Today, more than ever, building programs must be carried


out with greater efficiency and productivity. In order to
prosper, developers and builders emulate more and more
the manufacturing sector where speed, efficiency,
management and logistical control are critical.
By increasing productivity to levels commonly achieved
by manufacturers, builderscosts, completion times and
quality levels are substantially improved.
Outinord has been a pioneer and leader in the
mechanization of the building process. Builders who begin
using Outinord-developed technology and systems will
immediately achieve efficient labor utilization, speed up the
construction process and improve their on-site logistics and
scheduling control.
This improvement in results is consistent and verified by
more than 8,000,000 Outinord built dwellings throughout the
world. The effectiveness of Outinords construction technology
makes us a genuine partner of our colleagues in the
construction industry.
Owners and Developers:
Benefit from accurate completion schedules, time and cost
savings. This permits clients to build a better structure (often
with added sales appeal), accurately forecast move-in dates,
reduce costs (which may be used to add features or lower
prices below those of competitive projects), as well as
optimize profits.

Designers and Architects:


Benefit from superior design freedom, dimensional accuracy,
predictable inspection scheduling and quality control.

Builders, General Contractors and Sub-Contractors:


Benefit from predictable labor utilization, efficient logistical
control, repetitive tasks and a measurable production output.
Outinord is proud to show in this brochure a selection of
successful and interesting projects built by our worldwide
clientele.

Jean Luc BIKARD


President and C.E.O.
Group Outinord

MEP Anglais MEP Anglais 18/07/10 12:39 Page4

Outinord Yo
>Outinord
15% Cost Savings
construction efficiency brings:
- Optimized labor efficiency (from repetitive and wellorganized work tasks)
- Precise scheduling (of material deliveries and finishing trades)
- Measurable daily work output
- Reduced costs (general conditions, corporate overhead, etc.)
- Faster return on investment

15% Cost Saving, 25% Time

MEP Anglais MEP Anglais 18/07/10 12:39 Page5

2/3

ur Technical Partner
Outinord, a successful
French building
technology
>Outinord
25% Time Savings
construction efficiency delivers:

>Benefits
Superior Quality
of Outinord construction include:

- Daily production cycle


- Faster project completion (thanks to repetitive tasks and the
daily production cycle)
- Predictable scheduling and project completion dates
These are important and relevant advantages that will
accelerate income and increase profits.

- Monolithic reinforced concrete structures require low


maintenance and resist damage caused by weather, insects,
seismic shocks, tornadoes and other high wind forces.
- Durable steel forms produce smoother wall finishes requiring
minimal patching.
- Dimensional accuracy allows the industrialization of
follow-on trades (plumbing, electrical, cabinetry and interior
finishing).

Saving plus Superior Quality.

MEP Anglais MEP Anglais 18/07/10 12:40 Page6

The Load Be
>The Monolithic,
Solid Structures
worldwide acceptance and increased use of reinforced

>- Outinord
Design Economies
pre-construction and engineering services are

concrete structures are due to the undeniable benefits they


produce for both builders and residents.

available to adapt your plans to maximize production


efficiency.
- The smooth surface of load bearing walls offers significant
advantages over column and beam structures.
- The quantity of reinforcement steel needed for cast-in-place
concrete structures is 20% less than that required for similar
structures built with column and beam design.
These savings are equally available to buildings erected in
seismic areas:
- The elimination of columns optimizes the net usable
floor area.
- The durability of solid concrete walls is superior to masonry
construction.
- Interior partition walls may also be cast simultaneously in
the daily pour.

>The More
Efficient Load Distribution
load bearing wall structure incorporates significant
technical benefits:
- A better distribution of stress related to the buildings own
weight.
- Improved load distribution considerably simplifies and
lightens the foundation design.
- Improved sound insulation due to the density of the
structures solid concrete walls and slabs.
- Limited risk of crack formation due to the use of
homogeneous materials.
- Improved lateral load resistance as a result of the
simultaneous pour of walls and slabs; the cold joint is
eliminated.

15% Cost Saving, 25% Time

MEP Anglais MEP Anglais 18/07/10 12:40 Page7

4/5

aring Wall Structure


High technical performance
and design flexibility

> Improved
seismic properties and wind force
resistance
The load bearing wall design combined with the monolithic
pour process produces strong structures more capable of
resisting seismic shock waves and high wind forces. The
monolithic structure, incorporating longitudinal walls,
produces a rigid, three-dimensional support network.

Hundreds of thousands of quakeproof apartments have been


built in seismic zones

>A 17-Endurance
based on example
story, San Francisco State University dormitory,
located just three miles from the San Andreas fault,
was subject, while under construction, to the stress
and effects of the Loma Prieta earthquake.
In spite of the quakes intensity, the towers first
14 stories, which had already been built, did not
sustain to any damage.

Saving plus Superior Quality.

MEP Anglais MEP Anglais 18/07/10 12:40 Page8

100%

85,6%
83,3%

90%
80%
70%
60%
50%
40%
30%
20%
10%
0%

04

07

10

01

04

07

10

Efficient manpower
predictable produ
Outinords building technology facilitates the
introduction of just-in-time logistical control.
Builders can plan and meet their production deadlines,
accurately schedule all supplies, predict manpower needs and
coordinate the arrival and completion of finishing trades.

1h

2h

3h

4h

5h

6h

7h

8h

9h

10h

11h

12h

Initial striking operations


Movement of formwork
Adjustment of formwork
and placing of boxout etc...
Steel fixing
Final preparations
Handling of work platforms
Concreting

Crane and labour


Labour only
Concreting

15% Cost Saving, 25% Time

MEP Anglais MEP Anglais 18/07/10 12:40 Page9

6/7

management and
ction scheduling
Increasing productivity and efficiency

>- Thanks
Produces 350m of floor area per day. Every day.
to the daily work cycle, builders can produce 350 m
2

of floor area every workday. This consistent daily production


rate represents 2, 3, 4, or more apartments, which sets the
pace for the projects on-schedule progress. It allows the
contractor to accurately forecast and predict work schedules
and material deliveries and the developer to accurately
predict completion and move-in dates.

>- Finishing
Daily production cycle optimizes productivity.
trades may be scheduled to quickly follow the
formwork crew throughout the building process.
- Electrical conduits as well as plumbing stacks and cabinetry
can be pre-bent, built or assembled and delivered to the
work site with just-in-time precision and efficiency.

>- Because
Repetitive tasks propel manpower efficiency.
the work crew performs the same tasks every day,
workers quickly become proficient in their tasks and do not
require special construction trade skills.

Saving plus Superior Quality.

MEP Anglais MEP Anglais 18/07/10 12:40 Page10

Strong, durable
forms produce better
quality wall finishes.

15% Cost Saving, 25% Time

MEP Anglais MEP Anglais 18/07/10 12:40 Page11

8/9

A highly
accurate system
>- Thanks
Smooth concrete walls, ready for painting.
to the high quality of the forms smooth steel
surface, the concrete may be coated or covered with a
decorative material or it may be left untreated altogether.

> Wall
openings, door and window frames may
be installed easily and quickly.
- Wall and slab blockouts of various dimensions and shapes
can be accurately positioned into the formwork.

>- Electrical
Incorporated into the concrete pour.
conduit, outlet boxes for fans or other fixtures,
high speed computer wiring as well as plumbing stacks and
various embeds, can be incorporated into the structural
concrete.

>- Careful
Dimensionally accurate structures.
surveying and layout, combined with the high quality
and sturdiness of Outinord formwork, assure tolerance
accuracy within one millimeter.

Saving plus Superior Quality.

MEP Anglais MEP Anglais 18/07/10 12:40 Page12

OUTINORD,

MEP Anglais MEP Anglais 18/07/10 12:40 Page13

10/11

your reliable partner


for efficient concrete
construction
Over 8 million
apartments
built rapidly
and efficiently
worldwide !

1 or 2 story housing
5 story walk up
6-17 stories
18-42 stories
Hotels

Puerto Rico

MEP Anglais MEP Anglais 18/07/10 12:41 Page14

MEP Anglais MEP Anglais 18/07/10 12:41 Page15

12/13

The project
BORINQUEN VALLEY
Developer:
BORINQUEN VALLEY S.E.
Architect:
GUTIERREZ & GUTIERREZ
Builder:
BJN CONSTRUCTION
Affordable, all-concrete
homes 500 units of
700 square feet each

1 or 2 story
housing

Fabrice PERTOLDI
Outinord Ingeneer
For hurricane prone Puerto Rico, the all concrete
house is the preferred choice. The Outinord system
allows the production of 1 house per day,
consistently and with a superior concrete finish.
Due to the present labor shortages in Puerto Rico,
the efficiency of Outinord formwork allows the
builder to maintain a high volume of production
with a small work force.
It also helps to meet the schedule and to deliver
homes as promised.

MEP Anglais MEP Anglais 18/07/10 12:41 Page16

Puerto

2108

The Equipment Used for this Project


2 sets of modular tunnel forms
Foundation forms
Parapet forms
Mobile crane

1067

6477

Hauteur s/s plafond

Hauteur s/s plafond

Hauteur s/s plafond

2565

2464

2464

108

listel

6324

12268

listel

2413

3531

listel

listel

902
127

3048

127

3048
9652

127

1498
3048

902
127

MEP Anglais MEP Anglais 18/07/10 12:41 Page17

Rico

14/15

1 Foundation works.
2 Structural shell works.
3 Facade panels prefabrication.

105

2500

2500

214

220
2500
2500
2500

101

1245

1245

2500

2500

279 279

2500

2500

2500

2500

1245
279 279

2500

1245

279

2500

1245

2500

2500

2500

127

2500

2500

2500

2500

2500

104

2500

1250

220

214
2

1245

1245
279 279

1245

1245
279 279

1245

1245
279 279

2500
2500

2500

2500

2500
2500

2500

2500

2500
2500

10

2500

2500
2500

11

2500

2500

103

2500

12160

12033

102

USA

MEP Anglais MEP Anglais 18/07/10 12:41 Page18

The project
OAKMONT AT ABACOA
SINGLE FAMILY HOMES
Developer/ Builder:
DIVOSTA HOMES, INC.
(DIVISION OF PULTE
HOMES, INC.)
2100 square feet homes
with 2 car garage
Planned 2000 unit community

MEP Anglais MEP Anglais 18/07/10 12:41 Page19

16/17

Otto Buz DIVOSTA


Chairman and C.E.O.
In the Abacoa project and in 6 other locations
in Southeast Florida, Divosta Homes is building
concrete single family homes and townhouses,
using various Outinord forming systems. For over
25 years Built Solid is our signature. Predictable
production and quality structures enable the
builder to tightly organize the finishing trades,
thereby creating attractive homes at highly
competitive prices.

1 or 2 story
housing

MEP Anglais MEP Anglais 18/07/10 12:42 Page20

1 Foundation works.
2 Structural shell works.
3 Following trades.

MEP Anglais MEP Anglais 18/07/10 12:42 Page21

USA

18/19

The equipment used


for this project
Wall forms
Foundation forms
Mobile crane

India

MEP Anglais MEP Anglais 18/07/10 12:42 Page22

The project
SAMPADA NAVI
Mumbai, India
Construction of a
2,064 unit apartment
complex. Two phases,
60 buildings R+ 3. Three
different size apartments,
25, 34 and 40 m2 on an
identical base module.
This project, built in
36 months, houses a city
of 8-10,000 inhabitants.

MEP Anglais MEP Anglais 18/07/10 12:42 Page23

20/21

B.G. SHIRKE
General Manager
SHIRKE Company
Several determining elements allowed us to set our
choice on Outinord.
First, it enabled us to verify product quality with
each casting we also noted a significant reduction
in construction time and costs. In addition, we could
also eliminate some masonry and coating tasks. In
order to remain in the projects time limits, we were
obliged to order and use several sets of formwork.
The initial investment, although a factor, was
successfully amortized during the operation.
In spite of frequent poor weather conditions, we kept
to the daily rotation rhythm. This allowed us to
meet the project deadlines.
We have other advantages in addition to the quality
and the speed of completion:
A monolithic structure that suppresses all forms of
disjunction through use of different materials.
Economies on standing costs because of a quicker
achievement of the work as well as related labor
economies.
We have been in relation with Outinord for quite a
few years; their competence and experience have
proved to be quite useful to us for this operation.

5 story walk up

MEP Anglais MEP Anglais 18/07/10 12:43 Page24

India

MEP Anglais MEP Anglais 18/07/10 12:43 Page25

Poland

MEP Anglais MEP Anglais 18/07/10 12:44 Page26

MEP Anglais MEP Anglais 18/07/10 12:44 Page27

24/25

The project
PIASECZNO, POLAND
Developer:
HOUSING DEVELOPMENT
CORPORATION
Contractor: LECH
Construction of a housing project
on the outskirts of Warsaw of
R+4 apartment buildings.
Apartments range in size from
1 to 6 rooms, 47 to 152 m2.

Jacek BIELECKI
General Manager
LECH Company
We are building the 2nd phase of apartments at
Piaseczno using tunnel formwork purchased in
1993. These forms are in excellent, like-new
condition after 160 uses.
The rapid speed of the Outinord System has
allowed us to save at least 10% overall compared
to the traditional construction methods used in
Poland. Previously, it took us four months to build
a housing project using our traditional methods.
With Outinord formwork, we were able to build
twice as many identical structures in the same
time period. As a result, we are able to deliver
the apartments sooner and benefit from a quicker
return on our investment.

5 story walk up

MEP Anglais MEP Anglais 18/07/10 12:44 Page28

200

7300

3850

1650 200 2450

4000

200

3100

200

1400200

3100

2001400

200

3850

1100

200

7300

2450 200 1650

3850

1650 200 2450

4000

200
1400200

1020

3140

10100

910

2300

2300

6655

8375

4880

1020

10100

700

200

200

3140

4310

6900

6900

2000

2000

1075

1075

1100

2450 200 1650

500

200

3850

2001400

500

Poland

200

200 2000

950

200

4100
6100

2000 200

3100

200 2000

200

3100

200

4100
6100

200

2800

200

200

2800

200

2000 200

4100
6100

200

302

303

15

2500

2500

200

2800

310
102
1550

250 250
950 350 350 950

2500

125
250

1250
2500

2500

2500

2500

1250

2500

2500

2500

2500

1250

2500

2500

13

10
2500

2500

12

2500

11

2500

1250

950

1250

250

2500

2500

14

1250

2800

200

1550

16

250
125

1550

1550

2
250 250
200 200

200

1550

250

250

6100

2500

304

250 250
200 200

2500

306

2500

1550

4100

200

305

2500
2150
2500

2150

307

650
650
250 250

650
650
250 250

1250

2500

2150

2500

2500

101

2150

308

301

381

309

382

The 2 buildings are scheduled to be achieved in 35 weeks


months

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
weeks
BUILDING 1
Internal walls - Cellar
CHB Floor - Cellar
Internal Walls + Slab - GF
Internal walls + Slab - 1st Level
Internal walls + Slab - 2nd Level
Internal walls + Slab - 3rd Level
Internal walls + Slab - 4th Level

CRANE MOVEMENT
BUILDING 2
Internal walls - Cellar
CHB Floor - Cellar
Internal Walls + Slab - GF
Internal walls + Slab - 1st Level
Internal walls + Slab - 2nd Level
Internal walls + Slab - 3rd Level
Internal walls + Slab - 4th Level

MEP Anglais MEP Anglais 18/07/10 12:44 Page29

26/27
3 5

302

304

03

306
310

02

500

2500

250 2 0
9 0 350
50 950

15

25

Outinord engineering and services


Comparative costs survey with the traditional
methods in use in Poland.

01

3 8

01

3 1

309

307

382

305

02

3 3

3 6

11

12

304

3 0

1 2

16

7
1 1

381

301

3 9

07

82

308

MEP Anglais MEP Anglais 18/07/10 12:44 Page30

Indonesia

IR. BUDI RAHMAT


Project Manager

The project
BATAN
Contractor:
HUTMA KARYA-BM J.O.
Five double buildings of
five levels each, the four
upper levels being reserved
for the apartments.
The project represents a
total of 480 dwellings.

We have modified the original plans from column


and beam to a load bearing wall structure. This
has not changed the aspect of the architecture.
We were able to retain the overall look, as well as
the symmetrical split wing design, which was
used to form an attractive interior garden.
On the other hand, the load bearing wall
structure is an asset as regards the strength of
buildings and its monolithic construction awakens
a feeling of security.
The thin compactness of load bearing walls also
allows us to gain interior dwelling space on the
total area built.
Due to the rapid construction speed, the lesser
required quantities of reinforcement steel and the
more efficient worksite organization, we predict
we will enjoy economies between 10 and 15 % of
the cost of the complete project, compared to a
traditional construction solution.

MEP Anglais MEP Anglais 18/07/10 12:44 Page31

28/29

5 story walk up

MEP Anglais MEP Anglais 18/07/10 12:44 Page32

MEP Anglais MEP Anglais 18/07/10 12:45 Page33

30/31

nd services
structure into a
nd of the formwork.
nted
rmwork with bottom

on excepting land
ns: 550,000 Rp/m2
of 600,000 to
alent solution with

Colombia

MEP Anglais MEP Anglais 18/07/10 12:45 Page34

The project
ALAMEDAS DEL TIMIZA
Developer/Contractor:
PRODESA
Bogot, Colombia
Construction of a social housing
program of 1,200 units on the
outskirts of Bogot. PRODESA has
developed a unique, low cost
housing product incorporating a
significant number of social
conveniences for the residents.
These include a day nursery, school
and library, as well as
neighborhood stores and shops.
The same formula has been
repeated with great success in
various other locations.

MEP Anglais MEP Anglais 18/07/10 12:45 Page35

32/33

5 story walk up

Carlos Alfredo VARGAS DAVILA


General Contractor
We previously built 400 apartments a year using
traditional methods. Faced with the challenge to
boost our annual production to 1,200 or 1,500
units, we had to explore ways to reorganize our
construction methods from the conventional,
which required lots of masonry work and produced
an unsatisfactory quality, to a faster industrialtype production. We studied various alternatives
and selected the Outinord system, an industrialized
process that brings us repetitive work tasks. This
allowed us to increase production with great labor
efficiency. It also allows us to check progress and
quality more easily. By using traditional masonry
for facades, we can retain the regional
architectural character of our buildings so much

appreciated by our customers. We chose the


Outinord system because of the easy reuse of the
equipment over several operations and the
possibility to vary the facades. We are also able to
make more rational use of our manpower. The
process lets us incorporate plumbing and electrical
conduits into the load bearing concrete shell.
Despite using thinner walls and slabs (80 mm walls
and 100 mm slabs), we have met the demanding
seismic standards of the local building code. Our
concrete was designed at 5000 psi so as to avoid
overnight heating while still maintaining a daily
rotation cycle. After working with this system for
several years, the balance is very positive. We meet
our deadlines, stay within budget, improve quality
and still continue to increase production rates and
profitability.

MEP Anglais MEP Anglais 18/07/10 12:45 Page36

Colombia

660

1375

2500

30

2500
0

2500

30

1250

PHASE 1

MEP Anglais MEP Anglais 18/07/10 12:45 Page37

34/35

00

00

1 5

500

500

PHASE 2

250

PHASE 3

Outinord engineering and services


Adaptation of the building to a load bearing
wall structure.
Specification of formwork and the daily
equipment rotation schedule.
On-site supervision and training of local
manpower by Outinord technicians.
Periodic progress reports.
The equipment used for this project
Standard tunnel formwork.
Foundation formwork.
Precast mold for stairs.

12

250

250

PHASE 4
The result
Production of one apartment per day; one
level every four days.
Chart Captions
100%

85,6%
83,3%

90%
80%
70%

BUDGETED COSTS
ACTUAL COSTS

60%
50%
40%
30%
20%
10%
0%

04

07

10

01

04

Scheduled actual
50 000
45 000
40 000
35 000

BUDGETED COSTS
ACTUAL COSTS

30 000
25 000
20 000
15 000
10 000
5 000

n
tio
ure
da
uct
n
o
F
Str

s
g
es
ry
ng
bin
ram
son
ati
m
F
a
o
o
l
C
M
P
ow
nd
l&
Wi
ica
r
d
t
c
an
Ele
or
Do

el
Ste

ete
ncr
Co

07

10

Kenya

MEP Anglais MEP Anglais 18/07/10 12:45 Page38

James ISABIRYE
B.Sc (Civil Eng.) Managing Director
Only Outinord technology could allow us to build
a whole city at this pace!
Our delivery deadlines were tight and we had to
simultaneously start a number of buildings; in
spite of this everything turned out well.
Outinord advised us during the whole project,
whether it were for the preparation and use of
the formwork, or in the best ways to manage the
supplies of concrete and reinforcement.
It is also thanks to Outinord that we were able to
set up a more rational manufacturing process of
facades. These were made in concrete, in a
second phase, with molds especially made to that
effect. The coated masonry facades were
eliminated, which allowed us to have much less
labor on the work site.
With an average of 640 m2 of concrete cast on a
daily basis, the projects 5500 dwellings were
completed in three years, light finishing work
included.

MEP Anglais MEP Anglais 18/07/10 12:45 Page39

36/37

The project
MUGOYA KINGORANI
Customer: NSSF
Developer:
BETA HOUSING PROJECT
Architect: SYMBLON INT.
Construction of 5500
apartments, in two types.
Low cost (120 m2) and two
level duplexes (100 m2 each).
Project has 688 buildings
on 4 levels
(4000 apartments and
900 duplex units)

5 story walk up

MEP Anglais MEP Anglais 18/07/10 12:45 Page40

MEP Anglais MEP Anglais 18/07/10 12:47 Page41

Facades Planning
1h
Initial striking operations
Movement of formwork
Adjustment of formwork
and placing of boxout etc...
Steel fixing
Final preparations
Handling of work platforms
Concreting

Crane and labour


Labour only
Concreting

2h

3h

4h

5h

6h

7h

8h

9h

10h

11h

12h

Philippines

MEP Anglais MEP Anglais 18/07/10 12:47 Page42

MEP Anglais MEP Anglais 18/07/10 12:47 Page43

40/41

The project
H.I.G.C. C-5 MEDIUM RISE
BUILDINGS
Company:
EAGLERIDGE DEV. CORP.
Architects Engineers:
PROS
Seventeen five story buildings
on three hectares.
60 one room apartments per building.
The total project embraced
1,020 social housing units

Honesto T.MEDINA
Operations Manager
We had eighteen months to complete the entire
project, building trades and other finishing works
included. We quickly determined that conventional
building methods would not work. It would take
3 to 4 times as many engineers and workers (at
tremendous increase in cost) to meet the new
deadline. Thus, we had to find a cost-effective,
industrialized construction process to achieve our
cost and time objectives. We found the answer in
Outinord, a process that not only reduced our
manpower needs, it also allowed us to organize
a perfect logistical control among the various
sub-contractors, suppliers of material and other
site-related tradesmen and deliveries. This, together
with the clean well-organized work site, which
allowed us to reduce construction site accidents,
was an important source of economy. Finally, we
eliminated scaffolding (which obstructs movement
on the job site) and obtained a high quality
concrete wall and slab surface (which enabled us to
reduce our finishing costs). The results are very
satisfactory. And although we had to (slightly)
change our original plans when converting to a load
bearing wall structure, we benefited from greater
resistance against earthquakes, better acoustics
and increased fire repelling.

5 story walk up

MEP Anglais MEP Anglais 18/07/10 12:49 Page44

MEP Anglais MEP Anglais 18/07/10 12:50 Page45

Russia

MEP Anglais MEP Anglais 18/07/10 12:50 Page46

The project
JUKOVA
Contractor:
KROST
Building of 4 upscale
housing towers
in Moscow.
224 apartments of
various types;
from 2 room
apartments of 96 m2
to 5 room
apartments of 286m2.

MEP Anglais MEP Anglais 18/07/10 12:50 Page47

44/45

6-17 stories

Boris DOBACHINE
Assistant General Manager KROST
Our company has been using the Outinord
construction process for a year and a half now and
we have already defined a cooperation program
for the year to come.
Effectively, the Outinord method is at the peak of
its efficiency when we can link one work site after
another. For each of the new operations,
Outinords technical assistance department makes
a study of the reuse of the formwork and
recommends ways they can be adapted for
changing conditions.
For the Jukova work site, we have cast an average

of 175m2 of slabs per day, which allowed us to


produce the structural shell of a 17 story building
in only four months. Without such an efficient
system, we would have needed at least
2 additional months. Casting slabs and walls at
the same time and repeating these operations on
a daily basis, increases the work sites production
rate.
When we first looked into the Outinord process,
we were concerned about the initial investment
required. But we quickly realized that the improved
quality and increased speed far outweighed the
initial cost which could be quickly amortized. In
other words, we could not afford to not purchase
the formwork!

MEP Anglais MEP Anglais 18/07/10 12:50 Page48

Russia
Daily schedule detailing the structural shell operations
1h

2h

3h

4h

5h

6h

7h

8h

9h

10h

Initial striking oparations Team 1


Movement of formwork Team 2
Adjustment of formwork Team 1
Placing of boxout Team 4
Steel fixing, slabs Team 3
Steel fixing, walls Team 3
Final preparations Team 1
Handling of work platforms Team 2
Concreting with a pump Team 5

Crane and labour


Labour only
Concreting pump

PHASE 1

11h

12h

MEP Anglais MEP Anglais 18/07/10 12:50 Page49

46/47

Outinord engineering and services


Specification of the formwork and equipment.
Formwork reuse studies.
On-site technical assistance and manpower
training.
The equipment used for this project
TMPH tunnel formwork necessary to produce
one-quarter floor of daily production.
Shearwall forming panels.
Slab-edge forms to produce rounded balconies.
The result
A two-month gain over production achieved
when using conventional construction
methods.

PHASE 2

PHASE 3

PHASE 4

USA

MEP Anglais MEP Anglais 18/07/10 12:50 Page50

MEP Anglais MEP Anglais 18/07/10 12:50 Page51

48/49

The project
3225 TURTLE CREEK VILLAS
LUXURY RENTAL APARTMENTS
Developer;
GENESIS REAL ESTATE GROUP
Architect:
GROMATZY DUPREE &
ASSOCIATES
General Contractor:
C.D. HENDERSON
Concrete Subcontractor:
HIGHRISE CONCRETE SYSTEMS
605 apartment units850,000 square feet gross area
3,77 acres 160 units per acre
2 towers 22 story and 17 story
(3 wings)
908 car 7 story parking
structure

6-17 stories

Walter MAWBY,
President, High-rise Concrete Systems
At a consistent production rate of
80 apartments per month, we were able to
complete the concrete structure of this
downtown project on time and within budget.
The owners like the high quality reinforced
concrete structure of these buildings and have
asked us to build several similar projects in Dallas
and other cities. The Outinord system is well
engineered; combined with our specific high-rise
knowledge and highly productive crews, we feel
we have an edge in the competitive US market.

MEP Anglais MEP Anglais 18/07/10 12:51 Page52

USA
11

20
26

3
12

22

21

19

104

102

27

28
23

18
17

The equipment used for this project


2 sets of modular tunnel forms, each set able
to produce 3,500 to 4,000 square feet of floor
area per day.
2 Potain MD 345 tower cranes.
27

9
18

55

16

00

15

25

00

13

25

24

14

9
10

MEP Anglais MEP Anglais 18/07/10 12:51 Page53

50/51

4
6

26

25
17

03

27
1
18

12

7
8
21
22

PHASE 2

19

20

15
16

24
13

14

103

10
0

25
02

55
8

23

16

15

22

21

12

11

18

17

20

19

14

13

101

PHASE 1

4
1

14

13

16
11

18

17

15

12

23

22

21

20

19

Indonesia

MEP Anglais MEP Anglais 18/07/10 12:51 Page54

MEP Anglais MEP Anglais 18/07/10 12:51 Page55

52/53

The project
RAJAWALI
Contractor:
HUTAMA KARYA-BM J.O.
Architect: TEAM 4
A 38 story tower building
Containing 1232 studios
Between 20 and 36 m2.

Frederic THEETEN
Technical Assistance, OTN CI
This tower is the highest one built in Jakarta
using load bearing wall structure. Two sets of
forms and two separate work crews rotate the
forms on either side of a core area. Subsequently,
both formwork sets are combined to form a
central junction of the two towers. This requires
precise construction scheduling and management
coordination. The central core is formed in
advance using semi-climbing Outinord formwork.
The prefabricated facades are produced on-site
and are installed using a stabilizer, thus
considerably reducing the crane time required.
We were also able to optimize the structure by
reducing wall thickness on the upper levels.

18-42 stories

MEP Anglais MEP Anglais 18/07/10 12:51 Page56

MEP Anglais MEP Anglais 18/07/10 12:56 Page57

MEP Anglais MEP Anglais 18/07/10 12:56 Page58

England

Franois BRICE
Outinord Ingeneer

The project
WHITBREAD MARRIOT
HOTEL HEATHROW
AIRPORT
Contractor:
LAING
Architect:
EPR LONDON
Building of a 390 room
hotel quite close to the
airport.
This is a building
in two parts:
Atrium on 6 levels and
Courtyard on 4 levels.

The Outinord solution was chosen for its speed. The


customers had a three and a half-month deadline to
complete the structural shell. With Outinord, they knew they
could produce four rooms per day with every set of forms.
In the process, they also greatly appreciated the quality of the
surface obtained which allowed them to directly place the
wallpaper ; plus the ceilings could be painted after a simple,
preparatory application. The accuracy of dimensional and
geometrical tolerances was such that they had no trouble
in quickly integrating the prefabricated bathroom cabins.
These were brought up to room level, rolled inside, and rapidly
connected to the plumbing and electrical conduits. Similar
simple methods were used for placing the prefabricated
facades, which were bolted on sockets pre-positioned in
the concrete.
They appreciated Outinords assistance during the entire
project.
Some of their workmen were already familiar with this
method; others quite quickly adapted to it.
This building technique is particularly well adapted to hotel
construction.

MEP Anglais MEP Anglais 18/07/10 12:56 Page59

56/57

Hotels

MEP Anglais MEP Anglais 18/07/10 12:56 Page60

i ion 0

England
0

Cel ule 2

09

20

2
0

4
0

medusa pcmo habi h3992_ 0

402

401

CUSTOMER'S WOOD

PHASE 1

Equipment for Courtyard wing

Equipment for Atrium wing


0

HASE 6

HASE 2
0

The structual shell is achieved in 4 month


july

august

september

october

29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
ATRIUM
LEVEL

LEVEL

LEVEL

LEVEL

LEVEL

COURTYARD
LEVEL

LEVEL

LEVEL

MEP Anglais MEP Anglais 18/07/10 12:56 Page61

\m dus /p mo/h b / 3992_10

Ce u e 1

r pos i n 0

58/59

Outinord engineering and services


Specification of materials and formwork rotations.
Preparation of a job site reference manual.
Technical assistance and training during start up
period.
Periodic progress checks.
The result
High quality structures that produce
substantial economies for the installation
crews and finishing trades.

The Bahamas

MEP Anglais MEP Anglais 18/07/10 12:56 Page62

Alex KISH
Project Manager Baker Concrete
We are building this hotel at the rate of 8 rooms
per day and expect to complete the room structures
in 3 months.
The Outinord system was easily adapted to the
particular shape of this building. We dont have
parallel walls and therefore the roofpanels are of
trapezoidal shape. In spite of this complexity and
the weather conditions in this ocean side location,

MEP Anglais MEP Anglais 18/07/10 12:56 Page63

60/61

we have been able to maintain our construction


schedule. Although the initial investment is high,
we selected the Outinord system for their superior
service and for the excellent concrete quality we
manage to achieve. Outinord has a strong presence
in our business and we are well aware of their
capabilities.

The project
THE LUCAYA PLAZA RESORT
LUXURY BEACH HOTEL AND CASINO
Developer:
HUTCHINSON LUCAYA LTD.
Architect:
RTKL INTERNATIONAL, LTD.
General Contractor:
CENTEX ROONEY CONSTRUCTION
Concrete Subcontractor:
BAKER CONCRETE
550 room hotel on Lucaya Beach,
10 story curvilinear building
Conventional first floor with
transfer slab.

Hotels

MEP Anglais MEP Anglais 18/07/10 12:56 Page64

The Bahamas
ther

4'-0"

4' 0
1

5' 0
"

73'-

64' "

10

13'6"

C: PE

RTOL

14'
0"

DI C

ATALO
~1

2"

LUCA
YA~1

4' 0
1/32
"

B599

1_22

13'6"

By O

9' 5
"
34'

23'
10 1
/32"
11"

6
6

6"

5 6

10

12

13

8
9
Stud
y:
Plan
nr

Drw
:
Scale B Ph
: 1/
Date
275
:
11/1
0/19
99

Ceilin
g he
ight
9' 5"

Clien
t:
S te

By O

ther

14

6"

16

17

15

Wall
thick
ness
6"
Slab
thick
ness
: 7"

BAKE
RC
LUCA ONCRET
E
YA B
EACH
HOT
EL

1
2

WES

T AR

17

16

19 19 9 20 21

18

22 22
93
24

WEST AREA

25

26

27

EA

ST

28

AR

28 9
29

30

EA

31

33
34

54

35
36

37

301
02
303
11

304
306

07

10

309

308

1
3
5
7
9
11
13

991_

15
7

19

: pcm

o ha

bi/h5

21

10
1
14

12

18
0

22

312

313
314

322
21

315
16

Equipment
required to produce
one level in 5 days

17

318

19

20

er

76

R=

Oth

05

32

By

83

12

R=

10

20

87

n=

Rm
oy

EA

18

19

MEP Anglais MEP Anglais 18/07/10 12:56 Page65

6" 2 6"

6
6"

19 9

20

21

22

10 3/3

"

22 9
23

24

25

26

27
28

10

28 9

29
30

31

32

33
6

34
6

35
6

36
6

MEP Anglais MEP Anglais 18/07/10 12:56 Page66

Outinord, your

MEP Anglais MEP Anglais 18/07/10 12:56 Page67

64/65

technical partner
Outinords pre-construction and engineering
services will facilitate the transition of your
conventionally planned project to our
industrialized construction process.
We adapt your project plans to maximize
your efficiency.

MEP Anglais MEP Anglais 18/07/10 12:56 Page68


2

51

11

3
RECESSED 60 M

RECESSED 60MM
A

RECESSED 60MM

RECESSED 60MM

4
A

SEE DWG N
RSK0016 DWG

A1 4062

RECESSED 60M

A1 1148

RECESSED 60MM

A1 6 11

11

12

A1 1 75

\
A1 334

RECESSED 6 MM

SEE DWG N
ARSK0016 D G

SEE DWG
ARSK0016 D G

1 71
9

SEE PLA
ARPLC120

AGE PO NTS LOC T ONTO BE READ


ON W TH KISP2 0 DWG
ANT COURT CATERING

RECESSED

103

A1 1 386

RECESSED 60 M

Dra na e-by

SEE DETAIL A
M

D ai age by
Co rt Ca er ng

59

SEE DWG N
ARSK 016 D

nage by
r ng

4 s eeve n onc e e
lab or e c ab es

ED

R CESSE 60M
A

17

\A1 50

A1 959

A1 35

1 5 15

90

A1 36
A

Z A

A1 750

A1 2

12 0

\A1 3180

SEE DWG
N
RS 005 DWG

RECESSED 60MM
SEE DWG N
ARSK 016 D G

\
\A1 0

A1 81
A1 4 70

\A 78

10

RECESSED
60MM

1 68

A1 6850
\A1 2

\A1 200

A1 400

\A1 20

A1 3 80

\
A1 1 00
A1 180

\ 1 50

\A1 4170

\A1 4170

60MM
RECESSED

60MM
8

200

2200
6750

6 50

SEE DWG N
ARSK0016 D G

60MM
RECESSED

SEE DWG G
RSK 05 D

60MM
RECESSED

RECE SED
60MM

1 14 0

\A1 36 0

12

7 50
0
\ 1 15
00

A1 4170

A1 6859

A1 2

A1 2 0

\A1 180

A1

\A1 3670

A1 3 80

\A1 1400

\A1 1400

15 0

\A1 3180
A1 4 70

\A1 4170

6 MM
RECESSED

RECESSED
0MM

6950

\A1 15900

60MM
RECESSED

A1 1 900

RECES ED 60MM

6 50

850

\A1 8041

\A 2 0
A1 200

A1

\A1 3180

\A1 3670

12 0

510

A1 14

A1 3180

A1

SEE DWG
SK005

A1 4 70

\A1 170

0MM
RECESSED

0MM
RECESSED

\A1 8 96

7050

1 1 90

RECESSED
60MM

A1

A1 3 80

A1 1 0

SEE DWG
ARSK005 NO
DWG
A1 159

SEE DWG N
ARSK0016 D G

750

750

13

RECESSED 6 MM

220

22 0

000

RECESSED 60MM

20 0

\A1 909

\A1 20

00

\A1 2700
\A

\ 1 8960
A1 3180

60MM
RECESSED

\A1 1400

SEE DWG NO
RSK0016 DWG

\A1 3180

RECESSED 60MM

A1 31 0

Outinord

\A1 3670

60MM
RECESSED

RECE SED
60MM

A1 4 70

A1 170

GE
SLAB ED

69 0
A

A
A

19

1 1 900

1
\A1 2

A1 180

\A1 200

6 50

A1 4170

\A1 4170

60MM
R CE SED
050
15 0

1 90
1

\A1 159

850
\A1 2 0
A1 200

\A1 881

1 0

A1 0

A1 1 00

60MM
RECE SED
180

A1

\A1 836
A

1 90 1
9

\A1 6750
\
\A1 0

A1; 633

1 15

18

RR

A1 4275

\A1 3180

EE DW N G
RSK0

A1 4 7

\A1 7

82

17

1
7

6 2

0MM
RECESSED

6 MM
RECE SE

619

RECESSED
60MM

A 2 0

A1 31 0

3821

A A

A1 2
\A1 4170

5 0

\A1 950
\A1 3670

A1 2

A1 6750

RECESSED 0MM

\A1 417

\A1 4170

A1 3180

EC

1 1

\A1 0

NO
EE PLAN
DWG
ARPLC320

A1 6 50

A1 6850

ED

RECESSED

A1 1

\A1 200 \A1


200

MM

MM

1 525

1 21
0

A1

25

A1 3 47

\A1 3180

\A1 3180

A1 675

A1 4 70

A1 4 70

\
2

SE C

\A1 26 5

SEE DWG NO
ARSK0016 DWG

18

6 M
RECESSED

STORY

90

SHNO

RECESSED 60MM

A1

ESSED 60MM

11 2 2

\A1 20
1

QQ

GN

A1 31 0

A1 3 80

\A1 2949

A1 3 70

60MM
RECESSED

RECESSED
60MM

\A1 31

20 0

6850

RECESSED 6

RECESSED
0MM

60MM
RECESSED

WG N
5 WG

S AB
E GE

A1 9 32

O
EE DWG G
K 05 D

15

A1 9 12

\A1 318

\ 1 14 0

\A1 31 0

12 0

A1 0

15 0

A1 36 0

2 00

6750
0

14

A1 3190

1 200

19

A1 2

1 1 00

\A1 3095

6850

6850

A1 4170

\ 1 50

\A1 3180

1 40

\A1 31

\A1 3180

EE DWG
ARSK00 N
DWG

\A1 159 0
000

RECESSED 60MM

A1 5200

00

\A1 20

00

19

0 A

A1

MM

11

69 0

RECESSED
60MM

A1 1 900

60MM
RECESSED

\A1 159 0

RECESSED 60 M

A1 803

A1 31 0

3180

A1 670

90

6750

200

180

00

PP

6750
3180

200

ECESSED 0MM

O
SEE DWG
WG
RSK0

4 70

4170

SEE DWG NO
RSK00 6 DWG

3700

60MM
RECESSED

20
A

ED 60MM

RECESSED 0MM
0

21

0
500

450

17

A1 1 A1

60

60MM
RECESSED

RECESSED
0MM

S E DWG NO
RSK0016 DWG

RECESSED 0MM

RECESSED 60MM
0

22

27

21

20

23

17

24

21

26

22
23

90

24
HOLD

HOLD

27

26

19

AA

1125

80

200
A

660

200

200

500

200

00

850

6 50

>FromPreparatory
analysis
the original design, through completion of the project,
Outinord provides analysis, planning and technical support.
Outinords engineers will suggest structural adaptations,
including the conversion to load bearing wall structures. In
this process, your projects architectural esthetics, as well as
its finishing details, will be respected. And you will benefit
from the speed and efficiency delivered by Outinords
industrialized construction process.

MEP Anglais MEP Anglais 18/07/10 12:56 Page69

66/67

engineering services
Outinords on-line communications facilitate
contact with you and your building team
associates.
>EachJobproject
site analysis
file will include the following documents:

>The Additional
assistance available
project file may be amplified or completed with the

- A survey of soil reports and building configurations.


- A daily production plan optimizing the specified equipment.
- Detailed planning establishing the production of your
projects structural shell including all prefabricated elements.
- An outline profiling the planning of tasks in a typical
construction phase.

addition of the following support services:


- Crane specifications reflecting type, capacity, positioning and
a utilization schedule.
- Manpower requirements necessary to assure daily rotations.
- Specifications and recommendations regarding concrete
production.
- Specifications concerning the production of prefabricated
elements.
- An overall construction schedule.
If desired, a comparative analysis can also be provided.

MEP Anglais MEP Anglais 18/07/10 12:57 Page70

The approp
OUTINORD has designed 2 distinct systems to produce
load bearing wall structures. For repetitive
architectural layouts, the tunnelform system is
recommended. In other cases the wallform system
will be preferred.

At all times our priority centers around mechanization


of the on-site production. In both systems the
formwork is planned for a daily re-use. The same
crew operates the equipment in predetermined
construction phases on a daily cycle.
In general, they are reused from 800 to 1000 times.

>TheseTunnelforms
forms allow the daily pouring of walls, slabs and starter
walls for the next phase of production. Depending on the
project schedule, a typical tunnelform phase may involve the
production of 1 or several apartments or houses; the daily
production may vary from 80 m2 to 350 m2 of floor area.
On some high volume projects a production of 1200 to
1500 m2 of floor area has been reached.
The daily cycle can be broken down as follows:
- stripping forms from the previous days pour.
- installation of forms for todays pour, incorporating door and
windowblockouts, as well as plumbing stacks and electrical
wiring.

- installation of wall and slab reinforcement steel.


- the concrete pour, followed where needed by the heat
curing process.
Depending on the architectural design, the open ends of the
tunnelformed structure may be closed by either prefabricated
or poured in place facade elements.

MEP Anglais MEP Anglais 18/07/10 12:57 Page71

68/69

riate tools

>Outinord
Prefabricated elements
also manufactures and installs prefabrication molds
>Wallforms
Wallforms
are used in the same basic sequence as tunnelforms,
except that only walls are poured. A typical wallform production
unit will complete 20 to 60 linear meters of wall per day.
Combined with special angle forms, the modular wallforms can
be adapted to a new configuration on a daily basis.

for use on-site. The precast concrete elements can be


integrated in the tunnelform or wallform production cycle,
prior to the installation of the finishings, such cabinets,
kitchens and sanitary fixtures.

>Recognizing
Production and handling of concrete
that each jobsite has its unique requirements,
Outinord also sells a wide range of concrete production
equipment, tools and accessories.

MEP Anglais MEP Anglais 18/07/10 12:57 Page72

Outinords on-site
The task of Outinords consultants and jobsite
technicians is to assist contractors with the
efficient preparation and start-up of the
projects.
>Outinords
Production start-up
field technicians have a dual task:
-Verification and acceptance, as well as supervision of the
formwork assembly process.
-Training of the crew and implementation of the planned
construction phases, until the scheduled level of production
has been achieved.
This work implies close communication with the entire project
staff, the foremen and workers. The focus is on optimization
of material supplies, the use of equipment and human
resources.

MEP Anglais MEP Anglais 18/07/10 12:57 Page73

70/71

assistance
>Outinords
Methods and transfer of know-how
consultants analyze each projects methods file.

>Outinords
Operational follow-up
Engineers and technicians assist the contractor in

- They assure that adequate jobsite preparations have been


made: assembly area, hoisting equipment, manpower,
concrete and reinforcing steel supplies.
- They explain the intended use of the formwork systems, as
well as the phasing of the production process.

the initial stages, but will also assure a personalized follow-up


through regular site visits.

This training and technology transfer process will be of benefit


for clients present and future construction projects.

MEP Anglais MEP Anglais 18/07/10 12:57 Page74

MEP Anglais MEP Anglais 18/07/10 12:57 Page75

72/73

An impressive
industrial
capacity
Outinords
production capacity
assures delivery to
the jobsite within
the shortest possible
time.
>Outinords
An impressive plant
formwork factory is unique; covering 5 hectares, its
yearly output exceeds 200,000 m2 of steel forms, roughly
corresponding with a production capacity of 1000 housing
units per day.

>The Ahighhighly
industrialized production process
degree of automation of the plant centers on a
powerful computer management system, covering design,
planning and production of the forms.
Automation continues to be a priority to ensure consistent
high quality and to improve the competitive position of the
company. Also of prime importance for the durability of our
products is the choice of our raw materials.

>The Always
available
computer links between our various offices, our research
and engineering departments and the plant, allow for realtime adaptations of construction documents. Both
production and shipment logistics are carefully monitored.
The reliability of this process is consolidated in a total quality
management program.

MEP Anglais MEP Anglais 18/07/10 12:57 Page76

Outinord

MEP Anglais_MEP Anglais 18/07/10 12:57 Page77

74/75

worldwide
outinord@outinord.fr
www.outinord.fr

Outinord SA
BP. 99
59732 - St Amand les Eaux Cedex FRANCE
Tl. : +33 3 27 23 83 83
Fax : +33 3 27 23 83 55
Conception, graphic design : G. Hendoux Photos : G. Hendoux, Outinord, X rcs Valenciennes b 301 896 619