Doc No:TIJ-PNT-05
Rev:
00
st
Date: 1 June,
2012
Page: 1 of 5
METHOD STATEMENT
FOR PAINTING
00
1st June
2012
Rev
No
DATE
Ab.Maje
ed
Prepared
By
TITTLE
METHOD STATEMENT FOR
PAINTING
Checked
By
Approv
als
Doc No:TIJ-PNT-05
Rev:
00
st
Date: 1 June,
2012
Page: 1 of 5
Table of Contents
1. OBJECTIVE.......................................................................................................... 3
2. SCOPE................................................................................................................. 3
3. REFERECNES...................................................................................................... 3
4. ABBREVATIONS.................................................................................................. 3
5. RESPONSIBILITIES............................................................................................ 3
6. EQUIPMENT........................................................................................................ 4
7. PROCEDURE....................................................................................................... 4
8. MATERIAL........................................................................................................... 5
9. SAFETY EQUIPMENT........................................................................................ 5
10. SAFETY CHECKS............................................................................................ 5
11. MANPOWER.................................................................................................... 5
TITTLE
METHOD STATEMENT FOR
PAINTING
Doc No:TIJ-PNT-05
Rev:
00
st
Date: 1 June,
2012
Page: 1 of 5
1. OBJECTIVE
1.1-
2. SCOPE
2.1
This method of statement covers inspection and quality
monitoring of construction activities for houses based on approved
engineering principles.
3. REFERECNES
3.1
3.2
4. ABBREVATIONS
4.1
4.2
4.3
4.4
4.5
PM
CM
QA & QC
HSE
RFI
Project Manager
Construction Manager
Quality Assurance & Quality Control
Health Safety & Environment.
Request for Inspection
5. RESPONSIBILITIES
5.1
Project Manager is responsible to ensure that the
construction activities
for the building are conducted according to this method of
statement, latest
approved construction drawings & project specification will
be followed in
true later in sprit.
5.2
Construction Manager is responsible for the implementation
of method of
Statement
TITTLE
METHOD STATEMENT FOR
PAINTING
Doc No:TIJ-PNT-05
Rev:
00
st
Date: 1 June,
2012
Page: 1 of 5
6. EQUIPMENT
6.1
6.2
6.3
6.4
6.5
Different Brushes
Paint Bottles-gallons
Scraper for filling material in walls
Sand Paper
Cloth for cleaning
7. PROCEDURE
Pre-Cautions
7.1
The approved quality of paint as mentioned i.e. make, type or
color etc
would be used after approval from Engineer.
7.2
All oil, grease, dirt, dust, loose mil scale and any other
foreign substances
shall be removed from the surface to be painted.
7.3
Surfaces of stainless steel, aluminum, bronze and machined
surfaces
adjacent to metal work being cleaned or painted shall be
protected by
effective masking or other suitable means, during the
cleaning and painting
operations.
7.4
All work shall be done in a work man like manners, leaving
the finished free
from drips, redges, waves, laps brush marks.
7.5
All paints shall be applied under dry and dust free
conditions.
7.6
Surface shall be free from moisture at the time of painting.
7.7
All primary paints shall be applied by brushing.
Procedure
7.8
Surface Preparation for painting. i.e. rubbing, dusting,
chipping & sanding
METHOD STATEMENT FOR
CONSTRUCTION OF REMAINING WORKS ALMA-1
TOWNHOUSES
(58UNITS)
7.9
After surface preparation one coat of primer shall be applied.
7.10
After applying primer, 2 coats of Putty (stucco) shall be
applied. Each coat of
Putty (stucco) shall be allowed to dry and harden
thoroughly.
7.11
After applying both coats of putty (stucco), the surfaces shall
be cleaned.
7.12
After cleaning of surfaces, two coats of Paints shall be
applied. The first coat
of the paint shall be applied immediately after cleaning.
7.13
Each coat of paint shall be allowed to dry or harden
thoroughly before the
Succeeding coat is applied.
TITTLE
METHOD STATEMENT FOR
PAINTING
Doc No:TIJ-PNT-05
Rev:
00
st
Date: 1 June,
2012
Page: 1 of 5
8. Material
8.1
8.2
8.3
8.4
9. Safety Equipment
9.1
9.2
9.3
9.4
9.5
9.6
10.
Safety helmet
Safety shoes
Gloves
Safety Glasses
Dust Mask
Gas Mask(if required)
Safety Checks
10.1
Safety Engineer will make ensure that working area is safe
and accordance
with project site regulations
11.
11.1
11.2
11.3
11.4
11.5
MANPOWER
Site Engineer
QC Engineer
Supervisor
Painter
Helper for Painter