CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE

FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN
MAU Contract No:HQ807 PC 09

item no

Contractor:
Process Description

1.0

Material Control

INSTALLATION OF CONC. MASONRY UNIT

SCEC
lnsp

KJO
OA/QC

R/S

R/S

R/S

"

ASTM-C-270
ASTM-C-476
ASTM-C-90
KJO Spec.

"

S/R

KJO Spec.

"

SAES-M-100

"

4.2 Check masonry installed aligned bond pattern and


finish acceptable

"

4.3 Check reinforcement bars placed in accordance with the


construction drawing and specification

"

4.4 Check pre-fabricated elements and wall ties installed in


accordance with the specification

"

"

"

Masonry block cells filled with grout and acceptable

"

W/S

4.8 Extra mortar to be cleaned


4.9 Clean concrete surfaces of foreign matter with clean
water

"

"

"

"

1.1. Approval for Concrete Block

Pre Mixing Delsgn


mix ofmortar/grout 2.1
mixses

3.0

Pre Markation for


Masanory Unit

4.0

Application

ITP-C-O05
CIVIL

MAU/QC
Inspector

Inspection And Test Point

Applicable Code
or Standard

09-SAMSS-018

1.2 Check staging area sizes and loadbearing schedule of


concrete masonry blocks
2.0

Rev.00
Discipline:

Approval to desingmix of mortar / grout mixes

Approval of premarkation ( Layout Plan) prior to


start of any wall masonary units

4.1 Check surfaces of flooring and wall to receive the work


of any defects

4.5 Check placement of concrate mortar on required


masonry block
4.6 Check levelnes and plumbness of block laying
4.7

4.10 Check thickness of scratch brown and finish coats for


external walls
4.11 Practicable cured finish coat must be moisten for a
min period of 48 hours.

SAES-Q-001

Acceptance
Criteria

Quality Record or
Verfying Document

Proj.Spec.
04300

Approved shop
drawings

Third
party

5.0

5.1 Work must be completed prlor to handover to next


work Must have variation of true flatness (3mm in 3mtr)

"

I = Inspect or perform work WI= 100% witness

W = Random if inspector did not show proceed

R= Review / Approve records document

S=Survellance

H= Hold point

"

RFI= Issuued for H & W only

S/R

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI

tem No

INSPECTION & TEST PLAN CONCRETE STRUCTURE


Contractor:
MAU Contract No:HQ807 PC 09
Process Description
nspection and Test Point

Rev.00
Applicable Code Acceptance
or Standard
Criteria

A) SAES-Q-001
Section 13.0
Section 8.0/
ACI 301-304
Placement Pouring 3.1 Check truck ticket required mix desing slump end time 318 B)ASTM-C3.0
of concrete
intervals
94 10.7
KJO Spec.

3.2 Conduct slump test conc. Temperature reading and


sampling for compressive stregth test 6 samples for every
50 cu.m

A)SAES-Q- 001
Section 18.0/
KJO Spec.

Spec sec03300

Pfoj. Spec.
Sec. 03300

A)SAES-Q-C01
3.3 Check method of placament and movement of concrate section 8,0/
KJO Spec.
3.4 Check finishes of formed surfaces

4.0

5.0

Spec sec03300

Laboratory record

MAU QC
Inspector

S/R

W/R

A)Flaid test record


B)Laboratory record

MAU-C-C04

Visual Insp.followed
by shop drawings

4.1 Check methot of wet curing by placing wet purlab over


A) SAE8-Q-001
the precitable drled concrate and coninously wet for atleast 7
section 10.0 ACI
days or as approved by clent KJO/SCEC repsentative
308 Section
3.2.2
ACI 305 R/
KJO Spec

"

5.1 Bearn sides form columns and walls can only be


A) SAES Q-001
Form Dismantling removed al the min of 24 hours Bearn soffits slabs that
section 8.0
required
support
can
only
be
removed
after
attalning
70%
of
Aftercuring
KJO Spec.
desing strenght

"

S/R

ACI 503.2
KJO Spec.

"

A) SAES-Q-001
section 12.0/
KJO Spec.

"

N/A

"

H/R

H/R

Concrete Curing

5.2 Surfece repair should be done Immedlatey


6.1 After Practicable curing and befors backfill apply two
coats of cols tar or bitumen casting on surfacesof concrate
6.0 Protective Coating directly exposed to earth

7.0

KJO Spec.

Discipline:
Quality Record or
Verifying Document

ITP-C-004
CIVIL
SCEC
KJO Third
Insp. QA/QC party

Work Acceptence

7.1 All work must be completed prior to hand over to next


work

. I

I = Inspect or perform work WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records document

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

1.0

2.0

Pre-pouing
inspection

Rev.00

MAU Contract No:HQ807 PC 09


Acceptance
Criteria

1.1 FBE coated reinforcements are shipped and stored


properly

SAES-Q-001
Appendix-A/
KJO Spec.

Proj.specs 03210
Proj.specs 03200

1.2
ect

SAES-Q-001
Section 8/
KJO Spec.

Proj.specs 03300

1.3 Check plywood and lumber misc etc

SAES- Q-401
Section 9/
KJO Spec.

Proj.specs 03100

1.4

SAES-Q-001
Section 5.0
Section 18/
KJO Spec.

Spec.Sec03300

A) Trial mix record


B) Cillents approval

2.1 CheckIns installed reinforcements as per drawing


dimension and size and FBE costings spacers

SAES-Q-001
Appendix-A/
KJO Spec.

Spec .Sec03210 IFC


drawing

A) MAU-C-004
Visual

2.2 Check embedded materials in proper location and


anchorage

SAES-Q-001
Section 5.0
SAES-Q-005
Section 4.6/
KJO Spec.

2.3

SAES-Q-00I/
KJO Spec.

Spec
sec03300

2.4 Cheek fromworks layout dimensions elevations and


check support bracings

SAES-Q-O01
Section 9.0.
KJO Spec.

Spec Sec
O3100 &
01051 IFC
drawings
Approved shop
dwg

2.5 Check plasticized vapour barrier installation and


lappings

SAES-Q-001
Section 12.0
KJO Spec.

Spec Sec03300

Inspection and Test Point

Cheek embedded iterns - Pipings, Sleeves, Anchors

Approved desing mix of concrete

Check in the coating of the embedded items

ITP-C-004
CIVIL

Discipline:
Applicable Code
or Standard

Process Description

Material Control

CONCRETE STRUCTURE
Quality Record or
Verifying Document

MAU QC
inspector

SCEC
Insp

KJO
QA/QC

Third
party

A) MAU-C-004
B) Visual

Check Approved
shop drawings &
visual inspection

S/R

W/R

R/H

A)MAU-C-C04
B) visual report of
electrical
mechanical
,telecom.inspection

H .

A) MAU-C-004

"

A) MAU-C-004
B) Supplier certificate

B)

I = Inspect or perform work WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records document

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

2.0

Applicable Code
or Standard

Approved design mix concrete

SAES-Q-OO1
Section 5.0
Section 16
KJO Spec.

Material control
Verify FDT results to salisfy compaction requirements

Pre pouring
inspection

Concrate curing

5.0

Proj.specs 03100 &


01051
Stuructural
Drawing

Specification
1) SAES-Q-001/ sect.03300
ASTM-C94
KJO Spec.

3.3 Check method of placement and movernent of concrete SAES-QO01


section 10/
KJO Spec.
4.1 Check method of of wet curing for at least two 2 days SAES-Q-0010
setion 10/
KJO Spec.

Work Acceptance 5.1 All work must be completed hand acceptable prior to
and over to next work

I = Inspect or perform work

WI= 100% witness

R= Review / Approve records document

MAU QC
Inspector

SCEC
tnsp

KJO
QA/QC

Third
party

A) Suplier truck ticket


B)
MAU-C-003

S/R

S/R

A) Field test record


B)laboratory test
sheet

"

3.2 Conduct slump test concrete temperature reading and Specifiation


random sampling for comporasive test 4 samples for every SAES-Q-001/
50 cu M.
09-SAMSS-097
KJO Spec.

4.0

Quality Record or
Verifying Document

Tech,.specs - A) Trial mix record


3300
B) Clients approval

"

3.1 Check truck ticket for required mix design slump and
Placement pouring time intervals
concrete

Acceptance
Criteria

1) SAES-M-001/
SAES-A.Specs 02210 laboratory test Sheet
114/KJO Spec.

2.2 Check formworks layout dimensions and bracings


2.3 Check alevations by nstruments

3.0

N/A

"

Checked approved
shop drawings
supplier

1) MAU-C-003
"
1) MAU-C-003
"
"

1) MAU-C-003

W2 = Random if inspector did not show proceed


S=Survellance

ITP-C-003
CIVIL

Discipline:

Inspection and Test Point

2.1

Rev.00

MAU Contract No:HQ807 PC 09

Process Description
1.1

1.0

CONCRETE BLINDING

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:
MAU Contract No:HQ807 PC 09
Procest Description

BACKFILLING & COMPACTION

Rev.00

ITP-C-002
CIVIL

Discipline:

Inspection and Test Point

Applicable Code
or Standard

Acceptance
Criteria

Quality Record or
Verifying Document

MAU QC
Inspector

SCEC
insp

KJO
QA/QC

Third
party

1.1 Area Preparation

1.1

Cleaning and removing of all organic matters

SAES-A-114/
KJO Spec.

Cont Spec Sec


02210

MAU-C-003

2.0

2.1

Soil test

SAES-M-100
SAES-A-114/
KJO Spec.

"

Lab form

W//R

3.1 Density test


4.1 Visual/ grade line check by instrument

"

"

Lab form

WR

"

"

Survey data

S/R

4.2 Level and elevation of backfill check by instrument


5.1 Repair of settlement and working of graded area

"
"

"
"

I
I

W
W

S
S

"

"

Filling material

3.0 Compaction test


Grade shape and
4.0 slope
5.0
6.0

Document and
drawing for quality
record

6,1 Filed documents and drawings for record

I = Inspect or perform work WI= 100% witness


R= Review / Approve records document

MAU-C-003
MAU-C-003

W2 = Random if inspector did not show proceed


S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

1.0
2.0
3.0

4.0

5.0

EXCAVATION
MAU Contract No:HQ807 PC 09

Process Description
1,1

Location and
projection ofutilties

denficication of lines level and catum by the use


ofinstruments

Visual functional

Size and depth of


excevation prepare 4.1
bottom of excevation

Measurement and level instrument

Max dry densty value


5.1
of material

Soil test

6.0
Compection test

Quality Record or
Verifying Document

MAUQC
Inspector

SCEC
Insp

KJO
QA/QC

6.1 Densty test

7.0 Finish final inspection 7.1


8.0
Documents and
drawings for quality 8.1
record

Acceptance
Criteria

Survey data

S/R

SAES-A-114

MAU-C-COI

SAES-A-114

MAU-C-001

MAU-C-O01

SAES-M-100
SAES-A-114

Lap.test sheet

SAES-M-100
SAES-A-114
ASTM-D-698

Lap.test sheet

Wl

Survey data

Third
party

Proj.specs
SAES-M-100
sec 02210

2.1 Visual functional

Excevation sloping
3.1
shoring or benching

ITP-C-001
CIVIL

Discipline:
Applicable Code
or Standard

Inspection end Test Point

Excevation layout

Rev.00

Visual grade line check by instrument


Filed documents and drawing for record

I = Inspect or perform work WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records document

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

1.0

2.0

TERMITE CONTROL
MAU Contract No:HQ807 PC 09

Process Description

Material Control

Application &
inspection

Rev.00

Applicable Code
or Standard

Inspection and Test Point


1,1 Terminte control spray chemical shall be approved
material see proj.specfication.Rewivew the material data
sheets and manufacturer'recommendation

ITP-C-024
CIVIL

Discipline:
Acceptance
Criteria

KJO/ARAMCO Tech. Spec.


Standards Sec-02281

Quality Record or
Document

MAU QC
Inspector

SCEC
lnp

KJO
OA/QC

MAU-C-024

2,0 Examine the chemical dosage and material storage prior


to spray or application on site

"

"

"

Wl

2,1 Termite spray must be as per manufactuer'sinstruction &


the areas of application as agreed with KJO / SCEC
representalive

"

"

"

2.2 Check approval FDT and utility clearance prior


to application.

"

"

AS per approved
utility shop drawings

R/W

3.0 Protection shall be done as per the manufactuer's


procedure after the spray to keep the effect terminte control
chemical undistrubed

"

"

"

I = Inspect or perform work WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records document

S=Survellance

H= Hold point

Third
party

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN
item no

Contractor:

Process Description

1.0

Material Control

INSTALLATION OF CONC. MASONRY UNIT

MAU Contract No:HQ807 PC 09

Discipline:

Inspection And Test Point

1.1. Approval for Concrete Block

Applicable Code or
Standard

Acceptance Criteria

09-SAMSS-016.

Pro Specs Sec 04200

1.2 Checkstaging area sizes and loadbearing schdule of concrete masonry


blooks
2.0

Pre Mixing Delsgn mix


ofmortar/grout mixses

3.0

Application

2.1

ASTM-C-270
ASTM-C-476

Approval to desingmix of mortar / grout mixes

3.1 Check surfaces of flooring and wall to recelve the work of any defects
3.2

SAES-M-100

Check masonry installedalignedbond pattern andfinish acceptable

3.3 Checkreinforcement bers placed in accordance with theconstruction


drawingand specification
3.4 Check pre-fabricatedelements and wall tiesinstalled in accordance with
the specification
3.5 Check placement of concrate mortar on requiredmasonry block
3.6 Check level nes and plumbness of block laying
3.7

Masonry block cells filled with grout and acceptable

3.8

Extra mortar to be cleaned

3.9

Clean concrete surfaces of forelgn matter with clean water

3.10 Check thickness of scratch brown andfinish coatsfor external walls


4.0

4.1 Practicable cured finish coat must be molsten for a min period of 48
hours.

SAES-Q-001

5.1 Worg must be completedprlor to handover to next work Must have


varlation of trus flatness (3mm in 3mtr)

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN
tem No

Contractor:

CONCRETE STRUCTURE

MAU Contract No:HQ807 PC 09

Discipline:

Process Description

3.0 PlacementPouring of concrete

nspection and Test Point

Applicable Code or Acceptance Criteria


Standard

3.1 Check truck ticket requiredmix desing slump end time intervals

A) SAES-Q-001
Section 13.0
Section 8.0
C)ASTMC-94

Spec sec-03300

3.2 Conduct slump test conc. Temperature reading and sampling for
compressive stregth test 4 samples for every 75 cu.M

b)SAES-Q- 001
Section 18.0

Pfoj. Spec. Sec. 03300

3.3 Check method of placament and movement of concrate

a)SAES-Q-C01
section 8,0

4.0 Concrete Curing

4.1 Check methot o fwet curing by placing wet purlab over the precitable
drled concrate and coninously wet for atleast 7 days or as approved by clent
AGOC repsentative

a) SAE8-Q-001
section 10.0

5.0 Form Dismantling Aftercuring

5.1 Bearn sides form columns and walls can only be removed al the min of
24 hours Bearn soffits slabs that required support can only be removed after
attalning 70% of desing strenght

a) SAES Q-001
section 8.0

5.2 Surfece repair should be done Immedlatey

8.0 Protective Coating

6.1 After Practicable curing and befors backfill apply twocoats of cols tar or
bitumen casting on surfacesof concrate directly exposed to earth

b) SAES-Q-001
section 12.0

7.0 Work Acceptence

7.1 All work must be completed prior to hand over to next work

N/A

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN

CONCRETE STRUCTURE

item no

Contractor:
Process Description

Material Control

MAU Contract No:HQ807 PC 09


Inspection and Test Point

Acceptance Criteria

FBE coated reinforcements are shipped and stored property

SAES-Q-001
Appendix-A

Proj.specs - 03210
Proj.specs - 03200

1.2

Cheek embedded iterns - Pipings, Sleeves, Anchors ect

SAES-Q-001
Section 8

Proj.specs - 03300

SAES- Q-401
Section 9

Proj.specs - 03100

SAES-Q-001
Section 5.0 Section
18

Spec.Sec-03300

SAES-Q-001
Appendix-A

Spec .Sec-03210 IFC


drawing

1.4
Pre-peuing inspection

Applicable Coda or
Standard

1.1

1.3 Check plywood andlumber misc etc

2.0

Olaclplina:

Approved desing mix of concrete

2.1 CheckIns installed reinforcements as per drawing dimension and size


and FBE costings spacers
2.2 Check embedded materials in proper location and anchorage

2.3

Check in the coaliting of the embedded items

SAES-Q-001
Section 5.0 SAESQ-005 Section 4.6
SAES-Q-00I

Spec sec03300

2.4 Cheek fromworks layout dimensions elevations and check support


bracings

SAES-Q-O01
Section 9.0.

Spec Sec O3100 &


01051 IFC drawings
Approved shop dwg

2.5 Check plasticized vapour barrier installation and lappings

SAES-Q-001
Section 12.0

Spec Sec-03300

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN
item no

Contractor:
Process Description

CONCRETE BLINDING
MAU Contract No:HQ807 PC 09
Inspection and Test Point

Discipline:
CO o T7

Acceptance Criteria

1.0

material control

1.1

Approved desing mix concrete

SAES-Q-OOI
Section 5.0 Section
16

2.0

Pre pourning ispection

2.1

Verify FDT results to salisfy compaction requiremnist

1) SAES-M-001/
SAES-A-114

Proj.specs - 3300

Proj.specs 02210

2,2 Check formworks layout dimensions and bracings


2.3 Check alevations by nstruments
3.0

placement pourling cocrate

4.0

concrate curing

5.0

work Acceptance

3.1

Check truck licket for required mix desing slump and time intervals

Proj.specs - 03100
&01051 IFC Drawing
1) SAES-Q-001/ b) specification sect.03300
ASTM-C94

3.2 Conduct slump test concrete temperature reading and random sempling
for comporasive test 4 samples for every 75 cu M.

specifiation
SAES-Q-001

3.3 Check method of placement and movernent of concrete

SAES-QO01
section 10

4.1

SAES-Q-0010
setion 10

Check method of of wat curing for at least two 2 days

5.1 All work must be complated hand accepttable prior to hand over to next
work

N/A

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN
item no

Contractor:

BACKFILLING & COMPACTION

MAU Contract No:HQ807 PC 09


Inspection and Test Point

Procest Description

Discipline:
Applicable Code
or Standard

Acceptance
Criteria
Cont Spec Sec 02210

1.1 Area Propation

1.1

Cleaning and removing of all organic matters

SAES-A-114

2.0 Filling material

2.1

soll test

SAES-M-100
SAES-A-114

3.0

3.1

densty test

4.0 grade shape slope

4.1 Virsual/ grade line check by instrument


4.2 level and elevation of backfill check by nstrument

5.0

5.1 visual

6.0 document and drawing for quality 6,1 Filed documents and drawings for record
record

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN

EXCAVATION

item no

Contractor:

MAU Contract No:HQ807 PC 09

Process Description

1.0 excevation layout


2.0 location andprojectionofutilties

Discipline:
Inspection end Test Point Applicable Code or
Standard

1,1

denficication of lines level and catum by the use ofinstruments

SAES-M-100

2.1 Visual functional

SAES-A-114

3.0 excevation sloping shoring or


benching

3.1

Visual functional

SAES-A-114

4.0 size and depth of excevation


prepare bottom of excevation

4.1

measurement and level instrument

5.1

soil test

5.0 max dry densty value of material

Acceptance Criteria

Proj.specs
sec 02210

SAES-M-100
SAES-A-114

6.0 compection test

SAES-M-100
SAES-A-114
ASTM-D-698

6.1 densty test


7.0 finish final inspection

7.1

Visual grade line check by instrument

8.0 documents and drawings for


quality record

8.1

filed documents and drawing for record

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PUN

TERMITE CONTROL

item no

Contractor:

1.0

Process Description

material control

MAU Contract No:HQ807 PC 09


Inspection and Test Point

1,1 Terminte control spray chemical shall be 4 to dursban product of DOW


chemicals se per proj.specfication.Rewivew the material data sheets
andmanufacturer'recommendation
2,0 examine the chemical closage and material storage prior to spray or
application on site

2.0 Application & inspection

2,1 termite spray must be as per manufactuer'sinstruction & the aress of


application as agreed with AGOC'S representalive
2.2 protection shall be done as per the manufactuer's proceture after the spray
to keep the effect terminte control chemicalundistrubed

Discipline:
Applicable Code or Acceptance Criteria
Standard

AGOC'S standard Proj Spech Sec-02261

, AND 5 SCHOOLS PACKAGE

UNIT

Rev.00

ITP-C-O05

Discipline:

CIVIL
Quality Record or
Verfying Document

CCE/QC
Inspector

SCEC
lnsp

KJO OA/QC

QR-C-005

R/S

R/S

R/S

S/R

W/S

S/R

Third party

, AND 5 SCHOOLS PACKAGE


JI
Rev.00

ITP-C-004
CIVIL

Quality Record or
Verifying Document
laboratory record

CCEOC
Inspector

SCEC
Irvsp

KJO QA/QC Third party

S/R

W/R

A)Flaid test record


B)Laboratory record

QR-C-C04

S/R

. I

H/R

H/R

, AND 5 SCHOOLS PACKAGE


JI
Rev.00

ITP-C-O04

Olaclplina:

CIVIL
Quality Record or
Verifying Document

CCE QC
inspector

SCEC
Insp

KJO QA/QC

Third party

S/R

A) Trial mix record


B) Cillents approval

W/R

R/H

A) QR-C-004
Visual

A)6R-C-C04
B) visual report of
electrical mechanical
inspection

H .

A) QR-C-004

A) QR-C-004
Visual

B)

B)

A) QR-C-004
B) Suppler cartificate

, AND 5 SCHOOLS PACKAGE


JI
Rev.00

ITP-c-003

Discipline:

CIVIL
Quality Record or
Verifying Document

CCEQC
Inspector

SCEC
tnsp

KJO QA/QC Third party

A) Trial mix record


B) Cillents approval

laboratory record

1} QR-C-003

A) Supper truck ticket


B) QR-C003

S/R

S/R

A) Field test record


B)laboratory test
sheet

1} QR-C-003

1} QR-C-003

1} QR-C-003

, AND 5 SCHOOLS PACKAGE


FJI
Rev.00

ITP-C-O02

Discipline:

CIVIL

Quality Record or CCE QC


Inspector
Verifying
Document

SCEC

KJO QA/QC Third party

insp

QR-C-002

lab form

W//R

lab form

WR

survey data

S/R

QR-C-002

QC-C-002

, AND 5 SCHOOLS PACKAGE


FJI
Rev.00

ITP-C-001

Discipline:

CIVIL
Quality Record or
Verifying Document

CCEQC
Inspector

SCEC
Insp

KJO QA/QC Third party

survet data

S/R

QR-C-COI

QR-C-001

QR-C-O01

lap.test sheet

lap.test sheet

Wl

Survey data

, AND 5 SCHOOLS PACKAGE


FJI
Rev.00

ITP-C-024

Discipline:

CIVIL
Quality Record or
Document

QR-C-024

CCEQC
Inspector

SCEC
lnp

KJO OA/QC

Wl

Third
party

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

Contractor:

INSPECTION & TEST PLAN


MAU Contract No:HQ807 PC 09

Process Description

INSTALLATION OF CONC. MASONRY UNIT

Inspection And Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

tem No

INSPECTION & TEST PLAN CONCRETE STRUCTURE


Contractor:
MAU Contract No:HQ807 PC 09
Process Description
nspection and Test Point

Disciplin
Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS

FACILITY 1,2,3,4

AL-KHAFJI

item no

INSPECTION & TEST PLAN


CONCRETE STRUCTURE
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

Applicable Coda
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item
no

INSPECTION & TEST PLAN


CONCRETE BLINDING
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

CO o T7

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN BACKFILLING & COMPACTION


Contractor:
MAU Contract No:HQ807 PC 09
Procest Description

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


EXCAVATION
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Di

Inspection end Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

TERMITE CONTROL
MAU Contract No:HQ807 PC 09

Process Description

Disc

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


4
AL-KHAFJI

NC. MASONRY UNIT

Rev.00

ITP-C-O05
CIVIL

Discipline:
Acceptance
Criteria

Quality Record or
Verfying Document

CCE/QC
Inspector

SCEC
lnsp

KJO
OA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Acceptance
Criteria

Discipline:
Quality Record or
Verifying Document

CCEOC
Inspector

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE

ITP-C-004
CIVIL
SCEC KJO
Third
Irvsp
QA/QC party

AL-KHAFJI
Rev.00

ITP-C-O04

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCE QC
inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-c-003

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
tnsp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CCE QC
Inspector

ITP-C-O02
CIVIL
SCEC
insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-001

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-024

Discipline:
Acceptance
Criteria

ector did not show proceed


RFI= Issuued for H & W only

Quality Record or
Document

CIVIL
CCEQC
Inspector

SCEC
lnp

KJO
OA/QC

Third
party

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:
Process Description

Material

Installation

RESILIENT FLOORING
MAU Contract No:HQ807 PC 09
Applicable Code
or Standard

Inspection And Test Point

1.1 Check that material to be used is approved

SAES M-100

2.1 Check that area is clean prior to commencment


of works.

"

2.2 Check that floor is smooth,leveled with no cracks


or holes

"

2.3 Check that adhesive is properly spread and tile


relaid firmly.

"

2.4 Check that joints and seam are parallel to


building line and floor is termianted at center of door
opening where adjacent floor finish is disimilar

FS-L-F-475A

2.5 Ensure that metal edge strip is instatled at


unprotected or exposed edges.

"

2.6 Ensure at movable partitions,flooring is installed


under partitions without interrupting floor pattern.

"

2.7 Base joints shall be tight and vertical.

"

2.8 Ensure stair treads and risers are instelled in


one piece of full width end dept.

"

2.9 Check final and complate installation

"

I = Inspect or perform work

WI= 100% witness

R= Review / Approve records document

S=Survellance

W2 = Random if inspector did not show proceed


H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5


FACILITY 1,2,3,4
AL-KHAFJI

tem No

INSPECTION & TEST PLAN


Contractor:
MAU Contract No:HQ807 PC 09
Process Description

1.0

Material

2.0

Pre-Placing

ASPHALTIC CONCRETE

nspection and Test Point


1.1 Check that primer coat tack coat and asphalt mix
design are approved.

D
Applicable Code
or Standard
SAES -G -006/
KJO Spec.

2.1 Check that subbase material is compacted and


accepted

"

2.2 Check that surface is to the correct elevation,


clean from duet and loose material.

"

2.3 Check that primer coat has been applied


properly and cured at least 24 Hrs.

"

3.0

Asphalt Placing

2.4 Check that menholes frames and covers are in


correct elavation
3.1 Check the asphalt mix is as required and
approved

"
SAES -G -006/
KJO Spec.

3.2 Check temperature of the paving mixture is


within specified limits.

"

3.3 Check paving mixture uniformly of aggregates


bituminous content and not over heated.

"

3.4 Check placement of asphalt is uniform and


correct thickness

"

3.5 Check that asphalt is compacted to te reguired


degree of compactor with no displacement or
extrude pavement from position.

"

I = Inspect or perform work

WI= 100% witness

R= Review / Approve records document

S=Survellance

W2 = Random if inspector did not show proceed


H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:
Process Description

1.0

Material

2.0

Installation

MOTORIZED DRAPERIES & STAGE CURTAINS


MAU Contract No:HQ807 PC 09
Applicable Coda
or Standard

Inspection and Test Point


1.1 Check material and draperies & curtains
are as approved submittals

KJO Spec.

1.2 Check exact measurement and type

"

1.3 Check the wrapping & carton to bear the


manufacturer identification

"

2.1 Check the track on which pully operate is straight


and firm to take theload of curtain

"

2.2 Check the adjoining work is not dameged from


installation of tracks.

"

2.3 Check installation of tracks.

"

2.4 Check the draperies and curtains are clean after


installation.

"

2.5 Check the operation of system

"

I = Inspect or perform work

WI= 100% witness

R= Review / Approve records document

S=Survellance

W2 = Random if inspector did not show proceed


H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN
Contractor:

TILE WORK
MAU Contract No:HQ807 PC 09

item no

Process Description

1.0

Material

Inspection and Test Point


1.1 check tile is approved type ,brand,size and glazing.
1.2 Check that adhesive primer mortar and grout are
approved.

2.0

Installation

Applicable Coda
or Standard

2.1 Application of installation method is as per required


tile.
2.2 Installation of tile shall be as per the approved mock
up sample and as per acceptable layout prior to start.
2.3 Check that water proofing memberance is installed
and accepted prior to laying of floor tile.
2.4 Check tile joints are uniform and pattern is as
idicated.

TCA-137-1
ANSI -A-118
SAES-M-100
"
ANSI -A-118-1
SAES-M-100

2.5 Chec the setting for soundness replace hollow


sounding units.

"

2.6 Tile setting curing period is maintained prior to


grouting

"

2.7 check protective sealer is applied prior to grouting.

"

2.8 Check approved grouting material is applied and


grouting is accepted.

"

I = Inspect or perform work

WI= 100% witness

R= Review / Approve records document

S=Survellance

W2 = Random if inspector did not show proceed


H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SC


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:
MAU Contract No:HQ807 PC 09
Procest Description

ASPHALTIC CONCRETE

Inspection and Test Point


3.6 Check that surface receives consecutive passes
achieve smooth finish with no marks.
3.7 Check that discontinuation of asphalt paving is
made to an even squre cut and tack coated as specified

4.0

Testing

3.8 Check that paved surface is acceptable and all


defect corrected as required
4.1 Material

Applicable Code
or Standard
SAES Q-006
"
"
SAES Q-006

4.2 Uncompated Asphalt

"

4.2.1 Extraction

"

4.2.2 Gradation

"

4.2.3 Marshall properties

"

4.3 Compacted Asphalt

SAES Q-006

4.3.1 Core Density and thickness

"

4.4 Equipment

"

4.4.1 Weighing Scale

"

4.4.2 Temperature Gauges


4.5 Tolerance

"
SAES Q-006

4.5.1 Surface Tolerance

"

4.5.2 Thickness Tolerance

"

I = Inspect or perform work

WI= 100% witness

R= Review / Approve records document

S=Survellance

W2 = Random if inspector did not show proceed


H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SC


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

1.0

GYPSUM BOARD SYSTEM


MAU Contract No:HQ807 PC 09

Process Description
Material

Applicable Code
or Standard

Inspection end Test Point


1.1 Check Gypsum board of correct type,standard,Fire
Rated moisture resistant etc.

ASTM-C-36

1.2 Check runner,metal studs,fasteners,reinforcing tape


adhesive corner beads,fire retardant sealant that they are
approved products.

2.0

Installation

ASTM-C-475
ASTM-C-514
ASTM-C -645

2.1 Check installation of framing and furring in accordance


approved construction drawings.

ASTM-C-754
ASTM-C-36

2.2 Check spacing and direction of hangers,spacing of main


runner of suspended ceiling.
2.3 Check weather protection installation is provided

"
ASTM-C-665

2.4 For fire rated wall check that taping fasteners,


cementing and sealant of joints are in accordance with
applicable standards.

ASTM-C-665

2.5 Check installation of control joints when required.

ASTM-C- 475

2.6 Check Insulation

ASTM-C-665

2.7 Check embedded items & stud framing system.

ASTM-C 665

2.8 Check penetration through fire rated wall,position,


opening tolerance,sealant used and thickness.

ASTM-E-119

2.9 Check that water resistant gypsum packing board is


used for base to a tile or wall panel at tub,shower or water
closet

ASTM-C-630

2.10 Check that texture finish of gypsum board,framing is


as specified.

ASTM-C-640

I = Inspect or perform work

WI= 100% witness

R= Review / Approve records document

S=Survellance

W2 = Random if inspector did not show proceed


H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SC


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

1.0

Process Description
Material

PLASTERING
MAU Contract No:HQ807 PC 09
Inspection and Test Point

Applicable Code
or Standard

1.1 Aggregate:Natural sand of the required gradation.

ASTM-C-897

1.2 Portland Cement Type 1

ASTM-C-150

1.3 Mix Design for all plaster types


2.0

Execution

Spec Req.

2.1 Check surface preperation,masonry,concrete


2.2 Check items within wall have been already installed
2.3 Electro-Mechanical services have been tested and
approved.
2.4 Check required plaster mix for exterior wall,interior wall
and ceiling.
2.5 application of dash coat,scratch coat,brown coat and
finish coat as per mix design
2.6 Finish coat shall be cured for a minumum of 48 hours.
2.7 Plaster shall extend 100mm beyond finished ceiling
level for rooms with suspended ceiling.
2.8 Check plaster variation to true finish.

I = Inspect or perform work


R= Review / Approve records document

WI= 100% witness


S=Survellance

SAES-M-100
"
"
"
"
"
"
"

W2 = Random if inspector did not show proceed


H= Hold point

RFI= Issuued for H & W only

MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI

LOORING

Rev.00

ITP-C-012
CIVIL

Discipline:
Acceptance Criteria

Quality Record or
Verfying Document

MAU QC
Inspector

SCEC
lnsp

KJO
OA/QC

Spec.Sec.
09665

Approved
submittal

S/R

"

MAU-C-012

Wl

W2

"

"

Wl

W2

"

"

W2

"

"

"

"

"

"

"

Visual

"

MAU-C-012

"

"

Wl

Wl

Third
party

not show proceed

uued for H & W only

MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI

TE

Rev.00
Discipline:
Quality Record or
Acceptance Criteria Verifying Document
Spec.Sect.
02513
100%degree
of compaction
Spec.Sect.
02513 As per
Drawings
As per Spec.
02513

MAU QC
Inspector

ITP-C-010
CIVIL
SCEC KJO
Third
Irvsp
QA/QC party

MAU--C-010

H/R

Laboratory Record

"

R/I

"

As per approved
drawings
As per Spec.
02513 approved
submittal
Between 139 163 deg.

"

"

Laboratory Record

"
"
"

not show proceed

uued for H & W only

MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI

GE CURTAINS

ITP-C-011
CIVIL

Rev.00

Discipline:
Acceptance Criteria

Quality Record or
Verifying Document

MAU QC
inspector

SCEC
Insp

KJO
QA/QC

Tech.Spec
12535

MAU-C-011

I/R

I/R

"

"

"

"

W2

"

"

Wl

Wl

"

"

"

"

Wl

Wl

"

"

W2

"

"

Wl

Wl

not show proceed

uued for H & W only

MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Discipline:

ITP-C-009
CIVIL

Third
party

Acceptance Criteria

Quality Record or
Verifying Document

MAU QC
Inspector

SCEC
tnsp

KJO
QA/QC

Approved sample
Spec.Sec.09310

MAU-C-009

S/l

As per Spec.
09330

"

S/l

"

"

"

"

W/H

"

"

"

"

S/l

sound check/
knocking with
rubber hummer

"

manufacturer
instruction

"

"

"

S/l

Spec.and
manufacturer
recommendation..

"

R/l

R/S

Third
party

not show proceed

uued for H & W only

MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-010
CIVIL

Discipline:
Acceptance Criteria

Quality Record or
Verifying Document

MAU QC
Inspector

SCEC
insp

KJO
QA/QC

As per Spec.
02513

Visual

"

"

"

"

Wl

W/R

W/R

"

Laboratory
Records
Lab. Records

"

"

"

"
R

l/R

l/R

"

"

"

Spec.02513

Lab.Records

"

"

"

Calib. Certificates

"

"

"

"

"

MAU-010

Third
party

"
"

"
"

not show proceed

uued for H & W only

MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-008
CIVIL

Discipline:
Acceptance Criteria

Quality Record or
Verifying Document

MAU QC
Inspector

SCEC
Insp

KJO
QA/QC

Spec,Sect,
09260

MAU-C-008

S/R

"

"

S/R

Spec.approved
drawings/Instalition
procedures/
mockup sample

"

l/H

"

"

Sect.9260

"

"

R/l

R/l

S/R

"

"

"

"

"

"

"

"

"

"

"

UL or equivalent
Spec.Sec.09260

UL or equivalent
Spec.Sec.09260

Third
party

not show proceed

uued for H & W only

MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI

RING

Rev.00

ITP-C-006
CIVIL

Discipline:
Acceptance Criteria

Quality Record or
Document

MAU QC
Inspector

SCEC
lnp

KJO
OA/QC

Sec.09220

Lab.Records

"

Mill Certificate

l/R

Third
party

"

Lab.Records

"

Visual MAU-C-006

"

"

"

"

W/R

"

"

"

"

"

"

"

"

Max.Variation
3mm in 3m.

"

not show proceed

uued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOO


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:
Process Description

1.0

Material

2.0

Installation

DOORS AND WINDOWS


MAU Contract No:HQ807 PC 09
Applicable Code
or Standard

Inspection And Test Point


1.1 Check frame size and thickness,base
anchorage and primer

ANSI/SDI-100

1.2 Check frame identification number correct for


location
1.3 Check frame and paint not damaged,strut
welded across the jambs at base

ASTM-A-653

2.1 Check frame installation

ANSI/SDI-100

2.2 Check door identification number type and


opening direction is correct for location

"

"

2.3 Check caulking sealant & back-up rod.


"
2.4 Installation of door in accordance with
manufacturer and construction drawing.

"

2.5 Glass and glazing installed as per finishing


schedule

"

2.6 Installation is completed and with tolerance


"

2.7 Door operation is saticfactory

I = Inspect or perform work


R= Review / Approve records document

WI= 100% witness

"
W2 = Random if inspector did not show proceed

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOO


FACILITY 1,2,3,4
AL-KHAFJI

tem
No

INSPECTION & TEST PLAN CONCRETE STRUCTURE


Contractor:
MAU Contract No:HQ807 PC 09
Process Description
nspection and Test Point

Disciplin
Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOO


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

CONCRETE STRUCTURE
MAU Contract No:HQ807 PC 09

Process Description

Inspection and Test Point

Applicable Coda
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOO


FACILITY 1,2,3,4
AL-KHAFJI

item
no

INSPECTION & TEST PLAN


Contractor:

CONCRETE BLINDING
MAU Contract No:HQ807 PC 09

Process Description

Inspection and Test Point

CO o T7

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI
INSPECTION & TEST PLAN

BACKFILLING & COMPACTION

item no

Contractor:

MAU Contract No:HQ807 PC 09

Procest Description

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

EXCAVATION
MAU Contract No:HQ807 PC 09

Process Description

Inspection end Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

TERMITE CONTROL
MAU Contract No:HQ807 PC 09

Process Description

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

RS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


,3,4
AL-KHAFJI

RS AND WINDOWS

Rev.00

ITP-C-007
CIVIL

Discipline:
Acceptance Criteria

Quality Record or MAU/QC


Verfying Document Inspector

SCEC
lnsp

KJO
OA/QC

Spec.08120
08211

MAU-C-007

Spec.8305

"

Spec.6360
08410

"

W2

"

"

W2

"

"

W2

Spec.7920
Spec.7900

"

W2

As per drawing
manufac.recommenda
tion

"

Wl

Spec.08810

"

W2

"

"

Distortion less
than 3mm measured
with
straight edge corner
to corner

Third
party

ector did not show proceed


RFI= Issuued for H & W only

RS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


,4
AL-KHAFJI
Rev.00
Discipline:
Acceptance Criteria
Quality Record or CCEOC
Verifying
Inspector
Document

ITP-C-004
CIVIL
SCEC KJO
Third
Irvsp
QA/QC party

ector did not show proceed


RFI= Issuued for H & W only

RS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


,4
AL-KHAFJI
Rev.00

ITP-C-O04

Discipline:
Acceptance Criteria

Quality Record or
Verifying
Document

CIVIL
CCE QC
inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

RS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


,4
AL-KHAFJI

Acceptance Criteria

Rev.00
Discipline:
Quality Record or
CCEQC
Verifying
Inspector
Document

ITP-c-003
CIVIL
SCEC
tnsp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

ERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


4
AL-KHAFJI
Rev.00

ITP-C-O02

Discipline:
Acceptance Criteria

CIVIL

Quality Record or
CCE QC
Verifying
Inspector
Document

SCEC
insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

ERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


4
AL-KHAFJI
Rev.00

ITP-C-001

Discipline:
Acceptance Criteria

CIVIL

Quality Record or
CCEQC
Verifying
Inspector
Document

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

ERS MTD,AVIATION, AND 5 SCHOOLS PACKAGE


4
AL-KHAFJI
Rev.00

ITP-C-024

Discipline:
Acceptance Criteria

ector did not show proceed


RFI= Issuued for H & W only

Quality Record or CCEQC


Document
Inspector

CIVIL
SCEC
lnp

KJO
OA/QC

Third
party

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

Contractor:

INSPECTION & TEST PLAN


MAU Contract No:HQ807 PC 09

Process Description

INSTALLATION OF CONC. MASONRY UNIT

Inspection And Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

tem
No

INSPECTION & TEST PLAN CONCRETE STRUCTURE


Contractor:
MAU Contract No:HQ807 PC 09
Process Description
nspection and Test Point

Disciplin
Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


CONCRETE STRUCTURE
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

Applicable Coda
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item
no

INSPECTION & TEST PLAN


CONCRETE BLINDING
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

CO o T7

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN BACKFILLING & COMPACTION


Contractor:
MAU Contract No:HQ807 PC 09
Procest Description

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


EXCAVATION
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Di

Inspection end Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

TERMITE CONTROL
MAU Contract No:HQ807 PC 09

Process Description

Disc

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


4
AL-KHAFJI

NC. MASONRY UNIT

Rev.00

ITP-C-O05
CIVIL

Discipline:
Acceptance
Criteria

Quality Record or
Verfying Document

CCE/QC
Inspector

SCEC
lnsp

KJO
OA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Acceptance
Criteria

Discipline:
Quality Record or
Verifying Document

CCEOC
Inspector

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI

ITP-C-004
CIVIL
SCEC KJO
Third
Irvsp
QA/QC party

Rev.00

ITP-C-O04

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCE QC
inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-c-003

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
tnsp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CCE QC
Inspector

ITP-C-O02
CIVIL
SCEC
insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-001

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-024

Discipline:
Acceptance
Criteria

ector did not show proceed


RFI= Issuued for H & W only

Quality Record or
Document

CIVIL
CCEQC
Inspector

SCEC
lnp

KJO
OA/QC

Third
party

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

Contractor:

INSPECTION & TEST PLAN


MAU Contract No:HQ807 PC 09

Process Description

INSTALLATION OF CONC. MASONRY UNIT

Inspection And Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

tem
No

INSPECTION & TEST PLAN CONCRETE STRUCTURE


Contractor:
MAU Contract No:HQ807 PC 09
Process Description
nspection and Test Point

Disciplin
Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


CONCRETE STRUCTURE
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

Applicable Coda
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item
no

INSPECTION & TEST PLAN


CONCRETE BLINDING
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

CO o T7

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN BACKFILLING & COMPACTION


Contractor:
MAU Contract No:HQ807 PC 09
Procest Description

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


EXCAVATION
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Di

Inspection end Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

TERMITE CONTROL
MAU Contract No:HQ807 PC 09

Process Description

Disc

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


4
AL-KHAFJI

NC. MASONRY UNIT

Rev.00

ITP-C-O05
CIVIL

Discipline:
Acceptance
Criteria

Quality Record or
Verfying Document

CCE/QC
Inspector

SCEC
lnsp

KJO
OA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Acceptance
Criteria

Discipline:
Quality Record or
Verifying Document

CCEOC
Inspector

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI

ITP-C-004
CIVIL
SCEC KJO
Third
Irvsp
QA/QC party

Rev.00

ITP-C-O04

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCE QC
inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-c-003

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
tnsp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CCE QC
Inspector

ITP-C-O02
CIVIL
SCEC
insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-001

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-024

Discipline:
Acceptance
Criteria

ector did not show proceed


RFI= Issuued for H & W only

Quality Record or
Document

CIVIL
CCEQC
Inspector

SCEC
lnp

KJO
OA/QC

Third
party

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

Contractor:

INSPECTION & TEST PLAN


MAU Contract No:HQ807 PC 09

Process Description

INSTALLATION OF CONC. MASONRY UNIT

Inspection And Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

tem
No

INSPECTION & TEST PLAN CONCRETE STRUCTURE


Contractor:
MAU Contract No:HQ807 PC 09
Process Description
nspection and Test Point

Disciplin
Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


CONCRETE STRUCTURE
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

Applicable Coda
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item
no

INSPECTION & TEST PLAN


CONCRETE BLINDING
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

CO o T7

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN BACKFILLING & COMPACTION


Contractor:
MAU Contract No:HQ807 PC 09
Procest Description

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


EXCAVATION
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Di

Inspection end Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

TERMITE CONTROL
MAU Contract No:HQ807 PC 09

Process Description

Disc

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


4
AL-KHAFJI

NC. MASONRY UNIT

Rev.00

ITP-C-O05
CIVIL

Discipline:
Acceptance
Criteria

Quality Record or
Verfying Document

CCE/QC
Inspector

SCEC
lnsp

KJO
OA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Acceptance
Criteria

Discipline:
Quality Record or
Verifying Document

CCEOC
Inspector

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI

ITP-C-004
CIVIL
SCEC KJO
Third
Irvsp
QA/QC party

Rev.00

ITP-C-O04

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCE QC
inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-c-003

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
tnsp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CCE QC
Inspector

ITP-C-O02
CIVIL
SCEC
insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-001

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-024

Discipline:
Acceptance
Criteria

ector did not show proceed


RFI= Issuued for H & W only

Quality Record or
Document

CIVIL
CCEQC
Inspector

SCEC
lnp

KJO
OA/QC

Third
party

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

Contractor:

INSPECTION & TEST PLAN


MAU Contract No:HQ807 PC 09

Process Description

INSTALLATION OF CONC. MASONRY UNIT

Inspection And Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

tem
No

INSPECTION & TEST PLAN CONCRETE STRUCTURE


Contractor:
MAU Contract No:HQ807 PC 09
Process Description
nspection and Test Point

Disciplin
Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


CONCRETE STRUCTURE
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

Applicable Coda
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS


FACILITY 1,2,3,4
AL-KHAFJI

item
no

INSPECTION & TEST PLAN


CONCRETE BLINDING
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Inspection and Test Point

CO o T7

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN BACKFILLING & COMPACTION


Contractor:
MAU Contract No:HQ807 PC 09
Procest Description

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


EXCAVATION
Contractor:
MAU Contract No:HQ807 PC 09
Process Description

Di

Inspection end Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

CONSTRUCTION OF BACHELOR QUARTERS MTD,AVIATION, AND 5 SCHOOLS PA


FACILITY 1,2,3,4
AL-KHAFJI

item no

INSPECTION & TEST PLAN


Contractor:

TERMITE CONTROL
MAU Contract No:HQ807 PC 09

Process Description

Disc

Inspection and Test Point

Applicable Code
or Standard

I = Inspect or perform work

WI= 100% witness

W2 = Random if inspector did not show proceed

R= Review / Approve records documen

S=Survellance

H= Hold point

RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


4
AL-KHAFJI

NC. MASONRY UNIT

Rev.00

ITP-C-O05
CIVIL

Discipline:
Acceptance
Criteria

Quality Record or
Verfying Document

CCE/QC
Inspector

SCEC
lnsp

KJO
OA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Acceptance
Criteria

Discipline:
Quality Record or
Verifying Document

CCEOC
Inspector

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI

ITP-C-004
CIVIL
SCEC KJO
Third
Irvsp
QA/QC party

Rev.00

ITP-C-O04

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCE QC
inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-c-003

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
tnsp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00
Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CCE QC
Inspector

ITP-C-O02
CIVIL
SCEC
insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-001

Discipline:
Acceptance
Criteria

Quality Record or
Verifying Document

CIVIL
CCEQC
Inspector

SCEC
Insp

KJO
QA/QC

Third
party

ector did not show proceed


RFI= Issuued for H & W only

S MTD,AVIATION, AND 5 SCHOOLS PACKAGE


AL-KHAFJI
Rev.00

ITP-C-024

Discipline:
Acceptance
Criteria

ector did not show proceed


RFI= Issuued for H & W only

Quality Record or
Document

CIVIL
CCEQC
Inspector

SCEC
lnp

KJO
OA/QC

Third
party