Beruflich Dokumente
Kultur Dokumente
D1
Interfaces
Working Document
Page: i
TABLE OF CONTENTS
TITLE
PAGE
GENERAL.................................................................................................................................. 1
SCOPE....................................................................................................................................... 1
MECHANICAL INTERFACES........................................................................................ 3
4.1.1 General Guidelines ........................................................................................... 3
4.1.2 List of Mechanical Interfaces within L Station Phase II............................... 3
4.1.3 List of Mechanical Interfaces between L Station Phase II and
Phase I................................................................................................................ 4
4.1.4 List of Mechanical Interfaces between L Station Phase II and
External .............................................................................................................. 5
4.2
4.3
4.4
CIVIL INTERFACES....................................................................................................... 8
4.4.1 General Guidelines ........................................................................................... 8
4.4.2 List of Civil Interfaces....................................................................................... 9
D1_Interfaces_II_WD
Page: 1
GENERAL
Each Package shall co-ordinate his work in every phase of his activity like design, engineering,
workshop testing, construction, erection, site testing and commissioning directly with all other
Package(s).
During the design period, the concerned Package shall contact directly other Package(s) in all
matters concerning required data for his detailed technical design to get the necessary information.
The other Package is obliged to provide timely all necessary information as may be required by the
concerned Package(s). Copy of the correspondence shall be submitted to the Employer/Engineer.
The concerned Package may arrange for technical meetings with other Package(s) for the same
reason. The timing and agenda shall be submitted to the Employer/Engineer in due time before the
meeting for information and decision whether or not to attend the meeting. In case of nonattendance a copy of the Minutes of Meetings shall also be distributed to the Employer/Engineer.
SCOPE
This specification part D1 'Interfaces' describes the interfaces of the Package D - Desalination of
the Jebel Ali L Station, Phase II with the power package of Phase II, L Station Phase I and
External.
(Remark: Although Phase I is 'External' to the Phase II scope, the classification still contains this
category for better understanding.)
The number of interfaces shall be minimised, i.e. wherever possible, there shall be common
interface points for a system and sub-distribution in a package shall be done be the Contractor
responsible for that package.
To determine which package contractor has the lead responsibility for an interface, the following
order of priority shall be used:
P>D
The contractor who has the lead responsibility for the interface will be responsible for the coordination and for the physical completion of the interface. This includes providing the necessary
material (such as bolts, gaskets, flanges, weld rods, cable shoes and clamps, etc.) except the
cable and carry out the necessary work (such as aligning pipes, welding, tightening bolts, attaching
the cable shoes, connecting to the junction box, etc.) except pulling the cable.
Each interface shall be clearly identified by a unique identification code. Since every interface point
appears in the interface list of both involved systems, the interface shall use the exact same
identification code in both systems.
The following numbering system for interface points has been used in the tables below:
Xx-n/Yy-n-z
with
X, Y
Package Letter
P = Power, D = Desalination, S = 400kV Substation Phase I, E = External
The package letter shall always be in the following order: P>D>S>L>E
x, y
D1_Interfaces_II_WD
Page: 2
(The number is the same as used for the Particular Technical Specification X2.x
e.g. System P8 as specified in Part P2.8 - Condensate and Feedwater System)
n
Sequential number
For example:
P7II/D4II-3
= Interface point number 3 between the system P7 (Steam Systems) of Phase II
and system D4 (Seawater Supply) of Phase II
System Numbers
P Power
P0
Common
P1
GTs Turbine Units and Auxiliaries
including bypass stack
P2
HRSGs and Auxiliaries
P3
Auxiliary Boilers
P4
Fuel Oil storage and supply system for
GTs and Boilers
P5
Gas systems for GTs and Boilers
P6
Steam Turbine Units and Auxiliaries
P7
Steam Systems
P8
Condensate and Feedwater Systems
P9
Closed Cooling Water System
P10 Emergency Power Supply
P11 Instrument and Service Air
P12 Not Used
P13 Steam / Water Sampling System
P14 Steam / Water Circuit Chemistry / Dosing
P15 Demineralised Water Plant
P16 Not Used
P17 Not used
P18 Waste Water Treatment Plant
P19 Sewage Treatment Plant
P20 Sump Pumps
P21 Cranes and Hoists
P22 Not Used
P23 Station Fire Fighting and Fire Detection
Systems
P24 Heating, Ventilation and Air Conditioning
P25 Emission Monitoring System
P26 Electrical Equipment
P27 I&C Systems
P28 Civil Works
D - Desalination
D0
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
Common
Desalination Plant
Potable Water Pumps Station
Blending Station
Seawater Supply and Screening
Systems
Chemical Stores
Cranes and Hoists
Electrical Equipment
I&C Systems
Civil Works
Seawater Chlorination Plant
Plant Potable Water and Service Water
Systems
E External
E0 Common
E1 Natural Gas Pipeline
E2 Potable Water Pipeline
D1_Interfaces_II_WD
4
4.1
Page: 3
INTERFACE POINTS
MECHANICAL INTERFACES
System /Medium
D0
Common
P20-II/D0-II-1
Chemical Waste Water Tie-in points at the chemical drains sump pump suction
Drains
lines in the vicinity of the various plant systems
P23-II/D0-II-1
Fire Water
D1
Desalination Plant
P7-II/D1-II-1
LP Steam
P7-II/D1-II-2
IP Steam
P8-II/D1-II-1
Return Condensate
P11-II/D1-II-1
Service Air
P11-II/D1-II-2
Instrument Air
P20-II/D0-II-1
Chemical Waste Water Tie-in points at the chemical drain sump pump suction
Drains
lines in the vicinity of the various plant systems
P20-II/D0-II-2
D4
P6-II/D4-II-1
P6-II/D4-II-2
D1_Interfaces_II_WD
Location / Description
(co-ordinates are approximate)
Page: 4
Interface
System /Medium
Location / Description
(co-ordinates are approximate)
P9-II/D4-II-1
P9-II/D4-II-2
Sea Water Return from At each intercepting valve outlet counter flange
CCW
P18-II/D4-II-1
P18-II/D4-II-2
D11
P0-II/D11-II-1
P9-II/D11-II-1
CCW Supply
System /Medium
Location / Description
(co-ordinates are approximate)
D0
Common
P19-I/D0-II-1
D1
Desalination Plant
P15-I/D1-II-1
Distillate Water
P15-I/D1-II-2
P15-I/D1-II-3
D2
D2-II/D2-I-1
Potable Water
D3
Blending Plant
D1_Interfaces_II_WD
Page: 5
Interface
System /Medium
Location / Description
(co-ordinates are approximate)
P15-I/D3-II-1
Supply of Caustic
Solution to
Demineralised Water
Plant
D3-I/D3-II-1
D3-I/D3-II-2
Blending Seawater
D4
P18-II/D4-I-1
D4-II/D4-I-1
Cooling Seawater,
discharge
D10
System /Medium
D2
D2-II/E2-1
Potable Water
4.2
Location / Description
(co-ordinates are approximate)
ELECTRICAL INTERFACES
D1_Interfaces_II_WD
Page: 6
No.
System
Voltage
[V / kV]
Location
P26II/D7-II-1
11 kV Power Supply
Desalination Units
11 kV
P26II/D7-II-2
+ Protection,
control and
interlocking
380 V
+ Control and
interlocking
P26II/D7-II-3
Earthing system
D7-I/D7II-1
11 kV, 380 V
Power Supply from
Potable Water Pump Station
P26II/D7-II-1
4.3
+ Protection,
control and
interlocking
11 kV Power Supply
Seawater Supply and
Screening Systems
+ Protection,
control and
interlocking
The following interfacing with other Packages and others shall be considered for Package D
4.3.1 DCS Cubicles in Package D scope and Man-Machine Interface in the CCR
Interface / System
P27/D8 I&C
By Package P
DCS Cubicles
Plant/Highway Bus
connection
D1_Interfaces_II_WD
Page: 7
CCR MMI
(Hardware)
MMI Software
Documentation,
information and data
Remark
1)
List of all measurements (local and remote), including setpoints, alarms, etc.
Functional diagrams (logic and control diagrams with functional descriptions in clear text
P&I diagrams
MMI screen mimics for the Desalination Plant and proposal for common shared systems
Data for the plant management system, ready to use calculation routines, heat balance
calculations, correction curves, etc.
Layout drawings showing the location of the cubicles and other interfacing points, if any;
All necessary engineering data and any other data as required by package P to perform
their specified tasks
Whenever required, the exchanged data shall be provided on PC data carrier.
For the duration of DCS programming by Package P for Package D tasks the latter shall
delegate to Package P one competent process engineer familiar with all necessary
instrumentation and control aspects of their package.
Package D shall further support all Package P tasks as far as Package D systems /
constructions are concerned (e.g. proposing and releasing locations for Loudspeaker system, etc.).
D1_Interfaces_II_WD
Page: 8
System /Medium
Location / Description
D2.8-I/D8-II-1
D2.8-I/D8-II-2
Blending Plant
D2.8-I/D8-II-2
4.4
CIVIL INTERFACES
D1_Interfaces_II_WD
Page: 9
works are defined by the interfaces of the mechanical/electrical plants and equipments for which
the civil works are required. Reference is made to the relevant Clauses of mechanical/electrical
interfaces above.
Further interfaces for civil works not related directly to any of those plants, equipments, pipe and
cable racks/trenches, works such as roads, drainage and sewage etc., which need to be defined
area-wise i.e. to be shared by Packages, will be defined below in the Clause 4.4.2
Works for all of the Station to be executed by a certain Package will be defined accordingly.
Otherwise works of general nature mentioned in the scope of works below are limited to the
concerned packages only.
Storm Water Drainage lines along the roads are to be connected at manholes at the defined
limits for the roads
For general limits of the roads reference is made to General Plant Layout and to Part D2.9 of
the Sepcification
D1_Interfaces_II_WD