Lecture #2

CS 473 EX
February 6, 2016

Agenda
Course Structure and Expectations
Logistics
Term Project team, submissions
Assignments
Quizzes

Module 2
CSM
Estimation

Learning Objectives
Upon successful completion of this course, you will be prepared to:

Justify, implement and manage a global product development


Solicit, define and scope requirements as part of the product backlog grooming.
Play an effective role of a Software Engineering Manager in a context of IEEE CSDP
Select an estimation method that is appropriate for a specific phase of a product life
cycle. Oversee adoption of a consistent methodology to narrow the Cone of Uncertainty.
Support the Scrum delivery framework; become aware of several agile certification paths.
Play a role in a peer review, request and provide constructive and concise comments.
Evaluate software development tools (approved, allowed, restricted), while following the
Magic Quadrant technique. Maintain a logical relationship between tools and processes to
optimize their variety throughout an organization.
Articulate the strategy for system and unit test leading to continuous integration and
delivery.
Structure a project asset library aiming at a single-click navigation to a requested artifact.
Provide leadership to a process program using SEI CMMI as an improvement model.

Introduction

Introduction
Focus on learning . You should assume that you will be successful with the course
and hence, grades will be reflective of that. Focus on those best practices that you
learn here and be able to actually apply.
This is an overview course. It delves into multiple topics. Buckle up. You cannot
afford spending all your time on a single topic.
Time box your assignments. This is not about a PhD thesis. This is about becoming
aware of an important concept and then moving to the next concept.
This course is not about a specific language or a framework.
Some assignments and discussions - are optional, aimed to stimulate your thinking
Term project brings it all together. All predefined deliverables of a term project are
introduced in lectures.
How does it all fits together? It is all about how to do software better, about
software engineering and program management. You cannot function as a
professional software engineer or a project manager if you are unaware of these
key concepts covered in the class.

MET
CS473
Principles
Process has no goal in itself

Process
Improvement

Process
A Glue. A Heart bit. A Librarian. Architecture

Data-driven design

Test
Essentials

Mocks are not Stubs

Unit
Test

Deployment pipeline

Continuous
Delivery

Low coupling and high cohesion


Scale optimization

Globalization
Offshoring
Taxonomy

Do not offshore if unable to monetize

Requirements
Backlog
Grooming

If its not on a backlog it does not exist

Engineering
Management

Myth of organizational hierarchy

Software
Configuration
Management

2
4

Estimation

Identification , Control,
Auditing, Reporting
Precision equal to accuracy

Software
Design

Agile

SW Tools
Evaluation

Peer
Reviews

Wisdom of vertical slices


It is cheaper to find defects early

MET
CS473
Responsibilities
Find the shortest path
Separate released from drafts

Select best tests

Unit
Test

Merge each commit

Continuous
Delivery

Requirements
Backlog
Grooming

Process
Improvement

Engineering
Management

Process
Architecture

Test
Essentials

Fail, Pass, Refactor

Globalization
Offshoring
Taxonomy

2
4

Maintain requirements in canonical form


Manage flow of features
Focus your team

Software
Configuration
Management

Document Project Taxonomy

Estimation

Control changes
Retain historical estimates

Fit components into architecture

Software
Design

Agile

Facilitate convergence of tools

SW Tools
Evaluation

Peer
Reviews

Split
Ask for and provide comments

Engineering
Management

UML

Git

ISO

Test Essentials
Faults & Failures

Cost Of Delay
Black Swan

Requirements

Pivotal
Version
One
Rally

Backlog Grooming

5/20 Rule

Story Points

Architecture

Asset Library

Motivation

Peer Reviews

Defect Density &


Examination Rate

Estimation

Low Coupling and High Cohesion


Quality
Center

Continuous
Delivery

SW Tools
Evaluation

Agile Manifesto

Scrum

CMM

Regression

Cone Of Uncertainty

Software Process
Configuration
Management

MVC

Mocks & Stubs

Unit Test
Process Improvement

SCM
Software Configuration Management

What is SCM ?
There is a certain tradition to the way SCM (Software Configuration Management) is described
and taught. SEI CMMI has a process area at level 2 called SCM. Eric Braude book on Software
Engineering has a Chapter Six dedicated to this topic. Such long-standing tradition also stems
from the unmovable CM audits conducted by government agencies to all their large and small
vendors. Whether you use Agile or Waterfall methodology, whether you are a small startup or
a Fortune 500 company, the format and template of a CM Plan that you have to produce and
demonstrate to an auditor - remain identical.
Software Configuration management (SCM) is a discipline of maintaining integrity of
product parts as they propagate along a project life cycle.
There are many natural organizational forces that could impede the consistency,
completeness and traceability among various product pieces. If no systematic
improvement effort is applied, the amount of disorder is bound to increase. This is a
fundamental entropy law we learn at high school.
SCM discipline decreases the risk of losing integrity by establishing the four overriding
processes, Identification, Control, Auditing and Reporting.

Four Basic Essential Interdependent Activities

It is useful to trace the chain of events of a software change, so to understand the details
and mechanics of, first, how does it happen that following these four steps will prevent the
un-intended software changes,
and second, if you will not Configuration Identification Discipline for
identifying the item, its configuration, and
identification
follow these steps, then
documenting its functional and physical
sooner or later the chaos
characteristics; "What version of the file is this?"
will prevail.
Configuration Control Creation and
exercising of established procedures to classify,
approve or disapprove, release, implement and
confirm changes to agreed specifications and
baselines; "How many changes and which
changes went into the latest version of this
product?"

control

auditing
Here is the quote from James Bach
article "The highs and lows of change
control", where he describes the
balancing act. Both, too much or
too little of a change control
could cause issues.

Configuration Accounting Recording and


reporting of data concerning configuration
identification, approval status of proposed
changes and implementation status of approved
changes during all phases of the project; "How
many files were affected by fixing this one bug?"

reporting

Change Control is vital. But the forces that make it necessary also make it annoying. We worry about change because a tiny
perturbation in code can create a big failure in the product. But it can also fix a big failure or enable a wonderful new capabilities.
We worry about change because a single rouge developer could sink the project; yet brilliant ideas originated in the minds of
those rogues, and the burdensome change control process could effectively discourage them from doing creative work.

Configuration Items List

Here is an illustration of a CI list that is similar to the one you do at your term project. In a
commercial environment this is an extensive list that brings together different Owners and
various Repositories. One has to accustom to dealing with multiple tools of a large
organization. It is best if a CI List is a report produced auto-magically from various
repositories. Although in a real-life-project a manual intervention is common.
The list matches contents
of the project repository

Ideally, CI List is a report


dump from a repository

1
2
3
4
5
6
7
8
9
10
11
12
13

File names in repository


follow the naming
convention from CI list

Version, date, other attributes


are not a part of the name, so
distributed link remains the same

Configuration Item Name

Version

Date

Owner

Repository

Definition of users (personas)


Definition of Scope and Limitations
Engineering Requirements List
Estimation Record
State Transition Diagram
Definition of UseCases
Definition of Fields
Definition of Reports
Test Cases
Defect Tracking System
Defects from testing recorded
Issues from Peer Reviews retained
Configuration Items List

1.4
1.0
1.3
2.0
2.1
1.7
4.3
5.8
0.8
0.4
na
na
1.0

9-Sep
9-Sep
9-Sep
16-Sep
23-Sep
23-Sep
23-Sep
23-Sep
6-Oct
23-Sep
na
na
9-Sep

John S
Mary W
Joe B
Joe B
Alex B
John S
Harry V
Harry V
Bill K
Sam C
na
na
Peter Z

Word file (Drop Box)


Word file (Drop Box)
EXCEL file (Drop Box)
EXCEL file (Drop Box)
Power Point (Drop Box)
Visio file (Drop Box)
EXCEL file (Drop Box)
Word file (Drop Box)
EXCEL file (Drop Box)
Web App (Drop Box)
Defect Tracking System
Discussions Blackboard
EXCEL file (Drop Box)

ALL items are listed


without exceptions

Baselines confirm
traceability between
items
Example.
After a Baseline Audit, all
versions are bumped to 5.0

Version structure
shows whether an
item is a draft
The list itself has a version
Some items have no version,
since they are not controlled
One has to decide upfront which items are
controlled and which ones are stored

Change Requests
A simple bug fix

Change Management Team (Bug Review)


start

start

close

close

SUB1
Submits &
Assigns CR

Is resolution
acceptable?

QA1

SUB1
Submits &
Assigns CR

Is resolution
acceptable?

QA1

QA Engineer

Verify
Resolution

Verify
Resolution

QA Engineer

Resolves
CR

CMT1
Manage
deferred list

DEV3

Prioritize
CMT3

State Transition Diagram for a Change Request System

Change
Management
Team
(BugReview)

reject

DEV3
Resolve

Resolved
Developer

Assigned

What is the
outcome?

no

Submitter
Verifies
Accepts

defer

accept

Already Resolved

New

Manage
rejects

No

Developer

Pass to
someone
else

CMT4

CMT2

Resolved

Submit
new bug
Resolution
incorrect
ReOpened

Verified
Test Case
Exists &
Closed for Good

Zombie

Closed

SCM Scope - Adoption Chart


Identi
fication

Control

Auditing

Reporting

Code

User
Docs

Internal
Docs

Tools

This chart shows four parts of SCM applied to four different types of work products.
It could serve as an indicator of adopting best practices. You can see that Code is wellcontrolled, but the User Docs are not under control.

Baseline Audit (example)

A project baseline consists of a set of baselined work products that are required at the end of
each phase or at some designated interim quality checkpoint. The project baseline evolves
through the life of a project.
A baseline audit checks the integrity of each baseline. Artifacts are traceable to each other
within each baseline, although might NOT be traceable between different baselines.

Requirements Baseline
PRD

ERL

Proj
Plan

Development Baseline
Func
Doc
Proj
Spec
Plan
Sched
Test
Test
ERL
Cases
Plan

Baseline audit
release content
is clear and stable

Baseline Audit
ERL matches Test Plan
test cases match FS
FS is updated

Baseline Audit

Release Baseline
Func User Proj Test
Spec Doc Sched Report

Test Rep covers ERL


User Doc covers ERL
FCS is successful

Three Levels of Control


Standard Configuration Management offers three levels of control. The purpose of
differentiating between these levels is to focus on critical tasks at hand. Not to over-control
those items that need no control. And not to lose control over items that are key to our
operation and business success. Configuration Items List reflects the decision about which
items belong to which level of control.
No Control
Identification (or Stored Control)
Items are stored in the CM repository
Naming convention applied (with limitations)
Version control
Revisions to items are documented
Each version is maintained (any previous version can be retrieved)
Change control
Includes all attributes of Version Control
Change requires formal peer review and approval
Related work products are also updated

Examples of levels of control


An example of an asset from "No Control" category is a weekly e-mail distributed by BU
News Central. Such an e-mail is not maintained in our repository and is usually deleted after
being read. Since the today's news will surely become obsolete tomorrow.
The so-called "stored" items could be easily found in our repository. Their name complies
with the naming convention and they are searchable through the regular queries. Recorded
video to our Live Session is an example of a stored item. Its naming could be "MET CS473
Live Classroom 1/24/15". You could immediately notice a violation of a naming convention,
since the file name includes a date. So the only reason this is possible, since this item has no
version number, it will remain unchanged over time.
Items under "version control" have a version number that is being increased each time an
item is changed. The configuration item list, which you submit as part of the term project covers all such items. Your first configuration item called "Definition of Personas" is an
example of a version control. It is expected to have a version that is specific to this definition.
Change Control implies that an approval is required to implement a change to an item. In
most companies, the list of requirements is under a Change Control. It would be strange if a
random person or even an author is able to single-handedly add or delete requirements.
What about the other thousands people who need to implement these requirements? They
might have something to say about changes.

Not To Do List
Here is the so-called "Not-To-Do-List", as the following actions are greatly
discouraged,

Promote within organization or release major changes without an


appropriate peer review and approval

Distribute a documents as an attachments instead of distributing


it as a link

Include a date and a version - as part of the documents name

Assign names to documents that do not reflect the documents


content and librarys convention

Maintain duplicate documents in a library

Keep an important documents on individual desktops

Versioning Standard

A mature organization adopts a consistent definition of versioning. It could take you a full
page to describe various examples of versions, as well as scenarios of a transition between
versions, for both code and docs.
A common question is why do I need to manually insert a version (at the bottom right corner
of a document's footer), if a repository itself assigns a version automatically? The point is
that each time you hit the commit button, the version to your artifact is bumped. You can
insert ten blank spaces resulting in exactly ten additional versions. Obviously these new
versions have no corresponding software change that worth mentioning. You still have to tie
the meaningful software changes to the sequence of versions.
A versioning standard could be quite simple,
X.Y
<X> for major
<Y> for minor
or it could be more complex,

A.B.C.D
<A> designates a Major Release
<B> ... Minor Release
<C> ... Major Draft
<D> ... Minor Cosmetic Change

One of the Quiz questions reads as, "If a consistent versioning standard is adopted, it is enough to examine the
structure of a version number to determine whether a configuration item is a draft or a released." The expected
answer is "YES", regardless of the specifics of a versioning standard. It would be quite unusual for a versioning
not to distinguish a released from a draft.
Often folks make "C" and "D" equal to zero - after a customer release or after a baseline audit. Alternatively,
customers are never exposed to an internal versioning, so the only numbers customers see are "A" and "B".

Examples

Here are several common scenarios,


version 1.0 means that a document just been released to the field for the first time.
version 0.0.0.1 means that a document has been introduced as an initial draft into the
repository
version could be advanced from 0.0.0.1 to 0.0.0.2 with a minor alteration
version could be advanced from 1.0 to 2.0 as a major customer release
from 1.1 to 1.2 - as a minor customer update or a bug fix
Note that a versioning is usually influenced by marketing, industry standards, customers,
You may have a product line with a monthly public release, 15.1, 15.2, 15.3....15.12.
and then an internal scheme as, 15.1.8.3456 ... 15.1.23.3500 , that includes various
builds.

More Examples

Here are scenarios that are not supposed to happen,


from 1.3 to 1.6 ... missing versions
from 2.6 to 0.8 ... going backward

Transition from one version to another corresponds to a certain software change. A missing
version is indicative of a software change that has not been accounted for - which could
raise a red flag.

Basic Source Control

Source control is extremely important to the software development process. Its


importance is amplified in the distributed environment where people have no chance to
talk, but rely on a process 1. Branch specifications A and B are created for two project codelines, A and B, respectively.
2. Both project codelines are integrated from deployed
and a tool to carry the day. 3. Change list #12345 is made to project A
Pictorial below illustrates
the eleven basic scenarios
of code control.

4.
5.
6.
7.
8.
9.
10.
11.

Projects A and B are rebased and then change #12345 is shared (integrated) from project A to project B
Change list #12346 is made to project A
Project A codeline is moved to deployed.
A release is deployed to the network
Project B is rebased, during which a conflict occurs
Branch specification C is created and integrated
Project codeline C is rebased
A move to deployed is scheduled for Project C

Taxonomy

Here is some commonly accepted taxonomy.

Codeline
An area in the repository file system, consisting of all the files contained under a certain
directory. No two files in a codeline can share a common ancestor, except in the case of a
`rename' operation. Examples are the deployed codeline, and project codelines.
Branch Specification
An object that stores a list of relationships between codelines. It is used to simplify
integration commands.
Branch specifications are used to indicate how a project's code changes are to be integrated
into the deployed codeline
Rebase
To integrate changes from a `parent' codeline into a `child' codeline. This is used to integrate
changes made on the parent codeline into the child codeline, to keep the child codeline up
to date. Most rebases will be from the deployed codeline (the parent) to a project codeline
(the child). Projects are not released unless they are rebased from the head of the deployed
codeline; this ensures that changes to a component are not unintentionally lost.
Promote
To integrate changes from a `child' codeline into a `parent' codeline. Promotions occur from
project codelines to the deployed codeline, when projects are deployed

Key Concepts
The only way to ship software to the field is through Deployed Codeline. In some systems it is called
Trunk, or Master. On the pictorial such event is designated with a yellow square and called "Release is
Deployed". Understanding that the sole purpose of all our activities is to succeed with the Release to
customers. Here is the link to an interesting discussion about the "Power of One" covering concept of a
single delivery codeline. http://blogs.workday.com/why_weve_moved_to_single_codeline_development_at_workday.html
Synchronization among all branches of the repository should be as frequent as possible. The longer
branches are kept out of synch, the more difficult it is to merge them. "Building Often" - is the key
principle of a modern organization. Reading the Google's front site "Fast is Better Than slow", one could
appreciate the fact that the effectiveness of a huge enterprise is driven by a simple parameter "how fast
can you build".
Resolution of code conflicts is inherently manual process. Each source control tool offers a variety of
features to simplify the merge; however the final decisions are always done by a developer who is
familiar with the context.
More to the above paragraph, in most cases, resolution of a conflict could be only done by the
developer who introduced this conflict on a first place. This brings about the principle aired by Jez
Humble "Never Go Home On A Broken Build". Imagine yourself shutting down the Trunk and forcing
folks in different time zones to sit on their thumbs for the next twenty-four hours while waiting for your
return.
Branching and Merging Strategy should be well-documented. Who has his own branch and who does
not - should be determined and not improvised. Multiple branches kept for a long time without a
rebase - are bound to hinder the operation.

Tutorials

Module 4 assignment covers several source control tools, AccuRev, CVS, Subversion, GIT, ClearCase, and
Perforce. Here is the link to an explicit GIT tutorial. http://stackoverflow.com/questions/315911/git-for-beginners-the-definitive-practical-guide
Note that terminology from each tool
differs slightly, while basic concepts
remain common.

References to Software Configuration Management


Wayne A. Babich, "Software Configuration Management: Coordination for Team Productivity",
Addison-Wesley ; Original text establishing a taxonomy and scope of the SCM subject
IEEE Std 1042 "Guide for Software Configuration Management"
Consists of several examples (templates) of SCM Plans covering various types of software projects
MIL Std 483 "Configuration Management Practices"
If you work for a government contractor, as a minimum, you need to know the specific taxonomy, e.g.
allocated baseline, contract change proposal, etc.
James Bach, "The Highs and Lows of Change Control", Computer, vol.31, #8, August 1998.
Mario Moreira, "SCM Implementation Guide", Willey
A detailed treatment of SCM adoption steps for a large organization
Mario Moreira, "Adapting Configuration Management for Agile Teams", Willey
Balancing Agile speed with a prudent discipline leading to a long term sustainability
The importance of the topic is supported by the fact that every text book on software engineering,
(e.g. Pressman and Braude) has a chapter dedicated to SCM.
CMMI (Capability Maturity Model) has a prominent PA (Process Area) that is specific to this topic.

Exercise with GIT


1
Create your
account

https://github.com/
3

Fork
class
repository

Merge
changes

Suppose each student has few lines of a poem.


The task is to integrate all lines into a complete poem.

It takes exactly 60 seconds for all students in a class to


obtain a new account with GIT. Then it takes exactly
one hour to integrate a complete poem. Most of the
time is spent on coordination, waiting for each other
and then correcting conflicts, e.g. lines out of order and
doubles.

Search
class
repository

Consistent Estimation Practice

Rationale for Adopting Estimation


as a Defined Process
At this section we shall explore the key software process - Estimation. Its importance is
emphasized in CMM (Capability Maturity Model) framework where it is rightly called "the
heart of Level 2". Meaning... an organization cannot advance from initial level to the next,
unless there is a consistent estimation practice in place.
Key concepts and rationale for adopting estimation are as follows.
Estimation is not optional
a mandatory part of product delivery, as Design or Testing
features could not be included into a release without sound scoping
Does not involve black art
based on calculation and previous experience
Various groups have their own assumptions
enterprise collaboration involves multiple dependencies
if you do not provide estimates, then someone else will give it to you
How to improve Estimation accuracy?
acquire the skill, learn the craft
avoid surprises, prevent risks

What is Estimation?

Let us zero in on a definition of estimation process.


Estimation is an iterative process consisting of the following steps, (a) Size, (b) Effort, (c)
Duration (Schedule).
It involves Program / Project Managers, Feature/Test Leads, Owners of Components maintaining estimation records in a predefined program repository.
The process includes reporting accuracy trends
to drive improvement recommendations.

A typical Project Management Policy


is illustrated below. Hence, Estimation
is a part of a broad Program Management
process. It highlights an important
part of the process,
namely the historical estimation
repository, that we shall explore a bit later.

reconstruct
& correlate
historical
data

Product Delivery Life Cycle


A successful software business uses a product delivery life cycle to guide its many projects.
We should examine estimation process with a back drop being a defined product delivery
methodology.

Organizational Life Cycle creates a context for key processes of,


Software
Hardware
Service
Manufacturing
Also covers:
Documentation
Architecture
Program Management
Training
While one size does not fit all, there are common features of a life cycle leading to success:
Project plans are tailored to fit into a Product Delivery Life Cycle
Folks charge their time to activities inside each phase
The delivery model covers thousands of people contributing to a single delivery
Phases have a significant overlap
System Test is automated
To clarify the notion of a Product Life Cycle, it is recommended to ponder over the following discussion points.

How does a simple release of documentation fit into the Life Cycle
Which phase covers daily stand-ups of software development
What comes first, a Functional Spec or a Test Plan
What comes first, Code or Test Cases
How does MRD is traceable to unit test cases
How does bug fixing of customer-reported defects fit into the Life Cycle

These points shed light into grey areas and have to be responded to assure the life cycle is adopted at your specific environment.

Life
Cycle
A lifecycle is the set of
steps a program follows
from its conception,
through its design,
development, test,
manufacture, service, and
disposal.
Multiple programs follow
the different steps of a
predefined lifecycle.
A product life cycle is an organizational concept, not a project-level concept.
Refinements and improvements can be identified in a program and in a lifecycle. A
lifecycle is a general guidance, not a strict instruction set. Program deliverables differ
greatly depending on the program type.
The lifecycle is an important part of the organizational process set. As all controlled
processes, a lifecycle is under a version control that is periodically reviewed and updated.

How to Beat the Cone

Here we introduce a concept of Cone of Uncertainty as thick red lines overlaying the product life
cycle. I encourage you to examine the text book to this course by Steve McConnell "Software
Estimation" that has a chapter 4.2 dedicated to this topic. The red lines on the pictorial below
show the Estimation CP-0: Begin CP-1: Defined Requirements
Accuracy.
Project Charter

PRD Complete
Rough Schedule

There are several


immediate
observations we
could derive from
its shape.

Legend:

CP-3: Project Commit

Commit to Release date

Phase 1
Initiate

CP-5: Ready

Quality assessment

Phase 2
Plan
MRD

Checkpoints
Control Docs
Review Meetings

CP-6 Release Ready

Phase 3
Define

CP-7 General Availability

Phase 4
Build

CP-8 Steady State

Phase 5
Optimize

CP-2: Engineering Commit

Phase 6
Release

Functional Specs
Test Plans

Phase 7

Introduce

CP-4: Feature Done

RTS
RTM

System Test Gates

Phase 8
Support

EOL
EOS

First, you see that Estimation is iterative and the same features are being re-estimated
Second, the accuracy of estimation is improving dramatically. At the end, it is one hundred percent accurate since, while standing on
the shipping dock we know exactly when the product is shipped. In the beginning, the gap is huge. When the initial concept is being
analyzed, an estimate could be several hundred percent off.
The fundamental question that is being asked - How to Beat the Cone? How to reduce variability on a project? The cone does not narrow
itself. We need to maintain well-defined requirements, consistent code reviews and effective unit tests.

Three Gurus of Estimation

Its worth mentioning the names of three gurus, that are industry practitioners who have
been advancing the subject of estimation over the last thirty years. Barry Boehm, Capers
Jones and Steve McConnell have each a written well-known books on the subject. It is
prudent to use the wealth of knowledge these software gurus offer. Here we map the Cone
first published by Barry Boehm into our standard life cycle. Note that variability of
Scope in text books Cone (4X) is much greater than variability of Schedule (1.6X).

Example from a Real Project

The fundamental reason we introduce this training is to improve the Estimation Accuracy on
your project. Usually, Program Management is in a position to track the delivery dates of all
release types. Here is below we illustrate the concept with a Cone based on dates.

Several conclusions and lessons one could immediately derive from the chart that is a
slightly modified example of a real data.
The chart is lopsided, as none ships early. Schedules are always over-optimistic, as
programs frequently slip and hardly ever completed before a commitment.
Bigger programs have a greater margin of error.
The earlier we acknowledge an upcoming slippage the easier it is to implement a
correction. Late corrections are costly, as it is difficult to prepare for a dramatic change
of a course.
15 percent correction is expected at a program start
50 percent correction is the maximum one could anticipate at program start.
Let's compare these numbers (15% middle and 50% max) against the numbers quoted
by Steve McConnell and Burry Boehm. The text book chart above has 1.6X (60%)
variability. We should be able to justify this difference.
In our example, at "program start", a significant part of analysis has been completed
which mitigated some large sources of variability.
The data shown relates to Schedule, not to Effort and not to Size. As we all know, some
releases are compelled to drop features, so to keep the train on schedule.

Estimation Framework - Three Buckets

Let us review the framework for estimation in some detail. There are three buckets that all
measurements should fall into. Size. Effort, and Duration.
Example of Size would be Lines of Code, Screens, APIs, and, of course, Story Points.
Effort is measured in Person-Hours or (ideal hours). Only 7 hours per day are counted
considering this is the time that spent productively. Staff meetings, vacations, and
other non-productive work is excluded.
Duration is measured in Months.
The structured
estimation process
proceeds in this same
order. From Size to
Effort to Duration.
Skipping a step has its
ramifications. Managers
are encouraged not to
ask for a date, and not
to focus on when you
are going to finish. But
instead to ask first the
details of .what are
you going to do.

Estimating Size - is the Game Changer

Estimating Size is the key to a prudent process. It is a Game Changer so to speak. Instead of
first giving dates and then dealing with consequences. Our strategy is to,
retain size measures mapped into Effort and Duration,
maintain a historical estimation repository and
eventually re-use this historical data on next projects.
In fact these three points constitute the most basic method called Estimating By Analogy.

Key Principle of Estimation

An important estimation principal is that its Accuracy shall be equal to precision


Theres no point in being precise about something if you dont even know what youre
talking about.
John von Neumann [Steve McConnell, p.33, p.51]

This principle is more fundamental than it might be understood initially

The distinction between accuracy and precision is critical. Project stakeholders make
assumptions about project accuracy based on the precision with which an estimate is
presented.

When you present an estimate of 395.7 days, stakeholders assume the estimate is
accurate to 4 significant digits! The accuracy of the estimate might be better reflected
by estimating 1 year, 4 quarters, or 13 months rather than 395.7 days. Using an
estimate of 395.7 days instead of 1 year is like representing pi as 3.37882the
number is more precise, but its really less accurate.

Common Questions and Answers


(Q) A common question managers ask. If I give you another week to work on your
estimate, can you refine it so that it contains less uncertainty.
(A)The answer is No. The reason the estimate contains variability is that the software
project itself contains variability. The only way to reduce the variability in the estimate is
to reduce the variability in the project.
(Q) How to combine sizing from different features; how to aggregate estimates?
(A) Estimates are aggregated at an Effort-level not at the Size-level
For example, How would you aggregate five test cases with ten bug fixes? Although, if each
of these activities take 2 days then combined, it will take 4 days to complete them.
(Q) What do I do if it is unfeasible to estimate Size?
(A) Try using Analogy for Size, then derive Effort from Size. When people say that they
cannot estimate Size it usually means that they have no idea how to proceed with the
project. So the issue in front of us is little to do with estimation and everything to do
with domain expertise.
(Q) How to select the most effective Size Measures?
(A) Those Size measures that have the greatest correlation with Effort - are the best. Think
of the next step, when you have to estimate Effort. Focus on your strongest Effort
drivers.

Estimation Record - Leading to Historical Repository


Here is an example of an estimation record for a medium size project. The Decomposition
method is used. As the Project has been decomposed into Phases and then Tasks.

An appropriate Size measures were selected to drive the corresponding Effort.


The column "Typical Effort Per Size Measure" is taken from previous experience of similar projects.
The Size, for example 10,000 lines is also estimated from previous historical data.
Typical Effort per
Effort is computed and
Effort
Phase
Task
Size Measure
Size Measure
Size
(person / weeks)
derived from
(person / hours)
Feasibility Study
write a white paper
# white papers
40
1
Typical Effort
Definition
document Requirements
# requirements
1
20
0.5
multiplied by Size.
document new fields
document new reports
develop Functional Spec
peer review Functional Spec
develop Design Spec

Coding

LOC (changed / added / deleted)


GUI Screens (ch / add / del)
APIs exposed
New objects

Test

document test cases


execute test cases

# fields
# reports
# pages
# issues reported
# use cases
design complexity (S/M/L)

0.5
2
2
1
8

50
5
20
20
5
M

0.625
0.25
1
0.5
1

10,000
10
9
5

12
4
5
6
4
4

There are many assumptions and decisions that are made while completing this estimation record. Making decisions about small
project components (for example about GUI Screens) are much easier than to make such decisions about the whole project. That is why
the Decomposition is an effective method producing estimates within acceptable ranges.
Analyzing an estimation record could lead to some useful conclusions. One might observe that too much effort is spent on coding. If
we re-distribute the effort to put additional emphasis on requirements and design then coding and testing could be significantly
reduced, so the total effort will be smaller. Needless to say that without a consolidated estimation record, such analysis is impossible.
A collection of estimation records constitute a historical estimation repository. Some organizations maintain databases with
thousands of estimation records along with their corresponding actuals. Should note the significant value of actuals, since all future
estimates are based on past actuals.

40

Estimation Record - Example / Template

Here is an estimation record example/template that fits well into the context of the term
project. It should account for each member of the project team.
Decomposition method
is used

Following is the basic


order of its completion,

identify deliverables
that need to be done
Size Measures
Size (how many of each
of the size measure)
Effort
Round-up to the next
Fibonacci number

Analogy method
draws from
previous projects

Expert Judgment
method relies on
two SMEs

Schedule is not
estimated, since
duration is time boxed

Expert A Expert B
Typical Effort
Effort
Final
Expert A Expert B
Size Measure per Size Measure Size
(person / hours) (Fibonacci)
Typical
Effort
(person
/ hours)
Effort
Final
Size Measure per Size Measure Size
Definition of users (personas)
# roles
0.20
5
1 (person 1/ hours) (Fibonacci)
1
Requirements
(person / hours)
Definition of Scope and Limitations # attributes
0.10
10
1
1
1
Requirements Engineering
Definition
of users (personas)
# roles
5 5 2 1
1 1
2 1
Requirements
List
# requirements
0.40 0.20
Definition of Scope and Limitations
# attributes
0.10
10
1
1
1
Config Mngmt
Configuration Items List
# CI items
0.09
11
1
1
1
Engineering Requirements List
# requirements
0.40
5
2
1
2
Estimaton
Estimation Record
# activities
0.08
13
1
1
1
Config Mngmt
Configuration Items List
# CI items
0.09
11
1
1
1
0.5
1
Design
State Transition Diagram
# states
0.25
4
1
Estimation
Estimation Record
# activities
0.08
13
1
1
1
Definition of UseCases
# use cases
0.50
4
2
2
2
Design
State Transition
# states
20 4 2 1
2 0.5
2 1
Definition
of Fields Diagram
# fields
0.10 0.25
Definition
of UseCases
# use cases
Definition
of Reports
# reports
1 0.50
2 4 2 2
2 2
2 2
Definition of Fields
# fields
0.10
20
2
2
2
Peer Reviews
Issues from Peer Reviews retained # issues
0.16
25
4
4
5
Definition of Reports
# reports
1
2
2
2
2
8
Implementation Defect Tracking System
# User Screens
6
1
6
8
Peer Reviews
Issues from Peer Reviews retained
# issues
0.16
25
4
4
5
Test Design
Test Cases
# test cases
0.33
6
2
2
2
Implementation
Defect Tracking System
# User Screens
6
1
6
8
8
3
Test Execution
Defects from testing recorded
# defects
0.30
10
3
3
Test Design
Test Cases
# test cases
0.33
6
2
2
2
Total:
31
Test Execution
Defects from testing recorded
# defects
0.30
10
3
3
3
Total:
31

Estimates are done


several times
along the life cycle

Those Size measures


are selected that
correlate well with Effort

Final estimate is
rounded up to the next
Fibonacci number
to create a buffer

Planning Poker

Planning Poker is the key technique used to estimate stories. The whole SCRUM team is
involved in a Planning Poker session. The same or a similar technique could be used
successfully for non-agile projects to estimate features and individual requirements. Here are
several considerations.
Prepare to estimate. The process will not work if you are surprised when the Product
Owner describes a story. In fact the biggest myth about this method is that one can waltz
into a planning poker session and be able to respond with a reasonable prediction.
The reason process is so effective since experiences of several SMEs are combined and
the total is greater than the simple sum of its parts.
Ask questions and be ready to reconcile assumptions.
During initial discussion, numbers must not be mentioned at all in relation to feature size
to avoid anchoring, when team members are influenced prematurely.
Reveal cards all at once. This prevents folks from influencing each others estimates.
A value of 3 needs to be 3 times bigger than the value of one. Need to ground this proxy
measures to an actual Size. For example, to a number of test cases or bug fixes or GUI
changes.
The larger the estimate, the larger the error. Precision should be equal to accuracy.
Remember Leonardo Fibonacci who brought us the buffer.

Pictorial below shows standard cards.


For example, Fibonacci number "13"
on the card represents the size of a
story equal to 13 points.

The order of process steps is as follows.


1) Scrum Master takes a minute to review the process and roles
2) Then presents the top item of a product backlog to the team
3) The team discusses the essence and then details of the story
4) The Product Owner clarifies questions, assumptions as well as storys acceptance criteria.
5) Each team member privately decides how big this story is, writes a number (of points) on
an index card. Estimates are rounded to the next Fibonacci number. 1, 2, 3, 5, 8, 13, 21, 34.
Stories exceeding X are split or are marked with infinity sign. X being a team-specific
parameter.
6) At the count of three, everyone shows his or her index card simultaneously.
7) If there are significant differences, then reconcile assumptions.
8) Repeat the last steps no more than two times. Spend no more than 10 minutes on each
Story. Make sure the team consensus is reached and derived estimates are unaffected by
emotions or peer pressure.
9) Scrum Master documents Points and then documents Assumptions

Common Deployment Issues

Adopting a consistent estimation practice across a large enterprise usually meets with a
considerable resistance that is natural for any organizational change.
Here is the relevant LinkedIn discussion on the topic that might provide a taste for a common
deployment issues. We could continue this discussion within the framework of our class.
As Product Management is searching for a direct measure of Customer Value and
stating that Story Points are inappropriate measure of Value. Please suggest a way of
measuring Value, so to help Product Management.
What are the ramifications of missing the first step in our estimation process? Namely,
if we drop the idea of Size and jump directly to Effort.
Here is an interesting site called "Ballpark" http://www.stridenyc.com/ballpark/
It has a certain methodology for a rough-level initial estimate.
Apparently the site is trying to differentiate itself by juxtaposing Budgeting and
Estimation. Obviously these two concepts are not in any competition. First goes
estimation, second goes budgeting. They are not a substitute for each other. I feel that
there is an apparent confusion with terminology, as methodology like T-Shirt Sizing is
what these folks call Ballpark. Although glancing at their site it looks like Monte Carlo
Simulation is used as a first estimation method.

Estimation Tools

Most commercial tools are based on a proprietary database from thousands of completed
projects. Initially, you derive an estimate from an industry averages. After your companyspecific data is collected, you start customizing and substituting the industry data with your
specific data.
Checkpoint originally introduced by Capers Jones the founder of SPR (Software Productivity
Research) of Burlington, with projects contributed from AT&T. It uses Function Points and
employs more than a hundred parameters in five categories.
Process
Technology
Personnel
Environment
Special factors
SLIM (Software Lifecycle Management) has a proprietary algorithm, supported by QSM
(Quantitative Software Management). Commonly used by government contractors, uses a
variety of parameters, including software size and Productivity Index (PI). The PI is calibrated
to an organization's historical software development environment.