Beruflich Dokumente
Kultur Dokumente
Agenda
Potential Savings
Energy Monitoring Solutions
Case studies: You can monitor only what you measure !
Case study 1
: Controlling the Boiler efficiency
Case study 2
Case Study 3
14/06/2009
E+H-BE/JJR
Slide 2
Emissions/
Effluents
Labor
Emissions/
Effluents
Products
Steam
Vapeur
Gaz
Gaz
Electricity
Electricit
Slide 3
Air
Air
14/06/2009
E+H-BE/JJR
Water
Eau
Raw Material
Company image
Legislation
Increase of profits
Reduction of energy
consumption
14/06/2009
E+H-BE/JJR
Slide 4
Reduction of CO2
emissions (Kyoto
protocol and related
legislations exa: EU
Directives about
emissions trading, )
Potential Savings
Over the past 15 years, significant development work has
been undertaken in the UK. Results indicate that, when
properly implemented, an EMIS can save 5 to 15 percent of
annual energy costs. As an initial approximation, 8 percent
appears to be a reasonable estimate.
14/06/2009
E+H-BE/JJR
Slide 5
Controlling of
Energy Data
Optimize
(Understanding to results)
Transparency of
Consumption
Energy Reporting
(Informations to
understanding)
14/06/2009
E+H-BE/JJR
Slide 6
Data Analyses
(Data to information)
1.75 Mio
2 Mio.
2 Mio.
0.66 Mio.
96,000
13,300 per month
8 months
Price in Mio
2.0
without Energy Monitoring
ROI after
7.2 months
1.5
1.0
0.5
14/06/2009
E+H-BE/JJR
Slide 8
0
0
10
11
12
Time in Months
Water
ed
s
s
e
r
p
Com
Air
Gas
(NG,
oil an
d
othe
rs)
ity
c
i
r
t
Elec
Steam
14/06/2009
E+H-BE/JJR
Slide 9
Utilities
Steam
Compressed Air
Electricity
Gas
Oil
Water
Heating
Cooling
Analyses and
Reporting
Visualization and
Recording
Calculation and
Transmission
Process Fluids
14/06/2009
E+H-BE/JJR
Slide 10
Energy Measurement
Features
Accurate Calculation
and Notification in
14/06/2009 case of faults
- Data Recording
- Visualization
- Analyses
- Effiziency Calculation
- SEC
- CO2 Emissions
- Supervision of Comp.
Air Filters
- Find leaks
E+H-BE/JJR
Slide 11
Price
- Transparency of Energy
- KPIs
- Deviation Analyses
- ROI Calculation
- Benchmark
- Reporting
- Energy Cost per product
- Energy Planning
- Early Detection of
Deviations
Features
Accurate Calculation
and Notification in
14/06/2009 case of faults
- Data Recording
- Visualization
- Analyses
- Effiziency Calculation
- SEC
- CO2 Emissions
- Supervision of Comp.
Air Filters
- Find leaks
E+H-BE/JJR
Slide 12
Price
- Transparency of Energy
- KPIs
- Deviation Analyses
- ROI Calculation
- Benchmark
- Reporting
- Energy Cost per product
- Energy Planning
- Early Detection of
Deviations
14/06/2009
E+H-BE/JJR
Slide 13
Promass
Coriolis
Prowirl
Vortex
Prosonic Flow
Ultrasonic
T Mass
Thermal Mass
14/06/2009
E+H-BE/JJR
Deltatop
Differential Pressure
Slide 14
Conductive
Liquids
Low
viscosity
High
viscosity
Non-conductive
Liquids
Low
viscosity
High
viscosity
Gases
Steam
14/06/2009
E+H-BE/JJR
Slide 17
Vortex
Thermal
Coriolis
Differential Pressure
Features
Accurate Calculation
and Notification in
14/06/2009 case of faults
- Data Recording
- Visualization
- Analyses
- Effiziency Calculation
- SEC
- CO2 Emissions
- Supervision of Comp.
Air Filters
- Find leaks
E+H-BE/JJR
Slide 18
Price
- Transparency of Energy
- KPIs
- Deviation Analyses
- ROI Calculation
- Benchmark
- Reporting
- Energy Cost per product
- Energy Planning
- Early Detection of
Deviations
Case Study 1
Controlling the boiler efficiency
There can be no economy where there is no efficiency
(Benjamin Disraeli, 1 October 1868)
14/06/2009
E+H-BE/JJR
Slide 19
Steam
Make-up
water
Condensate
return
Feed water
Flue gas
14/06/2009
E+H-BE/JJR
Slide 20
Nat gas
Blowdown
Memograph M
Make-up
water
Condensate
return
Steam
[MJ/h]
Flow
Temperature
Feed water
[MJ/h]
Flue gas
Energy
14/06/2009
E+H-BE/JJR
Slide 21
Nat gas
[MJ/h]
Blowdown
Control limits
Target line
Installation of an Economiser
14/06/2009
E+H-BE/JJR
Slide 22
Case Study 2
A monastic brewery also subject to the energy agreement
Trappist brewery of Chimay can also improve earnings by
reducing the Energy bill !
14/06/2009
E+H-BE/JJR
Slide 23
14/06/2009
E+H-BE/JJR
Slide 24
14/06/2009
E+H-BE/JJR
Slide 25
Office
ReadWin
Electrical cabinet
ETHERNET
3 x Pulse
3 x 4-20 mA
Field
4-20 mA
14/06/2009
E+H-BE/JJR
Charcuterie dept
Slide 26
Bottling
Cheese dept
14/06/2009
E+H-BE/JJR
Slide 27
14/06/2009
E+H-BE/JJR
Slide 28
Features
Accurate Calculation
and Notification in
14/06/2009 case of faults
- Data Recording
- Visualization
- Analyses
- Effiziency Calculation
- SEC
- CO2 Emissions
- Supervision of Comp.
Air Filters
- Find leaks
E+H-BE/JJR
Slide 37
Price
- Transparency of Energy
- KPIs
- Deviation Analyses
- ROI Calculation
- Benchmark
- Reporting
- Energy Cost per product
- Energy Planning
- Early Detection of
Deviations
Data collection
once/month
Old electrical counters
14/06/2009
E+H-BE/JJR
Slide 38
Energy Monitoring
Software
Existing SCADA
Client Server
Existing
Production Data
Database
Ethernet
PLC
Field Controller
SFC173
Memograph M
FXZ520
Module
RS485
Fieldgate
FXA520
RS485
4x Pulse
HART-Multiplexer
Energy
Computer
RMx621
14/06/2009
E+H-BE/JJR
Slide 39
Fieldgate
FXA520
Mobilfunk
GSM/GPRS
14/06/2009
E+H-BE/JJR
Slide 40
14/06/2009
E+H-BE/JJR
Slide 41
Control limits
Target line
Installation of an Economiser
14/06/2009
E+H-BE/JJR
Slide 42
expense
14/06/2009
E+H-BE/JJR
Slide 43
14/06/2009
E+H-BE/JJR
Slide 44
HARIBO UK
software
Data Access
Scheduler
server
.CSV
Donnes de
production
Database
NETWORK
FXA520
RS485
FXA520
RS485
FXZ520s
FXZ520
14/06/2009
E+H-BE/JJR
Slide 45
Boiler gas
Compressed
air
Effluent
Steam
Temp
Gas supply
Water supply Pressure
Sub 2 electricity
Comp 1 electricity
Electricity
supplier