Sie sind auf Seite 1von 4

SAP BPC 10 Transport Guide

inShare4

Many partner friends and customers consult about the efficient and correct way to perform BPC 10 transport recently.
As in BPC 10 the transport mechanism has been significantly fine-tuned compared with previous versions with a lot of
behavioral changes, I drafted this transport guide to help partners or customers to facilitate BPC transport process.
The version I am demonstrating is BPC 10 SP9 Patch 1. CLM part is not covered. Any comments or suggestions are
very welcome.

1.
a.
b.
c.
2.
3.

4.
5.

1.
2.

Prerequisites Check:
The following prerequisite checks are highly recommended before transport, especially for the first transport:
Ensure Automatic Recording of Changes has been set in source system otherwise the transport request generation
dialog wont pomp up when you package your selected transport objects. You need to perform the following:
a. Transaction SCC4 in source system, select the client where BW is installed and click Display.
b. Set the option Changes and Transports for Client-Specific Objects to Automatic Recording of Changes
c. After the change is applied and saved, reopen RSA1 and attempt to collect the objects and create the transport
request again.
The BPC version and patch level in source system and in target system need to be equal.
Make sure the Planning and Consolidation installation guide is followed to configure the transport RFC destination.
Check transaction RSTPRFC that the right user has been assigned to handle the post-processing of the import. You
can refer note 1817817 if you want to know more details about BPC RFC connections.
Run report UJA_DATA_CHECKER and enter Environment name to check if the environments in source and in target
(if exist) are consistent to avoid unnecessary transport issues.
It is NOT best practice to assign task profiles or data access profiles directly to users from design aspect.
Furthermore, if you do so you may receive error during transport with error message Member XXX does not exist in
dimension YYY.
Transport Process:
Source System
Make source Environments to be transported have been set offline
Enter RSA1 --> Transport Connection --> Object Types --> More Types --> Environment --> Double click Selection

3.

Choose the Environment then click Transfer Selection.

4.

Choose the Objects that you are about to transport

There are some remarks here:


For best practice, master data is seldom transported from DEV to either QAS or PRD, however till now, it is
suggested to transport the Time Dimension Member for the first transport. From experience, static dimension
members (not imported from BW Info Provider or external systems) can be transported to shorten preparation phase
however users must be aware of the possible inconsistency it may bring. You can uncheck the Dimension Member if
you do not want to transport master data.

BPF templates will be collected here only if it is validated deployed.


Configurations only need to be transported if you really intend to do so.
Environment Level Work Status will NOT be transported. See section Reminder.

4. After you collect all objects you wish to transport, click the Transport Objects button. In pomp up dialog you
generate or enter a transport request. Then click OK.

6.

Enter SE09 and release your transport request.

Target System
7. Set the target Environments offline
8. Enter STMS to refresh the transport request and import
9. Verify the transport log to ensure the transport is performed successfully by entering SLG1 and input UJ in
OBJECT and UJT in SUBOBJECT field. In External ID field you can enter the Environment name if you like.

1.
2.

1.

Performance Consideration:
If you encounter performance issues during transport, you can refer to the following notes to help you out.
Increase performance and avoid TIME_OUT: 1795221 - Transport failed with TIME_OUT dump - BPC NW 10.0
Note 1826141 - Transport cost too much memory and time when exporting

Shortcuts:
If you are looking for some utilities to help you faster your operations you can refer to the below information.
Setting Offline: Using SE16 --> Table UJ0_PARAM_APP --> Enter Environment ID and Field AVAILABLEFLAG, then
change the fetched Value to 0 to make the environment offline.

2. You can set the target global parameter to ensure automatic environment offline. However, if is not
recommended be utilized in Production system.

3. If your transportation failed somehow, you can perform the report UJT_AFTER_FAIL_PROCESS to make a
quick clean in target before follow up re-transport. This report can also be used to help re-activate
ENVIRONMENTSHELL (by unchecks the Failed Only option).

1.

2.

Reminders:
Work Status Settings in Environment level will not be imported according to current design. For details see 1817597 Environment-level work status are not transported in BPC NW 10. This may lead to some inconsistency state. If you
have the issue of setting work status in target system after transport, you need to apply workaround as elaborated in
1823062 - EPM-BPC-NW - Invalid Work Status information after transport.
If you would like to ensure the model technical names consistent within transport landscape, you have to specify the
model level parameters ENABLE_FIXED_CUBENAME in all systems for all models you would like to keep technical
names consistent.

3. It is encouraged to include neither BPC generated objects such as Multiproviders/VirtualCubes nor


customized BW objects in the BPC transport request. If you do need get customized objects transported,
they should be transported after BPC transports have been done and the models are stabilized on target
(due to the possible change of the dimension attribute after transport).

Das könnte Ihnen auch gefallen