Beruflich Dokumente
Kultur Dokumente
Items
Sand (Screened & Washed)
Sand (Filling)
Moorum
K.B. Bricks (25cm x 12cm x 8cm)
C.B. Brick Khoa
H.G.Metal & Chips (CB)
R.R.H.G.stone
Existing Rate of
Royalty
19.60 x
19.60
19.60
98.00
19.60
70.56
70.56
Revised Royalty
40 %
40 %
40 %
40 %
40 %
40 %
40 %
Revised Royalty
7.84
7.84
7.84
39.2
7.84
28.224
28.224
Round
27.44
27.44
27.44
137.20
27.44
98.78
98.78
27.40
27.40
27.40
137.20
27.40
98.80
98.80
Lead W.E.F.
Royalty
1
1st
Next
Rest
5 km
45 km
270 km
@ Rs.
@ Rs.
9.20 /
6.50 /
km
km
PUR TOWN
156.40
414.00
1755.00
2325.40
156.4
270
1st
Rest
5 km
37 km
@ Rs.
5 Km
15 Km
@ Rs
5 Km
16 Km
@ Rs.
Royalty
2
Sand (Filling)
Dhobi jore-30 Km
1st
Rest
Royalty
Moorum
Kilasama-21Km
1st
Rest
Royalty
1st
5 Km
1st
Next
Rest
5 Km
0 Km
0 Km
@ Rs.
@ Rs.
1st
Rest
5 Km
15 Km
@ Rs.
5 Km
15 Km
@ Rs.
Roaylty
1st
Rest
Royalty
1st
5 Km
Rest
16 Km
@ Rs.
5 km
28 km
@ Rs.
@ Rs.
5 Km
@ Rs.
5 Km
Upto 50Km
@ Rs.
@ Rs.
Royalty
9
R.R.H.G.stone(Jujumura-33 Km
1st
Rest
Royalty
10
Wood(Local Market)
1st
11
1st
Rest
Certified that the leads provided above are shortest and true to the best of my knowledge.
BALPUR TOWN
10/11/2014
Nov-13
9.20 /
9.20 /
9.20 /
km
km
Km
156.40
340.40
496.80
27.40
524.20
524.20 /cum
156.40
138.00
294.40
27.40
321.80
321.80 /cum
156.40
147.20
303.60
27.40
331.00
331.00 /cum
169.00 MT
16.90
Qntl
7.50 /
6.40 /
41.40 /
km
km
Km
169.00
0.00
0.00
169.00
1010.80
621.00
1631.80
137.20
1769.00
884.50
9.20 /
Km
156.40
138.00
294.40
27.40
321.80
156.40
156.4
16.90 /Qntl
169.00 /MT
1769.00 /2000
nos
884.50 /1000
nos
321.80 /cum
696
9.20 /
9.20 /
169.00 /
1010.80 /
1035.00 /
For 10 sqm
knowledge.
Km
km
1.25
180.00sqm
180.00sqm
147.20
303.60
98.80
402.40
156.40
257.60
414.00
98.80
512.80
402.40 /cum
512.80 /cum
135.20 Qntl
5.62
5.75
11.37
113.70
Materials
Unit
Rates
SL No
3
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
Qntl
MT
1000
cum
cum
MT
Sqm
5
1
2
3
4
Sand (Filling)
Sand(Mortar)
Metal(40mm)
Chip(12mm)
Chip(6mm)
Chip(4.7mm)
Chip(20mm)
Chip(10mm)
Chip(6.7mm)
Chip(13.20mm)
Cement
Brick
R.R.Stone
Brick Khoa
Rod
Wall Tile (20cmx30cm/20cm x 20mm Special
Plain size
Floor Tile (30cm x 30cm or 40cm
floor tile size(30cm x 30cm or 40cm
size(Kajaria Crema)
Marble Chip
White Cement
Marble Power
Marble Tiles of minimum 16 mm thick, dunguri
Variety.
48.00
55.00
780.00
1168.00
811.00
742.00
1139.00
1215.00
811.00
1145.00
658.00
6580.00
4300.00
231.00
350.00
51880.00
387.00
Sqm
Sqm
429.00
0.00
Qntl
Qntl
Qntl
550.00
1750.00
320.00
b)
Up to 0.10 Sqm.
Above 0.10 sqm to 0.40
Above 0.40 sqm to 1.00
Vetrified tile Above 0.10 Sqm. to 0.40 Sqm. 1
Sqm
Sqm
Sqm
Sqm
495.00
605.00
682.00
665.00
c)
23
a)
b)
Sqm
726.00
c)
24
a)
b)
18
19
20
21
22
a)
1067.00
1210.00
1900.00
Sqm
Sqm
275.00
330.00
25
a)
Sqm
605.00
b)
Sqm
660.00
c)
Sqm
550.00
26
27
28
cum
cum
mtr
mtr
cum
mtr
Kg
litr
litr
litr
kG
Kg
Kg
Kg
Kg
litr
litr
litr
Kg
Kg
sqm
Kg
Kg
21287.00
21287.00
104.00
78.00
135.20
50.00
73.00
227.00
176.00
150.00
175.00
66.00
200.00
43.00
118.00
150.00
145.00
133.00
11.00
40.00
16.00
26.00
90.00
Sqm
Sqm
Sqm
pair
Sqm
260.00
266.00
182.00
171.00
210.00
litr
litr
108.00
140.00
sqm
198.00
29
30
26
28
sqm
sqm
610.00
217.00
ROYALTY OF MATERIALS
SL No
Materials
Unit
Rates
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
2
Sand (Filling)
Sand (Mortar)
Chips
Metal
Brick
Stone
Brick Khoa
Cement
Rod Rourkela
Wood
3
cum
cum
cum
cum
1000
cum
cum
Qntl
MT
Qntl
4
321.80
524.20
402.40
402.40
884.50
512.80
321.80
16.90
169.00
135.20
te
Type of Labour
Rates
6
High Skilled
Skilled
Semi-Skilled
Unskilled
7
260.00
240.00
220.00
200.00
52600
SAND FILLING
SL
No.
3
Description of items
Qnty
Unit
Rate
a)
i)
Materials
Sand for filling
Labour charges
Man Mulia (Unskilled)
12.36 nos
O.H.C. @
Add Contractor Profit@
C)
7.50 %
7.50 %
8362.80 /
Each
48.00
200.00
7272.00
7272.00
100 cum
Amount
in Rs.
4800.00
4800.00
2472.00
2472.00
211.40
Say
Remarks
4800.00
2472.00
7272.00
545.40
545.40
8362.80
83.63
211.40
295.03
2.95
297.98
298.00
SAND FILLING
SL
No.
3
Description of items
Qnty
Unit
Rate
a)
i)
Materials
Sand for filling
Labour charges
Man Mulia (Unskilled)
12.36 nos
O.H.C. @
Add Contractor Profit@
C)
7.50 %
7.50 %
8362.80 /
Each
48.00
200.00
7272.00
7272.00
100 cum
Amount
in Rs.
4800.00
4800.00
2472.00
2472.00
211.40
Say
Remarks
4800.00
2472.00
7272.00
545.40
545.40
8362.80
83.63
211.40
295.03
2.95
297.98
298.00
SAND FILLING
SL
No.
3
Description of items
Qnty
Unit
Rate
a)
i)
Materials
Sand for filling
Labour charges
Man Mulia (Unskilled)
12.36 nos
O.H.C. @
Add Contractor Profit@
C)
7.50 %
7.50 %
8362.80 /
Each
48.00
200.00
7272.00
7272.00
100 cum
Amount
in Rs.
4800.00
4800.00
2472.00
2472.00
321.80
Say
Remarks
4800.00
2472.00
7272.00
545.40
545.40
8362.80
83.63
321.80
405.43
4.05
409.48
409.50
SL
No.
Description of items
2
Supplying all materials, labour and T & P etc.
and cutting R.C.C. road for taking the pipeline
through as per specification and direction of
the Engineer-in-charge.
Road cutting
Qnty
Unit
a)
b)
c)
1.50 nos
1.50 nos
Overhead Charges @
Add Contractor Profit@
Data for 1 Cum
Add Labour Cess
7.5 %
7.5 %
1%
on
on
Each
Each
Rate
Amount in
Rs.
Remarks
330.00
300.00
630.00
47.25
47.25
724.50
7.25
731.75
731.70
220.00
200.00
630.00
630.00
Description of items
Qnty
a)
b)
c)
a)
1.25 nos
3.50 nos
Overhead Charges @
Add Contractor Profit.@
Data for 2.83 cum
For 1 cum
Add Labour Cess
7.5 %
7.5 %
1092.50
Each
Each
on
on
/
2.83
1%
b)
c)
Unit
1.50 nos
3.50 nos
Overhead Charges @
Add Contractor Profit.@
Data for 2.83 cum
For 1 cum
Add Labour Cess
7.5 %
7.5 %
1150.00
1%
Each
Each
on
on
/
2.83
a)
b)
c)
a)
Overhead Charges @
Add Contractor Profit.@
Data for 2.83 cum
For 1 cum
Add Labour Cess
a)
b)
c)
7.5 %
7.5 %
1955.00
Each
Each
on
on
/
2.83
1%
b)
c)
4.00 nos
4.50 nos
4.50 nos
4.50 nos
Overhead Charges @
Add contractor profit.@
Data for 2.83 cum
For 1 cum
Add Labour Cess
7.5 %
7.5 %
2070.00
Each
Each
on
on
/
2.83
1%
0.50 nos
1.75 nos
Overhead Charges @
Add Contractor Profit @
Data for 9.30 Sqm
For 1 Sqm
7.5 %
7.5 %
517.50
Each
Each
on
on
/
9.30
a)
b)
c)
a)
0.30 nos
0.25 nos
Overhead Charges @
Add Contractor Profit @
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
126.50
Each
Each
on
on
/
9.30
1%
b)
c)
1%
0.75 nos
2.00 nos
Overhead Charges @
Add Contractor profit
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
632.50
1%
Each
Each
on
on
/
9.30
a)
b)
c)
0.75 nos
1.25 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
2 First Floor
Rate Same as G.F.
Add Extra labour for First Floor
O.H.C
For 9.30
For Per sqm
Add Labour cess
2 First Floor
Rate Same as G.F.
Add Extra labour for First Floor
O.H.C
For 9.30
For Per sqm
Add Labour cess
a)
b)
c)
7.5 %
7.5 %
460.00
Each
Each
on
on
/
9.30
1%
5%
x
15 % on
23.00
400.00
20.00
9.3
1%
5%
x
15 % on
23.00
400.00
20.00
9.3
1%
1.00 nos
7.5 %
7.5 %
230.00
Each
on
on
/
9.30
First Floor
Rate Same as G.F.
Add Extra Labour for first floor
Add OHC
First Floor
Rate Same as G.F.
Add Extra Labour for first floor
Add OHC
a)
5%
15 %
11.50
x
on
/
200.00
10.00
9.3
1%
5%
15 %
11.50
x
on
/
200.00
10.00
9.3
1%
b)
c)
10
1%
0.50 nos
1.00 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
345.00
1%
Each
Each
on
on
/
9.30
a)
b)
c)
11
a)
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
a)
b)
c)
7.5 %
7.5 %
1460.50
Each
Each
on
on
/
9.30
1%
b)
c)
12
2.35 nos
4.00 nos
0.25 nos
0.5 nos
1 nos
Overhead Charges @
Add Contractor Profit @
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
414.00
Each
Each
Each
on
on
/
9.30
1%
Per 1 cum
(Data for 0.0283 cum)
Labour
Carpenter (2nd Class)
Man Mulia(U/S)
0.03 nos
0.04 nos
Overhead Charges @
Add Contractor Profit @
Data for 0.0283 cum
7.5 %
7.5 %
on
on
Each
Each
For 1 cum
Add Labour Cess
13
a)
b)
c)
14
a)
b)
c)
17.48
0.0283
1%
0.5 nos
0.6 nos
1 nos
7.5 %
7.5 %
506.00
Each
Each
Each
on
on
/
2.60
1%
0.75 nos
1.25 nos
0.25 nos
7.5 %
7.5 %
517.50
1%
Each
Each
Each
on
on
/
9.30
15
a)
b)
c)
16
a)
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
a)
b)
c)
7.5 %
7.5 %
356.50
Each
Each
on
on
/
9.30
1%
b)
c)
17
1.40 nos
0.15 nos
1.75 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
402.50
Each
on
on
/
9.30
1%
1.50 nos
0.10 nos
Overhead Charges @
Add Contractor Profit@
Data for 1 Cum
7.5 %
7.5 %
on
on
Each
Each
18
a)
19
a)
b)
c)
b)
c)
1%
1.50 nos
1.50 nos
Overhead Charges @
Add Contractor Profit@
Data for 1 Cum
Add Labour Cess
7.5 %
7.5 %
Each
Each
on
on
1%
3.50 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
805.00
1%
Each
on
on
/
9.30
20
a)
b)
c)
21
a)
b)
c)
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
0.85 nos
1.40 nos
7.5 %
7.5 %
517.50
Each
Each
on
on
/
9.30
1%
1.10 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
253.00
1%
Each
on
on
/
9.30
22
a)
b)
c)
23
a)
b)
c)
24
1.00 nos
1.50 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
575.00
Each
Each
on
on
/
9.30
1%
1.30 nos
Overhead Charges @
Add Contractor Profit@
Data for 9.30 Sqm
For 1 Sqm
Add Labour Cess
7.5 %
7.5 %
299.00
1%
1%
Each
on
on
/
9.30
25
25
01)
1%
1%
Note :
For dismantling work in 1st floor or any additional floor add 5% extra labour over &
above the rate of next lower floor for lowering the dismantled materials.
10% excess on the above rate will be allowed for the works being executed inside jail
Premises.
MS
Rate
Amount in
Rs.
Remarks
4.00
5.00
6.00
200.00
200.00
250.00
700.00
950.00
71.25
71.25
1092.50
386.04
3.86
389.90
389.90
300.00
700.00
1000.00
75.00
75.00
1150.00
406.36
4.06
410.42
410.40
950.00
950.00
200.00
200.00
1000.00
1000.00
200.00
200.00
1700.00
1700.00
200.00
200.00
1800.00
1800.00
200.00
200.00
450.00
450.00
800.00
900.00
1700.00
127.50
127.50
1955.00
690.81
6.91
697.72
697.70
900.00
900.00
1800.00
135.00
135.00
2070.00
731.45
7.31
738.76
738.80
100.00
350.00
450.00
33.75
33.75
517.50
55.65
0.56
56.20
200.00
200.00
110.00
110.00
200.00
200.00
550.00
550.00
60.00
50.00
110.00
8.25
8.25
126.50
13.60
0.14
13.74
13.70
150.00
400.00
550.00
41.25
41.25
632.50
68.01
0.68
68.69
68.70
200.00
200.00
400.00
400.00
Say
150.00
250.00
400.00
30.00
30.00
460.00
49.46
0.49
49.96
GF
49.96
50.00
49.46
20.00
3.00
23.00
2.47
51.94
0.52
52.45
52.50
51.94
20.00
3.00
23.00
2.47
54.41
0.54
54.95
200.00
200.00
200.00
200.00
200.00
15.00
15.00
230.00
24.73
55.00
Say
0.25
24.98
24.98
25.00
24.73
10.00
1.50
11.50
1.24
25.97
0.26
26.23
26.20
25.97
10.00
1.50
11.50
200.00
200.00
300.00
300.00
1.24
27.20
0.27
27.48
27.50
100.00
200.00
300.00
22.50
22.50
345.00
37.10
0.37
37.47
37.50
200.00
200.00
1270.00
1270.00
240.00
200.00
200.00
360.00
360.00
240.00
200.00
15.20
15.20
470.00
800.00
1270.00
95.25
95.25
1460.50
157.04
1.57
158.61
158.60
60.00
100.00
200.00
360.00
27.00
27.00
414.00
44.52
0.45
44.96
45.00
7.20
8.00
15.20
1.14
1.14
17.48
240.00
200.00
200.00
440.00
440.00
200.00
200.00
200.00
450.00
450.00
617.67
6.18
623.84
623.80
120.00
120.00
200.00
440.00
33.00
33.00
506.00
194.62
1.95
196.56
196.56
150.00
250.00
50.00
450.00
33.75
33.75
517.50
55.65
0.56
56.20
56.20
200.00
200.00
310.00
310.00
200.00
350.00
350.00
200.00
200.00
320.00
320.00
280.00
30.00
310.00
23.25
23.25
356.50
38.33
0.38
38.72
38.70
350.00
350.00
26.25
26.25
402.50
43.28
0.43
43.71
43.70
300.00
20.00
320.00
24.00
24.00
368.00
Say
220.00
200.00
630.00
630.00
200.00
700.00
700.00
3.68
371.68
371.70
330.00
300.00
630.00
47.25
47.25
724.50
7.25
731.75
731.70
700.00
700.00
52.50
52.50
805.00
86.56
0.87
87.42
87.40
200.00
200.00
450.00
450.00
200.00
220.00
220.00
170.00
280.00
450.00
33.75
33.75
517.50
55.65
0.56
56.20
56.20
220.00
220.00
16.50
16.50
253.00
27.20
0.27
27.48
27.50
200.00
200.00
500.00
500.00
200.00
260.00
260.00
200.00
300.00
500.00
37.50
37.50
575.00
61.83
0.62
62.45
62.40
260.00
260.00
19.50
19.50
299.00
32.15
0.32
32.47
32.50
3.50
0.04
3.54 /Sqm
64.9214
34.125
4.80
0.05
4.85 /Sqm
20.40
0.20
20.60 /100Sqm
over &
d inside jail
Concrete portion
SL
Description of items
No.
1
2
1
Supplying all materials, labour, T&P and providing
cement concrete(1:4:8) with 40cm size crusher broken
black hard granite metal including watering , curing,
conveyance of all materials to work site, payment of
royalty taxes,contractor profit & labour cess etc all
complete as per specification and direction of
Engineer-in-charge.
a)
Materials
Metal
Sand
Cement
b)
Materials
0.96 cum
0.48 cum
1.72 qntl
0.18 nos
1.80 nos
1.40 nos
0.70 nos
Add O.H.C.@
Add Contractor Profit@
c)
Qnty
7.5 %
7.5 %
0.96 cum
0.48 cum
1.72 qntl
1%
on(a+b)
on(a+b)
a)
Materials
Metal
Sand
Cement
b)
Materials
c)
0.96 cum
0.48 cum
2.29 qntl
0.18 nos
1.80 nos
1.40 nos
0.70 nos
O.H.C. @
Add Contractor Profit@
0.96 cum
0.48 cum
2.29 qntl
First Floor
7.5 %
7.5 %
1%
on(a+b)
on(a+b)
15 %
15 %
Add labour cess
a)
Materials
Metal
Sand
Cement-0.96 cum
b)
Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)
0.96 cum
0.48 cum
1.38 qntl
0.18 nos
1.8 nos
1.4 nos
x
x
823.20
123.48
1%
0.7 nos
7.5 %
7.5 %
0.96 cum
0.48 cum
1.38 qntl
1%
on(a+b+c)
on(a+b+c)
a)
Materials
Crusher broken Chips 12mm size
Sand
Cement
b)
0.90 cum
0.45 cum
2.15 Qntl
Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)
0.18 nos
1.80 nos
1.40 nos
1.40 nos
O.H.C. @
Add Conyractor Profit
c)
0.50 nos
7.5 %
7.5 %
on(a+b+c)
on(a+b+c)
Sand
Cement
First Floor
Rate same as G.F.
Add Extra labour for first floor i.e.
O.H.C
1%
15 %
15 %
Add labour cess
2nd Floor
Rate same as F.F.
Add Extra labour for 2nd floor i.e.
0.90 cum
0.45 cum
2.15 Qntl
x
X
15 %
1083.20
162.48
1%
1083.20
O.H.C
15 %
Add labour cess
162.48
1%
b)
Materials
Crusher broken granite chips 12mm size
0.023 cum
0.012 cum
Cement-
0.0754 qntl
labour
Man Mulia
Mason spl.
Man Mulia for mixing chips, sand and cement
O.H.C. @
Add Contractor Profit@
0.330 nos
0.103 nos
0.030 nos
7.5 %
7.5 %
0.023 cum
Cement-
0.0754 qntl
0.012 cum
1%
on(a+b+c)
on(a+b+c)
a)
Materials
Crusher broken Chips 12mm size
Sand
Cement
b)
0.90 cum
0.45 cum
4.29 qntl
Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)
0.18 nos
1.80 nos
1.40 nos
1.40 nos
O.H.C. @
Add Contractor profit @
c)
0.50 nos
7.5 %
7.5 %
Sand
Cement
First Floor
Rate same as G.F.
0.90 cum
0.45 cum
4.29 qntl
1%
on(a+b)
on(a+b)
15 %
15 %
Add labour cess
2nd Floor
Rate same as F.F.
Add Extra labour for first floor i.e.
O.H.C & C.P.
3RD Floor
Rate same as 2nd Floor
Add Extra labour for 3rd floor i.e.
O.H.C & C.P.
a)
Materials
Crusher broken Chips 12mm size
Sand
Cement -0.225 cum
b)
Materials
1083.20
162.48
1%
x
X
1083.20
162.48
1%
0.18 nos
1.8 nos
1.4 nos
O.H.C. @
Contractor profit @
Lead & Royalty
x
X
0.90 cum
0.45 cum
3.23 qntl
c)
1083.20
162.48
1%
15 %
15 %
Add labour cess
D)
15 %
15 %
Add labour cess
x
X
1.4 nos
0.5 nos
7.50
% on (a+b)
7.50 %
on(a+b)
0.90 cum
0.45 cum
3.23 qntl
Sand
Cement
First Floor
Rate same as G.F.
Add Extra labour for first floor i.e.
O.H.C
1%
15 %
15 %
Add labour cess
2nd Floor
Rate same as F.F.
Add Extra labour for 2nd floor i.e.
O.H.C
15 %
15 %
Add labour cess
x
X
1%
x
X
1083.20
162.48
1%
Materials
1083.20
162.48
0.0169
cum
0.0169
0.1208
cum
Qntl
Labour Charges
Mason ( Spl)
Man Mulia (U/S)
Man Mulia for mixing chips ,sand and cement
O.H.C. @
Add Contractor Profit @
Add Lead & Royalty
4.7mm size Crusher broken hard granite chips
(Royalty only)
Sand (Screened & Washed)
Cement 0.0085 cum or 0.1208 qntl
0.10 nos
0.33 nos
0.03 nos
7.50 %
7.50 %
0.0169
0.0169
0.1208
1%
on(a+b+c)
on(a+b+c)
a)
Materials
b)
Labour Charges
Mason ( Spl)
Man Mulia (U/S)
0.165 nos
0.528 nos
O.H.C. @
Add Lead & Royalty
0.48 nos
7.50 %
7.5 %
0.018 cum
0.018 cum
0.018 cum
0.1287 qntl
1%
on(a+b+c)
on(a+b+c)
10
Unit = Cum
a)
b)
3 nos
2 nos
c)
d)
e)
O.H.C.
Add contractor profit@
Cost of
Cost of 1 cum
Cost of Materials
40mm size C.B. Metal
Lead & Royalty
40mm size C.B. Metal
7.5 %
on
1000.00
7.5 %
on
1000.00
2.83 cum
2.83
1150.00 /
1 cum
1 cum
Unit
Rate
4.00
Amount in
Rs.
5.00
Cum
Cum
Qntl
780.00
55.00
658.00
Each
Each
Each
240.00
200.00
200.00
43.20
360.00
280.00
Each
200.00
140.00
823.20
6.00
748.80
26.40
1131.76
1906.96
2730.16
2730.16
Cum
Cum
Qntl
Remarks
402.40
524.20
16.90
386.30
251.62
29.07
666.99
Say
1906.96
823.20
2730.16
204.76
204.76
666.99
3806.67
38.07
3844.74
3844.70
cum
cum
Qntl
780.00
55.00
658.00
748.80
26.40
1506.82
2282.02
Each
Each
Each
240.00
200.00
200.00
43.20
360.00
280.00
Each
200.00
140.00
823.20
3105.22
3105.22
cum
cum
Qntl
402.40
524.20
16.90
386.30
251.62
38.70
676.62
Say
2282.02
823.20
3105.22
232.89
232.89
676.62
4247.62
42.48
4290.10
4290.10
4247.62
123.48
18.52
4389.63
43.90
4433.52
823.20
123.48
Say
4433.50
cum
cum
Qntl
780.00
55.00
658.00
748.80
26.40
908.04
1683.24
Each
Each
Each
240.00
200.00
200.00
43.20
360.00
280.00
1683.24
Each
200.00
140.00
823.20
2506.44
2506.44
cum
cum
Qntl
402.40
524.20
16.90
386.30
251.62
23.32
661.24
Say
823.20
2506.44
187.98
187.98
661.24
3543.65
35.44
3579.08
3579.10
Cum
Cum
Qntl
55.00
658.00
1051.20
24.75
1414.70
2490.65
Each
Each
Each
240.00
200.00
200.00
43.20
360.00
280.00
Each
200.00
280.00
Each
240.00
120.00
1083.20
1168.00
3573.85
3573.85
Cum
Cum
Qntl
402.40
524.20
16.90
362.16
235.89
36.34
634.39
Say
1083.20
162.48
Say
1083.20
4744.31
162.48
24.37
4931.16
49.31
4980.48
4980.50
4931.16
162.48
2490.65
1083.20
3573.85
268.04
268.04
634.39
4744.31
47.44
4791.76
4791.80
162.48
24.37
5118.02
51.18
5169.20
Say
5169.20
Cum
1168.00
26.86
Cum
55.00
0.66
Qntl
658.00
49.61
77.14
Each
Each
Each
200.00
260.00
200.00
66.00
26.78
6.00
98.78
175.92
175.92
Cum
402.40
9.26
Cum
524.20
6.29
Qntl
16.90
1.27
16.82
77.14
98.78
175.92
13.19
13.19
16.82
219.12
2.19
221.32
221.30
Say
Cum
Cum
Qntl
55.00
658.00
1051.20
24.75
2822.82
3898.77
Each
Each
Each
240.00
200.00
200.00
43.20
360.00
280.00
Each
200.00
280.00
Each
240.00
120.00
1083.20
1168.00
4981.97
4981.97
Cum
Cum
Qntl
402.40
524.20
16.90
362.16
235.89
72.50
670.55
Say
6399.82
3898.77
1083.20
4981.97
373.65
373.65
670.55
6399.82
64.00
6463.81
6463.80
1083.20
162.48
162.48
24.37
6586.67
65.87
6652.54
Say
6652.50
6586.67
162.48
24.37
6773.52
67.74
6841.26
1083.20
162.48
Say
6841.30
6773.52
162.48
24.37
6960.37
69.60
7029.98
1083.20
162.48
Say
7030.00
cum
cum
Qntl
1168.00
55.00
658.00
1051.20
24.75
2125.34
3201.29
Each
Each
Each
240.00
200.00
200.00
43.20
360.00
280.00
Each
200.00
280.00
Each
240.00
120.00
1083.20
4284.49
4284.49
3201.29
1083.20
4284.49
321.34
321.34
cum
cum
Qntl
402.40
524.20
16.90
362.16
235.89
54.59
652.64
Say
652.64
5579.80
55.80
5635.60
5635.60
5579.80
162.48
24.37
5766.65
57.67
5824.32
1083.20
162.48
Say
5824.30
5766.65
162.48
24.37
5953.50
59.54
6013.04
1083.20
162.48
Say
6013.00
cum
742.00
12.54
cum
Qntl
55.00
658.00
0.93
79.49
92.96
92.96
Each
Each
Each
260.00
200.00
200.00
26.00
66.00
6.00
98.00
190.96
190.96
cum
402.40
6.80
cum
Qntl
524.20
16.90
8.86
2.04
17.70
Say
98.00
190.96
14.32
14.32
17.70
237.30
2.37
239.67
239.70
cum
cum
cum
Qntl
1168.00
742.00
55.00
658.00
21.02
13.36
0.99
84.68
120.05
Each
Each
260.00
200.00
42.90
105.60
Each
200.00
96.00
244.50
364.55
364.55
cum
cum
cum
Qntl
402.40
402.40
524.20
16.90
7.24
7.24
9.44
2.18
26.10
Say
120.05
244.50
364.55
27.34
27.34
26.10
445.33
4.45
449.79
449.80
336130.18
9.2%
Each
200.00
600.00
Each
200.00
400.00
1000.00
75.00
75.00
1150.00
1000.00
1000.00
406.36
406.36
780.00
780.00
402.40
402.40
1182.40
1182.40
1588.76
1.8
1.4
1.4
4.6
367054.15656
SL
Description of items
No.
1
2
1
Supplying all labour, materials ,T&P and
providing Cement concrete (1:1:3)
with crusher broken hard granite chips on
12mm size RCC works including cost of
conveyance & royalty ,sundries , watering
,curing &lifting &laying concrete at a
height of 5mtr. Maximum complete etc
all
complete(Excluding
cost
of
reinforcement & centering & shuttering)
a)
b)
Materials
Crusher broken Chips 12mm size
Sand
Cement
Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)
Man Mulia for mixing stone, sand and
cement and getting Water
Mason 2
nd
class
O.H.C. @
Add contractor profit@
c)
Qnty
Unit
0.90 cum
0.45 cum
4.29 qntl
Cum
Cum
Qntl
0.18 nos
1.80 nos
1.40 nos
Each
Each
Each
1.40 nos
Each
0.50 nos
Each
7.5 %
7.5 %
4981
498
on(a+b+c)
on(a+b+c)
Sand
Cement
First Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.
0.90 cum
0.45 cum
4.29 qntl
Cum
Cum
Qntl
1%
15 %
15 %
x
x
1083.20
162.48
2nd Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.
15 %
15 %
3rd Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.
a)
Materials
Crusher broken Chips 12mm size
Sand
Cement -0.225 cum
Materials
Mason 2nd class
Man Mulia (Un-skilled)
Women Mulia(Un-skilled)
Man Mulia for mixing stone, sand and
cement and getting Water
Mason 2nd class
x
x
1083.20
162.48
x
x
1083.20
162.48
1%
15 %
15 %
b)
1%
1%
0.90 cum
0.45 cum
3.23 qntl
cum
cum
Qntl
0.18 nos
1.8 nos
1.4 nos
Each
Each
Each
1.4 nos
Each
0.5 nos
Each
O.H.C. @
Add contractor profit@
c)
First Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.& C.P.
7.5 %
7.5 %
2nd Floor
Rate Same as first floor
Add Extra labour for 2nd floor
Add O.H.C.& C.P.
3RD Floor
Rate Same as 2rd floor
Add Extra labour for 3rd floor
Add O.H.C.& C.P.
x
x
1083.20
162.48
x
x
1083.20
162.48
x
x
1083.20
162.48
1%
1%
15 %
15 %
cum
cum
Qntl
1%
15 %
15 %
on(a+b+c)
0.90 cum
0.45 cum
3.23 qntl
15 %
15 %
4284
4284
on(a+b+c)
1%
(a)
(B)
c)
Materials
20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement
0.54 cum
0.36 cum
0.45 cum
2.80 qntl
Cum
Cum
Cum
Qntl
Labour
Mate
Mason 2nd class
Man Mulia (U/S)
0.06 nos
0.10 nos
1.33 nos
Each
Each
Each
0.40 hrs
0.40 hrs
Hr
Hr
Mechinary
Concrete mixer( Cap.0.40/0.28 cum)
Generator-33KVA
Add OHC @
Add contractor profit@
D)
7.5 %
7.50 %
0.54 cum
0.36 cum
0.45 cum
2.80 Qntl
1%
on (a+b+c)
on (a+b+c)
Cum
Cum
Cum
Qntl
(a)
Materials
20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement
8.10 cum
5.40 cum
6.75 cum
5.21 M.T.
Cum
Cum
Cum
MT
(B)
c)
Labour
Mate
Mason 2nd class
Man Mulia (U/S)
0.86 nos
1.5 nos
20 nos
Mechinary
Concrete mixer( Cap.0.40/0.28 cum)
Generator-33KVA
6 hrs
6 hrs
Add OHC @
Add contractor profit@
D)
Each
Each
Each
7.5 %
7.50 %
Hr
Hr
on (a+b+c)
on (a+b+c)
8.10 cum
5.40 cum
6.75 cum
5.21 M.T.
Cum
Cum
Cum
MT
First Floor
Rate Same as Ground floor
Add Extra labour for First floor
Add O.H.C.& C.P.
For
For
Add Labour cess
(a)
Materials
75966.06
1%
15 %
x
15 %
x
15 cum
1 cum
1%
15
4549.20
682.38
c)
8.10 cum
5.40 cum
6.75 cum
6.05 M.T.
Labour
Mate
Mason 2nd class
Man Mulia (U/S)
0.86 nos
1.50 nos
20.00 nos
Each
Each
Each
Mechinary
6 hrs
6 hrs
Generator-33KVA
Add OHC @
Add contractor profit@
D)
Cum
Cum
Cum
MT
7.5 %
7.50 %
Hr
Hr
on (a+b+c)
on (a+b+c)
8.10 cum
5.40 cum
6.75 cum
6.05 M.T.
Cum
Cum
Cum
MT
2nd Floor
Rate Same as 1st floor
Add Extra labour for First floor
Add O.H.C.& C.P.
For
For
Add Labour cess
3rd Floor
Rate Same as 2nd floor
82464.30
1%
15 %
x
15 %
x
15 cum
1 cum
15
4549.20
682.38
1%
15 %
x
15 %
x
15 cum
1 cum
1%
4549.20
682.38
15 %
x
15 %
x
15 cum
1 cum
4549.20
682.38
1%
(a)
(B)
Materials
20mm size Chips
10mm size Chips
Coarse sand ( screened& washed)
Cement
Labour
Mate
Mason 2nd class
Man Mulia (U/S)
8.10 cum
5.40 cum
6.75 cum
6.10 M.T.
0.86 nos
1.50 nos
20.00 nos
Cum
Cum
Cum
MT
Each
Each
Each
c)
Mechinary
Concrete mixer( Cap.0.40/0.28 cum)
Generator-33KVA
Add OHC @
Add contractor profit@
D)
6 hrs
6 hrs
7.5 %
7.50 %
Hr
Hr
on (a+b+c)
on (a+b+c)
8.10 cum
5.40 cum
6.75 cum
6.10 M.T.
Cum
Cum
Cum
MT
82851.10
1%
15
(a)
Materials
20mm size Chips
10mm size Chips
8.10 cum
5.40 cum
Cum
Cum
c)
Labour
Mate
Mason 2nd class
Man Mulia (U/S)
Cum
MT
0.86 nos
1.50 nos
20.00 nos
Each
Each
Each
Mechinary
Concrete mixer( Cap.0.40/0.28 cum)
Generator-33KVA
Add OHC @
Add contractor profit@
D)
6.75 cum
6.33 M.T.
6 hrs
6 hrs
7.5 %
7.50 %
Hr
Hr
on (a+b+c)
on (a+b+c)
8.10 cum
5.40 cum
6.75 cum
6.33 M.T.
Cum
Cum
Cum
MT
84630.38
1%
15
(a)
(B)
c)
Materials
Cement
Coarse sand ( screened& washed)
20 mm Aggregate
10 mm Aggregate
Admixture @ 0.4 per cent of cement
6.45 MT
6.75 cum
8.10 cum
5.40 cum
25.80 kg
MT
cum
Cum
Cum
kg
Labour
Mate
Mason 2nd class
Man Mulia (U/S)
0.96 nos
2.00 nos
22.00 nos
Each
Each
Each
Mechinary
Concrete mixer( Cap.0.40/0.28 cum)
Generator-33KVA
Add OHC @
Add contractor profit@
D)
6 hrs
6 hrs
7.5 %
7.50 %
Hr
Hr
on (a+b+c)
on (a+b+c)
6.45 cum
6.75 cum
8.10 cum
5.40 M.T.
MT
Cum
Cum
Cum
87368.80
1%
15
Rate in Rs.
4
Amount in
Rs.
5
1168.00
55.00
658.00
1051.20
24.75
2822.82
3898.77
240.00
200.00
200.00
43.20
360.00
280.00
200.00
280.00
240.00
120.00
1083.20
4981.97
4981.97
402.40
524.20
16.90
362.16
235.89
72.50
670.55
3898.77
1083.20
4981.97
373.65
373.65
G.F.
670.55
6399.82
64.00
6463.81
Say
6463.80
6399.82
162.48
24.37
186.85
Remarks
186.85
6586.67
65.87
6652.54
6652.50 /cum
Say
6586.67
162.48
24.37
186.85
Say
186.85
6773.52
67.74
6841.26
6841.30 /cum
6773.52
162.48
24.37
186.85
Say
1168.00
55.00
658.00
186.85
6960.37
69.60
7029.98
7030.00 /cum
1051.20
24.75
2125.34
3201.29
240.00
200.00
200.00
43.20
360.00
280.00
200.00
280.00
240.00
120.00
1083.20
3201.29
1083.20
4284.49
321.34
321.34
4284.49
4284.49
402.40
524.20
16.90
362.16
235.89
54.59
652.64
652.64
5579.80
55.80
5635.60
Say
5635.60
5635.60
162.48
24.37
186.85
Say
186.85
5822.45
58.22
5880.68
5880.70 /cum
5822.45
162.48
24.37
186.85
Say
186.85
6009.30
60.09
6069.40
6069.40 /cum
6009.30
162.48
24.37
186.85
Say
186.85
6196.16
61.96
6258.12
6258.10 /cum
1139.00
1215.00
55.00
658.00
220.00
240.00
200.00
177.00
240.00
615.06
437.40
24.75
1842.40
2919.61
2919.61
13.20
24.00
266.00
303.20
303.20
70.80
96.00
166.80
3389.61
3389.61
402.40
402.40
524.20
16.90
217.30
144.86
235.89
47.32
645.37
For 1 cum
Say
166.80
3389.61
254.22
254.22
645.37
4543.42
45.43
4588.86
4588.90
1139.00
1215.00
55.00
6580.00
9225.90
6561.00
371.25
34281.80
50439.95
50439.95
220.00
240.00
200.00
177.00
240.00
189.20
360.00
4000.00
4549.20
1062.00
1440.00
2502.00
57491.15
57491.15
402.40
402.40
524.20
169.00
3259.44
2172.96
3538.35
880.49
9851.24
4549.20
2502.00
57491.15
4311.84
4311.84
9851.24
75966.06
5064.40
50.64
5115.05
5115.00
Say
5064.40
682.38
102.36
784.74
52.32
Say
52.32
5116.72
51.17
5167.89
5167.90 /cum
1139.00
1215.00
55.00
6580.00
220.00
240.00
200.00
177.00
240.00
9225.90
6561.00
371.25
39809.00
55967.15
55967.15
189.20
360.00
4000.00
4549.20
4549.20
1062.00
1440.00
2502.00
63018.35
63018.35
402.40
402.40
524.20
169.00
3259.44
2172.96
3538.35
1022.45
9993.20
5497.62
54.98
5552.60
2502.00
63018.35
4726.38
4726.38
9993.20
82464.30
5552.60
5497.62
682.38
102.36
784.74
52.32
Say
52.32
5549.94
55.50
5605.44
5605.40 /cum
5549.94
682.38
102.36
784.74
52.32
Say
52.32
5602.25
56.02
5658.27
5658.30 /cum
5602.25
682.38
102.36
784.74
52.32
Say
1139.00
1215.00
55.00
6580.00
220.00
240.00
200.00
52.32
5654.57
56.55
5711.11
5711.10 /cum
9225.90
6561.00
371.25
40138.00
56296.15
189.20
360.00
4000.00
56296.15
4549.20
177.00
240.00
1062.00
1440.00
2502.00
63347.35
63347.35
402.40
402.40
524.20
169.00
3259.44
2172.96
3538.35
1030.90
10001.65
5523.41
55.23
5578.64
1139.00
1215.00
9225.90
6561.00
4549.20
2502.00
63347.35
4751.05
4751.05
10001.65
82851.10
55.00
6580.00
220.00
240.00
200.00
177.00
240.00
371.25
41651.40
57809.55
57809.55
189.20
360.00
4000.00
4549.20
4549.20
1062.00
1440.00
2502.00
64860.75
64860.75
402.40
402.40
524.20
169.00
3259.44
2172.96
3538.35
1069.77
10040.52
5642.03
56.42
5698.45
2502.00
64860.75
4864.56
4864.56
10040.52
84630.38
5698.40
6580.00
55.00
1139.00
1215.00
40.00
220.00
240.00
200.00
177.00
240.00
42441.00
371.25
9225.90
6561.00
1032.00
59631.15
59631.15
211.20
480.00
4400.00
5091.20
5091.20
1062.00
1440.00
2502.00
67224.35
67224.35
169.00
524.20
402.40
402.40
1090.05
3538.35
3259.44
2172.96
10060.80
5824.59
58.25
5882.83
2502.00
67224.35
5041.83
5041.83
10060.80
87368.80
5882.80
FLOORING ITEMS
SL
No.
Description of items
Qnty
2
Supplying all materials, labour, T&P and
fixing Ceramic floor tiles using tile 30cm
x 30cm or 40cm x 40cm in floor treads or
steps and landing on 25mm thick bed of
cement mortar (1:1) jointed with neat
cement slurry mixed with pigment to
matching shades of the tiles including
rubbing and polishing ,contractor profit &
labour cess all complete as per direction of
Engineer-in-Charge.
a)
10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Sqm
Qntl
cum
Qntl
Qntl
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
b)
Unit
Add O.H.C@
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
7.5 %
7.5 %
on
on
(a+b)
(a+b)
0.13 cum
2.737 qntl
For 10 sqm
For 1 sqm
Add Labour Cess
First Floor
Rate Same as First Floor
Add Extra labour for first floor
9661.35
Cum
Qntl
/
1%
2203.60 x
10 %
x
For 10 Sqm
For 1 Sqm
121.20
10
10
%
110.18
a)
Sqm
0.15 cum
0.715 qntl
0.66 qntl
cum
Qntl
Qntl
Labour Charges
Mason (spl)
Mulia
Semi-skilled Mulia or rubbering
3.25 nos
3.25 nos
7.60 nos
Each
Each
Each
b)
1%
Add O.H.C @
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
7.5 %
7.5 %
on
on
0.15 cum
1.375 qntl
For 10 Sqm
For 1 Sqm
Wax polishing
22581.16
1%
(a+b)
(a+b)
cum
Qntl
10
a)
b)
10 sqm
Sqm
0.15 cum
0.715 qntl
0.66 qntl
cum
Qntl
Qntl
Labour Charges
Mason (spl)
Mulia
Semi-skilled Mulia or rubbering
3.25 nos
3.25 nos
7.60 nos
Each
Each
Each
Add O.H.C @
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
7.5 %
7.5 %
on
on
0.15 cum
1.375 qntl
For 10 Sqm
For 1 Sqm
Wax polishing
24692.86
1%
(a+b)
(a+b)
cum
Qntl
10
a)
b)
10 Sqm
Sqm
0.21 cum
0.744 Qntl
0.33 Qntl
0.076 Qntl
cum
Qntl
Qntl
Qntl
2.16 Nos
2.16 Nos
Each
Each
Labour charges
Mason Special
Mulia
Add O.H.C.@
Add Contractor profit@
c)
7.5%
7.5%
Sand
Cement
Cement for slurry
White cement
Rate for
Rate for
Add Labour cess @
10 Sqm
1 Sqm
1%
cum
qntl
qntl
qntl
0.00
0.00
0.00
0.00
13
a)
b)
10 sqm
Sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Qntl
cum
Qntl
Qntl
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
Add O.H.C@
Add contractor profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
on
on
0.13 cum
2.737 qntl
For 10 sqm
For 1 sqm
Add Labour Cess
For First Floor
Rate Same as Ground floor
Add extra labour for first floor
Add O.H.C
7.5 %
7.5 %
31626.44
5%
15 %
For 10 sqm
For 1 sqm 126.71 /
(a+b)
(a+b)
Cum
Qntl
/
1%
10
x
x
2203.60
110.18
10
1%
a)
10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Sqm
Qntl
cum
Qntl
Qntl
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
Chequred tile
b)
Add O.H.C@
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
For 10 sqm
For 1 sqm
Add Labour Cess
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
#REF!
/
1%
(a+b)
(a+b)
Cum
Qntl
10
Rate in Rs.
Amount in
Rs.
Remarks
4.00
429.00
658.00
55.00
658.00
658.00
4290.00
1221.91
7.15
289.52
289.52
6098.10
260.00
220.00
200.00
561.60
1210.00
432.00
2203.60
8301.70
8301.70
180
0.013
2.737
0.2737
6098.10
2203.60
8301.70
622.63
622.63
9546.95
524.20
16.90
68.15
46.26
114.40
114.40
9661.35
966.14
9.66
975.80
975.80
Say
966.14
=
=
110.18
11.02
121.20
12.12
12.12
978.25
9.78
988.04
988.00
Say
1546.72
15467.21
55.00
658.00
658.00
8.25
470.47
434.28
16380.21
260.00
200.00
220.00
845.00
650.00
1672.00
3167.00
19547.21
19547.21
524.20
16.90
2258.12
8.50
2266.62
22.67
2289.28 Say
78.63
23.24
101.87
1.375
0.1375
16380.21
0.015
0.1375
3167.00
19547.21
1466.04
1466.04
101.87
22581.16
2289.30
1730.35
17303.48
55.00
658.00
658.00
8.25
470.47
434.28
18216.48
260.00
200.00
220.00
845.00
650.00
1672.00
3167.00
21383.48
21383.48
524.20
16.90
2469.29
8.50
2477.79
24.78
2502.56 Say
78.63
23.24
101.87
1.375
0.1375
18216.48
0.015
0.1375
3167.00
21383.48
1603.76
1603.76
101.87
24692.86
2502.60
2339.01
23390.08
55.00
658.00
658.00
1925.00
11.55
489.55
217.14
146.30
24254.62
260.00
200.00
561.60
432.00
993.60
24254.62
993.60
25248.22
25248.22
25248.22
1893.62
1893.62
29035.46
0.00
10.00
1.00
Say
0.00
29035.46
2903.55
2903.50
Say
29035.46
2903.55
29.04
2932.58
2932.60
0.00
0.00
0.00
0.00
0.00
For Sqm
For Sqm
2339.01
23390.08
658.00
55.00
658.00
658.00
1221.91
7.15
289.52
289.52
260.00
220.00
200.00
25198.18
25198.18
561.60
1210.00
432.00
2203.60
2203.60
27401.78
2055.13
2055.13
27401.78
27401.78
524.20
16.90
68.15
46.26
114.40
114.40
31626.44
3162.64
31.63
3194.27
3194.30
Say
3162.64
110.18
16.53
126.71
Say
12.67
3175.32
31.75
3207.07
3207.10
198.00
#REF!
1980.00
180
0.013
2.737
0.2737
#REF!
#REF!
1980.00
#REF!
1980.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Say
#REF!
#REF!
#REF!
#REF!
FLOORING ITEMS
SL
No.
Description of items
Qnty
2
Supplying all labour,T&P, Materials and
making 2.5 cm artificial stone flooring with
cement concrete (1:2:4) including punning
using 12mm size crusher broken granites
chips. including cost of conveyance &
royalty ,sundries & watering for curing &
supervision charges ,contractor profit &
labour cess etc, all complete as per the
direction of Engineer-in-charge.
a)
b)
Materials
Unit
0.023 cum
Cum
0.012 cum
0.0858 qntl
Cum
Qntl
0.03 nos
0.13 nos
0.22 nos
0.11 nos
Each
Each
Each
Each
Labour charges
Man Mulia for mixing chips cement and Sand
in small quantity and watering
Mason (Spl)
Women Mulia
Man Mulia
O.H.C @
Add contractor profit @
7.5 %
7.5 %
on (a+b)
on (a+b)
0.023 cum
Cum
0.012 cum
0.0858 qntl
Cum
Qntl
First Floor
Rate Same as G.F.
Add Extra for First Floor
1%
105.80
15%
B)
2ND Floor
Rate Same as F.F.
Add Extra for 2nd Floor
Add OHC& C.P.@7.50% EACH
1%
5%
15% %
x
x
Cc)
3rd Floor
Rate Same as 2nd.F.
Add Extra for 3rd Floor
Add OHC& C.P.@7.50% EACH
a)
5%
15% %
x
x
105.80
5.29
1%
Materials
105.80
5.29
1%
5.29
0.023 cum
Cum
0.012 cum
0.0548 qntl
Cum
Qntl
Labour charges
Man Mulia for mixing chips cement and Sand
in small quantity and watering
Mason (Spl)
Women Mulia
Man Mulia
0.03 nos
0.13 nos
0.22 nos
0.11 nos
Each
Each
Each
Each
O.H.C @
Add Contractor profit@
7.5 %
7.5 %
on(a+b)
on(a+b)
0.023 cum
Cum
0.012 cum
0.0548 qntl
Cum
Qntl
First Floor
Rate Same as G.F.
Add Extra for First Floor
Add OHC& C.P.@7.50% EACH
1%
5%
15%
x
x
2nd Floor
Rate Same as F.F.
Add Extra for First Floor
Add OHC& C.P.@7.50% EACH
1%
5%
15%
a)
105.80
5.29
x
x
105.80
5.29
1%
Materials
K.B. Brick Khoa
1 cum
cum
Labour Charges
As per actual observation
Man Mulia (U/S)
2 nos
Each
O.H.C @
Add Contractor profit @
Lead & Royalty
K.B. Brick Khoa
7.5
7.5
a)
b)
on
on
1 cum
%
%
(a+b)
(a+b)
cum
1%
Per 1 sqm.
Materials
K.B.brick khoa 4cm size
0.14 cum
cum
Labour
Mason 2nd class
Man mulia for ramming
women mulia for watering
0.05 nos
0.16 nos
0.22 nos
Each
Each
Each
Add OHC @
Add Contractor Profit@
K.B. Brick Khoa
7.5 %
7.5 %
1 cum
on
on
(a+b)
(a+b)
cum
24
a)
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Sqm
Qntl
cum
Qntl
Qntl
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
Add O.H.C@
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
For 10 sqm
For 1 sqm
Add Labour Cess
9661.35
/
1%
(a+b)
(a+b)
Cum
Qntl
10
First floor
Rate Same as G.F.
Add Extra Labour for F.F.
Add O.H.C. &C.P.@7.50% EACH
For
For
Add labour cess
b)
2203.60
110.18
10 Sqm
1 Sqm
1% on
2nd floor
Rate Same as F.F.
Add Extra Labour for F.F.
Add O.H.C. &C.P.@7.50% EACH
For
For
Add labour cess
C)
5% X
15% X
5% X
15% X
2203.60
110.18
10 Sqm
1 Sqm
1% on
3RD floor
Rate Same as F.F.
Add Extra Labour for 2.F.
Add O.H.C. &C.P.@7.50% EACH
For
For
Add labour cess
5% X
15% X
10 Sqm
1 Sqm
1% on
2203.60
110.18
a)
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
Add O.H.C@
add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
For 10 sqm
For 1 sqm
Add Labour Cess
10 sqm
Sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Qntl
cum
Qntl
Qntl
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
4727.85
/
1%
(a+b)
(a+b)
Cum
Qntl
10
25
a)
Under Layer
Add cost of Wall tile 300mm x 200mm size
b)
Labour Charges
Mason (spl)
Mulia
Semi-skilled Mulia or rubbering
Add O.H.C @
Add Contractor Profit@
First Floor
Rate same as G.F.
Add Extra labour for F.F.
Add O.H.C.&C.P.@7.50 Each
For
For
Add labour cess
b)
2nd Floor
Rate same as F.F.
Add Extra labour for F.F.
Add O.H.C.&C.P.@7.50 Each
For
For
Add labour cess
C)
3RD Floor
Rate same as 2nd.F.
Sqm
cum
Qntl
Qntl
3.25 nos
3.25 nos
7.60 nos
Each
Each
Each
7.5 %
7.5 %
on
on
0.15 cum
1.375 qntl
For 10 Sqm
For 1 Sqm
Wax polishing
A)
10 sqm
0.15 cum
0.715 qntl
0.66 qntl
9244.37
(a+b)
(a+b)
cum
Qntl
5%
X
15%
x
10 sqm
1 sqm
10
3167.00
158.35
1%
5%
X
15%
x
10 sqm
1 sqm
1%
3167.00
158.35
5%
X
15%
x
10 sqm
1 sqm
1%
3167.00
158.35
a)
b)
Per 1 sqm
Details of cost for 10sqm
Materials
Bottom layer
12mm size chips
sand (Screened & washed)
Cement
Top Layer Marble chips 4 mm. to 7mm size
White Cement
Marble powder
Labour.
Mason special Bottom layer
Manson, special(toplayer)
Mulia (Bottom layer)
Mulia (top layer)
Semi-skilled mulia or rubbing (top layer)
c)
Add O.H.C. @)
Add lead & Royalty
12mm size chips
sand (Screened & washed)
Cement
0.23 cum
0.12 cum
0.754 qntl
1.4 qntl
0.578 qntl
0.1927 qntl
cum
cum
Qntl
Qntl
Qntl
Qntl
1.3 nos
1 nos
3.3 nos
1.35 nos
10.8 nos
Each
Each
Each
Each
Each
10 %
on
0.23 cum
0.12 cum
0.754 qntl
For 10 sqm
For 1 sqm
Add wax polishing
Add Labour Cess
7338.59 /
1%
(a+b)
cum
cum
Qntl
10
a)
Per 1 sqm
Details of cost for 10sqm
Materials
Bottom layer
Cement
sand (Screened & washed)
Top Layer Marble chips 4 mm. to 7mm size
White Cement
Marble powder
b)
Labour.
Mason special Bottom layer
Manson, special(toplayer)
Mulia (Bottom layer
Mulia (top layer)
Semi-skilled mulia or rubbing (top layer)
c)
Add O.H.C. @
Add lead & Royalty
sand (Screened & washed)
Cement
0.715 cum
0.150 cum
0.872 qntl
0.405 qntl
0.135 qntl
cum
cum
Qntl
Qntl
Qntl
1.10 nos
1.00 nos
1.2 nos
1.35 nos
10.8 nos
Each
Each
Each
Each
Each
10 %
on
(a+b)
0.150 cum
0.715 qntl
Cost for 10 sqm
Cost for 1 sqm
Add Wax polishing
Add Labour Cess
5747.21 /
1%
cum
Qntl
10
10
a)
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
Add O.H.C@
Add contractor Profit@
For 10 sqm
For 1 sqm
Add Labour Cess
10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Sqm
Qntl
cum
Qntl
Qntl
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
12375.35
/
1%
(a+b)
(a+b)
Cum
Qntl
10
11
a)
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Sqm
Qntl
cum
Qntl
Qntl
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
Add O.H.C@
Add contractor profit@
For 10 sqm
For 1 sqm
Add Labour Cess
12
a)
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
26577.85
/
1%
(a+b)
(a+b)
Cum
Qntl
10
10 sqm
1.857 Qntl
Sqm
Qntl
b)
0.13 cum
0.44 Qntl
0.44 Qntl
cum
Qntl
Qntl
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
Add O.H.C@
Add contractor profit@
For 10 sqm
For 1 sqm
Add Labour Cess
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
18642.85
/
1%
(a+b)
(a+b)
Cum
Qntl
10
13
a)
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
Sqm
Qntl
cum
Qntl
Qntl
2.16 nos
5.50 nos
2.16 nos
Add O.H.C@
Add contractor profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
Each
Each
Each
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
For 10 sqm
For 1 sqm
Add Labour Cess
For First Floor
Rate Same as Ground floor
Add extra labour for first floor
Add O.H.C
11685.35
5%
15 %
For 10 sqm
For 1 sqm
126.71 /
(a+b)
(a+b)
Cum
Qntl
/
1%
10
x
x
2203.60
110.18
10
1%
13
a)
600mm
Coloured
/Printed
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
Add O.H.C@
Add contractor profit@
For 10 sqm
For 1 sqm
Add Labour Cess
10 sqm
Sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Qntl
cum
Qntl
Qntl
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
7.5
7.5
%
%
on
on
0.13 cum
2.737 qntl
12317.85
/
1%
(a+b)
(a+b)
Cum
Qntl
10
5%
10 %
For 10 sqm
For 1 sqm
121.20 /
13
a)
b)
x
x
2203.60
110.18
10
1%
Add O.H.C@
Add contractor profit@
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Qntl
cum
Qntl
Qntl
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
7.5 %
7.5 %
on
on
(a+b)
(a+b)
14
a)
0.13 cum
2.737 qntl
4727.85
/
1%
Cum
Qntl
10
10 sqm
1.857 Qntl
0.13 cum
0.44 Qntl
0.44 Qntl
Sqm
Qntl
cum
Qntl
Qntl
b)
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
Add O.H.C@
Add contractor profit@
For 10 sqm
For 1 sqm
Add Labour Cess
a)
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
8902.35
/
1%
(a+b)
(a+b)
Cum
Qntl
10
10 sqm
1.857 Qntl
0.13 cum
Sqm
Qntl
cum
b)
0.44 Qntl
0.44 Qntl
Qntl
Qntl
Labour Charges
Mason (spl)
Semi-skilled Mulia or rubbering
Mulia
2.16 nos
5.50 nos
2.16 nos
Each
Each
Each
Add O.H.C@
Add Contractor Profit@
Lead & Royalty
Sand ( Screened and washed)
Cement
For 10 sqm
For 1 sqm
Add Labour Cess
7.5 %
7.5 %
on
on
0.13 cum
2.737 qntl
8393.33
/
1%
(a+b)
(a+b)
Cum
Qntl
10
Rate in Rs.
Amount in
Rs.
Remarks
4.00
1168.00
26.86
55.00
658.00
0.66
56.46
83.98
200.00
260.00
200.00
200.00
6.00
33.80
44.00
22.00
105.80
189.78
189.78
402.40
9.26
524.20
16.90
6.29
1.45
17.00
Say
5.29
235.24
83.98
105.80
189.78
14.23
14.23
17.00
235.24
2.35
237.60
237.60
0.79
6.08
5.29
0.79
6.08
5.29
0.79
6.08
6.08
241.33
2.41
243.74
243.70
241.33
6.08
247.41
2.47
249.88
249.90
247.41
6.08
253.49
2.53
256.03
1168.00
26.86
55.00
658.00
0.66
36.06
63.58
200.00
260.00
200.00
200.00
6.00
33.80
44.00
22.00
256.00
63.58
105.80
169.38
169.38
402.40
9.26
524.20
16.90
6.29
0.93
16.47
Say
5.29
0.79
6.08
5.29
0.79
6.08
105.80
169.38
12.70
12.70
16.47
211.26
2.11
213.37
213.40
211.26
6.08
217.34
2.17
219.52
219.50
217.34
6.08
223.43
2.23
225.66
225.70
350.00
350.00
350.00
350.00
200.00
400.00
400.00
400.00
750.00
56.25
56.25
750.00
750.00
321.80
321.80
321.80
Say
350.00
49.00
49.00
240.00
200.00
200.00
12.00
32.00
44.00
88.00
137.00
137.00
321.80
321.80
321.80
Say
321.80
1184.30
11.84
1196.14
1196.10
49.00
88.00
137.00
10.28
10.28
321.80
479.35
479.40
429.00
658.00
55.00
658.00
658.00
4290.00
1221.91
7.15
289.52
289.52
6098.10
260.00
220.00
200.00
561.60
1210.00
432.00
2203.60
180
0.013
2.737
0.2737
6098.10
2203.60
8301.70
8301.70
8301.70
622.63
622.63
9546.95
524.20
16.90
68.15
46.26
114.40
114.40
9661.35
966.14
9.66
975.80
975.80
Say
9661.35
110.18
16.53
126.71
978.81
Say
126.71
9788.06
978.81
9.79
988.59
988.60
9788.06
110.18
16.53
126.71
991.48
Say
126.71
9914.77
991.48
9.91
1001.39
1001.40
9914.77
110.18
16.53
126.71
1004.15
Say
126.71
10041.47
1004.15
10.04
1014.19
1014.20
0.00
0.00
658.00
55.00
658.00
658.00
1221.91
7.15
289.52
289.52
1808.10
260.00
220.00
200.00
561.60
1210.00
432.00
2203.60
4011.70
4011.70
524.20
16.90
68.15
46.26
114.40
1808.10
2203.60
4011.70
300.88
300.88
114.40
4727.85
472.79
4.73
477.51
387.00
55.00
658.00
658.00
260.00
200.00
220.00
3870.00
8.25
470.47
434.28
4783.00
845.00
650.00
1672.00
3167.00
7950.00
7950.00
524.20
16.90
78.63
23.24
101.87
924.44
8.50
932.94
9.33
942.27 Say
951.15
Say
18.21
951.15
9.51
960.66
960.70
951.15
158.35
23.75
182.10
18.21
969.36
Say
4783.00
0.015
0.1375
3167.00
7950.00
596.25
596.25
101.87
9244.37
942.30
932.94
158.35
23.75
182.10
18.21
1.375
0.1375
18.21
969.36
9.69
979.05
979.10
969.36
158.35
23.75
182.10
18.21
987.57
Say
18.21
987.57
9.88
997.44
997.40
1168.00
55.00
658.00
550.00
1750.00
320.00
268.64
6.60
496.13
770.00
1011.50
61.66
2614.54
260.00
260.00
200.00
200.00
220.00
338.00
260.00
660.00
270.00
2376.00
3904.00
6518.54
402.40
524.20
16.90
733.86
8.50
742.36
7.42
749.78
92.55
62.90
12.74
168.20
2614.54
3904.00
6518.54
651.85
168.20
7338.59
658.00
55.00
550.00
1750.00
320.00
470.47
8.25
479.60
708.75
43.20
1710.27
260.00
260.00
200.00
200.00
220.00
286.00
260.00
240.00
270.00
2376.00
3432.00
5142.27
524.20
16.90
574.72
8.50
583.22
5.83
78.63
12.08
90.71
1710.27
3432.00
5142.27
514.23
90.71
5747.21
589.05
665.00
658.00
55.00
658.00
658.00
6650.00
1221.91
7.15
289.52
289.52
8458.10
260.00
220.00
200.00
561.60
1210.00
432.00
2203.60
10661.70
10661.70
524.20
16.90
68.15
46.26
114.40
8458.10
2203.60
10661.70
799.63
799.63
114.40
12375.35
1237.54
12.38
1249.91
1900.00
658.00
55.00
658.00
658.00
260.00
220.00
200.00
19000.00
1221.91
7.15
289.52
289.52
20808.10
20808.10
561.60
1210.00
432.00
2203.60
2203.60
23011.70
1725.88
1725.88
23011.70
23011.70
524.20
16.90
68.15
46.26
114.40
114.40
26577.85
2657.79
26.58
2684.36
2684.40
Say
1210.00
12100.00
658.00
1221.91
55.00
658.00
658.00
260.00
220.00
200.00
7.15
289.52
289.52
13908.10
13908.10
561.60
1210.00
432.00
2203.60
2203.60
16111.70
1208.38
1208.38
16111.70
16111.70
524.20
16.90
68.15
46.26
114.40
114.40
18642.85
1864.29
18.64
1882.93
605.00
658.00
55.00
658.00
658.00
260.00
220.00
200.00
6050.00
1221.91
7.15
289.52
289.52
7858.10
7858.10
561.60
1210.00
432.00
2203.60
2203.60
10061.70
754.63
754.63
10061.70
10061.70
524.20
16.90
68.15
46.26
114.40
114.40
11685.35
1168.54
11.69
1180.22
1168.54
110.18
16.53
126.71
Say
12.67
1181.21
11.81
1193.02
1193.00
660.00
6600.00
658.00
55.00
658.00
658.00
1221.91
7.15
289.52
289.52
260.00
220.00
200.00
8408.10
8408.10
561.60
1210.00
432.00
2203.60
2203.60
10611.70
795.88
795.88
10611.70
10611.70
524.20
16.90
68.15
46.26
114.40
114.40
12317.85
1231.79
12.32
1244.10
110.18
11.02
121.20
1231.79
12.12
1243.90
12.44
1256.34
1256.30
Say
658.00
55.00
658.00
658.00
260.00
220.00
200.00
1221.91
7.15
289.52
289.52
1808.10
1808.10
561.60
1210.00
432.00
2203.60
2203.60
4011.70
4011.70
4011.70
300.88
300.88
524.20
16.90
68.15
46.26
114.40
14105.92
114.40
4727.85
472.79
4.73
477.51
363.00
3630.00
658.00
55.00
658.00
658.00
1221.91
7.15
289.52
289.52
260.00
220.00
200.00
5438.10
5438.10
561.60
1210.00
432.00
2203.60
2203.60
7641.70
573.13
573.13
7641.70
7641.70
524.20
16.90
68.15
46.26
114.40
114.40
8902.35
890.24
8.90
899.14
899.10
Say
198.00
658.00
55.00
1980.00
1221.91
7.15
180
0.013
2.737
658.00
658.00
289.52
289.52
3788.10
260.00
220.00
200.00
561.60
1210.00
432.00
2203.60
5991.70
5991.70
0.2737
3788.10
2203.60
5991.70
449.38
449.38
6890.45
524.20
524.20
68.15
1434.74
1502.88
1502.88
8393.33
Say
839.33
8.39
847.73
847.70
SL
No.
1
a)
Description of items
Qnty
2
Supplying all materials, labour, T&P and
Providing Brick work with K.B. Bricks
25cm x 12cm x 8cm size having
crushing strength not Less than
75kg/cm with dimensional tolerance
8 percent in Cement mortar in Cement
Mortar (1:3) foundation & Plinth
including cost of conveyance & royalty
,sundries & watering for curing &
supervision charges etc, all complete as
per the direction of Engineer-in-charge .
b)
Unit
0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos
Each
Each
Each
Each
Each
Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent
350 nos
1000 nos
0.28 cum
cum
Cement-0.093 cum or
1.33 qntl
Qntl
Add O.H.C. @
Add contractor Profit@
Lead & Royalty
K.B. Brick
Sharp sand (screened and washed)
Cement-0.093 cu or
7.50 %
7.50 %
on
on
350 nos
0.28 cum
1.33 Qntl
(a+b)
(a+b)
1000
1%
For Superstructure
Rate same as Foundation & Pilnth
For superstructre
Add Labour Cess
1%
4308.95
33.00
4341.95
43.42
4385.37
a)
First Floor
Rate Same as G.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH
15% on
15% on
b)
2nd Floor
Rate Same as F.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH
1%
15% on
15% on
C)
935.00
140.25
3RD Floor
Rate Same as 2nd
Add Extra labour 3rd floor
Add O.H.C&C.P.@7.50%EACH
935.00
140.25
1%
15% on
15% on
935.00
140.25
1%
a)
b)
0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos
Each
Each
Each
Each
Each
Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent
350 nos
1000 nos
0.28 cum
cum
Cement-0.07 cum
1.00 qntl
Qntl
Add O.H.C. @
Add Contractor profit@
7.50 %
7.50 %
on
on
350 nos
0.28 cum
1.00 Qntl
(a+b)
(a+b)
1000
cum
Qntl
1%
For Superstructure
Rate same as Foundation & Pilnth
For superstructre
Add Labour Cess
a)
First Floor
Rate Same as G.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH
1%
15% on
15% on
b)
2nd Floor
Rate Same as F.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH
935.00
140.25
1%
15% on
15% on
C)
3RD Floor
Rate Same as 2nd
Add Extra labour 3rd floor
Add O.H.C&C.P.@7.50%EACH
935.00
140.25
1%
15% on
15% on
4053.66
33.00
4086.66
40.87
4127.53
935.00
140.25
1%
a)
b)
0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos
Each
Each
Each
Each
Each
Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent
350 nos
1000 nos
0.28 cum
cum
Cement-0.055 cum
0.80 qntl
Qntl
Add O.H.C. @
Add contractor profit@
7.50 %
7.50 %
350 nos
0.28 cum
on
on
(a+b)
(a+b)
1000
cum
0.80 Qntl
Cement-0.055 cum
Qntl
1%
For Superstructure
Rate same as Foundation & Pilnth
For superstructre
Add Labour Cess
a)
First Floor
Rate Same as G.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH
1%
15% on
15% on
b)
2nd Floor
Rate Same as F.F.
Add Extra labour 2nd floor
Add O.H.C&C.P.@7.50%EACH
935.00
140.25
1%
15% on
15% on
c)
3rd Floor
Rate Same as 2nd F.
Add Extra labour 3rd floor
Add O.H.C&C.P.@7.50%EACH
935.00
140.25
1%
15% on
15% on
3898.94
33.00
3931.94
39.32
3971.26
935.00
140.25
1%
19
a)
0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos
Each
Each
Each
Each
Each
b)
Materials
K.B. Bricks 25cm x 12cm x 8cm size having
crushing strength not Less than 75kg/cm
with dimensional tolerance 8 percent
Add O.H.C. @
Add Contractor Profit@
350 nos
1000 nos
0.28 cum
cum
0.672 qntl
Qntl
7.50 %
7.50 %
on
on
350 nos
0.28 cum
1000
cum
Qntl
0.672 Qntl
Cement-0.047 cum
(a+b)
(a+b)
1%
For Superstructure
Rate same as Foundation & Pilnth
For superstructre
3799.92
33.00
3832.92
a)
First Floor
Rate Same as G.F.
Add Extra labour 1st floor
Add O.H.C&C.P.@7.50%EACH
1%
15% on
15% on
b)
2nd Floor
Rate Same as F.F.
Add Extra labour 2nd floor
Add O.H.C&C.P.@7.50%EACH
935.00
140.25
1%
15% on
15% on
c)
3rd Floor
Rate Same as 2nd F.
Add Extra labour 3rd floor
Add O.H.C&C.P.@7.50%EACH
935.00
140.25
1%
15% on
15% on
38.33
3871.25
935.00
140.25
1%
a)
b)
Materials
0.35 nos
1.05 nos
1.41 nos
1.41 nos
0.14 nos
Each
Each
Each
Each
Each
Add O.H.C. @
Add Contractor Profit@
350 nos
1000 nos
0.28 cum
cum
0.501 qntl
Qntl
7.50 %
7.50 %
on
on
350 nos
0.28 cum
1000
cum
Qntl
0.501 Qntl
Cement-0.035 cum
(a+b)
(a+b)
1%
For Superstructure
Rate same as Foundation & Pilnth
For superstructre
Add Labour Cess
1%
3667.63
33.00
3700.63
37.01
3737.64
a)
b)
0.35 nos
1.05 nos
1.41 nos
1.41 nos
Each
Each
Each
Each
350 nos
1000
Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent
O.H.C. @
Add Contractor Profit@
Lead & Royalty
K.B. Brick
7.5 %
7.5 %
350 nos
on
on
(a+b)
(a+b)
1000
Materials
K.B. Bricks 25cm x 12cm x 8cm size
having crushing strength not Less than
75kg/cm with dimensional tolerance 8
percent
Sand (Screened & Washed)
Cement-0.0071 cum
(b)
0.06 cum
0.1015 qntl
Labour Charges
Take 0.19 times of labour of item No.1 of
brick masonry =
Man Mulia for mixing sand and cement
1000
80 nos
0.19
935.00
Each
0.07 nos
7.5 %
7.5 %
on
on
(a+b)
(a+b)
80 nos
0.06 cum
0.1015 qntl
1000
cum
Qntl
Rate in Rs.
4.00
Amount in
Rs.
5.00
260.00
240.00
200.00
200.00
91.00
252.00
282.00
282.00
200.00
28.00
935.00
4300.00
1505.00
55.00
15.40
658.00
875.14
2395.54
3330.54
3330.54
884.50
524.20
16.90
309.58
146.78
22.48
478.83
Remarks
6.00
935.00
2395.54
3330.54
249.79
249.79
478.83
4308.95
43.09
4352.04
4352.00
Say
Say
4385.40
4341.95
140.25
21.04
161.29
Say
161.29
4503.24
45.03
4548.27
4548.30
4503.24
140.25
21.04
161.29
Say
161.29
4664.52
46.65
4711.17
4711.20
4664.52
140.25
21.04
161.29
Say
161.29
4825.81
48.26
4874.07
4874.10
260.00
240.00
200.00
200.00
91.00
252.00
282.00
282.00
200.00
28.00
935.00
4300.00
1505.00
55.00
15.40
658.00
658.00
2178.40
3113.40
3113.40
884.50
524.20
16.90
309.58
146.78
16.90
473.25
Say
935.00
2178.40
3113.40
233.51
233.51
473.25
4053.66
40.54
4094.20
4094.20
Say
4127.50 /cum
4086.66
140.25
21.04
161.29
Say
161.29
4247.95
42.48
4290.43
4290.40
4247.95
140.25
21.04
161.29
Say
161.29
4409.24
44.09
4453.33
4453.30
4409.24
140.25
21.04
161.29
Say
161.29
4570.52
45.71
4616.23
4616.20
260.00
240.00
200.00
200.00
91.00
252.00
282.00
282.00
200.00
28.00
935.00
4300.00
1505.00
55.00
658.00
15.40
526.40
2046.80
2981.80
2981.80
884.50
524.20
309.58
146.78
935.00
2046.80
2981.80
223.64
223.64
16.90
13.52
469.87
Say
3971.30 /cum
Say
3931.94
140.25
21.04
161.29
Say
161.29
4093.23
40.93
4134.16
4134.20
4093.23
140.25
21.04
161.29
Say
161.29
4254.52
42.55
4297.06
4297.10
4254.52
140.25
21.04
161.29
Say
469.87
3898.94
38.99
3937.93
3937.90
161.29
4415.80
44.16
4459.96
4460.00
260.00
240.00
200.00
200.00
91.00
252.00
282.00
282.00
200.00
28.00
935.00
935.00
4300.00
1505.00
55.00
658.00
15.40
442.18
1962.58
2897.58
2897.58
884.50
524.20
16.90
309.58
146.78
11.36
467.71
Say
1962.58
2897.58
217.32
217.32
467.71
3799.92
38.00
3837.92
3837.90
3871.20 /cum
Say
3832.92
140.25
21.04
161.29
Say
161.29
3994.21
39.94
4034.15
4034.10
3994.21
140.25
21.04
161.29
Say
161.29
4155.50
41.55
4197.05
4197.10
4155.50
140.25
21.04
161.29
161.29
4316.78
43.17
14105.923
11803.314
25909.31
15957.27
4359.95
4360.00
Say
260.00
240.00
200.00
200.00
91.00
252.00
282.00
282.00
200.00
28.00
935.00
935.00
4300.00
1505.00
55.00
658.00
15.40
329.66
1850.06
1850.06
2785.06
208.88
208.88
2785.06
2785.06
884.50
524.20
16.90
309.58
146.78
8.47
464.82
Say
Say
464.82
3667.63
36.68
3704.31
3704.30
3737.60 /cum
260.00
240.00
200.00
200.00
91.00
252.00
282.00
282.00
907.00
4300.00
907.00
1505.00
1505.00
2412.00
2412.00
884.50
309.58
309.58
1%
Say
1505.00
2412.00
180.90
180.90
309.58
3083.38
30.83
3114.21
3114.20
4300.00
344.00
55.00
658.00
3.30
66.79
414.09
414.09
177.65
200.00
14.00
191.65
605.74
605.74
884.50
70.76
524.20
16.90
31.45
1.72
103.93
191.65
605.74
45.43
45.43
103.93
800.52
1%
8.01
808.53
Description of items
Qnty
2
Supplying all labour, materials, T&P and
Random Rubble stone masonry in
Unit
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.068 cum
1.00 cum
Cum
0.34 cum
0.9724 qntl
Cum
Qntl
b)
Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar
0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos
Each
Each
Each
Each
Each
c)
1.00 cum
cum
O.H.C. Charges @
Add contractor profit@
7.5 %
7.5 %
on
on
(a+b+C)
(a+b+C)
1.00 cum
cum
0.34 cum
0.9724 qntl
cum
Qntl
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.057 cum
b)
Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar
O.H.C. Charges @
Add Contractor Profit@
1 cum
cum
0.34 cum
0.8151 qntl
cum
Qntl
0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos
7.5 %
7.5 %
Each
Each
Each
Each
Each
on
on
(a+b+c)
(a+b+c)
1 cum
cum
0.34 cum
0.8151 qntl
cum
Qntl
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.0425 cum
b)
Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar
O.H.C. Charges @
Lead & Royalty
1 cum
cum
0.34 cum
0.6078 Qntl
cum
Qntl
0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos
Each
Each
Each
Each
Each
10 %
on
(a+b)
cum
0.34
0.6078
cum
Qntl
.
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.085 cum
b)
Labour Charges
Mason (Special)
Mason 2nd class
1 cum
cum
0.34 cum
1.2156 qntl
cum
Qntl
0.35 nos
1.41 nos
Each
Each
Man Mulia
Women mulia
Man Mulia for mixing mortar
O.H.C. Charges @
1.41 nos
1.41 nos
0.35 nos
Each
Each
Each
10 %
on
(a+b)
1 cum
cum
0.34 cum
1.2156 qntl
cum
Qntl
Rate in Rs.
Amount in
Rs.
Remarks
4.00
5.00
6.00
231.00
231.00
55.00
658.00
18.70
639.84
889.54
889.54
260.00
240.00
200.00
200.00
200.00
91.00
338.40
282.00
282.00
70.00
1063.40
1063.40
414.00
414.00
2366.94
2366.94
98.80
98.80
524.20
16.90
178.23
16.43
293.46
%
Say
414.00
2366.94
177.52
177.52
293.46
3015.44
30.15
3045.60
3045.60
#REF!
231.00
231.00
55.00
658.00
18.70
536.34
786.04
260.00
240.00
200.00
200.00
200.00
91.00
338.40
282.00
282.00
70.00
1063.40
1849.44
1849.44
338.00
338.00
524.20
16.90
178.23
13.78
530.00
786.04
1063.40
1849.44
138.71
138.71
49200
530.00
2656.85
26.57
2683.42
Say
2683.40
231.00
231.00
55.00
658.00
18.70
399.93
649.63
260.00
240.00
200.00
200.00
200.00
91.00
338.40
282.00
282.00
70.00
1063.40
1713.03
649.63
1063.40
1713.03
171.30
338.00
338.00
524.20
16.90
178.23
10.27
526.50
231.00
231.00
55.00
658.00
18.70
799.86
1049.56
260.00
240.00
91.00
338.40
526.50
2410.84
24.11
2434.94
1049.56
200.00
200.00
200.00
282.00
282.00
70.00
1063.40
2112.96
338.00
338.00
524.20
16.90
178.23
20.54
536.77
1063.40
2112.96
211.30
536.77
2861.03
28.61
2889.64
2324.26
Description of items
Qnty
2
Supplying all labour, materials, T&P and
Random Rubble stone masonry in
Unit
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.068 cum
1.00 cum
Cum
0.34 cum
0.9724 qntl
Cum
Qntl
b)
Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar
0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos
Each
Each
Each
Each
Each
c)
1.00 cum
cum
O.H.C. Charges @
Add contractor profit@
7.5 %
7.5 %
on
on
(a+b+C)
(a+b+C)
1.00 cum
cum
0.34 cum
0.9724 qntl
cum
Qntl
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.057 cum
1 cum
cum
0.34 cum
0.8151 qntl
cum
Qntl
b)
Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar
0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos
Each
Each
Each
Each
Each
c)
1.00 cum
cum
O.H.C. Charges @
Add Contractor Profit@
7.5 %
7.5 %
on
on
(a+b+c)
(a+b+c)
1 cum
cum
0.34 cum
0.8151 qntl
cum
Qntl
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.0425 cum
b)
Labour Charges
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar
O.H.C. Charges @
1 cum
cum
0.34 cum
0.6078 Qntl
cum
Qntl
0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos
Each
Each
Each
Each
Each
10 %
on
(a+b)
cum
0.34
0.6078
cum
Qntl
.
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
Sand (Screened &Washed)
Cement-0.085 cum
b)
Labour Charges
1 cum
cum
0.34 cum
1.2156 qntl
cum
Qntl
Mason (Special)
Mason 2nd class
Man Mulia
Women mulia
Man Mulia for mixing mortar
0.35 nos
1.41 nos
1.41 nos
1.41 nos
0.35 nos
O.H.C. Charges @
Each
Each
Each
Each
Each
10 %
on
(a+b)
1 cum
cum
0.34 cum
1.2156 qntl
cum
Qntl
(a)
Per cum
Materials
Rough Granite stone quarried including
bond stones
1 cum
cum
b)
Labour Charges
Mason (Special)
Stone packer
Man Mulia
Women mulia
0.17 nos
0.35 nos
0.52 nos
0.52 nos
Each
Each
Each
Each
c)
1.00 cum
cum
O.H.C. Charges @
7.5 %
on
(a+b+c)
7.5 %
1 cum
on
(a+b+c)
cum
Rate in Rs.
Amount in
Rs.
Remarks
4.00
5.00
6.00
231.00
231.00
55.00
658.00
18.70
639.84
889.54
889.54
260.00
240.00
200.00
200.00
200.00
91.00
338.40
282.00
282.00
70.00
1063.40
1063.40
414.00
414.00
2366.94
2366.94
98.80
98.80
524.20
16.90
178.23
16.43
293.46
%
Say
414.00
2366.94
177.52
177.52
293.46
3015.44
30.15
3045.60
3045.60
#REF!
231.00
231.00
55.00
658.00
18.70
536.34
786.04
260.00
240.00
200.00
200.00
200.00
91.00
338.40
282.00
282.00
70.00
1063.40
414.00
414.00
138.71
138.71
786.04
1063.40
1849.44
414.00
138.71
138.71
2540.85
98.80
98.80
524.20
16.90
178.23
13.78
290.80
49200
290.80
2831.65
28.32
2859.97
2859.96
Say
231.00
231.00
55.00
658.00
18.70
399.93
649.63
260.00
240.00
200.00
200.00
200.00
91.00
338.40
282.00
282.00
70.00
1063.40
1713.03
649.63
1063.40
1713.03
171.30
98.80
98.80
524.20
16.90
178.23
10.27
287.30
231.00
231.00
55.00
658.00
18.70
799.86
1049.56
287.30
2171.64
21.72
2193.35
1049.56
260.00
240.00
200.00
200.00
200.00
91.00
338.40
282.00
282.00
70.00
1063.40
2112.96
98.80
98.80
524.20
16.90
178.23
20.54
297.57
231.00
231.00
231.00
260.00
240.00
200.00
200.00
44.20
84.00
104.00
104.00
336.20
512.78
512.78
42.54
1063.40
2112.96
211.30
297.57
2621.83
26.22
2648.05
231.00
336.20
567.20
512.78
42.54
2324.26
42.54
42.54
1165.06
0.00
0.00
0.00
%
Say
0.00
1165.06
11.65
1176.71
1176.71
1
11
(i)
a)
b)
Description of items
Qnty
Unit
2.75 nos
2.75 nos
Add O.H.C @
7.5 %
Add Contractor profit@
7.5 %
for 9.00 sqm
For 1 sqm
3248.76
Add Labour Cess
Each
Each
on
on
(a+b)
(a+b)
9
1
%
Say
(ii)
a)
b)
Add O.H.C @
7.5 %
on
cum
cum
mtr
cum
10
Each
Each
(a+b)
a)
b)
a)
5
1
cum
mtr
cum
6358.03
Labour
Carpenter 2nd
S.S.Mulia
10
0.50 nos
0.50 nos
Each
Each
7.5 %
7.5 %
995.67
on (a+b)
on (a+b)
/
1%
10
Add O.H.C@
Add Contractor Profit@
For 4.2 Sqm
For 1 sqm
Add Labour Cess
v)
Add O.H.C @
Add Contractor profit@
For 10 Sqm
For 1 sqm
Add Labour Cess
iv)
(a+b)
R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc
Use once
b)
on
R.C.C. Lintels
Data for 7.8 sqm
For 1 Sqm
Materials
38mm Non sal planks
0.218 cum
15.2 mtr
8.00 mtr
0.456 cum
7115.02
cum
mtr
mtr
mtr
/
10
2.75 nos
2.75 nos
7.5 %
7.5 %
2272.98
0.413 cum
Each
Each
on (a+b)
on (a+b)
/
1%
4.2
cum
21 mtr
0.689 cum
Use once
a)
Labour
Carpenter 2nd
S.S.Mulia
mtr
cum
10522.68
10
1.25 nos
1.25 nos
Add O.H.C@
Add Contractor Profit@
For 7.8 Sqm
For 1 sqm
Add Labour Cess
Each
Each
7.5 %
7.5 %
1871.36
on (a+b)
on (a+b)
/
1%
vi)
a)
Add O.H.C @
Add Contractor Profit @
For 23.90 Sqm
For 1 sqm
Add Labour Cess
7.8
0.954 cum
0.269 cum
100.80 mtr
2.461 cum
cum
cum
mtr
cum
34229.13
13.5 nos
13.5 nos
7.5 %
7.5 %
11077.85
10.00
Each
Each
on (a+b)
on (a+b)
/
1%
23.9
. Work
Rate in Rs.
Amount in
Rs.
Remarks
4.00
5.00
6.00
un shades and
21287.00
21287.00
104.00
135.20
2384.14
7237.58
5824.00
154.40
15600.12
1560.01
240.00
220.00
660.00
605.00
1265.00
2825.01
2825.01
1560.01
1265.00
2825.01
211.88
211.88
3248.76
360.97
3.61
364.58
329.10 /Sqm
21287.00
21287.00
78.00
135.20
240.00
220.00
1888.79
4853.44
830.19
507.00
47.32
6237.95
623.79
660.00
605.00
1265.00
623.79
1265.00
1888.79
141.66
1888.79
141.66
2172.11
434.42
4.34
438.77 Say
438.80
21287.00
50.00
135.20
5683.63
630.00
44.40
6358.03
635.80
240.00
220.00
120.00
110.00
230.00
865.80
865.80
99.57
1.00
100.56 Say
21287.00
104.00
104.00
135.20
240.00
220.00
230.00
865.80
64.94
64.94
995.67
100.60
4640.57
1580.80
832.00
61.65
7115.02
711.50
660.00
605.00
1265.00
1976.50
1976.50
541.18
5.41
546.60 Say
21287.00
635.80
711.50
1265.00
1976.50
148.24
148.24
2272.98
546.60
8791.53
78.00
135.20
1638.00
93.15
10522.68
1052.27
240.00
220.00
300.00
275.00
575.00
1627.27
1627.27
239.92
2.40
242.32 Say
575.00
1627.27
122.05
122.05
1871.36
242.30
21287.00
20307.80
21287.00
5726.20
7862.40
332.73
78.00
135.20
1052.27
34229.13
3422.91
240.00
220.00
9632.91
9632.91
463.51
4.64
468.14 Say
3240.00
2970.00
6210.00
3422.91
6210.00
9632.91
722.47
722.47
11077.85
468.10
Description of items
Qnty
Unit
(i)
a)
b)
Labour
Carpenter 2nd
S.S.Mulia
2.75 nos
2.75 nos
Add O.H.C @
7.5 %
Add Contractor profit@
7.5 %
for 9.00 sqm
For 1 sqm
3248.76
Add Labour Cess
Each
Each
on
on
(a+b)
(a+b)
9
1
%
Say
(ii)
a)
cum
0.039 cum
cum
6.50 mtr
0.35 cum
mtr
cum
6237.95
10
b)
Labour
Carpenter 2nd
S.S.Mulia
2.75 nos
2.75 nos
Each
Each
Add O.H.C @
7.5 %
Add Contractor Profit@
7.5 %
for 5.00 sqm
For 1 sqm
2172.11
Add Labour Cess
iii)
a)
b)
a)
b)
(a+b)
(a+b)
5
1
R.C.C. foundation , plinth band and footings bases of columns mass concre
precast slabs etc
Details for 10 Sqm
Materials
25mm non sal planks
Non sal Bullah 80mm dia
Carriage of wood
Considering 10times use of the
materials
Use once
Labour
Carpenter 2nd
S.S.Mulia
0.267 cum
12.60 mtr
0.3284 cum
cum
mtr
cum
6358.03
10
0.50 nos
0.50 nos
Add O.H.C @
Add Contractor profit@
For 10 Sqm
For 1 sqm
Add Labour Cess
iv)
on
on
Each
Each
7.5 %
7.5 %
995.67
on (a+b)
on (a+b)
/
1%
10
Add O.H.C@
Add Contractor Profit@
0.218 cum
15.2 mtr
8.00 mtr
0.456 cum
7115.02
cum
mtr
mtr
mtr
/
10
2.75 nos
2.75 nos
7.5 %
7.5 %
Each
Each
on (a+b)
on (a+b)
v)
a)
R.C.C. Lintels
Data for 7.8 sqm
For 1 Sqm
Materials
38mm Non sal planks
120mm dia non sal bullah
Carriage of wood
Considering for 10 times use
/
1%
4.2
0.413 cum
21 mtr
0.689 cum
Use once
a)
2272.98
Labour
Carpenter 2nd
S.S.Mulia
cum
mtr
cum
10522.68
10
1.25 nos
1.25 nos
Add O.H.C@
Add Contractor Profit@
For 7.8 Sqm
For 1 sqm
Add Labour Cess
Each
Each
7.5 %
7.5 %
1871.36
on (a+b)
on (a+b)
/
1%
vi)
a)
Add O.H.C @
Add Contractor Profit @
For 23.90 Sqm
For 1 sqm
Add Labour Cess
7.8
0.954 cum
0.269 cum
100.80 mtr
2.461 cum
cum
cum
mtr
cum
34229.13
13.5 nos
13.5 nos
7.5 %
7.5 %
11077.85
10.00
Each
Each
on (a+b)
on (a+b)
/
1%
23.9
. Work
Rate in Rs.
Amount in
Rs.
Remarks
4.00
5.00
6.00
un shades and
21287.00
21287.00
104.00
135.20
2384.14
7237.58
5824.00
154.40
15600.12
1560.01
240.00
220.00
660.00
605.00
1265.00
2825.01
2825.01
1560.01
1265.00
2825.01
211.88
211.88
3248.76
360.97
3.61
364.58
/Sqm
21287.00
4853.44
21287.00
830.19
78.00
135.20
507.00
47.32
6237.95
623.79
623.79
240.00
220.00
660.00
605.00
1265.00
1888.79
1888.79
434.42
4.34
438.77 Say
1265.00
1888.79
141.66
141.66
2172.11
438.80
mass concrete
21287.00
50.00
135.20
5683.63
630.00
44.40
6358.03
635.80
240.00
220.00
120.00
110.00
230.00
865.80
865.80
99.57
1.00
100.56 Say
21287.00
104.00
104.00
135.20
240.00
220.00
1976.50
1976.50
635.80
230.00
865.80
64.94
64.94
995.67
100.60
4640.57
1580.80
832.00
61.65
7115.02
711.50
660.00
605.00
1265.00
711.50
1265.00
1976.50
148.24
148.24
2272.98
541.18
5.41
546.60 Say
21287.00
78.00
135.20
546.60
8791.53
1638.00
93.15
10522.68
1052.27
240.00
220.00
300.00
275.00
575.00
1627.27
1627.27
239.92
2.40
242.32 Say
575.00
1627.27
122.05
122.05
1871.36
242.30
21287.00
20307.80
21287.00
5726.20
7862.40
332.73
78.00
135.20
1052.27
34229.13
3422.91
240.00
220.00
9632.91
9632.91
463.51
4.64
468.14 Say
3240.00
2970.00
6210.00
3422.91
6210.00
9632.91
722.47
722.47
11077.85
468.10
Description of items
Qnty
Unit
(i)
a)
b)
Labour
Carpenter 2nd
S.S.Mulia
2.75 nos
2.75 nos
Add O.H.C @
7.5 %
Add Contractor profit@
7.5 %
for 9.00 sqm
For 1 sqm
3248.76
Add Labour Cess
Each
Each
on
on
(a+b)
(a+b)
9
1
%
Say
1265.00 x
253.00 X
b)
290.95
20%
15%
/
9
1%
253.00
37.95
290.95
32.33
1265.00 x
506.00 X
581.90
40%
15%
/
b)
872.85
1163.80
80%
15%
/
(ii)
a)
1%
b)
1%
1265.00 x
1012.00 X
1012.00
151.80
1163.80
129.31
60%
15%
759.00
113.85
872.85
96.98
1%
1265.00 x
759.00 X
506.00
75.90
581.90
64.66
Labour
Carpenter 2nd
S.S.Mulia
0.228 cum
0.039 cum
cum
cum
6.50 mtr
0.35 cum
mtr
cum
6237.95
10
2.75 nos
2.75 nos
Add O.H.C @
7.5 %
Add Contractor Profit@
7.5 %
for 5.00 sqm
For 1 sqm
2172.11
Add Labour Cess
For First Floor
Each
Each
on
on
(a+b)
(a+b)
5
1
1265.00 x
253.00 x
For
5.00 SQM
For
1.00 sqm
20%
15%
1%
1265.00 x
253.00 x
For
5.00 SQM
For
1.00 sqm
20%
15%
a)
b)
253.00
37.95
290.95
58.19
1%
R.C.C. foundation , plinth band and footings bases of columns mass concre
precast slabs etc
Details for 10 Sqm
Materials
25mm non sal planks
Non sal Bullah 80mm dia
Carriage of wood
Considering 10times use of the
materials
Use once
Labour
Carpenter 2nd
S.S.Mulia
0.267 cum
12.60 mtr
0.3284 cum
cum
mtr
cum
6358.03
10
0.50 nos
0.50 nos
Add O.H.C @
Add Contractor profit@
For 10 Sqm
For 1 sqm
Add Labour Cess
iv)
253.00
37.95
290.95
58.19
Each
Each
7.5 %
7.5 %
995.67
on (a+b)
on (a+b)
/
1%
10
a)
b)
Materials
38mm non sal planks
120mm dia Sal bullah
80mm dua Sal bullahCarriage of wood
Considering for 10 times use
Use once
Labour
Carpenter 2nd
S.S.Mulia
0.218 cum
15.2 mtr
8.00 mtr
0.456 cum
7115.02
2.75 nos
2.75 nos
cum
mtr
mtr
mtr
/
10
Each
Each
Add O.H.C@
Add Contractor Profit@
For 4.2 Sqm
For 1 sqm
Add Labour Cess
7.5 %
7.5 %
2272.98
on (a+b)
on (a+b)
/
1%
4.2
253.00
37.95
290.95
69.27
1%
1265.00 X
40%
506.00 X
15%
Add O.H.C. & contractor profit
For
4.2 Sqm
For
1 Sqm
506.00
75.90
581.90
138.55
1%
For
For
Add Labour Cess
506.00 X
60%
303.60 X
15%
4.2 Sqm
1 Sqm
303.60
45.54
349.14
83.13
1%
For
For
Add Labour Cess
v)
a)
R.C.C. Lintels
Data for 7.8 sqm
For 1 Sqm
Materials
303.60 X
80%
242.88 X
15%
4.2 Sqm
1 Sqm
1%
242.88
36.43
279.31
66.50
0.413 cum
21 mtr
0.689 cum
Use once
a)
cum
mtr
cum
10522.68
10
Labour
Carpenter 2nd
S.S.Mulia
1.25 nos
1.25 nos
Add O.H.C@
Add Contractor Profit@
For 7.8 Sqm
For 1 sqm
Add Labour Cess
For First Floor
Rate same as G.F.
add extra labour for F.F.
OHC & Contractor profit
For
For 1 sqm
Each
Each
7.5 %
7.5 %
1871.36
on (a+b)
on (a+b)
/
1%
575.00 X
20%
115.00 x
15%
7.8 Sqm
132.25
/
7.8
1%
575.00 X
115.00 x
7.8 Sqm
1 Sqm
a)
Labour
Carpenter 2nd
S.S.Mulia 2.75 nos.
0.954 cum
0.269 cum
100.80 mtr
2.461 cum
34229.13
cum
cum
mtr
cum
/
13.5 nos
13.5 nos
Add O.H.C @
115.00
17.25
132.25
16.96
1%
vi)
115.00
17.25
132.25
16.96
256.87
20 %
15 %
7.8
7.5 %
10.00
Each
Each
on (a+b)
7.5 %
11077.85
6210.00 X
1242.00
For
23.90 sqm
For
1 sqm
Add Labour Cess
/
1%
23.9
20%
15%
1242.00
186.30
1428.30
59.76
1%
6210.00 X
1242.00
For
23.90 sqm
For
1 sqm
Add Labour Cess
on (a+b)
20%
15%
1%
1242.00
186.30
1428.30
59.76
. Work
Rate in Rs.
Amount in
Rs.
Remarks
4.00
5.00
6.00
un shades and
21287.00
21287.00
104.00
135.20
2384.14
7237.58
5824.00
154.40
15600.12
1560.01
240.00
220.00
660.00
605.00
1265.00
2825.01
2825.01
360.97
3.61
364.58
/Sqm
360.97
32.33
393.30
3.93
397.23
Say
393.30
1560.01
1265.00
2825.01
211.88
211.88
3248.76
64.66
457.96
4.58
462.54
457.96
96.98
554.94
5.55
560.49
554.94
129.31
684.25
6.84
691.09
691.10
Say
21287.00
21287.00
4853.44
830.19
78.00
135.20
507.00
47.32
6237.95
623.79
240.00
220.00
1888.79
1888.79
434.42
4.34
438.77 Say
660.00
605.00
1265.00
623.79
1265.00
1888.79
141.66
141.66
2172.11
438.80
434.42
58.19
492.61
4.93
497.54
497.50
492.61
58.19
550.80
5.51
556.31
556.30
mass concrete
21287.00
50.00
135.20
5683.63
630.00
44.40
6358.03
635.80
240.00
220.00
120.00
110.00
230.00
865.80
865.80
99.57
1.00
100.56 Say
21287.00
104.00
104.00
135.20
240.00
220.00
635.80
230.00
865.80
64.94
64.94
995.67
100.60
4640.57
1580.80
832.00
61.65
7115.02
711.50
660.00
605.00
711.50
1265.00
1976.50
1976.50
1265.00
1976.50
148.24
148.24
2272.98
541.18
5.41
546.60 Say
546.60
541.18
610.46
69.27
610.46
6.10
616.56 /sqm
610.46
749.01
Say
138.55
749.01
7.49
756.50 /sqm
756.50 /sqm
749.01
832.13
Say
83.13
832.13
8.32
840.46 /sqm
840.50 /sqm
832.13
898.64
Say
66.50
898.64
8.99
907.62 /sqm
907.60 /sqm
21287.00
78.00
135.20
240.00
220.00
8791.53
1638.00
93.15
10522.68
1052.27
300.00
275.00
575.00
1627.27
1627.27
239.92
2.40
242.32 Say
1052.27
575.00
1627.27
122.05
122.05
1871.36
242.30
239.92
16.96
256.87
2.57
259.44
259.40
Say
256.87
273.83
Say
16.96
273.83
2.74
276.57
276.60
21287.00
20307.80
21287.00
5726.20
7862.40
332.73
78.00
135.20
34229.13
3422.91
240.00
220.00
9632.91
3240.00
2970.00
6210.00
3422.91
6210.00
9632.91
722.47
9632.91
722.47
11077.85
463.51
4.64
468.14 Say
468.10
463.51
523.27
Say
59.76
523.27
5.23
528.50
528.50 /sqm
523.27
583.03
Say
59.76
583.03
5.83
588.86
588.90 /sqm
(i)
a)
b)
Description of items
Qnty
Unit
2.75 nos
2.75 nos
Add O.H.C @
7.5 %
Add Contractor profit@
7.5 %
for 9.00 sqm
For 1 sqm
3248.76
Add Labour Cess
Each
Each
on
on
(a+b)
(a+b)
9
1
%
Say
1265.00 x
253.00 X
b)
290.95
20%
15%
/
9
1%
253.00
37.95
290.95
32.33
1265.00 x
253.00 X
290.95
20%
15%
/
(ii)
a)
b)
1%
Add O.H.C @
7.5 %
Add Contractor Profit@
7.5 %
for 5.00 sqm
For 1 sqm
2172.11
Add Labour Cess
For First Floor
Rate same as G.F.
Add extra to the rates for F.F.
OHC &Contractor profit
1265.00 x
253.00 x
For
5.00 SQM
For
1.00 sqm
a)
cum
cum
mtr
cum
10
Each
Each
on
on
(a+b)
(a+b)
5
1
20%
15%
253.00
37.95
290.95
58.19
1%
1265.00 x
253.00 x
For
5.00 SQM
For
1.00 sqm
253.00
37.95
290.95
32.33
20%
15%
253.00
37.95
290.95
58.19
1%
R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc
0.267 cum
cum
6358.03
Labour
Carpenter 2nd
S.S.Mulia
a)
b)
10
0.50 nos
0.50 nos
Add O.H.C @
Add Contractor profit@
For 10 Sqm
For 1 sqm
Add Labour Cess
iv)
mtr
cum
Each
Each
7.5 %
7.5 %
on (a+b)
on (a+b)
995.67
/
1%
10
Add O.H.C@
Add Contractor Profit@
For 4.2 Sqm
For 1 sqm
Add Labour Cess
0.218 cum
15.2 mtr
8.00 mtr
0.456 cum
cum
mtr
mtr
mtr
7115.02
10
2.75 nos
2.75 nos
Each
Each
7.5 %
7.5 %
2272.98
on (a+b)
on (a+b)
/
1%
4.2
253.00
37.95
290.95
69.27
1%
20%
15%
253.00
37.95
v)
a)
For
For
4.2 Sqm
1 Sqm
1%
R.C.C. Lintels
Data for 7.8 sqm
For 1 Sqm
Materials
38mm Non sal planks
120mm dia non sal bullah
Carriage of wood
Considering for 10 times use
0.413 cum
21 mtr
0.689 cum
Use once
a)
290.95
69.27
Labour
Carpenter 2nd
S.S.Mulia
cum
mtr
cum
10522.68
1.25 nos
1.25 nos
Add O.H.C@
Add Contractor Profit@
For 7.8 Sqm
For 1 sqm
Add Labour Cess
Each
Each
7.5 %
7.5 %
1871.36
on (a+b)
on (a+b)
/
1%
575.00 X
115.00 x
For
For 1 sqm
115.00 x
7.8
20 %
15 %
7.8 Sqm
1 Sqm
20%
15%
1%
575.00 X
7.8
7.8 Sqm
132.25
/
vi)
10
1%
115.00
17.25
132.25
16.96
256.87
115.00
17.25
132.25
16.96
a)
For 1 Sqm
Materials
0.954 cum
0.269 cum
100.80 mtr
2.461 cum
cum
cum
mtr
cum
34229.13
Labour
Carpenter 2nd
S.S.Mulia 2.75 nos.
13.5 nos
13.5 nos
Add O.H.C @
Add Contractor Profit @
For 23.90 Sqm
For 1 sqm
Add Labour Cess
7.5 %
7.5 %
11077.85
6210.00 X
1242.00
For
23.90 sqm
For
1 sqm
Each
Each
on (a+b)
on (a+b)
/
1%
23.9
20%
15%
1242.00
186.30
1428.30
59.76
1%
6210.00 X
1242.00
For
23.90 sqm
For
1 sqm
Add Labour Cess
10.00
20%
15%
1%
1242.00
186.30
1428.30
59.76
. Work
Rate in Rs.
Amount in
Rs.
Remarks
4.00
5.00
6.00
un shades and
21287.00
21287.00
104.00
135.20
2384.14
7237.58
5824.00
154.40
15600.12
1560.01
240.00
220.00
660.00
605.00
1265.00
2825.01
2825.01
360.97
3.61
364.58
364.60 /Sqm
360.97
Say
32.33
393.30
3.93
397.23
397.20
393.30
1560.01
1265.00
2825.01
211.88
211.88
3248.76
32.33
425.63
4.26
429.89
21287.00
21287.00
78.00
135.20
240.00
220.00
4853.44
830.19
507.00
47.32
6237.95
623.79
660.00
605.00
1265.00
1888.79
1888.79
434.42
4.34
438.77 Say
623.79
1265.00
1888.79
141.66
141.66
2172.11
438.80
434.42
58.19
492.61
4.93
497.54
497.50
492.61
58.19
550.80
5.51
556.31
recast slabs etc
21287.00
5683.63
556.30
50.00
135.20
630.00
44.40
6358.03
635.80
240.00
220.00
635.80
120.00
110.00
230.00
230.00
865.80
64.94
64.94
995.67
865.80
865.80
99.57
1.00
100.56 Say
21287.00
104.00
104.00
135.20
240.00
220.00
100.60
4640.57
1580.80
832.00
61.65
7115.02
711.50
660.00
605.00
1265.00
1976.50
1976.50
541.18
5.41
546.60 Say
711.50
1265.00
1976.50
148.24
148.24
2272.98
546.60
541.18
610.46
69.27
610.46
6.10
616.56 /sqm
610.46
69.27
679.73
6.80
686.53 /sqm
686.50 /sqm
679.73
Say
21287.00
78.00
135.20
8791.53
1638.00
93.15
10522.68
1052.27
240.00
220.00
300.00
275.00
575.00
1627.27
1627.27
239.92
2.40
242.32 Say
16.96
256.87
2.57
259.44
259.40
256.87
273.83
Say
575.00
1627.27
122.05
122.05
1871.36
242.30
239.92
Say
1052.27
16.96
273.83
2.74
276.57
276.60
21287.00
20307.80
21287.00
5726.20
7862.40
332.73
78.00
135.20
34229.13
3422.91
240.00
220.00
3240.00
2970.00
6210.00
9632.91
9632.91
3422.91
6210.00
9632.91
722.47
722.47
11077.85
463.51
4.64
468.14 Say
468.10
463.51
523.27
Say
59.76
523.27
5.23
528.50
528.50 /sqm
523.27
583.03
Say
59.76
583.03
5.83
588.86
588.90 /sqm
Description of items
Qnty
2
Supplying all labour, materials ,T&P and
providing Cement concrete (1:1:3)
with crusher broken hard granite chips
on 12mm size RCC works including cost
of
conveyance&
royalty
,sundries,
watering ,curing &lifting &laying concrete
at a height of 5mtr. Maximum complete
etc all complete(Excluding cost of
Unit
a)
(i)
(ii)
Column Base
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
b)
(i)
(ii)
Lintel
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
c)
(i)
(ii)
Plinth Band
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
d)
(i)
(ii)
1 cum
1.5 Sqm
Cum
sqm
1%
1 cum
Cum
14 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
e)
(i)
(ii)
Roof slab
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
f)
(i)
(ii)
Stair Case
1 cum
Cum
10 Sqm
sqm
1%
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
1 cum
Cum
9 Sqm
sqm
1%
g)
(i)
Chajja(0.065 cum)
(ii)
Cost of C.C.(1:1 : 3 )
g)
(i)
(ii)
Cost of C.C.(1:1 : 3 )
1 cum
for
0.065
1.10 Sqm
Cum
cum
sqm
1%
1 cum
for
0.075
2.00 Sqm
1%
Cum
cum
sqm
a)
(i)
(ii)
Column Base
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess
b)
(i)
(ii)
Lintel
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess
c)
(i)
(ii)
Plinth Band
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
1 cum
1.5 Sqm
Cum
sqm
1%
1 cum
Cum
14 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
d)
(i)
(ii)
1%
e)
(i)
(ii)
(ii)
Cum
10 Sqm
sqm
1%
Roof slab
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess
f)
(i)
1 cum
1 cum
Cum
10 Sqm
sqm
1%
Stair Case
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
1 cum
Cum
9 Sqm
sqm
1%
g)
(i)
Chajja(0.065 cum)
(ii)
Cost of C.C.(1:2 : 4 )
1 cum
for
0.065
1.10 Sqm
g)
(i)
(ii)
Cost of C.C.(1:2 : 4 )
Cum
cum
sqm
1%
for
1 cum
0.075
2.00 Sqm
1%
Cum
cum
sqm
huttering
Rate in Rs. Amount in Rs.
4
5570.64
5570.64
99.57
149.35
5719.99
Say
5570.64
5570.64
239.92
3358.85
8929.49
Say
5570.64
5570.64
99.57
995.67
6566.31
Say
5570.64
5570.64
541.18
5411.85
10982.49
Say
Remarks
6
5719.99
57.20
5777.19
5777.20
8929.49
89.29
9018.78
9018.80
6566.31
65.66
6631.97
6632.00
5579.80
10982.49
109.82
11092.31
11092.30
541.18
6120.99
61.20985495
6182.20
5570.64
5570.64
5579.80
360.97
3609.74
9180.37
3609.74
9189.54
91.89538362
9281.43
Say
5570.64
5570.64
434.42
3909.81
9480.44
Say
5570.64
5570.64
360.97
6108.79
11679.42
Say
5570.64
5570.64
463.51
12360.22
17930.86
Say
9180.37
91.80
9272.18
9272.20
9480.44
94.80
9575.25
9575.20
11679.42
116.79
11796.22
11796.20
5579.80
12360.22
17930.86
179.31
18110.17
18110.20
17940.02
179.4002337
18119.42
5579.80
5579.80
99.57
149.35
5729.15
Say
5579.80
5579.80
239.92
3358.85
8938.65
Say
5579.80
5579.80
99.57
995.67
6575.47
5729.15
57.29
5786.44
5786.40
8938.65
89.39
9028.04
9028.00
6575.47
65.75
6641.23
5579.80
5579.80
27.34
541.18
5411.85
10991.65
Err:509
Err:509
Err:509
Err:509
Say
10991.65
109.92
11101.57
11101.60
5579.80
5579.80
27.34
360.97
3609.74
9189.54
3609.74
3637.08
36.37079457
3673.45
Say
5579.80
5579.80
21287.00
191583.00
197162.80
9189.54
91.90
9281.43
9281.40
197162.80
1971.63
199134.43
5579.80
5579.80
0.00
0.00
5579.80
5579.80
5579.80
27.34
12360.22
463.51
12360.22
17940.02
12387.56
123.8756446
12511.44
Say
5579.80
55.80
5635.60
17940.02
179.40
18119.42
18119.40
Description of items
Qnty
2
Supplying all labour, materials ,T&P and
providing Cement concrete (1:1:3)
with crusher broken hard granite chips
on 12mm size RCC works including cost
of
conveyance&
royalty
,sundries,
watering ,curing &lifting &laying concrete
at a height of 5mtr. Maximum complete
etc all complete(Excluding cost of
Unit
a)
(i)
(ii)
Column Base
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
b)
(i)
(ii)
Lintel
G.F.
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
(i)
(ii)
F.F.
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
(i)
(ii)
2nd Floor
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
1 cum
1.5 Sqm
Cum
sqm
1%
1 cum
Cum
14 Sqm
sqm
1%
1 cum
Cum
14 Sqm
sqm
1%
1 cum
Cum
14 Sqm
sqm
1%
c)
(i)
(ii)
Plinth Band
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
d)
(i)
(ii)
(i)
(ii)
F.F.
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
(i)
(ii)
2nd floor
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
e)
(i)
(ii)
Roof slab
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
(i)
(ii)
Roof slab(F.F.)
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
1 cum
Cum
10 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
(i)
(ii)
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
Add Labour Cess
f)
(i)
(ii)
f)
(i)
(ii)
f)
(i)
(ii)
Stair Case
sqm
1%
Cum
9 Sqm
sqm
1%
Stair Case(F.F.)
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
1 cum
Cum
9 Sqm
sqm
1%
1 cum
Cum
9 Sqm
sqm
1%
(ii)
Cost of C.C.(1:1 : 3 )
g)
(i)
10 Sqm
1 cum
Chajja(0.065 cum)
(ii)
Cum
Cost of C.C.(1:1 : 3 )
Cost of Centering & Shuttering
g)
(i)
(i)
1 cum
1 cum
for
0.065
1.10 Sqm
Cum
cum
sqm
1%
1 cum
for
0.065
1.10 Sqm
Cum
cum
sqm
1%
1 cum
Cum
for
(ii)
2.00 Sqm
(i)
(ii)
(i)
(ii)
0.075
cum
sqm
1%
F.F.
for
1 cum
0.075
2.00 Sqm
Cum
cum
sqm
1%
2nd Floor
1 cum
for
0.075
2.00 Sqm
1%
Cum
cum
sqm
a)
(i)
(ii)
Column Base
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess
b)
(i)
(ii)
Lintel
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess
c)
(i)
(ii)
Plinth Band
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess
d)
(i)
(ii)
e)
(i)
(ii)
Roof slab
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
Add Labour Cess
1 cum
1.5 Sqm
Cum
sqm
1%
1 cum
Cum
14 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
1 cum
Cum
10 Sqm
sqm
1%
f)
(i)
(ii)
Stair Case
Cost of C.C.(1:2 : 4 )
Cost of Centering & Shuttering
1 cum
Cum
9 Sqm
sqm
1%
g)
(i)
Chajja(0.065 cum)
(ii)
Cost of C.C.(1:2 : 4 )
g)
(i)
(ii)
Cost of C.C.(1:2 : 4 )
for
1 cum
0.065
1.10 Sqm
Cum
cum
sqm
1%
1 cum
for
0.075
2.00 Sqm
1%
Cum
cum
sqm
Shuttering
Rate in Rs. Amount in Rs.
4
6399.82
6399.82
99.57
149.35
6549.17
Say
6399.82
6399.82
239.92
3358.85
9758.67
Say
6586.67
6586.67
256.87
3596.22
10182.89
Say
6773.52
6773.52
273.83
3833.59
10607.11
Remarks
6
6549.17
65.49
6614.66
6614.70
9758.67
97.59
9856.25
9856.30
10182.89
101.83
10284.72
10284.70
10607.11
106.07
10713.18
Say
10713.20
6399.82
6399.82
99.57
995.67
7395.49
Say
7395.49
73.95
7469.44
7469.40
6399.82
6399.82
5579.80
541.18
5411.85
11811.67
541.18
6120.99
61.20985495
6182.20
Say
11811.67
118.12
11929.78
11929.80
6586.67
6586.67
0.00
610.46
6104.59
12691.26
0.00
0.00
0
0.00
Say
12691.26
126.91
12818.17
12818.20
6773.52
6773.52
0.00
679.73
6797.33
13570.85
0.00
0.00
0
0.00
Say
13570.85
135.71
13706.56
13706.60
6399.82
6399.82
5579.80
360.97
3609.74
10009.55
3609.74
9189.54
91.89538362
9281.43
Say
10009.55
100.10
10109.65
10109.60
6586.67
6586.67
0.00
393.30
3933.02
10519.68
3933.02
3933.02
39.3301564
3972.35
Say
10519.68
105.20
10624.88
10624.90
6773.52
6773.52
0.00
425.63
4256.29
11029.81
4256.29
4256.29
42.56293418
4298.86
Say
6399.82
6399.82
434.42
3909.81
10309.62
6586.67
6586.67
492.61
4433.52
11020.18
6773.52
6773.52
550.80
4957.23
11730.75
6399.82
6399.82
360.97
6108.79
12508.60
G.F.
10309.62
103.10
10412.72
11020.18
110.20
11130.39
11730.75
117.31
11848.05
12508.60
125.09
12633.69
6586.67
6586.67
393.30
6655.87
13242.54
G.F.
6399.82
11029.81
110.30
11140.11
11140.10
13242.54
132.43
13374.97
6399.82
379.93215
397.859
777.79115 13162.62
5579.80
12360.22
463.51
12360.22
18760.04
Say
18760.04
187.60
18947.64
18947.60
17940.02
179.4002337
18119.42
6586.67
6586.67
0.00
13953.86
523.27
13953.86
20540.53
13953.86
139.5386303
14093.40
Say
20540.53
205.41
20745.94
20745.90
6773.52
6773.52
0.00
15547.50
583.03
15547.50
22321.02
15547.50
155.475032
15702.98
Say
22321.02
223.21
22544.23
22544.20
5579.80
5579.80
99.57
149.35
5729.15
Say
5579.80
5579.80
239.92
3358.85
8938.65
Say
5729.15
57.29
5786.44
5786.40
8938.65
89.39
9028.04
9028.00
5579.80
5579.80
99.57
995.67
6575.47
5579.80
5579.80
27.34
541.18
5411.85
10991.65
Err:509
Err:509
Err:509
Err:509
Say
6575.47
65.75
6641.23
10991.65
109.92
11101.57
11101.60
5579.80
5579.80
27.34
360.97
3609.74
9189.54
3609.74
3637.08
36.37079457
3673.45
Say
9189.54
91.90
9281.43
9281.40
5579.80
5579.80
21287.00
191583.00
197162.80
5579.80
5579.80
360.97
6108.79
11688.59
197162.80
1971.63
199134.43
11688.59
116.89
11805.47
5579.80
5579.80
27.34
12360.22
463.51
12360.22
17940.02
12387.56
123.8756446
12511.44
Say
17940.02
179.40
18119.42
18119.40
Plastering work
SL No.
Description of items
Qnty
2
Providing fitting, fixing of Al. door with anodized Al.
door section of 9202 as vertical member, 9201 as
top,9200 as bottom and middle member with frame
section as 9221 with tapered clip No.4660 and the
frame to be complete by means of jointing angle
No.1855 including all cost of labour,T&P ,hire
charges of drilling machine,labour charge & labour
cess etc complete (excluding cost of laminated
board)
a)
27.13 sqm
4.06 mtr
2.14 mtr
2.13 mtr
16.65 mtr
0.42 mtr
6.2 mtr
Wastage
5%
Say
4" Anodised Al. Hinges.
U rubber beading
Door Stopper
Handle
6 Level mortice lock
Hire charges of drilling machine
Aluminium Screws adaessive
B)
Labour Charges
Carpenter (1st Class)
Fitter(2nd Class)
Helper to Carpenter
Mulia
@
@
@
@
@
@
0.92
4 nos
18.29 mtr
1 Day
2 nos
1 nos
1.5 Days
1.202 /
1.970 /
1.298 /
0.169 /
0.518 /
1.975 /
on
28.49
Sqm
0.42 nos
1.68 nos
2.3 nos
3 nos
O.H.C
Add contractor Profit
@ 7.50 % on(a+b)
@ 7.50 % on(a+b)
Total cost of (a+b+c)
Rate per Sqm
11234.60 /
27.13
Add Labour cess
@
1%
27.14
Unit
Rate in Rs.
4
kg/mtr
kg/mtr
kg/mtr
kg/mtr
kg/mtr
kg/mtr
4.88
4.22
2.76
2.81
0.22
12.25
27.14
1.36
28.49
226.00
577.00
39.00
15.00
25.00
62.50
400.00
100.00
27.14
Kg
Sqm
each
mtr
Day
each
each
Day
L.S.
Each
Each
Each
Each
260.00
240.00
220.00
200.00
9769.22
9769.22
Sqm
Say
Amount in
Rs.
5
Remarks
6
6439.63
530.84
156.00
274.35
25.00
125.00
400.00
150.00
50.00
8150.82
109.20
403.20
506.00
600.00
1618.40
8150.82
1618.40
9769.22
732.69
732.69
11234.60
414.10
4.14
418.24
418.20 /sqm
Plastering work
SL No.
Description of items
Qnty
2
Supplying all labour,T&P, materials and making
12mm thick cement plaster in cement
a)
b)
Per 1 sqm
Materials
Sand (Screened & washed)
Cement
0.015 cum
0.0715 Qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
0.14 nos
0.05 nos
0.05 nos
O.H.C. @
Add Contractor profit @
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.02 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0715 Qntl
57.60
2.88
1% on
57.60
2.88
a)
b)
1% on
0.015 cum
0.0543 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
0.14 nos
0.05 nos
0.05 nos
O.H.C. @
Add Contractor Profit @
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.02 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0543 qntl
57.60
X
2.88 x
5
10
1%
2nd floor
Rate same as f.F.
Extra labour for work in F.F
Add O.H.C.
57.60
X
2.88 x
3rd floor
Rate same as 2nd floor
Extra labour for work in 3rd floor
Add O.H.C.
1%
57.60
X
2.88 x
a)
b)
5
10
1%
0.015 cum
0.0644 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
5
10
0.15 nos
0.04 nos
0.05 nos
0.02 nos
O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0644 qntl
First floor
Rate same as G.F.
Extra labour for work in F.F
Add O.H.C.
58.00
X
2.90 x
2nd floor
Rate same as F.F.
Extra labour for work in F.F
Add O.H.C.
Per 1 sqm
1%
58.00
X
2.90 x
5
15
5
15
1%
a)
Materials
Sand (Screened & washed)
Cement 0.0045 cum or
b)
Labour charges
0.015 cum
0.0644 qntl
0.15 nos
0.04 nos
0.05 nos
O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.02 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0543 qntl
1 Sqm
1
16
a)
b)
0.015 cum
0.0358 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
0.14 nos
0.05 nos
0.05 nos
O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.02 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0358 qntl
57.60
X
2.88 x
5
15
1%
57.60
X
2.88 x
5
15
18
a)
b)
1%
Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.003 cum or
0.018 cum
0.043 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
0.16 nos
0.11 nos
0.11 nos
O.H.C. @
Add contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
7.5 %
7.5 %
on(a+b)
on(a+b)
0.018 cum
0.043 qntl
First Floor
0.02 nos
86.40 x
15 %
5
on
2ND Floor
Rate Same as F.F.
Add Extra labour for 2nd floor
Add OHC & C.P.@7.50% EACH
86.40 x
15 %
a)
b)
5
on
0.0114 qntl
Labour Charges
Mason (spl)
Women Mulia(U/S)
0.027 nos
0.027 nos
O.H.C. @
Add contractor profit@
Lead & Royalty
Cement
7.50 %
7.50 %
on(a+b)
on(a+b)
0.0114 qntl
Add Labour cess @
O.H.C. @
Add contractor Profit@
0.018 cum
0.0329 Qntl
0.16 nos
0.11 nos
0.11 nos
0.02 nos
7.50 %
7.5 %
0.018 cum
0.0329 Qntl
1%
Supplying all
materials, labour, T&P and
providing 20mm thick cement plaster (1:4) for
stone work
including watering , curing
conveyance of all materials to work site,
payment of royalty, taxes etc all complete as per
specification and direction of Engineer-incharge (including 1% labour cess).
Per 1 sqm
Materials
Sand (Screened & washed)
Cement
Labour charges
Mason (2nd class)
Man Mulia(U/S)
on(a+b)
on(a+b)
0.021 cum
0.0744 Qntl
0.16 nos
0.11 nos
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
O.H.C. @
Add Contractor profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
Supplying all
materials, labour, T&P and
providing 20mm thick cement plaster (1:6) for
stone work
including watering , curing
conveyance of all materials to work site,
payment of royalty, taxes etc all complete as per
specification and direction of Engineer-incharge (including 1% labour cess).
Per 1 sqm
Materials
0.11 nos
0.02 nos
7.5 %
7.5 %
on
on
0.021 cum
0.0744 Qntl
0.021 cum
0.057 Qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
O.H.C. @
Add contractor profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.16 nos
0.11 nos
0.11 nos
0.02 nos
7.5 %
7.5 %
on
on
0.021 cum
0.057 Qntl
17
a)
b)
Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.003 cum or
0.0075 cum
0.0372 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
Labour for closed deep chipping & cleaning
O.H.C. @
Add contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.16 nos
0.11 nos
0.11 nos
0.02 nos
0.05 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.0075 cum
0.0372 qntl
First Floor
Rate Same as G.F.
Add Extra labour for first floor
Add OHC
96.40 x
15 %
5
on
Unit
cum
Qntl
55.00
658.00
0.83
47.05
47.87
Each
Each
Each
240.00
200.00
200.00
33.60
10.00
10.00
Each
200.00
4.00
57.60
n(a+b)
n(a+b)
105.47
105.47
cum
Qntl
524.20
16.90
7.86
1.21
9.07
%
Say
5%
15%
133.68
2.88
0.43
3.31
Remarks
6
47.87
57.60
105.47
7.91
7.91
9.07
130.36
1.30
131.67
131.70
130.36
3.31
133.68
1.34
135.01
135.00
130.36
23.10
153.47
1.534662
155.00
48
524.20
5%
15%
133.68
2.88
0.43
3.31
136.99
3.31
136.99
1.37
138.36
138.40
36.55
cum
Qntl
55.00
658.00
0.83
35.73
36.55
Each
Each
Each
240.00
200.00
200.00
33.60
10.00
10.00
Each
200.00
4.00
57.60
n(a+b)
n(a+b)
cum
Qntl
94.15
94.15
524.20
16.90
7.86
0.92
8.78
%
Say
%
%
2.88
0.29
3.17
117.06
3.17
120.23
1.20
57.60
94.15
7.06
7.06
8.78
117.06
1.17
118.23
118.20
Say
%
%
121.40
120.23
2.88
0.29
3.17
Say
%
%
121.43
3.17
123.39
1.23
124.63
124.60
123.39
2.88
0.29
3.17
Say
3.17
126.56
1.27
127.83
cum
Qntl
55.00
658.00
0.83
42.38
43.20
Each
Each
Each
240.00
200.00
200.00
36.00
8.00
10.00
Each
200.00
4.00
58.00
127.80
43.20
58.00
n(a+b)
n(a+b)
cum
Qntl
101.20
7.59
7.59
101.20
101.20
524.20
16.90
7.86
1.09
8.95
%
Say
%
%
125.33
2.90
0.44
3.34
Say
%
%
8.95
125.33
1.25
126.58
126.60
3.34
128.67
1.29
129.95
130.00
128.67
2.90
0.44
3.34
Say
3.34
132.00
1.32
133.32
133.30
148.43
1.484336
149.92
cum
Qntl
55.00
658.00
0.83
42.38
43.20
Each
Each
Each
240.00
200.00
200.00
36.00
8.00
10.00
Each
200.00
4.00
58.00
n(a+b)
n(a+b)
cum
Qntl
101.20
101.20
524.20
16.90
7.86
0.92
8.78
%
Say
43.20
58.00
101.20
7.59
7.59
8.78
125.16
6.60
131.76
1.32
133.08
133.10
cum
Qntl
55.00
658.00
0.83
23.56
24.38
Each
Each
Each
240.00
200.00
200.00
33.60
10.00
10.00
Each
200.00
4.00
57.60
n(a+b)
n(a+b)
cum
Qntl
81.98
81.98
524.20
16.90
7.86
0.61
8.47
%
Say
%
%
2.88
0.43
3.31
2.88
0.43
57.60
81.98
6.15
6.15
8.47
102.75
1.03
103.77
103.80
102.75
Say
%
%
24.38
3.31
106.06
1.06
107.12
106.06
107.10
3.31
Say
3.31
109.37
1.09
110.46
cum
Qntl
55.00
658.00
0.99
28.29
29.28
Each
Each
Each
240.00
200.00
200.00
38.40
22.00
22.00
Each
200.00
4.00
86.40
n(a+b)
n(a+b)
cum
Qntl
115.68
115.68
524.20
16.90
9.44
0.73
10.16
%
Say
110.50
29.28
86.40
115.68
8.68
8.68
10.16
143.20
1.43
144.63
144.60
143.20
4.32
0.65
4.97
4.32
4.97
148.17
1.48
149.65
149.60 / sqm
%
Say
148.17
4.32
0.65
4.97
4.32
4.97
153.13
1.53
154.67
154.70 / sqm
%
Say
Qntl
658.00
7.50
7.50
Each
Each
260.00
200.00
7.02
5.40
12.42
n(a+b)
n(a+b)
Qntl
19.92
19.92
16.90
0.19
%
Say
7.50
12.42
19.92
1.49
1.49
22.91
0.19
23.10
0.23
23.33
23.30
20.11
0.15276
19.41
19.56276
0.195628
19.75839
Cum
Qntl
44.00
640.00
0.79
21.06
21.85
Each
Each
Each
Each
190.00
150.00
150.00
150.00
30.40
16.50
16.50
3.00
66.40
n(a+b)
n(a+b)
88.25
88.25
cum
Qntl
524.20
13.40
3.50
0.44
3.95
cum
Qntl
44.00
640.00
0.92
47.62
48.54
Each
Each
240.00
200.00
38.40
22.00
21.85
66.40
88.25
8.82
8.82
3.95
109.84
1.01
110.85
48.54
Each
Each
200.00
200.00
22.00
4.00
86.40
(a+b)
(a+b)
cum
Qntl
134.94
134.94
524.20
13.40
11.01
1.00
12.01
%
Say
86.40
134.94
10.12
10.12
12.01
167.19
1.67
168.86
168.90
cum
Qntl
55.00
658.00
1.16
37.51
38.66
Each
Each
Each
Each
240.00
200.00
200.00
200.00
38.40
22.00
22.00
4.00
86.40
(a+b)
(a+b)
125.06
125.06
cum
Qntl
524.20
16.90
11.01
0.96
11.97
%
Say
38.66
86.40
125.06
9.38
9.38
11.97
155.79
1.56
157.35
157.30
cum
Qntl
55.00
658.00
0.41
24.48
24.89
Each
Each
Each
Each
Each
240.00
200.00
200.00
200.00
200.00
38.40
22.00
22.00
4.00
10.00
96.40
n(a+b)
n(a+b)
24.89
96.40
121.29
9.10
9.10
121.29
121.29
cum
Qntl
183.80
16.90
1.38
0.63
2.01
%
Say
%
4.82
4.82
0.72
5.54
Sqm
141.49
5.54
147.03
1.47
148.50
2.01
141.49
1.41
142.91
142.90
572.20
Plastering work
SL No.
Description of items
Qnty
2
Supplying all labour,T&P, materials and making
12mm thick cement plaster in cement
a)
b)
Per 1 sqm
Materials
Sand (Screened & washed)
Cement
0.015 cum
0.0715 Qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
0.14 nos
0.05 nos
0.05 nos
O.H.C. @
Add Contractor profit @
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.02 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0715 Qntl
57.60
2.88
1% on
57.60
2.88
a)
b)
1% on
0.015 cum
0.0543 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
0.14 nos
0.05 nos
0.05 nos
O.H.C. @
Add Contractor Profit @
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.02 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0543 qntl
57.60
X
2.88 x
5
10
1%
2nd floor
Rate same as f.F.
Extra labour for work in F.F
Add O.H.C.
57.60
X
2.88 x
3rd floor
Rate same as 2nd floor
Extra labour for work in 3rd floor
Add O.H.C.
1%
57.60
X
2.88 x
a)
b)
5
10
1%
0.015 cum
0.0644 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
5
10
0.15 nos
0.04 nos
0.05 nos
0.02 nos
O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0644 qntl
First floor
Rate same as G.F.
Extra labour for work in F.F
Add O.H.C.
58.00
X
2.90 x
2nd floor
Rate same as F.F.
Extra labour for work in F.F
Add O.H.C.
Per 1 sqm
1%
58.00
X
2.90 x
5
15
5
15
1%
a)
Materials
Sand (Screened & washed)
Cement 0.0045 cum or
b)
Labour charges
0.015 cum
0.0644 qntl
0.15 nos
0.04 nos
0.05 nos
O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.02 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0543 qntl
1 Sqm
1
16
a)
b)
0.015 cum
0.0358 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
0.14 nos
0.05 nos
0.05 nos
O.H.C. @
Add Contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.02 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.015 cum
0.0358 qntl
57.60
X
2.88 x
5
15
1%
57.60
X
2.88 x
5
15
18
a)
b)
1%
Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.003 cum or
0.018 cum
0.043 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
0.16 nos
0.11 nos
0.11 nos
O.H.C. @
Add contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
7.5 %
7.5 %
on(a+b)
on(a+b)
0.018 cum
0.043 qntl
First Floor
0.02 nos
86.40 x
15 %
5
on
2ND Floor
Rate Same as F.F.
Add Extra labour for 2nd floor
Add OHC & C.P.@7.50% EACH
86.40 x
15 %
a)
b)
5
on
0.0114 qntl
Labour Charges
Mason (spl)
Women Mulia(U/S)
0.027 nos
0.027 nos
O.H.C. @
Add contractor profit@
Lead & Royalty
Cement
7.50 %
7.50 %
on(a+b)
on(a+b)
0.0114 qntl
Add Labour cess @
O.H.C. @
Add contractor Profit@
0.018 cum
0.0329 Qntl
0.16 nos
0.11 nos
0.11 nos
0.02 nos
7.50 %
7.5 %
0.018 cum
0.0329 Qntl
1%
Supplying all
materials, labour, T&P and
providing 20mm thick cement plaster (1:4) for
stone work
including watering , curing
conveyance of all materials to work site,
payment of royalty, taxes etc all complete as per
specification and direction of Engineer-incharge (including 1% labour cess).
Per 1 sqm
Materials
Sand (Screened & washed)
Cement
Labour charges
Mason (2nd class)
Man Mulia(U/S)
on(a+b)
on(a+b)
0.021 cum
0.0744 Qntl
0.16 nos
0.11 nos
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
O.H.C. @
Add Contractor profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
Supplying all
materials, labour, T&P and
providing 20mm thick cement plaster (1:6) for
stone work
including watering , curing
conveyance of all materials to work site,
payment of royalty, taxes etc all complete as per
specification and direction of Engineer-incharge (including 1% labour cess).
Per 1 sqm
Materials
0.11 nos
0.02 nos
7.5 %
7.5 %
on
on
0.021 cum
0.0744 Qntl
0.021 cum
0.057 Qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
O.H.C. @
Add contractor profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.16 nos
0.11 nos
0.11 nos
0.02 nos
7.5 %
7.5 %
on
on
0.021 cum
0.057 Qntl
17
a)
b)
Per 1 sqm
Materials
Sand (Screened & washed)
Cement 0.003 cum or
0.0075 cum
0.0372 qntl
Labour charges
Mason (2nd class)
Man Mulia(U/S)
Women Mulia(U/S)
Man Mulia (U/S)for mixing sand and watering
Labour for closed deep chipping & cleaning
O.H.C. @
Add contractor Profit@
Add Lead & Royalty
Sand (Screened & washed)
Cement
0.16 nos
0.11 nos
0.11 nos
0.02 nos
0.05 nos
7.5 %
7.5 %
on(a+b)
on(a+b)
0.0075 cum
0.0372 qntl
First Floor
Rate Same as G.F.
Add Extra labour for first floor
Add OHC
96.40 x
15 %
5
on
Unit
cum
Qntl
55.00
658.00
0.83
47.05
47.87
Each
Each
Each
240.00
200.00
200.00
33.60
10.00
10.00
Each
200.00
4.00
57.60
n(a+b)
n(a+b)
105.47
105.47
cum
Qntl
524.20
16.90
7.86
1.21
9.07
%
Say
5%
15%
133.68
2.88
0.43
3.31
Remarks
6
47.87
57.60
105.47
7.91
7.91
9.07
130.36
1.30
131.67
131.70
130.36
3.31
133.68
1.34
135.01
135.00
130.36
23.10
153.47
1.534662
155.00
48
524.20
5%
15%
133.68
2.88
0.43
3.31
136.99
3.31
136.99
1.37
138.36
138.40
36.55
cum
Qntl
55.00
658.00
0.83
35.73
36.55
Each
Each
Each
240.00
200.00
200.00
33.60
10.00
10.00
Each
200.00
4.00
57.60
n(a+b)
n(a+b)
cum
Qntl
94.15
94.15
524.20
16.90
7.86
0.92
8.78
%
Say
%
%
2.88
0.29
3.17
117.06
3.17
120.23
1.20
57.60
94.15
7.06
7.06
8.78
117.06
1.17
118.23
118.20
Say
%
%
121.40
120.23
2.88
0.29
3.17
Say
%
%
121.43
3.17
123.39
1.23
124.63
124.60
123.39
2.88
0.29
3.17
Say
3.17
126.56
1.27
127.83
cum
Qntl
55.00
658.00
0.83
42.38
43.20
Each
Each
Each
240.00
200.00
200.00
36.00
8.00
10.00
Each
200.00
4.00
58.00
127.80
43.20
58.00
n(a+b)
n(a+b)
cum
Qntl
101.20
7.59
7.59
101.20
101.20
524.20
16.90
7.86
1.09
8.95
%
Say
%
%
125.33
2.90
0.44
3.34
Say
%
%
8.95
125.33
1.25
126.58
126.60
3.34
128.67
1.29
129.95
130.00
128.67
2.90
0.44
3.34
Say
3.34
132.00
1.32
133.32
133.30
148.43
1.484336
149.92
cum
Qntl
55.00
658.00
0.83
42.38
43.20
Each
Each
Each
240.00
200.00
200.00
36.00
8.00
10.00
Each
200.00
4.00
58.00
n(a+b)
n(a+b)
cum
Qntl
101.20
101.20
524.20
16.90
7.86
0.92
8.78
%
Say
43.20
58.00
101.20
7.59
7.59
8.78
125.16
6.60
131.76
1.32
133.08
133.10
cum
Qntl
55.00
658.00
0.83
23.56
24.38
Each
Each
Each
240.00
200.00
200.00
33.60
10.00
10.00
Each
200.00
4.00
57.60
n(a+b)
n(a+b)
cum
Qntl
81.98
81.98
524.20
16.90
7.86
0.61
8.47
%
Say
%
%
2.88
0.43
3.31
2.88
0.43
57.60
81.98
6.15
6.15
8.47
102.75
1.03
103.77
103.80
102.75
Say
%
%
24.38
3.31
106.06
1.06
107.12
106.06
107.10
3.31
Say
3.31
109.37
1.09
110.46
cum
Qntl
55.00
658.00
0.99
28.29
29.28
Each
Each
Each
240.00
200.00
200.00
38.40
22.00
22.00
Each
200.00
4.00
86.40
n(a+b)
n(a+b)
cum
Qntl
115.68
115.68
524.20
16.90
9.44
0.73
10.16
%
Say
110.50
29.28
86.40
115.68
8.68
8.68
10.16
143.20
1.43
144.63
144.60
143.20
4.32
0.65
4.97
4.32
4.97
148.17
1.48
149.65
149.60 / sqm
%
Say
148.17
4.32
0.65
4.97
4.32
4.97
153.13
1.53
154.67
154.70 / sqm
%
Say
Qntl
658.00
7.50
7.50
Each
Each
260.00
200.00
7.02
5.40
12.42
n(a+b)
n(a+b)
Qntl
19.92
19.92
16.90
0.19
%
Say
7.50
12.42
19.92
1.49
1.49
22.91
0.19
23.10
0.23
23.33
23.30
20.11
0.15276
19.41
19.56276
0.195628
19.75839
Cum
Qntl
44.00
640.00
0.79
21.06
21.85
Each
Each
Each
Each
190.00
150.00
150.00
150.00
30.40
16.50
16.50
3.00
66.40
n(a+b)
n(a+b)
88.25
88.25
cum
Qntl
524.20
13.40
3.50
0.44
3.95
cum
Qntl
44.00
640.00
0.92
47.62
48.54
Each
Each
240.00
200.00
38.40
22.00
21.85
66.40
88.25
8.82
8.82
3.95
109.84
1.01
110.85
48.54
Each
Each
200.00
200.00
22.00
4.00
86.40
(a+b)
(a+b)
cum
Qntl
134.94
134.94
524.20
13.40
11.01
1.00
12.01
%
Say
86.40
134.94
10.12
10.12
12.01
167.19
1.67
168.86
168.90
cum
Qntl
55.00
658.00
1.16
37.51
38.66
Each
Each
Each
Each
240.00
200.00
200.00
200.00
38.40
22.00
22.00
4.00
86.40
(a+b)
(a+b)
125.06
125.06
cum
Qntl
524.20
16.90
11.01
0.96
11.97
%
Say
38.66
86.40
125.06
9.38
9.38
11.97
155.79
1.56
157.35
157.30
cum
Qntl
55.00
658.00
0.41
24.48
24.89
Each
Each
Each
Each
Each
240.00
200.00
200.00
200.00
200.00
38.40
22.00
22.00
4.00
10.00
96.40
n(a+b)
n(a+b)
24.89
96.40
121.29
9.10
9.10
121.29
121.29
cum
Qntl
524.20
16.90
3.93
0.63
4.56
%
Say
%
4.82
4.82
0.72
5.54
Sqm
144.04
5.54
149.59
1.50
151.08
4.56
144.04
1.44
145.48
145.50
572.20
SL
No.
10
a)
Reinforcement work
Qnty
Unit
Description of items
Supplying all materials, labour, T&P and
providing M.S. reinforcement for Reinforced
cement concrete work including cutting,
bending, binding and placing in position
including cost of binding wire 18 to 20 gauge,
conveyance of all materials to worksite,
payment of royalty, taxes ,contractor profit &
labour cess
etc all complete as per
specification and direction of the Engineer-incharge.
Unit -1M.T
Taking output = 1M.T.
Materials
Hysd
bar including 5
percent
overlaps(SAIL STEEL TMT-EQR 500/IS 1786
Fe 500 D) and wastage
Binding Wire
b)
Labour
Labour for cutting, bending, shifting to
Site, tying and placing in position
Mate
Blacksmith ( Spl)
Man Mulia (U/S)
Add OHC@
Add Contractor Profit @
COST OF CARRIAGE
Steel-5.00km
For M.T.
1.05 MT
MT
8 Kg
Kg
0.44 nos
3 nos
8 nos
7.5
7.5
Each
Each
Each
%
%
1.05 MT
on(a+b)
on(a+b)
MT
67005.89
1
/
10
2476.80
123.84 x
5%
10 %
1%
67143.48
10
Say
For 2nd Floor
Rate Same as G.F.
5% extra on Labour cost for F.F. i.e
10% O.H. On excess labour i.e.
2476.80
123.84 x
5%
10 %
1%
67281.07
10
51880.00
54474.00
73.00
584.00
55058.00
220.00
260.00
200.00
96.80
780.00
1600.00
2476.80
57534.80
57534.80
169.00
6634.20
177.45
177.45
Excl L.C.
6700.59
Per M.T.
Say
Remarks
5188.00
55058.00
3366.88
336.688
340.05488
2476.80
57534.80
4315.11
4315.11
66165.02
177.45
66342.47
663.42
67005.89
6700.60
66342.47
123.84
12.38
136.22
136.22
66478.69
664.79
584.00
2476.80
3060.80
306.08
6647.87
6634.25
66.34
6700.59
584.00
2476.80
3060.80
459.12
3519.92
351.992
355.51192
67143.48
6714.35
6714.30 / Qntl
66478.69
123.84
12.38
136.22
6728.11
136.22
66614.92
666.15
67281.07
2476.80
371.52
SL
No.
10
a)
Reinforcement work
Qnty
Unit
Description of items
Supplying all materials, labour, T&P and
providing M.S. reinforcement for Reinforced
cement concrete work including cutting,
bending, binding and placing in position
including cost of binding wire 18 to 20 gauge,
conveyance of all materials to worksite,
payment of royalty, taxes ,contractor profit &
labour cess
etc all complete as per
specification and direction of the Engineer-incharge.
Unit -1M.T
Taking output = 1M.T.
Materials
Hysd
bar including 5
percent
overlaps(SAIL STEEL TMT-EQR 500/IS 1786
Fe 500 D) and wastage
Binding Wire
b)
Labour
Labour for cutting, bending, shifting to
Site, tying and placing in position
Mate
Blacksmith ( Spl)
Man Mulia (U/S)
Add OHC@
Add Contractor Profit @
COST OF CARRIAGE
Steel-5.00km
For M.T.
1.05 MT
MT
8 Kg
Kg
0.44 nos
3 nos
8 nos
7.5
7.5
Each
Each
Each
%
%
1.05 MT
on(a+b)
on(a+b)
MT
67005.89
1
/
10
2476.80
123.84 x
5%
10 %
1%
67143.48
10
Say
For 2nd Floor
Rate Same as G.F.
5% extra on Labour cost for F.F. i.e
10% O.H. On excess labour i.e.
2476.80
123.84 x
5%
10 %
1%
67281.07
10
51880.00
54474.00
73.00
584.00
55058.00
220.00
260.00
200.00
96.80
780.00
1600.00
2476.80
57534.80
57534.80
169.00
6634.20
177.45
177.45
Excl L.C.
6700.59
Per M.T.
Say
Remarks
5188.00
55058.00
3366.88
336.688
340.05488
2476.80
57534.80
4315.11
4315.11
66165.02
177.45
66342.47
663.42
67005.89
6700.60
66342.47
123.84
12.38
136.22
136.22
66478.69
664.79
584.00
2476.80
3060.80
306.08
6647.87
6634.25
66.34
6700.59
584.00
2476.80
3060.80
459.12
3519.92
351.992
355.51192
67143.48
6714.35
6714.30 / Qntl
66478.69
123.84
12.38
136.22
6728.11
136.22
66614.92
666.15
67281.07
2476.80
371.52
SL
No.
14
Description of items
PAINTING ITEMS
Qnty
Unit
0.22
0.22
0.10
nos
nos
nos
Each
Each
Each
260.00
200.00
200.00
Kg
43.00
7.50 %
7.50 %
10.00 Sqm
1.00 Sqm
1.00 %
228.70
228.70
1.25
1.00
0.10
nos
nos
nos
Each
Each
Each
260.00
200.00
200.00
1.250 litrs
Kg
193.00
7.50 %
7.50 %
ON
ON
786.25
786.25
For cost
For cost
Add Labour Cess
14
9.30 Sqm
1.00 Sqm
1.00 %
0.52
0.52
0.10
nos
nos
nos
Each
Each
Each
260.00
200.00
200.00
Kg
66.00
a)
b)
2.50 Kg
7.5%
7.5%
10.00 Sqm
1.00 Sqm
1.00 %
424.20
424.20
18.66 Kg
Materials
Painter(2nd class)
Man Muia(unskilled)
Kg
1.00 nos
0.75 nos
O.ver Head Charge @
Add Contractor Profit @
7.5%
7.5%
Each
Each
on
on
745.66 /
1.00 %
93
744.54
744.54
19.00
240.00
200.00
a)
b)
23.32 Kg
Materials
Painter(2nd class)
Man Muia(unskilled)
Kg
1.50 nos
1.00 nos
O.ver Head Charge @
Add Contractor Profit @
Each
Each
7.50 % on
7.50 % on
93
933.12
933.12
16.00
240.00
200.00
a)
b)
c)
0.36
0.36
0.07
nos
nos
nos
0.08 % on
0.08 % on
10.00 Sqm
Each
Each
Each
260.00
200.00
200.00
179.60
179.60
17.99
0.075 ltr
1.00 %
Per lits
227.00
a)
Add O.H.C.@
Add Contractor profit @
Rate for
Rate for
Add labour cess
a)
b)
0.54
0.54
0.10
nos
nos
nos
1.250 ltr
Each
Each
Each
260.00
200.00
200.00
Per lits
249.00
Kg
128.00
Each
Each
Each
240.00
200.00
200.00
(a+b)
(a+b)
1258.00
7.5%
7.5%
10.00 Sqm
1.00 Sqm
1.00 %
8.00 kg
Labour
Painter 2nd class
Mulia
Mulia for preparation of surface
0.50
0.50
0.07
nos
nos
nos
7.500 % on
7.500 % on
10.00 Sqm
1.00 %
1258.00
135.24
1.35
136.59
13
0.52 nos
0.52 nos
0.10 nos
Materials
Weather coat-2.50 kg for 10 sqm
2.50
Add O.H.C.
Add C.P.
For
For
Add Labour cess
Kg
7.50 %
7.50 %
10.00 Sqm
1.00 Sqm
1%
Each
Each
Each
260.00
200.00
200.00
Kg
192.00
12
a)
0.50 nos
0.50 nos
Each
Each
260.00
200.00
0.540 litrs
sqm
129.00
Add O.H.C.
Add contractor profit
COST FOR
Cost for
Add Labour cess
7.50 %
7.50 %
9.30 Sqm
1.00 sqm
1.00 %
299.66
299.66
b)
Wood Work
Labour Rate
Add cost of Wood primer for 1 sqm
Add O.HC.
Add contractor profit
For
For
Add Labour cess
0.750 litrs
Ltr
133.00
7.50 %
7.50 %
9.30 Sqm
1.00 Sqm
1.00 %
Say
b)
Plaster Surface
Labour Rate
Add cost of wall cement primer(Water
bound) for 10 sqm
Add O.HC.
Add contractor profit
For
For
Add Labour cess
0.840 litrs
Ltr
154.00
7.50 %
7.50 %
9.30 Sqm
1.00 Sqm
1.00 %
Say
a)
b)
8.00
Kg
Kg
Labour
Painter (2nd class)
0.50
nos
Each
30.00
240.00
Mulia
Mulia for preparation of surface
0.50
0.07
c)
OHC
nos
nos
10.00 %
Each
Each
474.00
521.40
10
200.00
200.00
1%
1.25
1.00
0.10
nos
nos
nos
1.250 litrs
7.50 %
7.50 %
9.30 Sqm
1.00 Sqm
1.00 %
Each
Each
Each
260.00
200.00
200.00
Kg
350.00
ON
ON
982.50
982.50
Kg
17.00
b)
18.66
Kg
1.00 no
0.75 no
Add O.H.C.
Add Contractor Profit
Add for extra labour and colouring materials
Rate for
Rate per sqm
Add Labour cess
Each
Each
7.50 % on(a+b)
7.50 % on(a+b)
93.00 sqm
1.00 %
240.00
200.00
707.22
707.22
b)
11.80
Labour
Painter (2nd class)
Man Mulia
Kg
0.75 no
0.50 no
Add O.H.C.
Add Contractor Profit
Rate for
Rate per sqm
Add Labour cess
Kg
Each
Each
7.50 % on(a+b)
7.50 % on(a+b)
93.00 sqm
1.00 %
17.00
240.00
200.00
480.60
480.60
Rate in
Rs.
57.20
44.00
20.00
121.20
107.50
Say
325.00
200.00
20.00
545.00
241.25
Amount in Remarks
Rs.
121.20
107.50
228.70
17.15
17.15
263.01
26.30
0.26
26.56
26.60 Sqm
545.00
241.25
786.25
58.97
58.97
786.25
904.19
97.22
0.97
98.20 Sqm
Say
135.20
104.00
20.00
259.20
165.00
Say
98.20
259.20
165.00
424.20
31.82
31.82
487.83
48.78
0.49
49.27
49.30 Sqm
354.54
240.00
150.00
744.54
0.56
0.56
745.66
Say
8.02
0.08
8.10
8.10
134.28
299.66
1220.19
12.20189
1232.39
373.12
360.00
200.00
933.12
69.98
69.98
1073.09
Say
11.54
0.12
11.65
11.70
93.60
72.00
14.00
179.60
0.13
0.13
179.87
17.99
17.03
17.03
Say
0.075
17.03
35.01
0.35
35.36
35.40
140.40
108.00
20.00
268.40
311.25
311.25
579.65
579.65
Say
1024.00
1024.00
120.00
100.00
14.00
234.00
/sqm
268.40
0.075
311.25
579.65
43.47
43.47
666.60
66.66
0.67
67.33
67.30
1024.00
234.00
1258.00
94.35
94.35
1352.35
136.60
135.20
104.00
20.00
259.20
480.00
Say
259.20
480.00
739.20
55.44
55.44
850.08
85.01
0.85
85.86
85.90
130.00
100.00
230.00
69.66
69.66
230.00
69.66
299.66
22.47
22.47
344.61
37.05
0.37
134.28
135.622
Say
37.43
37.40
230.00
99.75
329.75
24.73
24.73
379.21
40.78
0.41
41.18
41.20
230.00
129.36
359.36
26.95
26.95
413.26
44.44
0.44
44.88
44.90
240.00
240.00
120.00
240.00
100.00
14.00
234.00
Say
325.00
200.00
20.00
545.00
437.50
317.22
317.22
234.00
474.00
47.40
521.40
52.14
0.52
52.66
52.70 /sqm
545.00
437.50
982.50
73.69
73.69
1129.88
121.49
1.21
122.71 Sqm
317.22
982.50
121.49
0.00
1103.99
11.03992
240.00
150.00
390.00
Say
390.00
707.22
53.04
53.04
813.30
25.00
838.30
9.01 sqm
0.09
9.10
9.10 /sqm
17.03
0.170318
17.20
200.60
200.60
180.00
100.00
280.00
Say
200.60
280.00
480.60
36.05
36.05
552.69
552.69
5.94 sqm
0.06
6.00
6.00 /sqm
SL
No.
1
Description of items
PAINTING ITEMS
Qnty
Unit
0.22
0.22
0.10
nos
nos
nos
7.50 % on
7.50 % on
139.38 /
Each
Each
Each
121.20
121.20
10
0.25 Kg
260.00
200.00
200.00
13.94
Kg
42.00
Each
Each
Each
260.00
200.00
200.00
1.00 %
1.25
1.00
0.10
nos
nos
nos
7.50 % on
7.50 % on
626.75 /
9.3
545.00
545.00
67.39
0.125 litrs
Add Labour Cess
Kg
176.00
Each
Each
Each
260.00
200.00
200.00
1.00 %
a)
b)
0.52
0.52
0.10
nos
nos
nos
7.50 % on
7.50 % on
298.08 /
259.20
259.20
10
0.25 Kg
29.81
Kg
66.00
Kg
16.00
1.00 nos
0.75 nos
Each
Each
240.00
200.00
7.50 % on
7.50 % on
688.56
688.56
1.00 %
18.66 Kg
Materials
Painter(2nd class)
Man Muia(unskilled)
O.ver Head Charge @
Add Contractor Profit @
Cost for 93 sqm
per sqm-535.08/93
Add Labour cess
791.84 /
1.00 %
93
a)
b)
23.32 Kg
Materials
Painter(2nd class)
Man Muia(unskilled)
O.ver Head Charge @
Add Contractor Profit @
Kg
16.00
1.50 nos
1.00 nos
Each
Each
240.00
200.00
7.50 % on
7.50 % on
933.12
933.12
1073.09 /
1.00 %
93
a)
b)
c)
a)
b)
c)
0.36
0.36
0.07
nos
nos
nos
7.50 % on
7.50 % on
10.00 Sqm
Each
Each
Each
260.00
200.00
200.00
179.60
179.60
20.65
0.075 ltr
Per lits
227.00
Each
Each
Each
260.00
200.00
200.00
1.00 %
0.54
0.54
0.10
nos
nos
nos
7.50 % on
7.50 % on
10.00 Sqm
268.40
268.40
30.87
0.125 ltr
1.00 %
Per lits
227.00
a)
b)
Per sqm
[ Data for 10 Sqm ]
Materials
Synthetic putty(water bound)
8.00 kg
Labour
Painter 2nd class
Mulia
Mulia for preparation of surface
0.50
0.50
0.07
nos
nos
nos
7.50 % on
7.50 % on
10.00 Sqm
Kg
128.00
Each
Each
Each
240.00
200.00
200.00
(a+b)
(a+b)
1258.00
1258.00
135.24
1.35
136.59
1.00 %
Labour
Painter (Spl)
Man Mulia (U/S)
0.52 nos
0.52 nos
0.10 nos
O.H.C@
Add contractor profit@
For
Cost for 1 sqm
Each
Each
Each
7.50 % on
7.50 % on
10.00 Sqm
10
298.08 /
260.00
200.00
200.00
259.20
259.20
Materials
Weather coat-2.50 kg for 10 sqm per sqm
0.25 Kg
0.25
Kg
Kg
175.00
a)
b)
1%
Wood Work
Labour Rate
Add cost of Wood primer for 1 sqm
Add Labour cess
0.50 nos
0.50 nos
7.50 % on
7.50 % on
9.30 sqm
264.50 /
0.054 litrs
Each
Each
260.00
200.00
230.00
230.00
9.30
sqm
118.00
Ltr
133.00
1.00 %
0.075 litrs
1.00 %
Say
a)
b)
c)
8.00
Kg
Kg
30.00
Labour
Painter (2nd class)
Mulia
Mulia for preparation of surface
0.50
0.50
0.07
nos
nos
nos
Each
Each
Each
240.00
200.00
200.00
OHC
10.00 %
474.00
521.40
10
1%
b)
18.66
Labour
Painter (2nd class)
Man Mulia
Kg
1.00 no
0.75 no
Add O.H.C.
Add Contractor Profit
Add for extra labour and colouring materials
Rate for
Rate per sqm
Add Labour cess
Kg
17.00
Each
Each
240.00
200.00
7.50 % on(a+b)
7.50 % on(a+b)
93.00 sqm
1.00 %
707.22
707.22
a)
b)
11.80
Labour
Painter (2nd class)
Man Mulia
Kg
0.75 no
0.50 no
Add O.H.C.
Add Contractor Profit
Rate for
Rate per sqm
Add Labour cess
Kg
16.00
Each
Each
240.00
200.00
0.00 % on(a+b)
0.00 % on(a+b)
93.00 sqm
1.00 %
468.80
468.80
Remarks
57.20
44.00
20.00
121.20
9.09
9.09
139.38
13.94
10.50
Say
10.50
24.44
0.24
24.68
24.70 Sqm
325.00
200.00
20.00
545.00
40.88
40.88
626.75
67.39
22.00
22.00
89.39
0.89
90.29 Sqm
Say
135.20
104.00
20.00
259.20
19.44
19.44
298.08
29.81
16.50
Say
16.50
46.31
0.46
46.77
46.80 Sqm
298.56
240.00
150.00
688.56
51.64
51.64
791.84
8.51
0.09
8.60
89.39
34.81
124.21
1.2420533
125.45
Say
8.60
373.12
360.00
200.00
933.12
69.98
69.98
1073.09
Say
11.54
0.12
11.65
11.70
93.60
72.00
14.00
179.60
13.47
13.47
206.54
20.65
17.03
17.03
Say
0.075
17.03
37.68
0.38
38.06
38.10
140.40
108.00
20.00
268.40
20.13
20.13
308.66
30.87
28.38
28.38
Say
0.075
28.38
59.24
0.59
59.83
59.80
1024.00
1024.00
120.00
100.00
14.00
234.00
/sqm
1024.00
234.00
1258.00
94.35
94.35
1352.35
136.60
135.20
104.00
20.00
259.20
19.44
19.44
298.08
29.81
29.81
43.75
43.75
73.56
0.74
74.29
74.30
Say
130.00
100.00
230.00
17.25
17.25
264.50
28.44
6.37
6.37
Say
34.81
9.98
44.79
0.45
45.24
45.20
28.44
6.37
34.81
0.35
35.16
35.20
124.21
124.21
1.2420533
125.45
240.00
240.00
120.00
100.00
14.00
234.00
Say
240.00
234.00
474.00
47.40
521.40
52.14
0.52
52.66
52.70 /sqm
317.22
317.22
240.00
150.00
390.00
Say
317.22
390.00
707.22
53.04
53.04
813.30
25.00
838.30
9.01 sqm
0.09
9.10
9.10 /sqm
17.53
0.1752846
17.70
188.80
188.80
180.00
100.00
280.00
Say
188.80
280.00
468.80
0.00
0.00
468.80
468.80
5.04 sqm
0.05
5.09
5.10 /sqm
SL
No.
1
Description of items
Qnty or Nos
Unit
Rate in Rs.
10.00 sqm
54.00 Kg
0.076 Qntl
sqm
Kg
Qntl
665.00
200.00
1750.00
2.16 nos
2.16 nos
Each
Each
260.00
200.00
b)
Materials
Cost of tile
Cost of Polyner modified adhesive
White cement
Labour
Mason Special
Mulia
c)
D)
O.H. Charge
10 % on (a+b)
Lead
White cemnt
18576.60
0.076 Qntl
Qntl
20435.28
10
1%
13.40
a)
b)
10.00 sqm
sqm
665.00
Sand
0.210 cum
cum
55.00
Cement
Cement for slurry
White cement
0.744 Qntl
0.33 Qntl
0.076 Qntl
Qntl
Qntl
Qntl
658.00
640.00
1750.00
2.16 nos
2.16 nos
Each
Each
260.00
200.00
Labour
Mason Special
Mulia
c)
d)
D)
O.H. Charge
Add Contractor Profit @
7.5 % on (a+b)
7.5 % on (a+b)
Lead
White cement
Sand
8488.90
8488.90
1.150 Qntl
0.210 cum
Qntl
cum
13.40
524.20
9887.73
10
1%
Say
Amount in
Rs.
6650.00
10800.00
133.00
17583.00
561.60
432.00
993.60
1.02
1.02
Total
17583.00
993.60
18576.60
1857.66
20434.26
1.02
20435.28
2043.53
20.44
2063.96 / Sqm
6650.00
11.55
489.55
211.20
133.00
7495.30
561.60
432.00
993.60
0.021
7495.30
993.60
8488.90
636.67
636.67
15.41
110.08
125.49
0.115
125.49
9887.73
988.77
9.89
998.66 / Sqm
998.70 / Sqm
A.C. ROOFING
SL
Description of items
No.
1
Supplying all materials, labour, T&P and
fixing big six or trafford A.C. Sheet in roof
including fixing of ridges wind ties etc.
complete including cost of fitting including
drilling holes in wind ties & labour cess
etc all complete as per specification and
direction of Engineer-in-charge.
a)
b)
c)
d)
O.H.C
@
7.5 %
Add contractor profit
b)
c)
1.00 no
3.00 nos
Each
Each
7.5 %
on
Data for
Per Sqm
989.00 /
a)
Unit
on
@
Qnty or Nos
860.00
860.00
9.30
Rate in Rs.
260.00
200.00
Sqm
9.30
1.00 Sqm
Sqm
182.00
0.50 nos
1.50 nos
3.00 nos
4.00 nos
Each
Each
Each
Each
260.00
240.00
260.00
200.00
78.10
156
156.00
1%
ON
7.5 %
1 Sqm
2070.00
2070.00
30.48 mtr
2380.50 /
1.00
1%
30.48
a)
b)
c)
d)
d)
Labour
Carpenter 2nd class
Man mulia
Women mulia
Add O.H.C.
Add contractor profit
1.06
1.135
Sqm
Kg
100.00 nos
100
1.00 no
2.00 nos
2.00 nos
7.5 % on(a+b)
7.5 % on(a+b)
Rate for
Rate for
9.30
1
1 sqm
1%
Sqm
135.00
Kg
36.00
nos
63.00
Each
Each
Each
240.00
200.00
200.00
1286.96
1286.96
Sqm
Sqm
1480.00
Sqm
231.00
a)
1.135
Labour
Carpenter (Special)
Fitter(Special)
Man Mulia(un-skilled)
Sqm
9.30
=
=
=
Sqm
135.00
Kg
36.00
100
nos
63.00
sqm
Sqm
292.00
Each
Each
Each
260.00
260.00
200.00
Kg
100.00 nos
1.06
0.5 nos
1 no.
2 nos
c)
Add O.H.C. @
Add Contractor profit. @
7.50 %
7.50 %
Cost for
Cost for
Add Labour cess
3752.56
3752.56
9.30
1.00
1%
sqm
sqm
a)
1.06
1.135
Sqm
135.00
Kg
36.00
100
nos
63.00
sqm
Sqm
1661.20
Kg
100.00 nos
Sqm
9.30
b)
Labour
Carpenter (Special)
Fitter(Special)
Man Mulia(un-skilled)
=
=
=
0.50 nos
1.00 no.
2.00 nos
Each
Each
Each
260.00
260.00
200.00
c)
Add O.H.C. @
Add Contractor profit. @
7.50 %
7.50 %
Cost for
Cost for
Add Labour cess
16486.12
16486.12
9.30
1.00
1%
sqm
sqm
Amount in
Rs.
260.00
600.00
860.00
64.50
64.50
989.00
106.34
182.00
288.34
2.88
291.23
Total
106.30
291.20
Sqm
130.00
360.00
780.00
800.00
2070.00
155.25
155.25
2380.50
78.10
156.00
156.00
Say
156.00
234.10
2.34
236.44
236.40
143.10
40.86
63.00
246.96
240.00
400.00
400.00
1040.00
9.30
231.00
231.00
Say
246.96
1040.00
1286.96
96.52
96.52
1480.00
159.14
231.00
390.14
3.90
394.04
394.00
143.10
40.86
63.00
2715.60
2962.56
130.00
260.00
400.00
790.00
Say
2962.56
790.00
3752.56
281.44
281.44
4315.44
464.03
4.64
468.67
468.70
sqm
143.10
40.86
63.00
15449.16
15696.12
15696.12
130.00
260.00
400.00
790.00
790.00
16486.12
1236.46
1236.46
18959.04
Say
2038.61
20.39
2058.99
2059.00
sqm
1444.5
144.45
72.225
1661.175
Sl No.
Description of items
total
sqm
1840.00
248.40
2088.40
sqm
1185.00
159.98
1344.98
x 1
sqm
1350.00
182.25
1532.25
sqm
1433.00
71.65
1504.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
6
7
Woody
248
Tranportation.12%
G.T.
250.61
2339.01
201.75
1546.72
229.84
1762.09
225.70
1730.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
p/f 80 mm thick factory made C.C interlocking paver Block of M30 grade made by block making machine over and i/c 50 mm
thick bed of C. sand, filling the joints.
Materials
Interlocking C.C. paver block ( 60 mm thick), M.30
Labour
Day
Beldar
Coolie
Mason Special
Mason II class
Contractor Profit
O.H. Charge
c)
D)
Lead
Paver Block
Course sand
Fine sand
Materials
Chequre tile
Cement
Fine sand
b)
Day
semiskilled mulia
Mulia
Labour
Mason Special
Contractor Profit
O.H. Charge
c)
D)
Lead
Chequred tile
Cement
Fine sand
Materials
Chequre tile
Cement
Fine sand
b)
Day
semiskilled mulia
Mulia
Labour
Mason Special
Contractor Profit
O.H. Charge
c)
D)
Lead
Chequred tile
Cement
Fine sand
Labour cess
10.00 Sqm
0.50 Cum
0.150 Cum
Sqm
Cum
Cum
1135.00
48.00
55.00
11350.00
24.00
8.25
11382.25
1.00 nos
1.00 nos
0.50 nos
Each
Each
Each
Each
200.00
200.00
260.00
240.00
200.00
200.00
130.00
120.00
650.00
0.50 nos
12032.25
7.5 % on (a+b)
7.5 % on (a+b)
902.42
902.42
10.000 Sqm
0.500 cum
0.150 cum
Sqm
cum
cum
11.37
321.80
524.20
14190.27
10
113.66
160.90
78.63
353.19
1419.03
1%
14.19
1433.22
Say
1433.00
10.00 Sqm
2.74 Qntl
0.130 Cum
Sqm
Qntl
Cum
217.00
658.00
55.00
2170.00
1800.95
7.15
3978.10
5.50 nos
2.16 nos
2.16 nos
Each
Each
Each
200.00
200.00
260.00
1100.00
432.00
561.60
2093.60
6071.70
7.5 % on (a+b)
7.5 % on (a+b)
455.38
455.38
10.000 Sqm
2.740 Qntl
0.130 cum
Sqm
qntl
cum
Labour cess
11.37
16.90
524.20
11188.65
10
1118.87
1%
11.19
1130.05
Say
10.00 Sqm
2.74 Qntl
113.66
46.31
68.15
228.11
Sqm
Qntl
1130.00
605.00
658.00
6050.00
1800.95
Labour cess
0.130 Cum
Cum
55.00
7.15
7858.10
5.50 nos
2.16 nos
2.16 nos
Each
Each
Each
200.00
200.00
260.00
1100.00
432.00
561.60
2093.60
9951.70
7.5 % on (a+b)
7.5 % on (a+b)
746.38
746.38
10.000 Sqm
2.740 Qntl
0.130 cum
Sqm
qntl
cum
11.37
16.90
524.20
19530.65
10
113.66
46.31
68.15
228.11
1953.07
1%
19.53
1972.60
Say
1972.60
11382.25
12032.25
902.42
902.42
13837.09
353.19
14190.27
/ Sqm
3978.10
6071.70
10049.79
455.38
455.38
10960.55
228.11
11188.65
/ Sqm
/sqm
7858.10
9951.70
17809.79
746.38
746.38
19302.55
228.11
19530.65
/ Sqm
/sqm
FLOORING ITEMS
SL No.
Description of items
Qnty
13
Unit
Materials
Vitrified Tile 600mmx 600mm Plain (Ivory)
10 sqm
b)
Sqm
1.857 Qntl
Qntl
0.13 cum
cum
0.44 Qntl
Qntl
0.44 Qntl
Qntl
Mason (spl)
2.16 nos
Each
5.50 nos
Each
Mulia
2.16 nos
Each
Labour Charges
Add O.H.C@
7.5 %
on
(a+b)
7.5 %
on
(a+b)
0.13 cum
Cum
2.737 qntl
Qntl
For 10 sqm
For 1 sqm
18431.81
10
1%
5%
2203.60
15 %
110.18
For 10 sqm
For 1 sqm
126.71
13
10
1%
Materials
Vitrified
Tile
600mmx
series(Homogeneous)
600mm
b)
Coloured
/Printed
10 sqm
1.857 Qntl
Sqm
Qntl
0.13 cum
cum
0.44 Qntl
Qntl
0.44 Qntl
Qntl
Mason (spl)
2.16 nos
Each
5.50 nos
Each
Mulia
2.16 nos
Each
Labour Charges
Add O.H.C@
7.5
on
(a+b)
7.5
on
(a+b)
0.13 cum
Cum
2.737 qntl
Qntl
For 10 sqm
For 1 sqm
12494.11
10
1%
5%
2203.60
10 %
110.18
For 10 sqm
For 1 sqm
121.20
10
13
1%
Materials
Vitrified
Tile
600mmx
series(Homogeneous)
600mm
Coloured
/Printed
b)
10 sqm
Sqm
1.857 Qntl
Qntl
0.13 cum
cum
0.44 Qntl
Qntl
0.44 Qntl
Qntl
Mason (spl)
2.16 nos
Each
5.50 nos
Each
Mulia
2.16 nos
Each
Labour Charges
Add O.H.C@
7.5
on
(a+b)
Labour Charges
7.5
on
(a+b)
0.13 cum
Cum
2.737 qntl
Qntl
For 10 sqm
For 1 sqm
16059.11
10
1%
5%
2203.60
10 %
110.18
For 10 sqm
For 1 sqm
121.20
13
10
1%
Materials
Cement- 0.13 cum or
1.857 Qntl
Qntl
b)
0.13 cum
cum
0.44 Qntl
Qntl
0.44 Qntl
Qntl
Mason (spl)
2.16 nos
Each
5.50 nos
Each
Mulia
2.16 nos
Each
Labour Charges
Add O.H.C@
7.5 %
on
(a+b)
7.5 %
on
(a+b)
0.13 cum
Cum
2.737 qntl
Qntl
For 10 sqm
For 1 sqm
Add Labour Cess
4904.11
/
1%
10
Rate in Rs.
Amount in Rs.
Remarks
4.00
605.00
6050.00
658.00
1221.91
55.00
7.15
658.00
289.52
658.00
289.52
7858.10
260.00
561.60
220.00
1210.00
200.00
714
7858.10
432.00
2203.60
2203.60
10061.70
10061.70
754.63
10061.70
754.63
52420.00
6814.60
16.90
46.26
6860.86
6860.86
18431.81
1843.18
18.43
1861.61
1843.18
110.18
16.53
126.71
12.67
1855.85
18.56
1874.41
Say
1874.40
660.00
6600.00
714.00
1325.90
55.00
7.15
714.00
314.16
714.00
314.16
8561.37
260.00
561.60
220.00
1210.00
200.00
8561.37
432.00
2203.60
2203.60
10764.97
10764.97
807.37
10764.97
807.37
524.20
68.15
16.90
46.26
114.40
114.40
12494.11
1249.41
12.49
1261.91
1249.41
110.18
11.02
121.20
12.12
1261.53
12.62
1274.15
Say
1274.10
970.00
9700.00
714.00
1325.90
55.00
7.15
714.00
314.16
714.00
314.16
11661.37
260.00
561.60
220.00
1210.00
200.00
11661.37
432.00
2203.60
2203.60
13864.97
13864.97
1039.87
13864.97
1039.87
524.20
68.15
16.90
46.26
114.40
114.40
16059.11
1605.91
16.06
1621.97
1605.91
110.18
11.02
121.20
12.12
1618.03
16.18
1634.21
Say
1634.20
714.00
1325.90
55.00
7.15
714.00
314.16
714.00
314.16
1961.37
260.00
561.60
220.00
1210.00
200.00
1961.37
432.00
2203.60
2203.60
4164.97
4164.97
312.37
4164.97
312.37
524.20
16.90
68.15
46.26
114.40
14105.923
114.40
4904.11
490.41
4.90
495.32