A user of the SAP ECC system wants a rolling planning time fence (firming type
= 1) to be set up for a material; in other words, new planned orders are firmed
within a planning time fence. When an unforeseen production failure occurs, it can
happen that such firmed planned orders are not being processed because time
passes. What solution would automatically delete firmed planned orders?
Note: Please choose the correct answer.
a) In the material master, an MRP type is used in which the roll-forward mechanism is
activated (Customizing for requirements planning).
b) The demand adjustment activated in the Customizing for demand adjustment is used.
c) Firmed planned orders can only ever be deleted manually because of the header data
firming.
03. In the Customizing for requirements planning, a project team notices that the
alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP
type Pd) The number in each of these alternatives represents a firming type.
What does a firming type define?
Note: There are 2 correct answers to this question.
a) Handling existing procurement proposals outside the planning time fence.
b) Handling existing procurement proposals within a planning time fence.
c) Handling new requirements within the planning time fence.
d) Handling new procurement proposals that need to be created due to new requirements
within the planning time fence.
04. What options does the SAP ECC system offer to retrieve the available capacity
for work centers?
Note: There are 3 correct answers to this question.
a) Attendance list
b) Standard available capacity
c) Shift plan
d) Interval of available capacity
e) Shift sequence
05. Which of the following master data can be used with process orders?
Note: There are 3 correct answers to this question.
a) Serial numbers
b) Master recipes
c) Resources
d) Production/resource tools
e) Production versions
06. Which of the following organizational units does the manufacturing, planning,
and execution process use?
Note: There are 2 correct answers to this question.
a) Storage Location

b) Sales Area
c) Purchase Organization
d) Plant
07. You want to enhance the system statuses of a production order with user
statuses.
How do you do this?
Note: Please choose the correct answer.
a) Define the user statuses in the order type-dependent parameters.
b) Define a status profile in Customizing and assign it to the production scheduling profile.
c) Define a status profile in Customizing and assign it to the order type.
d) Define the user statuses in the Customizing table of the system statuses.
08. You enter a new BOM (Bill of Materials) in SAP ECC but forget to enter a plant
reference.
Which of the following statements describes what happens when you try to save
it?
Note: Please choose the correct answer.
a) When saving the BOM, a group BOM is created which can, under certain conditions, be
assigned to a plant later.
b) When saving the BOM, a dialog box appears prompting the user to enter a plant.
c) When saving the BOM, an error message appears stating that it is not possible to save a
BOM without a plant reference.
d) When saving the BOM, a warning message appears. In the corresponding dialog box, it is
possible to create a plant-specific engineering BOM.
09. You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
Note: Please choose the correct answer.
a) Sales and operations planning -> Demand management -> Long-term planning ->
Material requirements planning -> Capacity planning
b) Demand management -> Sales and operations planning -> Capacity planning -> Longterm planning -> Material requirements planning
c) Material requirements planning -> Demand management -> Sales and operations
planning -> Long-term planning -> Capacity planning
d) Long-term planning -> Sales and operations planning -> Demand management ->
Material requirements planning -> Capacity planning
10. In the SAP ECC system, you interpret the result of a routing schedule.
When scheduling a routing in the SAP ECC system which of the following time
elements are interoperation times?
Note: There are 2 correct answers to this question.
a) Safety time
b) Floats before and after production

c) Processing time
d) Move time
11. Which activity can trigger an automatic availability check for the components
of a production order?
Note: Please choose the correct answer.
a) Material staging
b) Order rescheduling
c) Order release
d) Goods receipt for a missing part
12. During the implementation of SAP ECC material requirements planning, the
project team defines MRP controller numbers in Customizing under the entry
"Define MRP Controller" that can be assigned to the planners responsible for the
material.
Which of the following statements are correct concerning these MRP controllers?
Note: There are 2 correct answers to this question.
a) The MRP controller number is a central selection
b) A planner responsible for a material can have multiple MRP controller numbers.
c) In multilevel single-item planning, materials are selected using the MRP controller
number.
d) The MRP controller number is assigned using the production version.
13. Which of the following scheduling types can only be used in capacity planning?
Note: Please choose the correct answer.
a) Midpoint
b) Forward
c) Only capacity requirements
d) Backward
14. The company you are advising uses a plant data collection system from
company XYZ and would like to distribute production orders to the terminals on
this system and enter feedback using these terminals.
Which integration possibilities would you recommend so that as little work as
possible is required for the customer to implement this?
Note: Please choose the correct answer.
a) SAP Manufacturing Integration and Intelligence (SAP MII)
b) The plant data collection interface (PP-PDC)
c) Execution Steps (XSteps)
d) The process control system interface PI-PCS
15. The final assembly of a finished product should only be triggered when a
customer order arrives.
Which planning strategy for the finished product do you use?
Note: Please choose the correct answer.

a) Planning with make-to-stock (strategy 10)


b) Planning at the assembly level (strategy 70)
c) Planning without final assembly (strategy 50)
d) Planning with final assembly (strategy 40)
16. Which options can you use to convert planned orders into production orders in
the SAP ECC system?
Note: There are 3 correct answers to this question.
a) Mass processing
b) Automatically in the planning run (MRP)
c) Background processing in a program
d) Customizing for the planned order
e) Order progress report
17. You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message. What could be
the reason?
Note: Please choose the correct answer.
a) The material availability check has been performed.
b) Goods movements have been posted.
c) The production order has been released.
d) Order papers have been printed.
18. Which statements about the reorganization of planned independent
requirements in SAP ECC are true?
Note: There are 2 correct answers to this question.
a) The reorganization only affects planned independent requirements that lie on a time axis
to the past from a specified key date.
b) The reorganization can be parameterized using a plant-specific reorganization interval.
c) The reorganization only deletes planned independent requirements that have no fixed
planned orders to them.
d) The reorganization is a form of demand adjustment in which non-settled planned
independent requirements for the planning are set to inactive but are not deleted.
19. Which types of objects can be changed with Engineering Change Management
(ECM)?
Note: There are 3 correct answers to this question.
a) Task list
b) Work center
c) Production version
d) Bill of material
e) Material master
20. Which BOM (bill of materials) selection possibilities are available for opening a

production order?
Note: There are 2 correct answers to this question.
a) Manual selection
b) Automatic selection controlled with Customizing settings
c) Selection by BOM number in the material master of the material to be produced
d) Selection using the production scheduling profile
e) Selection using a production version

Solutions:
QUESTION: 01

QUESTION: 02

QUESTION: 03

QUESTION: 04

QUESTION: 05

Answer: a, d, e

Answer: a

Answer: b, d

Answer: b, d, e

Answer: b, c, e

QUESTION: 06

QUESTION: 07

QUESTION: 08

QUESTION: 09

QUESTION: 10

Answer: a, d

Answer: c

Answer: a

Answer: a

Answer: b, d

QUESTION: 11

QUESTION: 12

QUESTION: 13

QUESTION: 14

QUESTION: 15

Answer: c

Answer: a, b

Answer: a

Answer: b

Answer: c

QUESTION: 16

QUESTION: 17

QUESTION: 18

QUESTION: 19

QUESTION: 20

Answer: a, c, e

Answer: b

Answer: a, b

Answer: a, d, e

Answer: b, e