Located in our existing Taman Putra Prima and fronting the main road
(Lingkaran Putra Prima) Appendix A
Size
Residential
Commercial
1:4
Proposed Components
Concept
Proposed Units
Description
a) Overall day time shops
b) Overall night view shops
c) Overall day time service apartment
d) Overall night time service apartment
e) Service apartment main entrance
f) Service apartment tower main lobby
g) Service apartment facilities deck / swimming pool
h) Any other unique features proposed
Site Plans
a)
b)
c)
d)
e)
f)
g)
Floor Plans
a) All floor plans must include the following info: Unit size ( in sq ft)
Level indication
Level GFA
Level efficiency
Furniture layout for units
Labelling of rooms
Color coding between saleable area and common area
Color coding of lifts
Color coding of M&E provisions
Should include sections and elevations of overall building and unit
Fees Proposal
a)
b)
c)
d)
Design Guidelines
1
a) Shops
i)
Incoming power 3 Phase 100A
ii)
Individual electrical meter for every floor
iii)
Separated electrical meter for lift
iv)
Gr floor height slab to slab at least 14
v)
Shop front Roller shutters
vi)
Access to stair case High quality MS grille door
vii) Letter Box Drop box from front and not accessible from
outside if grille door is locked.
viii) Air/Con ledge Must be concealed with MS louvers &
with opening from outside / inside and lockable.
ix)
Separated telekom incoming for each level.
x)
Separated water meter for each level.
xi)
Roof type Depending on Arch design and proposal.
xii) Roof system must include appropriate sisalation method.
xiii) Building 5 walkway level must not exceed 350mm higher
than road level.
xiv) Allocation of space at faade for signboard for each level
and on roof parapet wall.
xv) Include a small pantry area in front of toilets.
xvi) Must include 2 toilet cubicles for each level.
Floor Finish
a)
b)
c)
d)
e)
f)
Wall finish
a)
b)
c)
d)
Sanitary Wares
Windows
Doors
a)
b)
c)
d)
General
Requirements For
Service Apartments
a) Service Apts
i) Incoming power 3 Phase 60A
ii) Individual electrical meter for every unit including dual key units.
iii) Separated electrical meter for lifts
iv) Clear floor height slab to slab at least 3300mm
v) Unit numbering to avoid no 4.
vi) Letter Box to design a centralised letter box system to each block
with access to control access for POS Msia.
vii) Air/Con ledge Must be concealed with MS louvers & with opening
from outside / inside and lockable.
viii) Incoming telekom exchange with fiber ready.
ix) Separated water meter for each unit including dual key.
x) Roof type Depending on Arch design and proposal.
xi) Corridor walkway width must be at least 1,500mm wide.
xii) Car park level efficiency must be around 350 sq ft 450 sq ft.
xiii) Allocation of car park, to follow authoritys requirements.
xiv) Refuse chamber Design for each block must have individual refuse
chamber with external access for garbage trucks.
Security
Wall Finish
Sanitary Wares
Windows
Doors
b)
c)
d)
e)
APPENDIX A
Subject Property