Date : 28/01/16
0-1
3
0-2
4
1-3
8
2-3
10
2-4
12
3-5
10
4-5
6
4-6
9
5-6
8
n
1) The project of the work is checked at the end of 10 day and it is observed that activities 0-1, 02, 1-3 are completed.
2) Activity 2-3, 2-4 are in progress and will take 6 and 7 days.
3) Due to arrival of new machinery activity 3-5 takes only 6 days update the network.
Think (15 min)
First student will read the question and solve the problem.
Pair (10 min)
After solving the problem student will discuss with neighbors in pair and modified the solution.
Share (15 min)
All students of class will share the answer to the facilitator, and discussion is done between
student and facilitator.
Analysis of Results:
Y Attempted both test.
N Attempted one test.
SR
.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Roll
No
1
2
3
4
5
6
7
8
10
11
13
14
15
16
17
18
20
21
22
23
24
25
26
27
28
30
31
Y/N
N
Y
N
N
Y
Y
Y
Y
Y
N
Y
Y
N
N
Y
Y
Y
Y
Y
N
Y
Y
N
Y
Y
Y
N
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
49
50
51
52
57
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
Y
Y
Y
Y
Y
Y
Y
Y
Y
Hussain
Shaikh Sumer Pappu
Shinde Pritesh Pradeep
Turup Prashant Shamrao
/Umbarje Aishwarya Mahendra
Wadapurkar Shubham Mukund
/Yemul Prajakta Shriniwas
Shoeb Khan
Phade Aditya Shashikant
Taggelli Vishal Sharnappa
Waghmare Swapnil Shivkumar
Kotecha Akash Satish
Wakse Akshay Arjun
Gandhi Ajinkya Ajit
Shaha Manish Pradip
Durugakar Ashish Shital
Samyak Bajaj
Shashank Jain
Sayyed fauzan
Gundeli Pravin Buchayya
Patil Vrushabh Rajendra
Naik Abhishek Babaso
Magdum Prashant Ajit
Aurade Tahazoheb Daoud
Ambure Harshvardhan Sudesh
/Shinde Pooja Hari
Nalla Pawan Govind
/ Pathan Farhanaaz Firozkhan
Mhetre Kedarnath Mallikarjun
Birajdar Satish Maruti
Sonigra Harshal S.
Ajanalkar Ronit N.
Kulkarni Shubham M.
Chogule Sumit U.
Shah Sanket H.
N
Y
Y
Y
Y
Y
Y
Y
Y
N
N
N
Y
Y
N
Y
Y
Y
Y
Y
Y
Y
N
Y
Y
Y
N
Y
N
N
N
N
Y
N
71
72
73
74
75
81
82
83
84
85
N
N
Y
Y
Y
Jain Mahaveer D.
Sanjekar Rohit K.
Jadhav Sneha
Yambal Piyush
Kastariwale Alkeshsangai
Date : 09/03/16
0-1
3
0-2
4
1-3
8
2-3
10
2-4
12
3-5
10
4-5
6
4-6
9
5-6
8
n
1) The project of the work is checked at the end of 10 day and it is observed that activities 0-1, 02, 1-3 are completed.
2) Activity 2-3, 2-4 are in progress and will take 6 and 7 days.
3) Due to arrival of new machinery activity 3-5 takes only 6 days update the network.
First student will read the question and solve the problem.
Pair Phase: (10 min)
After solving the problem student will discuss with neighbors in pair and modified the solution.
Share Phase: (15 min)
All students of class will share the answer to the facilitator, and discussion is done between
student and facilitator.
Date : 27/02/2016
1-2
6
1-30
10
3-2
5
3-4
12
2-5
20
4-5
7
4-6
7
5-6
6
n
Activity 1-2 and 1-3 are completed on original planned. Activity 3-4 is in progress and will need
16 more days for completion. Activity 4-5 appears to present some problem and estimated time is
10 days. Activity 4-6 can be completed in 5 days instead of 7 days.
Project was updated on 14th day.
Analysis of Results:
Y Attempted both test.
N Attempted one test.
SR
.
No.
1
2
3
4
5
6
Roll
No
Y/N
1
2
3
4
5
6
N
Y
N
N
Y
Y
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
7
8
10
11
13
14
15
16
17
18
20
21
22
23
24
25
26
27
28
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
49
50
51
52
57
59
60
Y
Y
Y
N
Y
Y
N
N
Y
Y
Y
Y
Y
N
Y
Y
N
Y
Y
Y
N
Y
Y
Y
Y
Y
Y
Y
Y
Y
N
Y
Y
Y
Y
Y
Y
Y
Y
N
N
N
Y
Y
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
N
Y
Y
Y
Y
Y
Y
Y
N
Y
Y
Y
N
Y
N
N
N
N
Y
N
N
N
Y
Y
Y