Main Topics
1. PLN System
2. Runner Replacement
01/2014
www.andritz.com
PLN System
www.andritz.com
01/2014
System Planning
P3B
System Security
System Quality (frequency & voltage)
Economic dispatch (Optimization of
Opex only)
PJB & IP
Missing
www.andritz.com
01/2014
www.andritz.com
01/2014
www.andritz.com
to
thermal
Identify Hydro
replacement
Peaker
unit(s)
which
require
runner
01/2014
Remark: In Jawa Bali System while peak load has increased from 14.000 MW (2005)
to 22.000 MW, no new big Hydro Power Plant peaker is installed.
www.andritz.com
Assumptions
During the peak hours (from 5 pm 9 pm), existing Peaking Hydro power plants are
performing full frequency for the Jawa-Bali power system.
During off-peak hours (from 10 pm 4 pm on the following day), the frequency regulation are
taken over by the existing combined-cycle power plants.
After modification, one unit of Cirata will reduce/replace the operation/output of 125 MW
existing combined-cycle power plant(s) during off-peak hours.
The new mode of operation will produce fuel cost saving in the Jawa-Bali power system
during off-peak hours as a result of Cirata runner modification.
USD 5 / MMBtu
www.andritz.com
300,000 EUR
Efficiency of combined-cycle
power plant
Natural Gas Price
Energy conversion 1 MMBtu
equals to
40 %
5 USD / MMBtu
293.071 kWh
1 EUR equals to
Installed Capacity
Daily off-peak energy production
Energy production of modified
unit of Cirata during off-peak
hours
1.3702 USD
125 MW
125 MW
20 h
16 h
2500 MWh
2000 MWh
125 MW
12 h
1500 MWh
125 MW
125 MW
8 h
4 h
1000 MWh
500 MWh
0.0311 EUR/kWh
0.0311 EUR/kWh
0.0311 EUR/kWh
0.0311 EUR/kWh
0.0311 EUR/kWh
77,819 EUR/day
62,255 EUR/day
46,691 EUR/day
31,127 EUR/day
15,564 EUR/day
Payback after
4 days
5 days
6 days
10 days
19 days
www.andritz.com
300,000 EUR
Efficiency combined-Cycle
power plant
40 %
Installed Capacity
Daily off-peak energy production
Energy production of modified
unit of Cirata during off-peak
hours
Off-peak reagulating power
costs generated by
combined-cycle PP based on
HSD oil
125 MW
125 MW
20 h
125 MW
16 h
2500 MWh
2000 MWh
0.1591 EUR/kWh
0.1591 EUR/kWh
12 h
1500 MWh
0.1591 EUR/kWh
397,849 EUR/day
318,280 EUR/day
238,710 EUR/day
Payback after
1 day
1 day
1 day
125 MW
125 MW
8 h
4 h
1000 MWh
0.1591 EUR/kWh
159,140 EUR/day
2 days
500 MWh
0.1591 EUR/kWh
79,570 EUR/day
4 days
www.andritz.com
10
Runner Replacement
www.andritz.com
11
01/2014
Compared to other types of power plants Hydro Power Plants are able to provide very
fast and easy ancillary service (power regulation).
Hydro Power Plants are predestinated to take over tasks regarding primary control and
power regulation!
In the usual scheduled refurbishment after centuries of operation a hydro power plant
can be designed for power regulation.
This can be done very economical. The additional costs for certain analysis (strength
analysis, etc.) and for a most likely slightly heavier runner are low compared to the
capability of power regulation.
This solution reduces tremendous the OPEX and leads to least CAPEX costs.
www.andritz.com
12
01/2014
www.andritz.com
INTERESTED AREA
NO DETAILED
INVESTIGATIONS in
1984
13
Refurbishment Alternatives!
Option 1: Runner Replacement without
development
Scope of Supply:
Manufacturing, Installation
01/2014
www.andritz.com
14
01/2014
www.andritz.com
15
Design Differences
The difference of the runner fit for power regulation compared to a
conventional are:
01/2014
www.andritz.com
16
www.andritz.com
17
intermittency
low predictable
low reliable
non dispatchable
The load in the grid is changing and to remain with all synchronous generators
at synchronous frequency we have to regulate it fast. -> Frequency Control!
01/2014
www.andritz.com
18
Supply of appr.
450 million people with
TWh
electricity
900 GW Generating capacity
Annual electrical consumption
appr. 3500 TWh
01/2014
Zone 1
www.andritz.com
Zone 2
19
Supply of appr.
800 million people with
electricity
Appr. 1200 GW installed
capacity
Inter-Area Oscillation
Hydro Power as damping
factor
01/2014
www.andritz.com
20
01/2014
Plants
Prepared by: Mr. Adhi Satriya
www.andritz.com
21
01/2014
22
01/2014
www.andritz.com
23
Load Fluctuation
Approx.1-3% of Network
Capacity
Dispatching Control
Ancillary Services
Governor
System Inertia
1sec
01/2014
Primary Control
1min
1hr
Secondary Control
www.andritz.com
24
plus
Frequency Control
Wind
Production
Consumption
MW
Load
Hydro
Wind
schematic illustration
01/2014
source: IEA - World Energy Outlook 2010; IEA Projected Costs of Generating Electricity 2010
Prepared by: Mr. Adhi Satriya
www.andritz.com
25
Frequency regulation
primary control reserve
secondary control reserve
minute reserve
voltage control
01/2014
www.andritz.com
26
The Situation
OPEX cost using gas fired power station for regulating power are very high
CAPEX for planting up of new Open Cycle capacity which is expensive
Due to enough fossil base load (coal and gas fired power station) hydro
power plants with low capacity factors could be switched to peaking and
regulating functions
The planned Pump Storage will ease the situation
01/2014
www.andritz.com
27
Low OPEX
Least Cost CAPEX for
Runner replacement
Fast Implementation time
Regulation
by Gas
Open Cycle
Regulation
by Hydro
Power
Function
Function
Now
Peaking
Limited frequency control
Limited Ancillary Services
Slower Response time
Peaking
Higher regulating regime
Full Ancillary Service
capabilities
Smooth frequency control
Fast response time
01/2014
www.andritz.com
28