

7.86
1.09
8.95

%
Say

%
%

125.33

2.90
0.44
3.34

Say

%
%

8.95
125.33
1.25
126.58
126.60

3.34
128.67
1.29
129.95

130.00

128.67

2.90
0.44
3.34

Say

3.34
132.00
1.32
133.32

133.30

148.43
1.484336
149.92

cum
Qntl

55.00
658.00

0.83
42.38
43.20

Each
Each
Each

240.00
200.00
200.00

36.00
8.00
10.00

Each

200.00

4.00
58.00

n(a+b)
n(a+b)

cum
Qntl

101.20
101.20

524.20
16.90

7.86
0.92
8.78

%
Say

43.20

58.00
101.20
7.59
7.59

8.78
125.16
6.60
131.76
1.32
133.08
133.10

cum
Qntl

55.00
658.00

0.83
23.56
24.38

Each
Each
Each

240.00
200.00
200.00

33.60
10.00
10.00

Each

200.00

4.00
57.60

n(a+b)
n(a+b)

cum
Qntl

81.98
81.98

524.20
16.90

7.86
0.61
8.47

%
Say

%
%

2.88
0.43
3.31

2.88
0.43

57.60
81.98
6.15
6.15

8.47
102.75
1.03
103.77
103.80

102.75

Say

%
%

24.38

3.31
106.06
1.06
107.12

106.06

107.10

3.31

Say

3.31
109.37
1.09
110.46

cum
Qntl

55.00
658.00

0.99
28.29
29.28

Each
Each
Each

240.00
200.00
200.00

38.40
22.00
22.00

Each

200.00

4.00
86.40

n(a+b)
n(a+b)

cum
Qntl

115.68
115.68

524.20
16.90

9.44
0.73
10.16

%
Say

110.50

29.28

86.40
115.68
8.68
8.68

10.16
143.20
1.43
144.63
144.60

143.20

4.32
0.65
4.97

4.32

4.97
148.17
1.48
149.65
149.60 / sqm

%
Say

148.17

4.32
0.65
4.97

4.32

4.97
153.13
1.53
154.67
154.70 / sqm

%
Say

Qntl

658.00

7.50
7.50

Each
Each

260.00
200.00

7.02
5.40
12.42

n(a+b)
n(a+b)

Qntl

19.92
19.92

16.90

0.19

%
Say

7.50

12.42
19.92
1.49
1.49
22.91
0.19
23.10
0.23
23.33
23.30

20.11

0.15276
19.41
19.56276
0.195628
19.75839

Cum
Qntl

44.00
640.00

0.79
21.06
21.85

Each
Each
Each
Each

190.00
150.00
150.00
150.00

30.40
16.50
16.50
3.00
66.40

n(a+b)
n(a+b)

88.25
88.25

cum
Qntl

524.20
13.40

3.50
0.44
3.95

cum
Qntl

44.00
640.00

0.92
47.62
48.54

Each
Each

240.00
200.00

38.40
22.00

21.85

66.40
88.25
8.82
8.82

3.95
109.84
1.01
110.85

48.54

Each
Each

200.00
200.00

22.00
4.00
86.40

(a+b)
(a+b)

cum
Qntl

134.94
134.94

524.20
13.40

11.01
1.00
12.01

%
Say

86.40
134.94
10.12
10.12

12.01
167.19
1.67
168.86
168.90

cum
Qntl

55.00
658.00

1.16
37.51
38.66

Each
Each
Each
Each

240.00
200.00
200.00
200.00

38.40
22.00
22.00
4.00
86.40

(a+b)
(a+b)

125.06
125.06

cum
Qntl

524.20
16.90

11.01
0.96
11.97

%
Say

38.66

86.40
125.06
9.38
9.38

11.97
155.79
1.56
157.35
157.30

cum
Qntl

55.00
658.00

0.41
24.48
24.89

Each
Each
Each
Each
Each

240.00
200.00
200.00
200.00
200.00

38.40
22.00
22.00
4.00
10.00
96.40

n(a+b)
n(a+b)

24.89

96.40
121.29
9.10
9.10

121.29
121.29

cum
Qntl

524.20
16.90

3.93
0.63
4.56

%
Say

%
4.82

4.82
0.72
5.54

Sqm
144.04

5.54
149.59
1.50
151.08

4.56
144.04
1.44
145.48
145.50

572.20

SL
No.
10

a)

Reinforcement work
Qnty
Unit

Description of items
Supplying all materials, labour, T&P and
providing M.S. reinforcement for Reinforced
cement concrete work including cutting,
bending, binding and placing in position
including cost of binding wire 18 to 20 gauge,
conveyance of all materials to worksite,
payment of royalty, taxes ,contractor profit &
labour cess
etc all complete as per
specification and direction of the Engineer-incharge.

Unit -1M.T
Taking output = 1M.T.
Materials
Hysd
bar including 5
percent
overlaps(SAIL STEEL TMT-EQR 500/IS 1786
Fe 500 D) and wastage
Binding Wire

b)

Labour
Labour for cutting, bending, shifting to
Site, tying and placing in position
Mate
Blacksmith ( Spl)
Man Mulia (U/S)

Add OHC@
Add Contractor Profit @
COST OF CARRIAGE
Steel-5.00km
For M.T.

1.05 MT

MT

8 Kg

Kg

0.44 nos
3 nos
8 nos

7.5
7.5

Each
Each
Each

%
%

1.05 MT

on(a+b)
on(a+b)

MT

Add Labour Cess


Rate for Per Qntl

67005.89

1
/

10

For First Floor


Rate Same as G.F.
5% extra on Labour cost for F.F. i.e
10% O.H. On excess labour i.e.

Add Labour Cess

2476.80
123.84 x

5%
10 %

1%

Rate for Per Qntl

67143.48

10

Say
For 2nd Floor
Rate Same as G.F.
5% extra on Labour cost for F.F. i.e
10% O.H. On excess labour i.e.

2476.80
123.84 x

Add Labour Cess


Rate for Per Qntl

5%
10 %

1%
67281.07

10

Rate in Rs. Amount in Rs.

51880.00

54474.00

73.00

584.00
55058.00

220.00
260.00
200.00

96.80
780.00
1600.00
2476.80

57534.80
57534.80

169.00
6634.20

177.45
177.45
Excl L.C.

6700.59

Per M.T.
Say

Remarks

5188.00

55058.00

3366.88
336.688
340.05488
2476.80
57534.80
4315.11
4315.11
66165.02

177.45
66342.47
663.42
67005.89
6700.60

66342.47
123.84
12.38
136.22

136.22
66478.69
664.79

584.00
2476.80
3060.80
306.08

6647.87

6634.25
66.34
6700.59

584.00
2476.80
3060.80
459.12
3519.92
351.992
355.51192

67143.48
6714.35
6714.30 / Qntl
66478.69
123.84
12.38
136.22

6728.11

136.22
66614.92
666.15
67281.07

2476.80
371.52

SL
No.
10

a)

Reinforcement work
Qnty
Unit

Description of items
Supplying all materials, labour, T&P and
providing M.S. reinforcement for Reinforced
cement concrete work including cutting,
bending, binding and placing in position
including cost of binding wire 18 to 20 gauge,
conveyance of all materials to worksite,
payment of royalty, taxes ,contractor profit &
labour cess
etc all complete as per
specification and direction of the Engineer-incharge.

Unit -1M.T
Taking output = 1M.T.
Materials
Hysd
bar including 5
percent
overlaps(SAIL STEEL TMT-EQR 500/IS 1786
Fe 500 D) and wastage
Binding Wire

b)

Labour
Labour for cutting, bending, shifting to
Site, tying and placing in position
Mate
Blacksmith ( Spl)
Man Mulia (U/S)

Add OHC@
Add Contractor Profit @
COST OF CARRIAGE
Steel-5.00km
For M.T.

1.05 MT

MT

8 Kg

Kg

0.44 nos
3 nos
8 nos

7.5
7.5

Each
Each
Each

%
%

1.05 MT

on(a+b)
on(a+b)

MT

Add Labour Cess


Rate for Per Qntl

67005.89

1
/

10

For First Floor


Rate Same as G.F.
5% extra on Labour cost for F.F. i.e
10% O.H. On excess labour i.e.

Add Labour Cess

2476.80
123.84 x

5%
10 %

1%

Rate for Per Qntl

67143.48

10

Say
For 2nd Floor
Rate Same as G.F.
5% extra on Labour cost for F.F. i.e
10% O.H. On excess labour i.e.

2476.80
123.84 x

Add Labour Cess


Rate for Per Qntl

5%
10 %

1%
67281.07

10

Rate in Rs. Amount in Rs.

51880.00

54474.00

73.00

584.00
55058.00

220.00
260.00
200.00

96.80
780.00
1600.00
2476.80

57534.80
57534.80

169.00
6634.20

177.45
177.45
Excl L.C.

6700.59

Per M.T.
Say

Remarks

5188.00

55058.00

3366.88
336.688
340.05488
2476.80
57534.80
4315.11
4315.11
66165.02

177.45
66342.47
663.42
67005.89
6700.60

66342.47
123.84
12.38
136.22

136.22
66478.69
664.79

584.00
2476.80
3060.80
306.08

6647.87

6634.25
66.34
6700.59

584.00
2476.80
3060.80
459.12
3519.92
351.992
355.51192

67143.48
6714.35
6714.30 / Qntl
66478.69
123.84
12.38
136.22

6728.11

136.22
66614.92
666.15
67281.07

2476.80
371.52

SL
No.
14

Description of items

PAINTING ITEMS
Qnty

Unit

Supplying all materials,labour, T&P, an


painting walls with water proofing cement
paint approved shade two coats to give an
even shade including cost of conveyance,
taxes
etc,
&
including sundries,
brushes,putty, contractor profit & labour
cess as per direction of Engineer-in-charge..
Data for 10 sqm
Painter or Polisher (Spl)
Man Mulia (U/S)
Man Mulia for preparation of Surface

0.22
0.22
0.10

nos
nos
nos

Each
Each
Each

260.00
200.00
200.00

Kg

43.00

Add Cost of materials


Cement Paint two coat-2.50 kg for 10 sqm
2.50 Kg
Add O.H.C.
Add Contractor profit
For
For
Add Labour Cess

7.50 %
7.50 %
10.00 Sqm
1.00 Sqm
1.00 %

228.70
228.70

Supplying all labour, T&P and painting two


coats with any approved synthetic paint
on new/old wood work including cost of
Sundries, brushes, soap, &putty etc
including
preparation
of
Surface
,contractor profit &
labour cess
all
complete as per the direction of Engineerin- Charge.
Data for 9.30 sqm
Painter (Spl)
Man Mulia (U/S)
Man Mulia for preparation of Surface
Add Cost of materials
Paint two coat-1.25 ltrs for 10 sqm
per sqm 0.125 litrs.
Add O.H.C.@
Add Contractor profit@

1.25
1.00
0.10

nos
nos
nos

Each
Each
Each

260.00
200.00
200.00

1.250 litrs

Kg

193.00

7.50 %
7.50 %

ON
ON

786.25
786.25

For cost
For cost
Add Labour Cess

14

9.30 Sqm
1.00 Sqm
1.00 %

Supplying all materials,labour, T&P and


Providing two coat of Distempering with any
approved
shades
including
cost
of
Conveyance, taxes of, brushes, sundries,
contractor profit& labour cess all complete as
per the direction of Engineer-in-charge.

Data for 10 sqm


Painter or Polisher (Spl)
Man Mulia (U/S)
Man Mulia for preparation of Surface

0.52
0.52
0.10

nos
nos
nos

Each
Each
Each

260.00
200.00
200.00

Kg

66.00

Add Cost of materials


Distemper two coats 2.50 kg for 10 sqm
Add O.H.C.
Add Contractor profit
For
For

Add Labour Cess

a)

b)

2.50 Kg
7.5%
7.5%
10.00 Sqm
1.00 Sqm
1.00 %

424.20
424.20

Supplying all labour, T&P, materials an


washing two coats with shell lime to give
an
even
shade
including
cost
of
conveyance, taxes etc,
& including
sundries, brushes & putty.
(Data for 93 sqm)
Materials
Shell lime (Unslaked)

18.66 Kg

Materials
Painter(2nd class)
Man Muia(unskilled)

Kg

1.00 nos
0.75 nos
O.ver Head Charge @
Add Contractor Profit @

7.5%
7.5%

Each
Each

on
on

Cost for 93 sqm


per sqmAdd Labour cess

745.66 /

1.00 %

93

744.54
744.54

19.00

240.00
200.00

a)

b)

Supplying all labour, T&P, materials an


washing three coats with shell lime to give
an
even
shade
including
cost
of
conveyance, taxes etc,
& including
sundries, brushes & putty,contractor profit
& labour cess etc all complete as per the
direction of Engineer-in-charge.
(Data for 93 sqm)
Materials
Shell lime (Unslaked)

23.32 Kg

Materials
Painter(2nd class)
Man Muia(unskilled)

Kg

1.50 nos
1.00 nos
O.ver Head Charge @
Add Contractor Profit @

Each
Each

7.50 % on
7.50 % on

Cost for 93 sqm


Add Labour cess

per sqm- 1073.09 /


1.00 %

93

933.12
933.12

16.00

240.00
200.00

a)

b)
c)

Supplying all labour, T&P, materials and


Wall painting one coat with plastic
emulsion paint of approved shade on new
work to give an even shade inculding cost
of paint,cost of conveyance,taxes of
materials & labour cess etc all complete as
per specification of Engineer-In-Charge.
Per Sqm
Data for 10 Sqm.
Labour
Painter or polisher (special)
Man Mulia
Man Mulia for preparation of suface
Over Head Charge @
Add contractor profit @
Rate for
Rate for 1 sqm
Add cost of Plastic Emulsion Paint
0.75 ltrs per 10 sqm or per sqm

Add labour cess

Supplying all labour, T&P, materials and


Wall painting 2 coat with plastic emulsion
paint of approved shade on new work to
give an even shade inculding cost of
paint,cost of conveyance,taxes of materials
& labour cess etc all complete as per
specification of Engineer-In-Charge.
Per Sqm

0.36
0.36
0.07

nos
nos
nos

0.08 % on
0.08 % on
10.00 Sqm

Each
Each
Each

260.00
200.00
200.00

179.60
179.60

17.99
0.075 ltr

1.00 %

Per lits

227.00

a)

Data for 10 Sqm.


Labour
Painter or polisher (special)
Man Mulia
Man Mulia for preparation of suface
Add cost of Plastic Emulsion Paint
1.25 ltrs per 10 sqm or per sqm

Add O.H.C.@
Add Contractor profit @
Rate for
Rate for
Add labour cess

a)

b)

0.54
0.54
0.10

nos
nos
nos

1.250 ltr

Each
Each
Each

260.00
200.00
200.00

Per lits

249.00

Kg

128.00

Each
Each
Each

240.00
200.00
200.00

(a+b)
(a+b)

1258.00

7.5%
7.5%
10.00 Sqm
1.00 Sqm
1.00 %

Supplying all materials,labour,T&P and


Finishing wall surface of walls with Acrylic
wall putty (Water based ) of approved
make and finished smooth and even
surface to receive painting including cost of
scaffolding staging charges with cost of all
materials taxes, labour cess etc complete
as per specification and direction of
Engineer-in-charge.
Per sqm
[ Data for 10 Sqm ]
Materials
Synthetic putty(water bound)

8.00 kg

Labour
Painter 2nd class
Mulia
Mulia for preparation of surface

0.50
0.50
0.07

Add Over Head Charge @


Add Contractor profit@
Rate for
Rate for 1 sqm
Add Labour cess

nos
nos
nos

7.500 % on
7.500 % on
10.00 Sqm
1.00 %

1258.00

135.24
1.35
136.59

13

Supplying all materials,labour, T&P and


providing two coat of Weather Coats with
any approved shades including cost of
conveyance, taxes of, brushes, sundries
,contractor profit & labour cess etc all
complete as per the direction of Engineerin-charge
Data for 10 sqm
Labour
Painter (Spl)
Man Mulia (U/S)
Man Mulia for preparation of Surface

0.52 nos
0.52 nos
0.10 nos

Materials
Weather coat-2.50 kg for 10 sqm

2.50

Add O.H.C.
Add C.P.
For
For
Add Labour cess

Kg

7.50 %
7.50 %
10.00 Sqm
1.00 Sqm
1%

Each
Each
Each

260.00
200.00
200.00

Kg

192.00

12

a)

Supplying all materials, labour,T&P and


Priming 1 coat with any appproved Primer
on old Wood/Iron work including cost of
Sundries, brushes, putty ,conveyance &
taxes & labour cess etc all complete as per
direction of Engineer
Iron Steel Work
Per Sqm[Data for 9.30 sqm]
Labour
Painter Special
Man Mulia for preparation of surface

0.50 nos
0.50 nos

Each
Each

260.00
200.00

Add Cost of Red oxide Primer for 10sqm

0.540 litrs

sqm

129.00

Add O.H.C.
Add contractor profit
COST FOR
Cost for
Add Labour cess

7.50 %
7.50 %
9.30 Sqm
1.00 sqm
1.00 %

299.66
299.66

b)

Wood Work
Labour Rate
Add cost of Wood primer for 1 sqm
Add O.HC.
Add contractor profit
For
For
Add Labour cess

0.750 litrs

Ltr

133.00

7.50 %
7.50 %
9.30 Sqm
1.00 Sqm
1.00 %
Say

b)

Plaster Surface
Labour Rate
Add cost of wall cement primer(Water
bound) for 10 sqm
Add O.HC.
Add contractor profit
For
For
Add Labour cess

0.840 litrs

Ltr

154.00

7.50 %
7.50 %
9.30 Sqm
1.00 Sqm
1.00 %
Say

Supplying all materials, labour,T&P and


finishing surface of walls with cement
based
wass
putty(Water
Based)
of
approved make and finished smooth and
even surface to receive paiting including
cost of scaffolding staging charges with
cost of all materials,taxes & labour cess etc
all complete as per the direction of
Engineer-in-charge.

a)

b)

Data for 10 sqm


Materials
Cement based Putty

8.00

Kg

Kg

Labour
Painter (2nd class)

0.50

nos

Each

30.00

240.00

Mulia
Mulia for preparation of surface

0.50
0.07

c)

OHC

nos
nos

10.00 %

Each
Each

474.00

rate for sqm

521.40
10

Add Labour cess

200.00
200.00

1%

Supplying all labour, T&P and painting two


coats with any approved epoxy based
paint including cost of Sundries, brushes,
soap, &putty etc including preparation of
Surface ,contractor profit & labour cess all
complete as per the direction of Engineerin- Charge.
Data for 9.30 sqm
Painter (Spl)
Man Mulia (U/S)
Man Mulia for preparation of Surface
Add Cost of materials
epoxy based Paint two coat 10 sqm
Add O.H.C.@
Add Contractor profit@
For cost
For cost
Add Labour Cess

1.25
1.00
0.10

nos
nos
nos

1.250 litrs
7.50 %
7.50 %
9.30 Sqm
1.00 Sqm
1.00 %

Each
Each
Each

260.00
200.00
200.00

Kg

350.00

ON
ON

982.50
982.50

Kg

17.00

Supplying all material, labour,T&P and


Colour washing two coats with shell lime
and colouring mateials including cost of
conveyance,taxes,contractor profit,labour
cess etc all complete.
a)

b)

Data for 93 sqm


Materials
Shell lime ( unslaked)
Labour

18.66

Kg

Painter (2nd class)


Man Mulia

1.00 no
0.75 no

Add O.H.C.
Add Contractor Profit
Add for extra labour and colouring materials
Rate for
Rate per sqm
Add Labour cess

Each
Each

7.50 % on(a+b)
7.50 % on(a+b)

93.00 sqm
1.00 %

240.00
200.00

707.22
707.22

Supplying all labour, T&P, materials an


washing two coats with shell lime to give
an
even
shade
including
cost
of
conveyance, taxes etc,
& including
sundries, brushes & putty ,contractor profit
& labour cess etc all complete.
a)

b)

Data for 93 sqm


Materials
Shell lime ( unslaked)

11.80

Labour
Painter (2nd class)
Man Mulia

Kg

0.75 no
0.50 no

Add O.H.C.
Add Contractor Profit
Rate for
Rate per sqm
Add Labour cess

Kg

Each
Each

7.50 % on(a+b)
7.50 % on(a+b)
93.00 sqm
1.00 %

17.00

240.00
200.00

480.60
480.60

Rate in
Rs.

57.20
44.00
20.00
121.20

107.50

Say

325.00
200.00
20.00
545.00

241.25

Amount in Remarks
Rs.

121.20

107.50
228.70
17.15
17.15
263.01
26.30
0.26
26.56
26.60 Sqm

545.00

241.25
786.25
58.97
58.97

786.25

904.19
97.22
0.97
98.20 Sqm
Say

135.20
104.00
20.00
259.20
165.00

Say

98.20

259.20
165.00
424.20
31.82
31.82
487.83
48.78
0.49
49.27
49.30 Sqm

354.54

240.00
150.00
744.54
0.56
0.56
745.66

Say

8.02
0.08
8.10
8.10

134.28
299.66
1220.19
12.20189
1232.39

373.12

360.00
200.00
933.12
69.98
69.98
1073.09

Say

11.54
0.12
11.65
11.70

93.60
72.00
14.00
179.60
0.13
0.13
179.87
17.99
17.03
17.03

Say

0.075
17.03
35.01
0.35
35.36
35.40

140.40
108.00
20.00
268.40
311.25
311.25
579.65
579.65

Say

1024.00
1024.00
120.00
100.00
14.00
234.00

/sqm

268.40
0.075
311.25
579.65
43.47
43.47
666.60
66.66
0.67
67.33
67.30

1024.00

234.00
1258.00
94.35
94.35
1352.35

136.60

135.20
104.00
20.00
259.20

480.00

Say

259.20

480.00
739.20
55.44
55.44
850.08
85.01
0.85
85.86
85.90

130.00
100.00
230.00
69.66
69.66

230.00
69.66
299.66
22.47
22.47
344.61
37.05
0.37

134.28
135.622

Say

37.43
37.40

230.00
99.75
329.75
24.73
24.73
379.21
40.78
0.41
41.18
41.20

230.00
129.36
359.36
26.95
26.95
413.26
44.44
0.44
44.88
44.90

240.00
240.00
120.00

240.00

100.00
14.00
234.00

Say

325.00
200.00
20.00
545.00
437.50

317.22
317.22

234.00
474.00
47.40
521.40
52.14
0.52
52.66
52.70 /sqm

545.00
437.50
982.50
73.69
73.69
1129.88
121.49
1.21
122.71 Sqm

317.22

982.50

121.49
0.00
1103.99
11.03992

240.00
150.00
390.00

Say

390.00
707.22
53.04
53.04
813.30
25.00
838.30
9.01 sqm
0.09
9.10
9.10 /sqm

17.03
0.170318
17.20

200.60
200.60
180.00
100.00
280.00

Say

200.60

280.00
480.60
36.05
36.05
552.69
552.69
5.94 sqm
0.06
6.00
6.00 /sqm

SL
No.
1

Description of items

PAINTING ITEMS
Qnty

Unit

Supplying all labour, T&P, materials an painting


walls with water proofing cement paint approved
shade two coats to give an even shade including
cost of conveyance, taxes etc, & including
sundries, brushes,putty, contractor profit & labour
cess as per direction of Engineer-in-charge..

Data for 10 sqm


Painter or Polisher (Spl)
Man Mulia (U/S)
Man Mulia for preparation of Surface
O.H.C. @
Add Contractor Profit@
Rate for 10 sqm
Rate for per sqm
Add Cost of materials
Cement Paint two coat-2.50 kg for 10 sqm
per sqm 0.250 kg
Add Labour Cess

0.22
0.22
0.10

nos
nos
nos

7.50 % on
7.50 % on
139.38 /

Each
Each
Each
121.20
121.20

10

0.25 Kg

260.00
200.00
200.00

13.94

Kg

42.00

Each
Each
Each

260.00
200.00
200.00

1.00 %

Supplying all labour, T&P and painting two coats


with any approved synthetic paint on new/old
wood work including cost of Sundries, brushes,
soap, &putty etc including preparation of Surface
,contractor profit & labour cess all complete as
per the direction of Engineer-in- Charge.

Data for 9.30 sqm


Painter (Spl)
Man Mulia (U/S)
Man Mulia for preparation of Surface
O.H.C. @
Add Contractor Profit@
Rate for 10 sqm
Rate for per sqm
Add Cost of materials
Paint two coat-1.25 ltrs for 10 sqm

1.25
1.00
0.10

nos
nos
nos

7.50 % on
7.50 % on
626.75 /

9.3

545.00
545.00

67.39

per sqm 0.125 litrs.

0.125 litrs
Add Labour Cess

Kg

176.00

Each
Each
Each

260.00
200.00
200.00

1.00 %

Supplying all labour, T&P materials and two coat of


Distempering with any approved shades including
cost of Conveyance, taxes of, brushes, sundries&
labour cess all complete as per the direction of
Engineer-in-charge.

Data for 10 sqm


Painter or Polisher (Spl)
Man Mulia (U/S)
Man Mulia for preparation of Surface
O.H.C. @
Add Contractor Profit @
Rate for 10 sqm
Rate for per sqm
Add Cost of materials
Distemper two coats 2.50 kg for 10 sqm
per sqm 0.250 kg
Add Labour Cess

a)

b)

0.52
0.52
0.10

nos
nos
nos

7.50 % on
7.50 % on
298.08 /

259.20
259.20

10

0.25 Kg

29.81

Kg

66.00

Kg

16.00

1.00 nos
0.75 nos

Each
Each

240.00
200.00

7.50 % on
7.50 % on

688.56
688.56

1.00 %

Supplying all labour, T&P, materials an washing


two coats with shell lime to give an even shade
including cost of conveyance, taxes etc, &
including sundries, brushes & putty.
(Data for 93 sqm)
Materials
Shell lime (Unslaked)

18.66 Kg

Materials
Painter(2nd class)
Man Muia(unskilled)
O.ver Head Charge @
Add Contractor Profit @
Cost for 93 sqm
per sqm-535.08/93
Add Labour cess

791.84 /

1.00 %

93

a)

b)

Supplying all labour, T&P, materials an washing


three coats with shell lime to give an even shade
including cost of conveyance, taxes etc, &
including sundries, brushes & putty,contractor
profit & labour cess etc all complete as per the
direction of Engineer-in-charge.
(Data for 93 sqm)
Materials
Shell lime (Unslaked)

23.32 Kg

Materials
Painter(2nd class)
Man Muia(unskilled)
O.ver Head Charge @
Add Contractor Profit @

Kg

16.00

1.50 nos
1.00 nos

Each
Each

240.00
200.00

7.50 % on
7.50 % on

933.12
933.12

Cost for 93 sqm


per sqm-535.08/93
Add Labour cess

1073.09 /

1.00 %

93

Supplying all labour, T&P, materials and Wall


painting one coat with plastic emulsion paint of
approved shade on new work to give an even
shade
inculding
cost of
paint,cost of
conveyance,taxes of materials & labour cess etc
all complete as per specification of Engineer-InCharge.
Per Sqm

a)

b)
c)

Data for 10 Sqm.


Labour
Painter or polisher (special)
Man Mulia
Man Mulia for preparation of suface
Over Head Charge @
Add contractor profit @
Rate for
Rate for 1 sqm
Add cost of Plastic Emulsion Paint
0.75 ltrs per 10 sqm or per sqm

Add labour cess

a)

b)
c)

0.36
0.36
0.07

nos
nos
nos

7.50 % on
7.50 % on
10.00 Sqm

Each
Each
Each

260.00
200.00
200.00

179.60
179.60

20.65
0.075 ltr

Per lits

227.00

Each
Each
Each

260.00
200.00
200.00

1.00 %

Supplying all labour, T&P, materials and Wall


painting 2 coat with plastic emulsion paint of
approved shade on new work to give an even
shade
inculding
cost of
paint,cost of
conveyance,taxes of materials & labour cess etc
all complete as per specification of Engineer-InCharge.
Per Sqm
Data for 10 Sqm.
Labour
Painter or polisher (special)
Man Mulia
Man Mulia for preparation of suface
Over Head Charge @
Add contractor profit @
Rate for
Rate for 1 sqm
Add cost of Plastic Emulsion Paint
1.25 ltrs per 10 sqm or per sqm

Add labour cess

0.54
0.54
0.10

nos
nos
nos

7.50 % on
7.50 % on
10.00 Sqm

268.40
268.40

30.87
0.125 ltr

1.00 %

Per lits

227.00

a)

b)

Supplying all materials,labour,T&P and Finishing


wall surface of walls with Acrylic wall putty (Water
based ) of approved make and finished smooth
and even surface toreceive painting including
cost of scaffolding staging charges with cost of all
materials taxes, labour cess etc complete as per
specification and direction of Engineer-in-charge.

Per sqm
[ Data for 10 Sqm ]
Materials
Synthetic putty(water bound)

8.00 kg

Labour
Painter 2nd class
Mulia
Mulia for preparation of surface

0.50
0.50
0.07

Add Over Head Charge @


Add Contractor profit@
Rate for
Rate for 1 sqm
Add Labour cess

nos
nos
nos

7.50 % on
7.50 % on
10.00 Sqm

Kg

128.00

Each
Each
Each

240.00
200.00
200.00

(a+b)
(a+b)

1258.00
1258.00

135.24
1.35
136.59

1.00 %

Supplying all labour, T&P materials and two coat


of Weather Coats with any approved shades
including cost of conveyance, taxes of, brushes,
sundries & labour cess etc all complete as per
the direction of Engineer-in-charge

Data for 10 sqm

Labour
Painter (Spl)
Man Mulia (U/S)

0.52 nos
0.52 nos
0.10 nos

Man Mulia for preparation of Surface

O.H.C@
Add contractor profit@
For
Cost for 1 sqm

Each
Each
Each

7.50 % on
7.50 % on
10.00 Sqm
10
298.08 /

260.00
200.00
200.00
259.20
259.20

Materials
Weather coat-2.50 kg for 10 sqm per sqm
0.25 Kg

0.25

Kg

Kg

175.00

Add Labour cess

a)

Supplying all materials, labour,T&P and Priming 1


coat with any appproved Primer on
old
Wood/Iron work including cost of Sundries,
brushes, putty ,conveyance & taxes & labour
cess etc all complete as per direction of Engineer

Iron Steel Work


Per Sqm[Data for 9.30 sqm]
Labour
Painter Special
Man Mulia for preparation of surface
O.H.C.
Add contractor profit@
For
For1 sqm
Add Cost of Red oxide Primer for sqm

Add Labour cess

b)

1%

Wood Work
Labour Rate
Add cost of Wood primer for 1 sqm
Add Labour cess

0.50 nos
0.50 nos
7.50 % on
7.50 % on
9.30 sqm
264.50 /
0.054 litrs

Each
Each

260.00
200.00
230.00
230.00

9.30
sqm

118.00

Ltr

133.00

1.00 %

0.075 litrs
1.00 %

Say

Supplying all materials, labour,T&P and finishing


surface of walls with cement based wass
putty(Water Based) of approved make and
finished smooth and even surface to receive
paiting including cost of scaffolding staging
charges with cost of all materials,taxes & labour
cess etc all complete as per the direction of
Engineer-in-charge.

a)

b)

c)

Data for 10 sqm


Materials
Cement based Putty

8.00

Kg

Kg

30.00

Labour
Painter (2nd class)
Mulia
Mulia for preparation of surface

0.50
0.50
0.07

nos
nos
nos

Each
Each
Each

240.00
200.00
200.00

OHC

10.00 %

474.00

rate for sqm


Add Labour cess

521.40
10
1%

Supplying all material, labour,T&P and Colour


washing two coats with shell lime and colouring
mateials
including
cost
of
conveyance,taxes,contractor profit,labour cess
etc all complete.
a)

b)

Data for 93 sqm


Materials
Shell lime ( unslaked)

18.66

Labour
Painter (2nd class)
Man Mulia

Kg

1.00 no
0.75 no

Add O.H.C.
Add Contractor Profit
Add for extra labour and colouring materials
Rate for
Rate per sqm
Add Labour cess

Kg

17.00

Each
Each

240.00
200.00

7.50 % on(a+b)
7.50 % on(a+b)

93.00 sqm
1.00 %

707.22
707.22

Supplying all labour, T&P, materials an washing


two coats with shell lime to give an even shade
including cost of conveyance, taxes etc, &
including sundries, brushes & putty ,contractor
profit & labour cess etc all complete.

a)

b)

Data for 93 sqm


Materials
Shell lime ( unslaked)

11.80

Labour
Painter (2nd class)
Man Mulia

Kg

0.75 no
0.50 no

Add O.H.C.
Add Contractor Profit
Rate for
Rate per sqm
Add Labour cess

Kg

16.00

Each
Each

240.00
200.00

0.00 % on(a+b)
0.00 % on(a+b)
93.00 sqm
1.00 %

468.80
468.80

Rate in Rs. Amount in


Rs.

Remarks

57.20
44.00
20.00
121.20
9.09
9.09
139.38
13.94

10.50

Say

10.50
24.44
0.24
24.68
24.70 Sqm

325.00
200.00
20.00
545.00
40.88
40.88
626.75
67.39

22.00

22.00
89.39
0.89
90.29 Sqm

Say

135.20
104.00
20.00
259.20
19.44
19.44
298.08
29.81

16.50

Say

16.50
46.31
0.46
46.77
46.80 Sqm

298.56

240.00
150.00
688.56
51.64
51.64
791.84
8.51
0.09
8.60

89.39
34.81
124.21
1.2420533
125.45

Say

8.60

373.12

360.00
200.00
933.12
69.98
69.98
1073.09

Say

11.54
0.12
11.65
11.70

93.60
72.00
14.00
179.60
13.47
13.47
206.54
20.65
17.03
17.03

Say

0.075
17.03
37.68
0.38
38.06
38.10

140.40
108.00
20.00
268.40
20.13
20.13
308.66
30.87
28.38
28.38

Say

0.075
28.38
59.24
0.59
59.83
59.80

1024.00
1024.00
120.00
100.00
14.00
234.00

/sqm

1024.00

234.00
1258.00
94.35
94.35
1352.35

136.60

135.20
104.00
20.00
259.20
19.44
19.44
298.08
29.81

29.81

43.75

43.75

73.56
0.74
74.29
74.30

Say

130.00
100.00
230.00
17.25
17.25
264.50
28.44
6.37
6.37

Say

34.81
9.98
44.79
0.45
45.24
45.20

28.44

6.37
34.81
0.35
35.16
35.20

124.21

124.21
1.2420533
125.45

240.00
240.00
120.00
100.00
14.00
234.00

Say

240.00

234.00
474.00
47.40
521.40
52.14
0.52
52.66
52.70 /sqm

317.22
317.22
240.00
150.00
390.00

Say

317.22

390.00
707.22
53.04
53.04
813.30
25.00
838.30
9.01 sqm
0.09
9.10
9.10 /sqm

17.53
0.1752846
17.70

188.80
188.80
180.00
100.00
280.00

Say

188.80

280.00
468.80
0.00
0.00
468.80
468.80
5.04 sqm
0.05
5.09
5.10 /sqm

SL
No.
1

Description of items

Qnty or Nos

Unit

Rate in Rs.

10.00 sqm
54.00 Kg
0.076 Qntl

sqm
Kg
Qntl

665.00
200.00
1750.00

2.16 nos
2.16 nos

Each
Each

260.00
200.00

Supplying,fitting,fixing vetrified tile in floors of


size 600mm x 600mm of approved make
confirming to IS:13755 with application of
Polymer modified quick set cement based
water resistant adhesive conforming to
IS:15477 of 3mm thick bed and filling joints
with white cement of approved quality
including cost of all materials,labour , T&P etc
required for the work & labour etc all complete
as per the direction of Engineer-in-charge(For
repair work only)

Data for 10 sqm


a)

b)

Materials
Cost of tile
Cost of Polyner modified adhesive
White cement
Labour
Mason Special
Mulia

c)

D)

O.H. Charge

10 % on (a+b)

Lead
White cemnt

18576.60

0.076 Qntl

Qntl

Data for 10 sqm


For 1 sqm
Add Labour cess

20435.28
10
1%

13.40

a)

b)

Supplying,fitting,fixing vitrified tile in floors of


size 600mm x 600mm of approved make
conforming to IS:13755 laid on 20mm thick
cement mortar(1L4) (cement :4 course sand)
and filling joint with white cement of approved
quality including cost of all materials,
labour,T&P etc required for the work & labour
cess all complete as per direction of EngineerIn-charge( For New work only)

Data for 10.00 sqm)


Materials
Cost of tile

10.00 sqm

sqm

665.00

Sand

0.210 cum

cum

55.00

Cement
Cement for slurry
White cement

0.744 Qntl
0.33 Qntl
0.076 Qntl

Qntl
Qntl
Qntl

658.00
640.00
1750.00

2.16 nos
2.16 nos

Each
Each

260.00
200.00

Labour
Mason Special
Mulia

c)
d)

D)

O.H. Charge
Add Contractor Profit @

7.5 % on (a+b)
7.5 % on (a+b)

Lead
White cement
Sand

8488.90
8488.90

1.150 Qntl
0.210 cum

Qntl
cum

Data for 10 sqm


For 1 sqm
Add Labour cess

13.40
524.20

9887.73
10
1%
Say

Amount in
Rs.

6650.00
10800.00
133.00
17583.00
561.60
432.00
993.60

1.02
1.02

Total

17583.00

993.60
18576.60
1857.66
20434.26

1.02
20435.28

2043.53
20.44
2063.96 / Sqm

6650.00
11.55
489.55
211.20
133.00
7495.30
561.60
432.00
993.60

0.021

7495.30

993.60
8488.90
636.67
636.67

15.41
110.08
125.49

0.115
125.49
9887.73

988.77
9.89
998.66 / Sqm
998.70 / Sqm

A.C. ROOFING
SL
Description of items
No.
1
Supplying all materials, labour, T&P and
fixing big six or trafford A.C. Sheet in roof
including fixing of ridges wind ties etc.
complete including cost of fitting including
drilling holes in wind ties & labour cess
etc all complete as per specification and
direction of Engineer-in-charge.

a)
b)

Per 1 Sqm(Data for 9.30 sqm)


Labour charge
Carpenter(Specials)
Mulia (un-skilled)

c)
d)

O.H.C
@
7.5 %
Add contractor profit

b)
c)

1.00 no
3.00 nos

Each
Each

7.5 %
on
Data for
Per Sqm
989.00 /

Add Labour Cess

a)

Unit

on
@

Add cost of A.C. Sheet

Qnty or Nos

860.00
860.00
9.30

Rate in Rs.

260.00
200.00

Sqm

9.30

1.00 Sqm

Sqm

182.00

0.50 nos
1.50 nos
3.00 nos
4.00 nos

Each
Each
Each
Each

260.00
240.00
260.00
200.00

78.10

156

156.00

1%

Supplying & fixing and fitting Asbestos


sheet ridges or valleys (double) as per
specification and direction of Engineer-incharge.
Per 1 RM(Data for 30.48 mtr)
Labour
Carpenter (Special)
Carpenter (2nd class)
Fitter(1st Class)
Man Mulia
O.H.C.
@
7.5 %
Add contractor profit
@
Rate for
Rate for

ON
7.5 %
1 Sqm

Add cost of A.C. Ridge

Add Labour cess

2070.00
2070.00
30.48 mtr
2380.50 /
1.00

1%

30.48

a)

Supplying & fitting, fixing of 6mm thick


A.C. sheet flat ceiling fitted and fixed
complete including cost of A.C.sheets &
batttens 5cm 3cm1cm & labour cess
etc all complete as per direction and
direction of Engineer-in-charge.

Per 1 sqm (Data for 9.30 sqm)


Materials
50mm 30mm 10mm
Sal wooden strips including framing and
beading the edges
4 cm nail-200nos or Say
5cm long wood screws

b)

c)
d)

d)

Labour
Carpenter 2nd class
Man mulia
Women mulia

Add O.H.C.
Add contractor profit

1.06
1.135

Sqm
Kg

100.00 nos

100

1.00 no
2.00 nos
2.00 nos

7.5 % on(a+b)
7.5 % on(a+b)
Rate for
Rate for

Add 6mm thick A.C. Plain Sheet

9.30
1
1 sqm

Add Labour cess

1%

Sqm

135.00

Kg

36.00

nos

63.00

Each
Each
Each

240.00
200.00
200.00

1286.96
1286.96
Sqm
Sqm

1480.00

Sqm

231.00

Supplying all materials, labour,T&P and fixing G.C.I. Sheet in roof


drilling hole in wind ties including fixing of ridges valleys wind ties
etc. including cost of G.C.I. sheet & fittings & contractor profit &
labour cess etc all complete as per the direction of Engineer-incharge.

a)

Per 1 sqm (Data for 9.30 sqm)


Materials
50mm 30mm 10mm
Sal wooden strips including framing and
beading the edges
4 cm nail-200nos or Say

1.135

5cm long wood screws

Labour
Carpenter (Special)
Fitter(Special)
Man Mulia(un-skilled)

Sqm

9.30

=
=
=

Sqm

135.00

Kg

36.00

100

nos

63.00

sqm

Sqm

292.00

Each
Each
Each

260.00
260.00
200.00

Kg

100.00 nos

G.C.I. sheet (0.40mm thick)


b)

1.06

0.5 nos
1 no.
2 nos

c)
Add O.H.C. @
Add Contractor profit. @

7.50 %
7.50 %
Cost for
Cost for
Add Labour cess

3752.56
3752.56
9.30
1.00
1%

sqm
sqm

Supplying all materials, labour,T&P and fixing G.C.I. Sheet in roof


drilling hole in wind ties including fixing of ridges valleys wind ties
etc. including cost of G.C.I. sheet & fittings & contractor profit &
labour cess etc all complete as per the direction of Engineer-incharge.

a)

Per 1 sqm (Data for 9.30 sqm)


Materials
50mm 30mm 10mm
Sal wooden strips including framing and
beading the edges
4 cm nail-200nos or Say

1.06
1.135

5cm long wood screws

Sqm

135.00

Kg

36.00

100

nos

63.00

sqm

Sqm

1661.20

Kg

100.00 nos

G.C.I. sheet (Coloured)

Sqm

9.30

(as per current market Rate)

b)

Labour
Carpenter (Special)
Fitter(Special)
Man Mulia(un-skilled)

=
=
=

0.50 nos
1.00 no.
2.00 nos

Each
Each
Each

260.00
260.00
200.00

c)
Add O.H.C. @
Add Contractor profit. @

7.50 %
7.50 %
Cost for
Cost for
Add Labour cess

16486.12
16486.12

9.30
1.00
1%

sqm
sqm

Amount in
Rs.

260.00
600.00
860.00
64.50
64.50
989.00
106.34
182.00
288.34
2.88
291.23

Total

106.30

291.20
Sqm

130.00
360.00
780.00
800.00
2070.00
155.25
155.25
2380.50
78.10
156.00
156.00

Say

156.00
234.10
2.34
236.44
236.40

143.10
40.86
63.00
246.96
240.00
400.00
400.00
1040.00

9.30
231.00
231.00

Say

246.96

1040.00
1286.96
96.52
96.52
1480.00
159.14

231.00
390.14
3.90
394.04
394.00

143.10
40.86
63.00
2715.60
2962.56
130.00
260.00
400.00
790.00

Say

2962.56

790.00
3752.56
281.44
281.44
4315.44
464.03
4.64
468.67
468.70
sqm

143.10
40.86
63.00
15449.16
15696.12

15696.12

130.00
260.00
400.00
790.00

790.00
16486.12

1236.46
1236.46
18959.04

Say

2038.61
20.39
2058.99
2059.00
sqm

1444.5
144.45
72.225
1661.175

Sl No.

Description of items

Qnty or Nos As per price list Vat 13.50%

total

Vetrified tiles 605x605 Valanvcia Maharaja wood 1


land ,Arosia,Eros,Ivora (Make Assian) Page-130.

sqm

1840.00

248.40

2088.40

Creami tiles 300 x 450mm Triedant Wood Brown 1


(Make Assian) Page No.73

sqm

1185.00

159.98

1344.98

Digital Ceramic wall Congo


375(Make Assian) Page No.35.

x 1

sqm

1350.00

182.25

1532.25

Ceramic Tiles-248 x 375 Onice squeexe 1


Dekar,Grinder Dekor Kidece Dcor,Textrure squre
Dcor ( Make Assian)

sqm

1433.00

71.65

1504.65

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

5
6
7

Woody

248

Tranportation.12%

G.T.

250.61

2339.01

201.75

1546.72

229.84

1762.09

225.70

1730.35

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

p/f 80 mm thick factory made C.C interlocking paver Block of M30 grade made by block making machine over and i/c 50 mm
thick bed of C. sand, filling the joints.

Data for 10 sqm


a)

Materials
Interlocking C.C. paver block ( 60 mm thick), M.30

Coarse sand =10x0.050=0.50 cum


Fine sand
b)

Labour

Day

Beldar
Coolie

Mason Special
Mason II class

Contractor Profit
O.H. Charge

c)

D)

Lead
Paver Block
Course sand
Fine sand

Add Labour cess

Providing and fixing Chequred tiles in floors treads steps and


landings on 25 mm thick bed of cement mortar (1:1) jointed
with neat cement slurry mixed with pigments to match the
shade of tiles rubbing polishing etc complete

Data for 10 sqm


a)

Materials
Chequre tile

Cement
Fine sand
b)

Day
semiskilled mulia
Mulia

Labour

Mason Special

Contractor Profit
O.H. Charge

c)

D)

Lead
Chequred tile
Cement
Fine sand

Add Labour cess

Providing and fixing Vitrified industrial tiles in floors treads


steps and landings on 25 mm thick bed of cement mortar (1:1)
jointed with neat cement slurry mixed with pigments to match
the shade of tiles rubbing polishing etc complete

Data for 10 sqm


a)

Materials
Chequre tile

Cement

Fine sand
b)

Day
semiskilled mulia
Mulia

Labour

Mason Special

Contractor Profit
O.H. Charge

c)

D)

Lead
Chequred tile
Cement
Fine sand

Add Labour cess

Labour cess

10.00 Sqm
0.50 Cum
0.150 Cum

Sqm
Cum
Cum

1135.00
48.00
55.00

11350.00
24.00
8.25
11382.25

1.00 nos
1.00 nos
0.50 nos

Each
Each
Each
Each

200.00
200.00
260.00
240.00

200.00
200.00
130.00
120.00
650.00

0.50 nos

12032.25
7.5 % on (a+b)
7.5 % on (a+b)

902.42
902.42

10.000 Sqm
0.500 cum
0.150 cum

Sqm
cum
cum

Data for 10 sqm


For 1 sqm

11.37
321.80
524.20

14190.27
10

113.66
160.90
78.63
353.19
1419.03

1%

14.19
1433.22
Say

1433.00

10.00 Sqm
2.74 Qntl
0.130 Cum

Sqm
Qntl
Cum

217.00
658.00
55.00

2170.00
1800.95
7.15
3978.10

5.50 nos
2.16 nos
2.16 nos

Each
Each
Each

200.00
200.00
260.00

1100.00
432.00
561.60
2093.60
6071.70

7.5 % on (a+b)
7.5 % on (a+b)

455.38
455.38

10.000 Sqm
2.740 Qntl
0.130 cum

Sqm
qntl
cum

Data for 10 sqm


For 1 sqm

Labour cess

11.37
16.90
524.20

11188.65
10

1118.87

1%

11.19
1130.05
Say

10.00 Sqm
2.74 Qntl

113.66
46.31
68.15
228.11

Sqm
Qntl

1130.00

605.00
658.00

6050.00
1800.95

Labour cess

0.130 Cum

Cum

55.00

7.15
7858.10

5.50 nos
2.16 nos
2.16 nos

Each
Each
Each

200.00
200.00
260.00

1100.00
432.00
561.60
2093.60
9951.70

7.5 % on (a+b)
7.5 % on (a+b)

746.38
746.38

10.000 Sqm
2.740 Qntl
0.130 cum

Sqm
qntl
cum

Data for 10 sqm


For 1 sqm

11.37
16.90
524.20

19530.65
10

113.66
46.31
68.15
228.11
1953.07

1%

19.53
1972.60
Say

1972.60

11382.25

12032.25
902.42
902.42
13837.09

353.19
14190.27

/ Sqm

3978.10

6071.70
10049.79
455.38
455.38
10960.55

228.11
11188.65

/ Sqm
/sqm

7858.10

9951.70
17809.79
746.38
746.38
19302.55

228.11
19530.65

/ Sqm
/sqm

FLOORING ITEMS
SL No.

Description of items

Qnty

13

Unit

Supplying all materials, labour, T&P and fixing Vetrified tiles in


floor threads or steps and landing and dados on 25mmthick bed
of cement mortar (1:1) jointed with neat cement slurry mixed
with pigment to matching shades of the tiles including rubbing
and polishing including cost of Vetrified tiles ,taxes of all
materials , royalty taxes, etc all complete as per specification
and direction of Engineer-in-charge.(Ties to be used of Size
60cm x 60cm)

(Data for 10 sqm)


For 1 Sqm
a)

Materials
Vitrified Tile 600mmx 600mm Plain (Ivory)

10 sqm

Cement- 0.13 cum or

b)

Sqm

1.857 Qntl

Qntl

Sand ( Screened and washed)

0.13 cum

cum

Cement for slurry 4.45kg/sqm

0.44 Qntl

Qntl

Cement for grutting

0.44 Qntl

Qntl

Mason (spl)

2.16 nos

Each

Semi-skilled Mulia or rubbering

5.50 nos

Each

Mulia

2.16 nos

Each

Labour Charges

Add O.H.C@

7.5 %

on

(a+b)

Add contractor profit@

7.5 %

on

(a+b)

Lead & Royalty


Sand ( Screened and washed)
Cement

0.13 cum

Cum

2.737 qntl

Qntl

For 10 sqm
For 1 sqm

18431.81

Add Labour Cess

10

1%

For First Floor


Rate Same as Ground floor
Add extra labour for first floor
Add O.H.C

5%

2203.60

15 %

110.18

For 10 sqm
For 1 sqm

126.71

Add Labour cess

13

10
1%

Supplying all materials, labour, T&P and fixing Vetrified tiles in


floor threads or steps and landing and dados on 25mmthick bed
of cement mortar (1:1) jointed with neat cement slurry mixed
with pigment to matching shades of the tiles including rubbing
and polishing including cost of Vetrified tiles ,taxes of all
materials , royalty taxes, etc all complete as per specification
and direction of Engineer-in-charge.(Ties to be used of Size
60cm x 60cm)

(Data for 10 sqm)


For 1 Sqm
a)

Materials
Vitrified
Tile
600mmx
series(Homogeneous)

600mm

Cement- 0.13 cum or

b)

Coloured

/Printed

10 sqm
1.857 Qntl

Sqm
Qntl

Sand ( Screened and washed)

0.13 cum

cum

Cement for slurry 4.45kg/sqm

0.44 Qntl

Qntl

Cement for grutting

0.44 Qntl

Qntl

Mason (spl)

2.16 nos

Each

Semi-skilled Mulia or rubbering

5.50 nos

Each

Mulia

2.16 nos

Each

Labour Charges

Add O.H.C@

7.5

on

(a+b)

Add contractor profit@

7.5

on

(a+b)

Lead & Royalty


Sand ( Screened and washed)
Cement

0.13 cum

Cum

2.737 qntl

Qntl

For 10 sqm
For 1 sqm

12494.11

Add Labour Cess

10

1%

Labour Charges only 1 Sqm


For First Floor
Rate Same as Ground floor
Add extra labour for first floor
Add O.H.C

5%

2203.60

10 %

110.18

For 10 sqm
For 1 sqm

121.20

10

Add Labour cess

13

1%

Supplying all materials, labour, T&P and fixing Vetrified tiles in


floor threads or steps and landing and dados on 25mmthick bed
of cement mortar (1:1) jointed with neat cement slurry mixed
with pigment to matching shades of the tiles including rubbing
and polishing including cost of Vetrified tiles ,taxes of all
materials , royalty taxes, etc all complete as per specification
and direction of Engineer-in-charge.(Ties to be used of Size
60cm x 60cm)

(Data for 10 sqm)


For 1 Sqm
a)

Materials
Vitrified
Tile
600mmx
series(Homogeneous)

600mm

Coloured

/Printed

Cement- 0.13 cum or

b)

10 sqm

Sqm

1.857 Qntl

Qntl

Sand ( Screened and washed)

0.13 cum

cum

Cement for slurry 4.45kg/sqm

0.44 Qntl

Qntl

Cement for grutting

0.44 Qntl

Qntl

Mason (spl)

2.16 nos

Each

Semi-skilled Mulia or rubbering

5.50 nos

Each

Mulia

2.16 nos

Each

Labour Charges

Add O.H.C@

7.5

on

(a+b)

Labour Charges

7.5

on

(a+b)

Lead & Royalty


Sand ( Screened and washed)
Cement

0.13 cum

Cum

2.737 qntl

Qntl

For 10 sqm
For 1 sqm

16059.11

Add Labour Cess

10

1%

Labour Charges only 1 Sqm


For First Floor
Rate Same as Ground floor
Add extra labour for first floor
Add O.H.C

5%

2203.60

10 %

110.18

For 10 sqm
For 1 sqm

121.20

Add Labour cess

13

10
1%

Supplying all materials, labour, T&P and fixing Vetrified tiles in


floor threads or steps and landing and dados on 25mmthick bed
of cement mortar (1:1) jointed with neat cement slurry mixed
with pigment to matching shades of the tiles including rubbing
and polishing excluding cost of Vetrified tiles ,taxes of all
materials , royalty taxes, etc all complete as per specification
and direction of Engineer-in-charge.(Ties to be used of Size
60cm x 60cm)

(Data for 10 sqm)


For 1 Sqm
a)

Materials
Cement- 0.13 cum or

1.857 Qntl

Qntl

b)

Sand ( Screened and washed)

0.13 cum

cum

Cement for slurry 4.45kg/sqm

0.44 Qntl

Qntl

Cement for grutting

0.44 Qntl

Qntl

Mason (spl)

2.16 nos

Each

Semi-skilled Mulia or rubbering

5.50 nos

Each

Mulia

2.16 nos

Each

Labour Charges

Add O.H.C@

7.5 %

on

(a+b)

Add contractor profit@

7.5 %

on

(a+b)

Lead & Royalty


Sand ( Screened and washed)
Cement

0.13 cum

Cum

2.737 qntl

Qntl

For 10 sqm
For 1 sqm
Add Labour Cess

4904.11

/
1%

10

Rate in Rs.

Amount in Rs.

Remarks

4.00

605.00

6050.00

658.00

1221.91

55.00

7.15

658.00

289.52

658.00

289.52
7858.10

260.00

561.60

220.00

1210.00

200.00

714

7858.10

432.00
2203.60

2203.60
10061.70

10061.70

754.63

10061.70

754.63

52420.00

6814.60

16.90

46.26

6860.86

6860.86
18431.81
1843.18
18.43
1861.61

1843.18
110.18
16.53
126.71
12.67
1855.85
18.56
1874.41
Say

1874.40

660.00

6600.00

714.00

1325.90

55.00

7.15

714.00

314.16

714.00

314.16
8561.37

260.00

561.60

220.00

1210.00

200.00

8561.37

432.00
2203.60

2203.60
10764.97

10764.97

807.37

10764.97

807.37

524.20

68.15

16.90

46.26
114.40

114.40
12494.11
1249.41
12.49
1261.91

1249.41
110.18
11.02
121.20
12.12
1261.53
12.62
1274.15
Say

1274.10

970.00

9700.00

714.00

1325.90

55.00

7.15

714.00

314.16

714.00

314.16
11661.37

260.00

561.60

220.00

1210.00

200.00

11661.37

432.00
2203.60

2203.60
13864.97

13864.97

1039.87

13864.97

1039.87

524.20

68.15

16.90

46.26
114.40

114.40
16059.11
1605.91
16.06
1621.97

1605.91
110.18
11.02
121.20
12.12
1618.03
16.18
1634.21
Say

1634.20

714.00

1325.90

55.00

7.15

714.00

314.16

714.00

314.16
1961.37

260.00

561.60

220.00

1210.00

200.00

1961.37

432.00
2203.60

2203.60
4164.97

4164.97

312.37

4164.97

312.37

524.20
16.90

68.15
46.26
114.40

14105.923
114.40
4904.11
490.41
4.90
495.32

Das könnte Ihnen auch gefallen