8
cal
we
‘et
a
tas
an ante gM HR
CONTENTS
ERAN
INTRODUCTION -
WHAT IS THE SOIL STABILIZATION? --
2
ADDITIVES USED FOR STABILIZATION AND FACTORS
FOR ACHIEVING THE STABILIZATION: .0+0+ss0sseesesecee
$1 Lime 3
32. CEMENT - aa oo
33 ASPHALT EMULSION -- HG
3.4 CEMENT PLUS ASPHALT EMULSION -- 6
STUDY AND DESIGNING TO BE CONDUCTED PRIOR TO
EXECUTION OF STABILIZATION TREATMENT -.2.0..sc0s0s 7
4-1 GRASPING THE CONDITION OF THE SITE ----. 7
ao WO
DESIGNING THE SUBGRADE & BASE COURSE AND SUBBASE
WITH THE STABILIZED LAYER INCORPORATED «2.002.055. 15
BA OUTLINE «oes. “15
52 DESIGN PROCEDURE «+1000+eserseeseeereeeeeee se
PROCEDURES -. 28
6-1 STABILIZATION OF SUBGRADE (LIME OR CEMENT) ---. 25
62 STABILIZATION OF BASE -+--+2202200000ss3.additives used for stabilization
‘and factors for achieving the stabilizativadditives used for stabilization
and factors for achieving the stabillzatic7 additives used for stabilization
and factora for achieving the stabilizaliy
1
1
1
1
1
1
1
'
'
iadditives used for stabilization
and factors for achieving the stabilizatic4. study and designing to be conductedstudy and designing to be conducted
prior to execution
aod *
.
Ge -study and designing to be conducted
‘tw execution of stabilization tretmen
1
1
1study and desi
prior to executi
i
mning to be conducted
ion of stabilization tretmentstudy and designing to bestudy and desi
to be conducted
rior to execution of stabilization tretment
reestudy and designing to be conducted
prior to exevution uf stabilization euneri
I
i
1
study and Sean to be conducted
Prior to execution of stapization werentstudy and designing
prior to execution
i
1
i
1
1
1
1
i
t
i
1study and de
prior to executi
igning to be conducted
fon of stabilization tretment
15. designing the subgrade & base course and
subbase wih te Sablize ayer Incorporatedesigning the subgrade & base course and
subbase with the stabilized layer incorporateddesigning the subgrade & base course and
subase wih the sablized layer incorporatedesigning the subgrade & base course and
subbese wih the tabzed ayer ncorpotteddesigning the subgrade & base course and
subbase wi the labiced layer inputsdesigning the subgrade & base course and
subbase wilh the stabilized layer incorporatesdesigning the subgrade & base course and
subbase with tne stapized layer ncorporategdesigning the subgrade & base course and
ublaoe wit the stable lye incorpodesigning the subgrade & base course and
subbape with te stabilized laye ateG.procedures.procedures
“connedpres
Paper No. TRB #01-3486 Development of Testing Procedures To Determine The Water-Cement Ratio of Hardened Portland Cement Concrete Using Semi-Automated Image Analysis Techniques