Sie sind auf Seite 1von 8

MINE TRADING

STANDARD
TANDARD OPERATING PROCEDURE (SOP)

FTA RESOURCES

PAGE 1

MINE TRADING
STANDARD
TANDARD OPERATING PROCEDURE (SOP)
MINE TRADING (CASH PAYMENT TERMS) SOP
TRANSACTION MECHANISM SCHEME
STAGE I - 25%

STAGE IV - 25%

1.
2.
3.
4.
5.
6.
7.

1.
2.
3.

Initial Enquiry, Correspondent & Soft offer


Letter of Intent (LOI)
Full Corporate Offer (FCO)
Full Corporate Offer (FCO) Acceptance/ICPO
Draft Contract Negotiation
Final Contract
Delivering Down Payment.

STAGE II - 25%
1.
2.
3.
4.
5.
6.

Mine Site Visit at Buyer Cost


Guarantee Supply Letter from Mine Owner (KP)
Supply Confirmation Sheet from Seller
Mining Activity & Cargo Preparation up to Stockpile
Pre-shipment Analysis
Mine Site Visit at Buyer Cost

4.

FOLLOW UP AFTER SHIPMENT


1.
2.
3.

2.
3.
4.
5.

6.

Issuing of Shipping Instruction & Submission of


Stowage Plan to Seller
Indenting of Stevedoring Company & Local Export
Clearing Agent
Provide Vessel Local Agent Particular & Contract
Detail
Booking of Jetty Slot for Loading to Barge
Crushing & Hauling of Cargo to Jetty
Indenting of Independent Surveyor for Barge
Inspection

Claim on Demurrage and Dispatch


Arrival of Vessel at Destination Port &
Unloading
Local Custom Clearance (eq. CIQ for China)

INCASE OF DISPUTE AFTER


INSPECTION AT DISCHARGE PORT
1.

STAGE III - 25%


1.

Loading
ding Activities to Barge
Draft Survey & Quality Analysis on Barge
Final Invoicing after Price Adjustment Base
on Draft Survey & Quality Analysis by
Surveyor
Seller Get Payment

2.
3.

4.

If, Substantial Differences in Quality (e.g Up


to 150 Kcal/Kg)
One Part of Sample Taken by Surveyor at
Loading
ng Port Send to Umpire
Result from Umpire is Final and Difference in
Cargo Payment Recover Accordingly
Seller Re-imburse
Re
Overpayment to Buyer if
Umpire Result is on Buyer Interest.

FTA RESOURCES

PAGE 2

MINE TRADING
STANDARD OPERATING PROCEDURE (SOP)
GENERAL PROCESS
1.

2.

3.

METHOD

ACTION

1.
2.
3.
4.
5.

Initial Enquiry, Correspondent & Soft offer


Letter of Intent (LOI)
Full Corporate Offer (FCO)
Full Corporate Offer (FCO) Acceptance/ICPO
Draft Contract Negotiation

1-5
1-3
1-3
5-7
5-7

Days
Days
Days
Days
Days

Email
Email
Email
Email
Email

Buyer
Buyer
Seller
Buyer
Buyer/Seller

6.
7.

Final Contract
Delivering Down Payment.

3-5
1-3

Days
Days

Email
Bank Payment

Buyer/Seller
Bank/Buyer

REMARK
--------Must be ready, willing & able (RWA) in company letter head
----------------Inc. estimate laycan, anchorage point, surveyor, specification,
payment, shipping terms, price & adjustment
Inc. estimate darft DLC finalization
---------

STAGE II - 25%
1.
2.

Mine Site Visit at Buyer Cost


Guarantee Supply Letter from Mine Owner (KP)

3-5
3-5

Days
Days

On Site Visit
Aggrement/Letter

Buyer/Seller
Seller

3.

Supply Confirmation Sheet from Seller

3-5

Days

Formal Letter

Seller

4.
5.
6.

Mining Activity & Cargo Preparation up to Stockpile


Pre-shipment Analysis
Mine Site Visit at Buyer Cost

20 - 25
3-5
3-5

Days
Days
Days

Mining & Hauling


Inspection
On Site Visit

Miner
Buyer/Surveyor
Buyer/Seller

If required
This is necessary if seller if not the miner which is always the case
if we deal with SME miners
To ensure every aspect of the cargo, funding, stevedoring &
quality control is in place
Til cargo readiness
To ensure quality & result email to Buyer
If required, to ensure cargo readiness

1-2

Days

Email

Buyer

3-5

Days

Formal Agreement

Seller

3-5

Days

Email

Buyer

1-3
5-6
1-3

Days
Days
Days

Email
Crushing & Hauling
Formal Agreement

Seller
Miner
Seller

To match estimate laycan date provided by Buyer


--------To inspect for quantity & quality (i.e. Sucofindo, SGS, CCIC,
Geoservice & Carsurin)

STAGE III - 25%


1.
2.
3.
4.
5.
6.

4.

TIME

STAGE I - 25%

Issuing of Shipping Instruction & Submission of


Stowage Plan to Seller
Indenting of Stevedoring Company & Local Export
Clearing Agent
Provide Vessel Local Agent Particular & Contract
Detail
Booking of Jetty Slot for Loading to Barge
Crushing & Hauling of Cargo to Jetty
Indenting of Independent Surveyor for Barge
Inspection

Necessary for Seller to co-ordinate with stevedoring company &


loading master
Provide local stevedoring & export clearing agent particullar &
contract detail to Buyer
---------

STAGE IV - 25%
1.

Loading Activities to Barge

3-6

Days

Conveyor/Truck

Stevedoring

2.
3.

Draft Survey & Quality Analysis on Barge


Final Invoicing after Price Adjustment Base on Draft
Survey & Quality Analysis by Surveyor
Seller Get Payment

1-2
1-2

Days
Days

Inspection
Final Invoice

Surveyor
Seller

Depending on Jetty Loading Rate of Jetty use. Arranged &


Supervise by Seller/Loading Master
By independent surveyor arrange and paid by Seller
For submission to Bank and get payment from The DLC

5-7

Days

Bank Payment

Bank

Provide all document are complete and accurate

35 - 40

Days

4.

TOTAL ESTIMATE OF NO. DAYS

Some of the process is concurrent and overlapping

FTA RESOURCES

PAGE 3

MINE TRADING
STANDARD
TANDARD OPERATING PROCEDURE (SOP)
MINE TRADING (STANDBY
STANDBY LETTER OF CREDIT (SBLC) PAYMENT TERMS) SOP
TRANSACTION MECHANISM SCHEME
STAGE I - 25%

STAGE IV - 25%

1.
2.
3.
4.
5.
6.

1.
2.
3.
4.

Initial Enquiry, Correspondent & Soft offer


Letter of Intent (LOI)
Full Corporate Offer (FCO)
Full Corporate Offer (FCO) Acceptance/ICPO
Draft Contract Negotiation
Final Contract via Email Exchange/in Jakarta

STAGE II - 25%
1.
2.
3.
4.
5.
6.
7.

Mine Site Visit at Buyer Cost


Issuance of Document Standby Letter of Credit
(DSBLC)
Guarantee Supply Letter from Mine Owner (KP/IUP)
Supply Confirmation Sheet from Seller
Mining Activity & Cargo Preparation up to Stockpile
Pre-shipment Analysis
Mine Site Visit at Buyer Cost

5.
6.
7.
8.
9.
10.
11.

STAGE III - 25%


1.
2.
3.
4.
5.
6.
7.

8.

Nomination of Vessel
Acceptance of Vessel
Issuing of Shipping Instruction & Submission of
Stowage Plan to Seller
Indenting of Stevedoring Company & Local Export
Clearing Agent
Provide Vessel Local Agent Particular & Contract
Detail
Booking of Jetty Slot for Loading to Barge
Crushing & Hauling of Cargo to Jetty
Indenting of Independent Surveyor for Barge &
Vessel Inspection

12.

13.

Loading Activities to Barge


Draft Survey & Quality Analysis on Barge
Barge Transshipment to Vessel
Notice of Arrival (NOA) to Seller or It's
Agent
Vessel Laycan at Agreed Loading Anchorage
Point
Notice of Readiness (NOR) to Seller or It's
Agent
NOR Acceptance by Seller
Loading to Vessel & Depart from Loading
Anchorage
Submission of Time Sheet by Vessel Captain
Draft Survey
Sur
& Quality Analysis on Vessel
Final Invoicing after Price Adjustment Base
on Draft Survey & Quality Analysis by
Surveyor
Preparation and Submission of Document to
Bank Base on DSBLC
D
Requirement
Seller Get Payment

FOLLOW UP AFTER SHIPMENT


1.
2.
3.

Claim on Demurrage and Dispatch


Arrival of Vessel at Destination Port &
Unloading
Local Custom Clearance (eq. CIQ for China)

INCASE OF DISPUTE AFTER


INSPECTION AT DISCHARGE PORT
1.
2.
3.

4.

If, Substantial Differences in Quality (e.g Up


to 150 Kcal/Kg)
One Part of Sample Taken by Surveyor at
Loading Port Send to Umpire
Result from Umpire is Final and Difference in
Cargo Payment Recover Accordingly
Seller Re-imburse
Re
Overpayment to Buyer if
Umpire Result is on Buyer Interest

FTA RESOURCES

PAGE 4

MINE TRADING
STANDARD
TANDARD OPERATING PROCEDURE (SOP)
MINE TRADING (LETTER
LETTER OF CREDIT (LC) PAYMENT TERMS)
TERMS SOP
TRANSACTION MECHANISM SCHEME
STAGE I - 25%

STAGE IV - 25%

1.
2.
3.
4.
5.
6.

1.
2.
3.
4.

Initial Enquiry, Correspondent & Soft offer


Letter of Intent (LOI)
Full Corporate Offer (FCO)
Full Corporate Offer (FCO) Acceptance/ICPO
Draft Contract Negotiation
Final Contract via Email Exchange/in Jakarta

STAGE II - 25%
1.
2.
3.
4.
5.
6.
7.
8.

Mine Site Visit at Buyer Cost


Issuance of Document Letter of Credit (DLC)
Performance Bond 2% Guaranteed by Bank
Guarantee Supply Letter from Mine Owner (KP/IUP)
Supply Confirmation Sheet from Seller
Mining Activity & Cargo Preparation up to Stockpile
Pre-shipment Analysis
Mine Site Visit at Buyer Cost

5.
6.
7.
8.
9.
10.
11.

STAGE III - 25%


1.
2.
3.
4.
5.
6.
7.

8.

Nomination of Vessel
Acceptance of Vessel
Issuing of Shipping Instruction & Submission of
Stowage Plan to Seller
Indenting of Stevedoring Company & Local Export
Clearing Agent
Provide Vessel Local Agent Particular & Contract
Detail
Booking of Jetty Slot for Loading to Barge
Crushing & Hauling of Cargo to Jetty
Indenting of Independent Surveyor for Barge &
Vessel Inspection

12.

13.

Loading Activities to Barge


Draft Survey & Quality Analysis on Barge
Barge Transshipment to Vessel
Notice of Arrival (NOA) to Seller or It's
Agent
Vessel Laycan at Agreed Loading Anchorage
Point
Notice of Readiness (NOR) to Seller or It's
Agent
NOR Acceptance by Seller
Loading to Vessel & Depart from Loading
Anchorage
Submission of Time Sheet by Vessel Captain
Draft Survey & Quality Analysis on Vessel
Final Invoicing after Price Adjustment Base
on Draft Survey & Quality Analysis by
Surveyor
Preparation and Submission of Document to
Bank Base on DLC Requirement
Seller Get Payment

FOLLOW UP AFTER SHIPMENT


1.
2.
3.

Claim on Demurrage and Dispatch


Arrival of Vessel at Destination Port &
Unloading
Local Custom Clearance (eq. CIQ for China)

INCASE OF DISPUTE AFTER


INSPECTION AT DISCHARGE PORT
5.
6.
7.

8.

If, Substantial Differences in Quality (e.g Up


to 150 Kcal/Kg)
One Part of Sample Taken by Surveyor at
Loading Port Send to Umpire
Result from Umpire is Final and Difference in
Cargo Payment Recover Accordingly
Seller Re-imburse
Re
Overpayment to Buyer if
Umpire Result is on Buyer Interest

FTA RESOURCES

PAGE 5

MINE TRADING
STANDARD
TANDARD OPERATING PROCEDURE (SOP)

FTA RESOURCES

PAGE 6

MINE TRADING
STANDARD
TANDARD OPERATING PROCEDURE (SOP)
MINE TRADING (SKBDN PAYMENT TERMS) SOP
TRANSACTION MECHANISM SCHEME
STAGE I - 25%

STAGE IV - 25%

1.
2.
3.
4.
5.
6.

1.
2.
3.

Initial Enquiry, Correspondent & Soft offer


Letter of Intent (LOI)
Full Corporate Offer (FCO)
Full Corporate Offer (FCO) Acceptance/ICPO
Draft Contract Negotiation
Final Contract via Email Exchange/in Jakarta

STAGE II - 25%
1.
2.
3.
4.
5.
6.
7.
8.

Mine Site Visit at Buyer Cost


Issuance of SKBDN
Performance Bond 2% Guaranteed by Bank
Guarantee Supply Letter from Mine Owner (KP/IUP)
Supply Confirmation Sheet from Seller
Mining Activity & Cargo Preparation up to Stockpile
Pre-shipment Analysis
Mine Site Visit at Buyer Cost

STAGE III - 25%


1.
2.
3.
4.
5.
6.
7.

8.

Nomination of Barge
Acceptance of Barge
Issuing of Shipping Instruction & Submission of
Stowage Plan to Seller
Indenting of Stevedoring Company & Local Export
Clearing Agent
Provide Barge Local Agent Particular & Contract
Detail
Booking of Jetty Slot for Loading to Barge
Crushing & Hauling of Cargo to Jetty
Indenting of Independent Surveyor for Barge
Inspection

Loading Activities to Barge


Draft Survey & Quality Analysis on Barge
Notice of Arrival (NOA) to Seller or It's
Agent
4. Barge Laycan
L
at Agreed Loading Anchorage
Point
5. Notice of Readiness (NOR) to Seller or It's
Agent
6. NOR Acceptance by Seller
7. Loading to Barge & Depart from Unloading
8. Submission of Time Sheet by Barge Captain
9. Draft Survey & Quality Analysis on Barge
10. Finall Invoicing after Price Adjustment Base
on Draft Survey & Quality Analysis by
Surveyor
11. Preparation and Submission of Document to
Bank Base on SKBDN Requirement
12. Seller Get Payment

FOLLOW UP AFTER SHIPMENT


1.
2.
3.

Claim on Demurrage and Dispatch


Arrival of Barge at Destination Port &
Unloading
Local Custom Clearance (eq. CIQ for China)

INCASE OF DISPUTE AFTER


INSPECTION AT DISCHARGE PORT
1.
2.
3.

4.

If, Substantial Differences in Quality (e.g Up


to 150 Kcal/Kg)
One Part of Sample Taken by Surveyor at
Loading Port Send to Umpire
Result from Umpire is Final and Difference in
Cargo Payment Recover Accordingly
Seller Re-imburse
Re
Overpayment to Buyer if
Umpire Result is on Buyer Interest

FTA RESOURCES

PAGE 7

MINE TRADING
STANDARD
TANDARD OPERATING PROCEDURE (SOP)

FIVIL OCWANTIANUS
FTA RESOURCES

PAGE 8

Das könnte Ihnen auch gefallen