The purpose of this IT Infrastructure Disaster Recovery Plan Template is to guide you through the
development of the steps and procedures necessary to successfully recover from a disruption at the
primary data center.
This fully editable and customizable template helps jumpstart your planning effort by offering sample
content. Edit the content as needed to customize this plan to your organization and unique needs.
Contents
Cover Page ............................................................................................................................................................ 4
Introduction .......................................................................................................................................................... 4
Assumptions ......................................................................................................................................................... 4
Scope / Infrastructure Information....................................................................................................................... 5
Infrastructure Recovery Team .............................................................................................................................. 6
Team Communication ........................................................................................................................................... 6
Recovery Prerequisites Checklist .......................................................................................................................... 6
Recovery Procedures ............................................................................................................................................ 7
Verification Procedures ........................................................................................................................................ 7
Return Home Procedures ..................................................................................................................................... 8
Appendix I: Attachments ...................................................................................................................................... 8
Appendix II: Third Party Contacts ......................................................................................................................... 8
History Log ............................................................................................................................................................ 9
TERMS OF USE
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
View a copy of this license online, or send a letter to Creative Commons, PO Box 1866, Mountain View, CA 94042, USA.
Cover Page
Title:
Description:
Owners:
Contributors:
Last Updated:
Last Approved:
Status:
Exercise Status:
Introduction
The purpose of this infrastructure disaster recovery plan is to guide personnel through the steps necessary to
recover from a disruption at the primary data center. This plan will be activated based on the type and
severity of a disruptive event or failure as characterized by management and may be used individually or in
conjunction with other plans throughout the organization.
Assumptions
The following assumptions were used in developing this plan:
The infrastructure is inoperable at its primary data center, with downtime potentially exceeding the
approved recovery time objective (RTO).
Key personnel have been identified and trained in their response and recovery roles; they are
available to activate this plan.
Current backups of software and data are intact and available for recovery.
Scope/Infrastructure Information
TITLE
DESCRIPTION
OWNER(S)
ROLE
LOWEST
COMMITTED
COMMITTED
RTO
RTO
PROVEN
RTO
LOWEST
COMMITTED
COMMITTED
RPO
RPO
PROVEN
RPO
RELATED
ITEMS
ALTERNATE
MEMBERS
IT Owner/Team Leader
Provide leadership to department personnel regarding recovering in-scope IT
infrastructure using alternate methods and/or resources; submit status reports
and requests for assistance to management.
[Insert]
[Insert]
[Insert]
[Insert]
[Insert]
[Insert]
Team Communication
Throughout the recovery effort, the Recovery Team should remain in contact with management. In order to
do so, the following methods (aside from normal communication devices) should be used.
Website:
[Insert]
Team Room:
[Insert]
Other:
[Insert]
PLAN NAME
OWNER/VENDOR
CONTACT
PHONE
DR TIER /
CLASSIFICATION
COMMENTS
Recovery Procedures
Insert procedure(s) or refer to existing document(s) regarding the process to restart the application and
prepare for validation testing.
#
1
TITLE
[Procedure Title 1]
[Insert]
[Insert Description]
2
ROLE
[Procedure Title X]
[Insert]
[Insert Description]
Verification Procedures
This section of the plan addresses how IT will verify that the infrastructure is operating
appropriately. Describe the system checks necessary to ensure the technology is operating / processing
completely / accurately and that data is restored within expectations.
#
1
TITLE
[Procedure Title 1]
[Insert Description]
[Procedure Title X]
[Insert Description]
ROLE
[Insert]
[Insert]
TITLE
ROLE
[Procedure Title 1]
[Insert]
[Insert Description]
2
[Procedure Title X]
[Insert]
[Insert Description]
Appendix I: Attachments
Additional support files can be documented here.
FILE NAME
DESCRIPTION
FILE LOCATION
EMAIL:
ADDRESS:
PHONE:
ALT PHONE:
MOBILE:
FAX:
OTHER:
History Log
VERSION
DATE
[Insert]
ACTION
[Insert]
Schedule a Demo
Contact Us
>> Enjoy an extended free trial of Catalyst Pro (45 days!) with referral code: DRJ Plan Templates
10